CN106836794A - A kind of construction method of concatermer sliding formwork - Google Patents

A kind of construction method of concatermer sliding formwork Download PDF

Info

Publication number
CN106836794A
CN106836794A CN201710030295.0A CN201710030295A CN106836794A CN 106836794 A CN106836794 A CN 106836794A CN 201710030295 A CN201710030295 A CN 201710030295A CN 106836794 A CN106836794 A CN 106836794A
Authority
CN
China
Prior art keywords
sliding
sliding formwork
concrete
formwork
concatermer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710030295.0A
Other languages
Chinese (zh)
Inventor
王贵祥
徐亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG QINYE JIANGONG GROUP CO Ltd
Original Assignee
ZHEJIANG QINYE JIANGONG GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG QINYE JIANGONG GROUP CO Ltd filed Critical ZHEJIANG QINYE JIANGONG GROUP CO Ltd
Priority to CN201710030295.0A priority Critical patent/CN106836794A/en
Publication of CN106836794A publication Critical patent/CN106836794A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/20Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
    • E04G11/22Sliding forms raised continuously or step-by-step and being in contact with the poured concrete during raising and which are not anchored in the hardened concrete; Arrangements of lifting means therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The present invention relates to a kind of construction method of concatermer sliding formwork, comprise the following steps:(1)Foundation construction and basic acceptance of concealed work;(2)Basic plane assembles sliding formwork;(3)Sliding formwork is sliding to base plate bottom;(4)The empty sliding reinforcing support bar of sliding formwork;(5)Sliding formwork sky slides to base top, and funnel back base plate or funnel beam are constructed;(6)The secondary arrangement of sliding formwork, joist;(7)Sliding formwork is secondary sliding to top;(8)Girder steel is in place;(9)Sliding formwork is removed;(10)Into the steel structure construction stage.In present invention construction from stencil design, makings, assembling, it is sliding to the control of depanning concrete strength, mix Design, depanning concrete with cunning with smearing, joist, the technique such as dismounting form the quick Slip Form Construction Technique of concatemer silo of complete set; easy construction; steady quality, it is safe and reliable.

Description

A kind of construction method of concatermer sliding formwork
Technical field
The present invention relates to a kind of construction method of concatermer sliding formwork, it is adaptable to which major diameter high or concatemer silo sliding formwork are applied Work, has directive significance to the slding form operation of extensive joint reinforced concrete silo group.
Background technology
Silo structure as the goods and materials in bulk such as industrial enterprise, cement industry one of main storage facilities, as society passes through The development of Ji, its scale expands rapidly.Used as cement industry, current monomer storehouse diameter is maximum to reach 60m, conjuncted most up to 32 It is conjuncted.Round silo is larger using full hall scaffold over-form construction occupied ground, and template demand is big, long construction period, efficiency Lowly, quality is also difficult to ensure that.And over-form construction technique in the past is changed in slding form operation, tool, mechanization degree are expected with saving The features such as height, low labour intensity, continuous operation, good engineering quality, low cost, short time limit.It is therefore proposed that of the invention.
The content of the invention
For the above-mentioned technical problem of prior art, the invention provides a kind of construction method of concatermer sliding formwork, construction In from stencil design, making, assembling, it is sliding to the control of depanning concrete strength, mix Design, depanning concrete with It is sliding with smearing, joist, the technique such as dismounting form the quick Slip Form Construction Technique of concatemer silo of complete set, easy construction, matter Amount stabilization, it is safe and reliable.
To reach above-mentioned purpose, the present invention is achieved by the following technical solutions:
A kind of construction method of concatermer sliding formwork, comprises the following steps:
(1)Foundation construction and basic acceptance of concealed work;
(2)Basic plane assembles sliding formwork;
(3)Sliding formwork is sliding to base plate bottom;
(4)The empty sliding reinforcing support bar of sliding formwork;
(5)Sliding formwork sky slides to base top, and funnel back base plate or funnel beam are constructed;
(6)The secondary arrangement of sliding formwork, joist;
(7)Sliding formwork is secondary sliding to top;
(8)Girder steel is in place;
(9)Sliding formwork is removed;
(10)Into the steel structure construction stage.
The mould unloading strength of the sliding formwork is 0.2~0.4MPa.
The assembling of the sliding formwork includes installing and debugging, during installation, first will be mutually related component in installation position with bolt Combination is put, combination finishes again symmetrically fastening bolt.
The installation and debugging of the sliding formwork are comprised the following steps:
(2-1) checks point coordinates in each storehouse, marks the theoretical position of hoisting frame at installation site and control mark and each axis;
(2-2) cushion cap top surface levelling, it is determined that rational sliding formwork installed height mark benchmark;
(2-3) lays steel loop component in each storehouse according to center point coordinate and installed height mark benchmark;
(2-4) installs hoisting frame, radiation beam on each storehouse line of centres, each interior steel loop is linked together, and check again interior The center of steel loop, if there is deviation to be adjusted with jack or jack in time;
(2-5) loads onto the hoisting frame at remaining position, the radiation component such as beam and shroud, diagonal brace one by one, by set installed height mark Benchmark carries out just leveling;
(2-6) platform bed board and hydraulic system installation and debugging;
(2-7) installs internal model and inserts jack support rod;
(2-8) is checked and is fastened each position connecting bolt, adjusts the level and pre- arch of platform, mold plate verticality is checked, to not being inconsistent Desired position is closed to process in time;
(2-9) welding, colligation, examination reinforcing bar;
Cushion cap surface in (2-10) cleaning template, installs outer modular system, and the seam between template and cushion cap is blocked with malthoid and mortar Gap;
(2-11) installs hanging basket.
The step(2-7)It is middle that supporting knock-off joint staggers by 30%.
The sliding formwork it is sliding since basic top surface, to Hold Ceiling under absolute altitude stop, including reinforcing bar colligation, ironware Install, the reserved of door and window hole, reinforcing bar is pre-buried, technique built-in fitting is embedded, silo roof beam slab and bearing is reserved, concrete enter mould make firm by ramming, Repair and smear and conserve, template cleaning, support rod continued access and spacing leveling, squareness measurement and entangle torsion in surface.
The sliding formwork it is sliding including just sliding, normal sliding and whole cunning.
Described first cunning is comprised the following steps:Water wetting, laying 1 are spread in slip-form template:2 3~5cm of cement mortar, then Layering concrete perfusion, thickness 30cm lifts 2~3 jack strokes after having filled 3 layers, per stroke 35mm, observation concrete goes out Mould intensity, such as mould unloading strength are suitably transferred to normal sliding, and such as mould unloading strength is too high, and adjustable match ratio simultaneously accelerates speed of application, If mould unloading strength is too low, can suitably slow down sliding speed or mix appropriate additive, concrete mould unloading strength is met the requirements.
It is described it is normal sliding carried out after concrete is filled and made firm by ramming, 30cm is lifted every time, steel bar welding can be carried out during lifting Connect, colligation and concrete enter mould, lifting is finished and proceeds reinforcing bar, concrete construction, and concrete tamping is complete to be carried again Rise, and so on, until whole slide sign is high;Concatemer silo therein is synchronously sliding, makes it in same level position and keeps sliding Modular system occurs without the translation of horizontal direction, reverses.
It is described it is normal sliding close to end slide sign it is high when, carry out levelling to sliding mode system, and by sliding mode system leveling, then Fill last layer concrete, top surface absolute altitude control errors in ± 20mm, last layer concrete make firm by ramming finish stopping it is sliding, reach To form removal during strength of mould stripping.
The construction method of concatermer sliding formwork of the present invention, has the advantages that compared with prior art:
1st, the present invention uses major diameter concatermer sliding formwork, realizes the sliding construction of multiple major diameter joint reinforced concrete silos, it is ensured that structure Globality, shortens the construction period, improves efficiency.
2nd, the present invention entrusts girder steel using sliding formwork top depth system, saves Large-scale Hoisting expense, and saving of work and time both improves work efficiency And reduce risk.
3rd, the concrete ratio that the present invention is prepared has early strong, cracking resistance high performance characteristics, and under the conditions of megathermal climate, depanning is mixed Solidifying soil can be with sliding with light is received, and presentation quality is good.
4th, the present invention uses " automatic blending+tank car+pumping+part flow arrangement " Quick delivery material system, substantially increases concrete Travelling speed and then improve concrete placings speed and sliding formwork sliding speed.
5th, the present invention have developed thickness control of protection cover of rebar device and automatic spray maintenance technology, and construction quality is protected Card.
Brief description of the drawings
Fig. 1 is the structural representation of the sliding formwork in the present invention;
Fig. 2 is the 1-1 directions sectional view of Fig. 1.
Specific embodiment
With reference to specific embodiment, the present invention is further illustrated, but protection scope of the present invention is not limited to This.
The construction method of concatermer sliding formwork of the present invention, comprises the following steps:
(1)Foundation construction and basic acceptance of concealed work;
(2)Basic plane assembles sliding formwork, and the assembling of sliding formwork includes installing and debugs, during installation, will be first mutually related with bolt Component is combined in installation site, and combination finishes again symmetrically fastening bolt.The installation and debugging of sliding formwork are comprised the following steps:
(2-1) checks point coordinates in each storehouse, marks the theoretical position of hoisting frame at installation site and control mark and each axis;
(2-2) cushion cap top surface levelling, it is determined that rational sliding formwork installed height mark benchmark;
(2-3) lays steel loop component in each storehouse according to center point coordinate and installed height mark benchmark;
(2-4) installs hoisting frame, radiation beam on each storehouse line of centres, each interior steel loop is linked together, and check again interior The center of steel loop, if there is deviation to be adjusted with jack or jack in time;
(2-5) loads onto the hoisting frame at remaining position, the radiation component such as beam and shroud, diagonal brace one by one, by set installed height mark Benchmark carries out just leveling;
(2-6) platform bed board and hydraulic system installation and debugging;
(2-7) installs internal model and inserts jack support rod, and supporting knock-off joint is staggered by 30%.The sliding of sliding formwork is pushed up from basis Face starts, to Hold Ceiling under absolute altitude stop, being installed including reinforcing bar colligation, ironware, the reserved of door and window hole, reinforcing bar are pre-buried, work Skill built-in fitting is embedded, silo roof beam slab and bearing is reserved, concrete enter mould make firm by ramming, surface repair smear and conserve, template cleaning, support rod Continued access and spacing leveling, squareness measurement and entangle torsion.
Sliding formwork it is sliding including just sliding, normal sliding and whole cunning.
Just cunning is comprised the following steps:Water wetting, laying 1 are spread in slip-form template:2 3~5cm of cement mortar, then it is layered filling Note concrete, thickness 30cm lifts 2~3 jack strokes after having filled 3 layers, per stroke 35mm, observation concrete depanning is strong Degree, such as mould unloading strength be suitable to be transferred to normal sliding, and such as mould unloading strength is too high, and adjustable match ratio simultaneously accelerates speed of application, if going out Mould intensity is too low, can suitably slow down sliding speed or mix appropriate additive, concrete mould unloading strength is met the requirements.
It is normally sliding to be carried out after concrete is filled and made firm by ramming, 30cm is lifted every time, reinforcement welding, colligation can be carried out during lifting And concrete enters mould, lifting is finished and proceeds reinforcing bar, concrete construction, and concrete tamping is complete to be lifted again, so Back and forth, until whole slide sign is high;Concatemer silo therein is synchronously sliding, makes it in same level position and keeps sliding mode system not There is the translation of horizontal direction, reverse.
When normally sliding close end slide sign is high, levelling is carried out to sliding mode system, and by sliding mode system leveling, then fill last One layer concrete, top surface absolute altitude control errors in ± 20mm, last layer concrete make firm by ramming finish stopping it is sliding, reach form removal Form removal during intensity.
(2-8) is checked and is fastened each position connecting bolt, adjusts the level and pre- arch of platform, checks mold plate verticality, right Undesirable position is processed in time;
(2-9) welding, colligation, examination reinforcing bar;
Cushion cap surface in (2-10) cleaning template, installs outer modular system, and the seam between template and cushion cap is blocked with malthoid and mortar Gap;
(2-11) installs hanging basket.
(3)Sliding formwork is sliding to base plate bottom;
(4)The empty sliding reinforcing support bar of sliding formwork;
(5)Sliding formwork sky slides to base top, and funnel back base plate or funnel beam are constructed;
(6)The secondary arrangement of sliding formwork, joist;
(7)Sliding formwork is secondary sliding to top;
(8)Girder steel is in place;
(9)Sliding formwork is removed;
(10)Into the steel structure construction stage.
The mould unloading strength of sliding formwork is 0.2~0.4MPa in the present invention.
Construction Principle of the invention is:
After the completion of silo foundation, according to the uniformity in silo section, basic plane assembling sliding mode system make one it is whole Body, including climbing form system, operation platform system(Containing hanging basket, guardrail), hydraulic lifting system, Construction precision control system And hydroelectric system.Climbed sleiding form system, template by set speed on support bar by hydraulic jack in work progress The concrete of bottom skid off after troweling immediately, receive face maintenance, template top slides empty part and is layered assembling reinforcement, layering perfusion again Concrete, so circulation after the sliding whole Cylinder wall structure of completion high to design top mark until carry out unloading dismounting.
Rubble used in the present invention meets《Normal concrete rubble or cobble quality standard and the method for inspection》 Requirement of the requirement and pumping concrete of (JGJ 53-92) professional standard to cobble-stone diameter, particularly sheet particle diameter more than 5cm Grain and needle-like, powdery absolutely not it is exceeded.Sand meets《Regular concrete sand quality standard and the method for inspection》(JGJ 53— 92) medium coarse sand that professional standard specifies.
As illustrated in fig. 1 and 2, the agent structure of slip-form template and hydraulic system is hoisting frame connection to sliding formwork in the present invention Blocking syndication platform, unit platforms radiate beam platform structure using interior steel loop brace.Door frame is using the channel-section steel being welded to connect Door frame, sliding formwork processing and fabricating at the scene.Necessary technological measure must be worked out in making, carrying out commission to component classification packet adds Work.The part of the same race of processing must have interchangeability.Press《Technical code for construction using hydraulic slip formworks》(GBJ113-87) are listed The tolerance of sliding formwork structure manufacture carries out process control and quality inspection.
Whether reasonable the horizontal layout of the operating platform of the sliding formwork in the present invention is, will directly influence it is sliding during platform Whether the key that appearance is reversed, inclined etc., control each storehouse operating platform to be in the method for same level:
1. jack limiting card is set, to be copied per sliding 1m or class and once put down, each limiting card is in same level On.
2. material, equipment are put and want equilibrium on platform, should not cause bias.
3. lifting is intended to check that whether in place, in time jack changes jack that is undesirable and damaging every time, really The each jack synchronization in each storehouse is protected, each storehouse platform error on the same plane is no more than code requirement.
The method of translation and torsion that holding concatermer sliding mode system occurs without horizontal direction is in the present invention:
1. enough perpendicularity observation devices are set, 1m observations is often slided once, are pinpointed the problems in time.
2. it is timely using sloping platform method or other method when finding to be translated in one direction in same level Correct.
3. the perfusion direction of adjacent two storehouse concrete should be conversely, prevent sliding mode system from totally reversing.
Ensure that method is each storehouse filling concrete speed in a balanced way in the present invention:
1. each storehouse configures essentially identical skilled worker, the equipment of skilled operation degree.
2. the speed of each storehouse concrete supply should be essentially identical.
3. silo roof scheduling should coordinate filling concrete speed between each storehouse, balanced in the hope of each storehouse.
The present invention needs to carry out concrete mixing transport and perfusion in work progress.Concrete uses automatic gauge mix Stand mixing, transport splits hopper, hopper three discharge ducts of setting using the concrete of tank car horizontal transport, pump truck vertical transport to silo roof By flashboard flow-controllable, people is connect in concrete pusher reverse mould plate with handcart irrigate on the operational platform, and tower crane coordinates reinforcing bar material tool Completion.Concrete perfusion should be carried out in sequence, and since at intersecting wall, first heavy wall, rear thin-walled, the first back is positive afterwards Face, each storehouse is strictly layered perfusion, thickness 30cm per layer concrete or so, and after every layer has filled, top surface absolute altitude error should be controlled Within ± 3cm.Enter mould and want close fit with making firm by ramming.Enter mould concrete quantity moderate, make firm by ramming it is critical with.When strict control is made firm by ramming Between, it is ensured that dot density and insertion depth are inserted, accomplishes not leakage is shaken, non-cross to shake.Do not made firm by ramming when sliding, forbid to make rod firm by ramming and directly shake Moving platen and reinforcing bar.The speed of perfusion of concrete determines according to climatic condition, is carried out between 35~39 DEG C flat during slding form operation 0.2m should be poured per hour, and should pour 0.15m per hour at 30~35 DEG C, should be poured per hour at 25~30 DEG C 0.12m, should pour 0.1m at less than 25 DEG C, but specific control should be carried out with depanning concrete strength.
During present invention construction, before the sliding bottom 5cm to silo roof beam of bulkhead, good wooden model should be buried in sliding formwork, reserve beam support Position, taking-up after having slided, carries out beam-ends Bar Anchorage when being constructed so as to silo roof.Sliding formwork answers timely continued access to slide the support rod of sky. Jack matches somebody with somebody limit leveling device, and limit leveling device often lifts 30cm and carries out once spacing leveling.Leveling is after lifting terminates every time It is adjusted in place by sliding formwork work, levelling is once with measurement work for per tour.
The present invention also needs to carry out squareness measurement and partial twist preventing and treating in construction.Observed once per sliding 0.9~1.5m Climbing verticality, 30~60cm is observed once.Wherein, anti-bias measure is:
A. strict control support rod absolute altitude, spacing absolute altitude and jack absolute altitude, accomplish synchronous sliding, often lift one-time leveling one It is secondary.
B. the various construction live loads on operating platform are evenly arranged, symmetrical to stack.
C. concrete is tried one's best uniformly, symmetrical perfusion, while the perfusion that must commutate on request.
D. keep the stabilization and perpendicularity of support rod, duty to check observation, it is found that skew is corrected in time.
E. No. 16 channel-section steels of outer hoisting frame or external mold are connected into four closure stirrups.
Anti- torsion measure is:
A. using maximization template balanced configuration, hoisting frame is effectively fastened with enclosure.
B. mould inner side adds anti-torsion bar, using concrete constraint torsion.
C. make support rod with the steel pipes of Φ 48 × 3.5, increase support rod rigidity and offset its partial twist.
E. concrete is poured into a mould simultaneously in the opposite direction, and its partial twist is prevented using force balance principle.
Glanced off in slding form operation, rectified a deviation using sloping platform method, the gradient of platform should be controlled within 1%, noted Whole job platform anticipate in-individual plane, should not cause platform that larger inclination locally occurs in correction.If hair is reversed by ox, Pouring squence effect on change coagulation is taken preferably, i.e., first to concentrate the concrete of perfusion and deviation rightabout side, by mixed Solidifying earth lateral pressure and frictional resistance force template and platform displacement, gradually resume normal position, eliminate torsion.
The concrete surface for skidding off template should have been smeared in 0.5h.Depanning concrete strength starts when reaching 1~1.5MPa Watering maintenance, or painted concrete curing fluid.
It is sliding to finish, girder steel is dropped into designed elevation according to prior line setting, and fixed welding is firm.Start sliding formwork to tear open Remove.
When silo last board concrete intensity reaches more than 75%, you can split out sleiding form.Dismounting order is first to tear open Inner template, then tear exterior sheathing open, then tear jack stand open, after completion top board is plastered and repaired, then inside and outside hanging scaffolding is removed, most Platform bed board and operating platform skeleton are once removed afterwards, and dismounting should be segmented to be carried out.
Above-described embodiment is only used for illustrating inventive concept of the invention, rather than the restriction to rights protection of the present invention, All changes for carrying out unsubstantiality to the present invention using this design, all should fall into protection scope of the present invention.

Claims (10)

1. a kind of construction method of concatermer sliding formwork, it is characterised in that comprise the following steps:
(1)Foundation construction and basic acceptance of concealed work;
(2)Basic plane assembles sliding formwork;
(3)Sliding formwork is sliding to base plate bottom;
(4)The empty sliding reinforcing support bar of sliding formwork;
(5)Sliding formwork sky slides to base top, and funnel back base plate or funnel beam are constructed;
(6)The secondary arrangement of sliding formwork, joist;
(7)Sliding formwork is secondary sliding to top;
(8)Girder steel is in place;
(9)Sliding formwork is removed;
(10)Into the steel structure construction stage.
2. the construction method of concatermer sliding formwork as claimed in claim 1, it is characterised in that:The mould unloading strength of the sliding formwork is 0.2 ~0.4MPa.
3. the construction method of concatermer sliding formwork as claimed in claim 1, it is characterised in that:The assembling of the sliding formwork include install and Debugging, during installation, first will be mutually related component in installation site combination with bolt, and combination finishes again symmetrically fastening bolt.
4. the construction method of concatermer sliding formwork as claimed in claim 3, it is characterised in that the installation and debugging of the sliding formwork include Following steps:
(2-1) checks point coordinates in each storehouse, marks the theoretical position of hoisting frame at installation site and control mark and each axis;
(2-2) cushion cap top surface levelling, it is determined that rational sliding formwork installed height mark benchmark;
(2-3) lays steel loop component in each storehouse according to center point coordinate and installed height mark benchmark;
(2-4) installs hoisting frame, radiation beam on each storehouse line of centres, each interior steel loop is linked together, and check again interior The center of steel loop, if there is deviation to be adjusted with jack or jack in time;
(2-5) loads onto the hoisting frame at remaining position, the radiation component such as beam and shroud, diagonal brace one by one, by set installed height mark Benchmark carries out just leveling;
(2-6) platform bed board and hydraulic system installation and debugging;
(2-7) installs internal model and inserts jack support rod;
(2-8) is checked and is fastened each position connecting bolt, adjusts the level and pre- arch of platform, mold plate verticality is checked, to not being inconsistent Desired position is closed to process in time;
(2-9) welding, colligation, examination reinforcing bar;
Cushion cap surface in (2-10) cleaning template, installs outer modular system, and the seam between template and cushion cap is blocked with malthoid and mortar Gap;
(2-11) installs hanging basket.
5. the construction method of concatermer sliding formwork as claimed in claim 4, it is characterised in that:The step(2-7)It is middle by support rod Joint staggers by 30%.
6. the construction method of concatermer sliding formwork as claimed in claim 1, it is characterised in that:The sliding formwork it is sliding from basic top surface Start, to Hold Ceiling under absolute altitude stop, being installed including reinforcing bar colligation, ironware, the reserved of door and window hole, reinforcing bar are pre-buried, technique Built-in fitting is embedded, silo roof beam slab and bearing is reserved, concrete enter mould make firm by ramming, surface repair smear and conserve, template cleaning, support rod continue Connect and spacing leveling, squareness measurement and entangle torsion.
7. the construction method of concatermer sliding formwork as claimed in claim 1, it is characterised in that:The sliding formwork it is sliding including it is just sliding, It is normal sliding and whole sliding.
8. the construction method of concatermer sliding formwork as claimed in claim 7, it is characterised in that described first cunning is comprised the following steps: Water wetting, laying 1 are spread in slip-form template:2 3~5cm of cement mortar, then concrete perfusion is layered, thickness 30cm, after having filled 3 layers 2~3 jack strokes of lifting, per stroke 35mm, observe concrete mould unloading strength, and such as mould unloading strength is suitably transferred to normal cunning Rise, such as mould unloading strength is too high, adjustable match ratio simultaneously accelerates speed of application, if mould unloading strength is too low, can suitably slow down sliding speed Appropriate additive is spent or mixed, concrete mould unloading strength is met the requirements.
9. the construction method of concatermer sliding formwork as claimed in claim 7, it is characterised in that:Described is normal sliding in concrete filling Carried out after completely making firm by ramming, 30cm is lifted every time, reinforcement welding, colligation and concrete can carried out during lifting and enters mould, lifting finishes continuation Reinforcing bar, concrete construction are carried out, concrete tamping is complete to be lifted again, and so on, until whole slide sign is high;It is therein many Joint reinforced concrete silo is synchronously sliding, makes it in same level position and keeps sliding mode system to occur without the translation of horizontal direction, torsion.
10. the construction method of concatermer sliding formwork as claimed in claim 7, it is characterised in that:Described is normal sliding close sliding eventually During absolute altitude, levelling is carried out to sliding mode system, and by sliding mode system leveling, then fill last layer concrete, top surface absolute altitude error In ± 20mm, last layer concrete is made firm by ramming and finishes sliding, form removal when reaching strength of mould stripping of stopping for control.
CN201710030295.0A 2017-01-17 2017-01-17 A kind of construction method of concatermer sliding formwork Pending CN106836794A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710030295.0A CN106836794A (en) 2017-01-17 2017-01-17 A kind of construction method of concatermer sliding formwork

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710030295.0A CN106836794A (en) 2017-01-17 2017-01-17 A kind of construction method of concatermer sliding formwork

Publications (1)

Publication Number Publication Date
CN106836794A true CN106836794A (en) 2017-06-13

Family

ID=59124438

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710030295.0A Pending CN106836794A (en) 2017-01-17 2017-01-17 A kind of construction method of concatermer sliding formwork

Country Status (1)

Country Link
CN (1) CN106836794A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107587770A (en) * 2017-09-29 2018-01-16 中亿丰建设集团股份有限公司 Disjunctor storehouse synchronization slding form operation method
CN109518940A (en) * 2018-12-08 2019-03-26 上海宝冶冶金工程有限公司 Coal silo warehouse construction sliding form apparatus and system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103031950A (en) * 2013-01-13 2013-04-10 中煤建筑安装工程集团有限公司 Method for constructing as-cast concrete slip-forms of silo
CN103615111A (en) * 2013-09-29 2014-03-05 天津大学 Silo top construction method
CN103790423A (en) * 2012-10-29 2014-05-14 五冶集团上海有限公司 Construction method of large concrete granary

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103790423A (en) * 2012-10-29 2014-05-14 五冶集团上海有限公司 Construction method of large concrete granary
CN103031950A (en) * 2013-01-13 2013-04-10 中煤建筑安装工程集团有限公司 Method for constructing as-cast concrete slip-forms of silo
CN103615111A (en) * 2013-09-29 2014-03-05 天津大学 Silo top construction method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
孟建周: ""浅析建筑滑模施工在建造联体筒仓的实践"", 《河南建材》 *
王聪明: ""主立井提升***原煤筒仓滑模设计与施工探讨"", 《山西煤炭管理干部学院学报》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107587770A (en) * 2017-09-29 2018-01-16 中亿丰建设集团股份有限公司 Disjunctor storehouse synchronization slding form operation method
CN109518940A (en) * 2018-12-08 2019-03-26 上海宝冶冶金工程有限公司 Coal silo warehouse construction sliding form apparatus and system

Similar Documents

Publication Publication Date Title
CN105464244A (en) Prefabricated integrated shear wall construction method
CN107542268A (en) The reverse construction method of installation of stage steel construction in a kind of grand theater room
CN103410320B (en) The tower silo flexibility platform bitubular connects sliding construction method
CN110952456A (en) Pile type bridge construction process
CN108330835A (en) The construction method of setting bracket
US7784231B2 (en) Multi-story building
CN109736354A (en) Tunnel open excavation section main structure construction method
CN108532466A (en) A kind of bridge pier over-form construction technique
CN109537895A (en) Method for mounting beam-slab column of cast-in-place core tube structure of assembled integral frame
CN114164764A (en) Construction method for high-fill bridge bearing platform structure
CN110184941A (en) A kind of bridge main tower construction method
CN106930194A (en) Inter-tie and pier stud global formation construction method and template used support
CN110145124A (en) A kind of control shear wall level connects the reinforcement tools and its construction method of batch quality
CN110552440A (en) safe and environment-friendly construction process for high-strength assembled integral type sandwich heat-insulation shear wall
CN208280003U (en) A kind of bridge pier over-form construction system
CN110939052B (en) Subway cover beam construction method
CN107806019A (en) Large-span suspension bridge gate Sarasota construction method
CN112627030A (en) Gravity type anchorage structure of cable saddle buttress foundation and approach bridge foundation and construction method
CN114370188A (en) Construction method for public pipe gallery of industrial plant area in severe cold region
CN106836794A (en) A kind of construction method of concatermer sliding formwork
CN107905609A (en) Underground people's air defense construction method
CN103061508A (en) Triangular slip form device and construction method for the same triangular slip form
CN106223960A (en) High ferro major long tunnel inverted arch moves integrally mould bases construction
CN108677722A (en) Hollow High Pier with Thin Wall stub top section construction technology
CN102777044A (en) Hoisting method of steel-structured spraying layer of urea prilling tower

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170613