Prior art keywords
steel form
roofing
concrete
slide rail
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611090429.XA
Other languages
Chinese (zh)
Other versions
CN106836662A (en
Inventor
刘雪辉
郭华新
牛宏磊
张�浩
曹素芬
王永利
李廷秀
王宁
孙凯旋
李同玉
马燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei 20 Smelting Construction Co Ltd
China MCC20 Group Corp Ltd
Original Assignee
Hebei 20 Smelting Construction Co Ltd
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei 20 Smelting Construction Co Ltd, China MCC20 Group Corp Ltd filed Critical Hebei 20 Smelting Construction Co Ltd
Priority to CN201611090429.XA priority Critical patent/CN106836662B/en
Publication of CN106836662A publication Critical patent/CN106836662A/en
Application granted granted Critical
Publication of CN106836662B publication Critical patent/CN106836662B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D7/00Roof covering exclusively consisting of sealing masses applied in situ; Gravelling of flat roofs
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B7/00Roofs; Roof construction with regard to insulation
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The present invention provides a kind of concrete construction methods of Curved Roof, comprising the following steps: a, installation slide rail;B, group merges installation steel form;C, the radian of steel form is adjusted;D, the installation template mobile mechanism on steel form;E, plate vibrator is installed on assembled steel form;F, pattern movement mechanism is checked;G, roofing concrete is carried out after the completion of pattern movement mechanism pours work;H, after the completion of the region roofing where steel form pours, steel form is integrally hung to using tower crane by next casting area, step f and g is repeated and carries out concreting, until entire roofing pours completion;After the completion of roofing concrete pours, after concrete reaches some strength, steel form is removed.The present invention solves the problems, such as difficult forming present in Curved Roof concreting, bent roofing concrete plate construction quality and curve surface accuracy are improved, design thickness, concrete density of Curved Roof concrete etc. has been effectively ensured and has reached design requirement.

Description

The concrete construction method of Curved Roof
Technical field
The present invention relates to a kind of construction method of roofing, specifically a kind of concrete construction side of Curved Roof Method.
Background technique
In building engineering, in order to make building really become connection natural landscape and cultural characteristics, traditional culture with One carrier of modern civilization reaches the natural effect of the unification of mountain stone, humane unification, has emerged in large numbers a large amount of Curved Roof.Mesh Before, the concrete construction of Curved Roof is substantially are as follows: bracket is set up;Formwork;Beam, the binding of slab muscle;Lanyard bracing wire control Pitched roof elevation;Casting concrete.But in concrete construction, the radian for pouring thickness and roofing of concrete It is more difficult to control, cause the concrete slab construction of Curved Roof second-rate and bent surface accuracy is lower.
Summary of the invention
It is an object of the invention to provide a kind of concrete construction methods of Curved Roof, to solve existing curved shape The lower problem of the second-rate and bent surface accuracy of concrete slab construction present in the construction method of the concrete on roof.
The object of the present invention is achieved like this: a kind of concrete construction method of Curved Roof, comprising the following steps:
A, slide rail is installed: uniformly popping up a plurality of put down along roofing radian direction on the roofing plank sheathing laid in advance Capable track centerline is evenly arranged on every track centerline on roofing plank sheathing more along the direction of track centerline A hold-down support, is equipped with the adjusting screw rod with its plane perpendicular on the hold-down support, and the adjusting screw rod passes through screw thread It is fixedly connected at the top of the mode of connection and the hold-down support, is fixedly installed at the top of the adjusting screw rod for accommodating The rail mounting groove of slide rail, places slide rail in rail mounting groove, and the upper surface of the slide rail is to be set as Continuous broached-tooth design is installed when installing same slide rail from eaves mouth to the direction of ridge sequence, and slide rail passes through pin Nail is fixedly connected with the side wall of rail mounting groove, and the slide rail radian of identical elevation location is identical, by adjusting the adjusting Screw rod is screwed into depth on the hold-down support to adjust the thickness to casting concrete;
B, group merges installation steel form: making muti-piece punching block of different size according to the common modulus of each building roof Then plate is combined collocation according to the area of roofing to be poured, passes through between every piece of steel form and adjacent steel form Bolt is attached, and the good steel form of composite assembly is placed on slide rail so that steel form and roofing wooden model using tower crane Plate is oppositely arranged;When placing the steel form that combination is completed, the long side of steel form is parallel with track centerline;
C, it adjusts the radian of steel form: intermediolateral column is fixedly mounted at the back side of every piece of steel form, and will be every using scaffold tubes Intermediolateral column on block steel form is linked to be overall structure, is connected with and is used between every piece of steel form and intermediolateral column mounted thereto The telescopic support adjusting rod for adjusting steel form radian, between support adjusting rod and steel form and support adjusting rod and intermediate It is connected by pin rotation between column, the support adjusting rod is symmetrically distributed in the radial two sides of intermediolateral column;Adjust support The length of adjusting rod is so that corresponding steel form checks punching block when adjusting the radian of steel form along the axis rotation of itself always The distance between plate and roofing plank sheathing, to adjust roofing concrete molding radian and roofing concrete thickness to be poured at any time;
D, the installation template mobile mechanism on steel form: pattern movement mechanism includes driving shaft and driven shaft, in the master Be cased on moving axis and the driven shaft with the same number of gear of the slide rail, the driving shaft and driven shaft are pacified respectively The top and bottom end of the steel form of dress after assembling are equipped with the drive for driving the driving shaft rotation on the steel form Gear is fixed on its institute by pin with after the engagement of corresponding slide rail by the gear on driving shaft and driven shaft by dynamic motor Driving shaft or driven shaft on;
E, plate vibrator is installed on assembled steel form: according to the face of different concrete plate thickness and steel form assembly Product chooses appropriate number of plate vibrator, and plate vibrator is arranged in assembled punching block in the form of multiple lines and multiple rows The back side of plate;
F, it checks pattern movement mechanism: after installing plate vibrator, driving motor is debugged, by the steering tune of driving motor It is whole to arrive the state in the same direction with steel form direction of travel;Driving motor is powered after the completion of turning to adjustment to driving motor to debug punching block Walking of the plate on slide rail, it is ensured that steady walking of the steel form on slide rail;
G, roofing concrete is carried out after the completion of pattern movement mechanism pours work: when carrying out concreting to roofing It pours from the bottom to top, plate vibrator is opened when pouring, driving motor is opened after concreting to certain altitude, make group Steel loading template moves up, and adjusts concreting speed by controlling the movement speed of steel form;
H, after the completion of the region roofing where steel form pours, steel form is integrally hung to using tower crane by next pouring area Domain repeats step f and checks steel form mobile mechanism, and repeats the concreting of step g from the bottom to top to roofing progress, until Entire roofing pours completion;After the completion of roofing concrete pours, after concrete reaches some strength, steel form is removed, it will Steel form is transported to next construction area and reuses.
In step a, the hold-down support uses rubber hold-down support, and the hold-down support is fixedly mounted on by steel nail On roofing plank sheathing.
In step c, the connection structure of the intermediolateral column and steel form are as follows: the back side of every piece of steel form is provided with fixing card Intermediolateral column is inserted into fixed card slot and intermediolateral column is fixedly mounted in the fixed card slot again by pin by slot.
In step c, symmetrically adjusted to intermediolateral column direction simultaneously when adjusting steel form radian from two sides.
It is connected between the driving motor and driving shaft by chain.
The gear on gear sideslip or driven shaft in step f, when the walking to steel form is debugged, on driving shaft When sideslip, the verticality and driven shaft of driving shaft and slide rail and the verticality of slide rail are checked, by adjusting actively The measure of the position or local directed complete set slide rail position of axis or driven shaft ensures engaging for gear and slide rail.
Present invention installation template mobile mechanism on steel form, and pass through the gear and slide rail on pattern movement mechanism Engagement realize movement of the steel form on slide rail, simplify the concrete working device of Curved Roof, make curve room The concreting process in face is easily controllable, improves the recycling rate of waterused of steel form, reduces the construction cost of concrete. Intermediolateral column is fixedly mounted at the back side of every piece of steel form in the present invention, and is linked to be the intermediolateral column on every piece of steel form using scaffold tubes Overall structure is connected with for adjusting the scalable of steel form radian between every piece of steel form and intermediolateral column mounted thereto Support adjusting rod, by support adjusting rod realize steel form radian adjust, improve the surface accuracy of Curved Roof.
The present invention solves the problems, such as difficult forming present in Curved Roof concreting, improves bent roofing coagulation Design thickness, the concrete density of Curved Roof concrete has been effectively ensured in native plate construction quality and curve surface accuracy Etc. reaching design requirement.The shelving roofing concrete that mobile steel form can adapt to different radians simultaneously pours, with existing song The advantages that construction method of linear roofing is compared, economical, economies and advance.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the scaffold of Curved Roof of the invention.
Fig. 2 is the structural schematic diagram of steel form of the invention.
Fig. 3 is the connection structure diagram of slide rail and hold-down support of the invention.
Fig. 4 is the connection structure top view of slide rail and hold-down support of the invention.
Fig. 5 is the structural schematic diagram of slide rail of the invention.
In figure: 1, roofing plank sheathing;2, hold-down support;3, adjusting screw rod;4, slide rail;5, steel form;6, intermediolateral column; 7, support adjusting rod;8, scaffold tubes.
Specific embodiment
As shown in Fig. 1 ~ Fig. 5, a kind of concrete construction method of Curved Roof, comprising the following steps:
A, slide rail 4 is installed: uniformly being popped up on the roofing plank sheathing 1 laid in advance along roofing radian direction a plurality of Parallel track centerline is uniformly arranged on every track centerline on roofing plank sheathing 1 along the direction of track centerline There are multiple hold-down supports 2, hold-down support 2 uses rubber hold-down support 2, and hold-down support 2 is fixedly mounted on roofing by steel nail On plank sheathing 1, be arranged in the hold-down support 2 on same track centerline between adjacent hold-down support 2 at a distance from for 1 meter. Adjusting screw rod 3 with its plane perpendicular, the mode and fixation that adjusting screw rod 3 is connected through a screw thread are installed on hold-down support 2 The top of support 2 is fixedly connected, and is fixedly installed the rail mounting groove for accommodating slide rail 4 at the top of adjusting screw rod 3, Slide rail 4 is placed in rail mounting groove, rail mounting groove is channel steel structure, i.e., the top of rail mounting groove and leads along sliding The both ends of rail center line are disposed as being open.The upper surface of slide rail 4 is to be set as continuous broached-tooth design, slide rail 4 It is installed when installing same slide rail 4 from eaves mouth to the direction of ridge sequence, slide rail 4 passes through pin and track installation The side wall of slot is fixedly connected, and 4 radian of slide rail of identical elevation location is identical, by adjusting adjusting screw rod 3 in hold-down support 2 On be screwed into depth to adjust the thickness to casting concrete.Axis intersection can be used when construction to measure slide rail Positioning.
B, group merges installation steel form 5: making muti-piece punching block of different size according to the common modulus of each building roof Then plate 5 is combined collocation according to the area of roofing to be poured, passes through spiral shell between every piece of steel form 5 and adjacent steel form 5 Bolt is attached, and the good steel form 5 of composite assembly is placed on slide rail 4 so that steel form 5 and roofing wood using tower crane Template 1 is oppositely arranged;When placing the steel form 5 that combination is completed, the long side of steel form 5 is parallel with track centerline.It is making The size that steel form can be adjusted when steel form according to the gradient of Curved Roof, wherein steel form can be increased in heavy grade roofing Lateral length conversely, can reduce the longitudinal length of steel form, while adjusting the slump of concrete, has concrete good Mobility.
C, it adjusts the radian of steel form 5: intermediolateral column 6 is fixedly mounted at the back side of every piece of steel form 5, and uses scaffold tubes 8 Intermediolateral column 6 on every piece of steel form 5 is linked to be overall structure, is connected between every piece of steel form 5 and intermediolateral column 6 mounted thereto Be connected to it is several for adjusting the telescopic support adjusting rods 7 of 5 radian of steel form, between support adjusting rod 7 and steel form 5 and It is connected by pin rotation between support adjusting rod 7 and intermediolateral column 6, the pin between connection support adjusting rod 7 and steel form 5 The outer surface of pin between nail and connection support adjusting rod 7 and intermediolateral column 6 is coated with lubricating oil.In the present embodiment, The front of steel form is concreting face, and the back side of steel form is the back side in the concreting face of steel form, in steel form The back side multiple ribs disposed in parallel are installed, the long side of ribs and steel form it is axial parallel.Support adjusting rod 7 is right Claim the radial two sides for being distributed in intermediolateral column 6.In the present embodiment, the back side axial direction of every piece of steel form 5 is arranged in intermediolateral column 6 The middle part of side, support adjusting rod 7 are connect steel form 5 with intermediolateral column 6 along the both ends of curve radian and middle part respectively.It adjusts The length of support adjusting rod 7 is so that corresponding steel form 5 is rotated along the axis of itself, always when adjusting the radian of steel form 5 Check the distance between steel form 5 and roofing plank sheathing 1, with adjust at any time roofing concrete form radian and roofing wait pouring it is mixed Solidifying soil thickness is symmetrically adjusted to 6 direction of intermediolateral column when adjusting 5 radian of steel form from two sides simultaneously.Wherein, intermediolateral column 6 and steel The connection structure of template 5 are as follows: the back side of every piece of steel form 5 is provided with fixed card slot, intermediolateral column 6 is inserted into fixed card slot and is led to It crosses pin intermediolateral column 6 is fixedly mounted in fixed card slot again.Each support adjusting rod 7 includes first connect with steel form 5 The mutually close both ends of bar and the second strut connecting with intermediolateral column, the first strut and the second strut are provided with external screw thread, the The external screw thread of one strut and the external screw thread of the second strut are oppositely oriented.Adjusting set is connected between the first strut and the second strut Cylinder, the inner tube wall for adjusting sleeve are provided with the internal screw thread matched with the first strut and the second strut, pass through rotating regulating sleeve The flexible of support adjusting rod 7 may be implemented.
D, the installation template mobile mechanism on steel form 5: pattern movement mechanism includes driving shaft and driven shaft, in driving shaft The steel after assembling is separately mounted to the same number of gear of slide rail 4, driving shaft and driven shaft with being cased on driven shaft The top and bottom end of template 5 are equipped with the driving motor for driving driving shaft to rotate, driving motor and master on steel form 5 It is connected between moving axis by chain.In the present embodiment, the axis for being used to support driving shaft rotation is installed at the top of steel form Seat is held, the bearing block for being used to support driven shaft rotation is installed in the bottom of steel form.By the gear on driving shaft and driven shaft With gear is fixed on by pin after the engagement of corresponding slide rail 4 on the driving shaft or driven shaft where it.
E, plate vibrator is installed on assembled steel form 5: assembled according to different concrete plate thickness and steel form 5 Area chooses appropriate number of plate vibrator, and plate vibrator is arranged in assembled steel in the form of multiple lines and multiple rows The back side of template 5.Horizontally the spacing between plate vibrator and adjacent plate vibrator is 1 meter, in the longitudinal direction plate Spacing between vibrator and adjacent plate vibrator is 1 meter.
F, it checks pattern movement mechanism: after installing plate vibrator, driving motor is debugged, by the steering tune of driving motor It is whole to arrive the state in the same direction with 5 direction of travel of steel form;Driving motor is powered after the completion of turning to adjustment to driving motor to debug steel Walking of the template 5 on slide rail 4, it is ensured that steady walking of the steel form 5 on slide rail 4;Steel form 5 is run smoothly Afterwards, vibrator is opened, the steel form 5 that reruns moves up and down, it is ensured that during steel form 5 shakes again, remains to even running.? When debugging to the walking of steel form 5, when gear sideslip on driving shaft or the gear sideslip on driven shaft, driving shaft is checked With the verticality of the verticality and driven shaft of slide rail 4 and slide rail 4, by adjusting the position of driving shaft or driven shaft Or the measure of 4 position of local directed complete set slide rail ensures engaging for gear and slide rail 4.
G, roofing concrete is carried out after the completion of pattern movement mechanism pours work: when carrying out concreting to roofing It pours from the bottom to top, plate vibrator is opened when pouring, driving motor is opened after concreting to certain altitude, make group Steel loading template 5 moves up, and adjusts concreting speed by controlling the movement speed of steel form 5.
H, after the completion of the region roofing where steel form 5 pours, 5 entirety of steel form is hung to by next pour using tower crane Region repeats step f and checks 5 mobile mechanism of steel form, and repeats the concreting of step g from the bottom to top to roofing progress, Until entire roofing pours completion;After the completion of roofing concrete pours, after concrete reaches some strength, steel form is removed 5, steel form 5 is transported to next construction area and is reused.
Next construction area carry out roofing concrete the installation that can successively carry out steel form when pouring by above-mentioned steps, The adjustment of steel form radian and pouring for roofing concrete.The present invention is suitable for curved shape pitched roof, arc pitched roof and broken line The concrete of shape pitched roof pours.
The present invention obtains good application effect in Ancient City of Ping Yao eco-tour cultural industry garden project.

Claims (6)

1. a kind of concrete construction method of Curved Roof, characterized in that the following steps are included:
A, slide rail is installed: uniformly being popped up on the roofing plank sheathing laid in advance along roofing radian direction a plurality of parallel Track centerline is evenly arranged on every track centerline on roofing plank sheathing multiple solid along the direction of track centerline Determine support, the adjusting screw rod with its plane perpendicular is installed on the hold-down support, the adjusting screw rod is connected through a screw thread Mode and the hold-down support at the top of be fixedly connected, be fixedly installed at the top of the adjusting screw rod for accommodate sliding The rail mounting groove of guide rail, places slide rail in rail mounting groove, and the upper surface of the slide rail is to be set as continuous Broached-tooth design, when installing same slide rail from eaves mouth to the direction of ridge sequence install, slide rail by pin with The side wall of rail mounting groove is fixedly connected, and the slide rail radian of identical elevation location is identical, by adjusting the adjusting screw rod Depth is screwed on the hold-down support to adjust the thickness to casting concrete;
B, group merges installation steel form: making muti-piece steel form of different size according to the common modulus of each building roof, so Collocation is combined according to the area of roofing to be poured afterwards, pass through between every piece of steel form and adjacent steel form bolt into The good steel form of composite assembly, is placed on slide rail so that steel form is opposite with roofing plank sheathing by row connection using tower crane Setting;When placing the steel form that combination is completed, the long side of steel form is parallel with track centerline;
C, it adjusts the radian of steel form: intermediolateral column is fixedly mounted at the back side of every piece of steel form, and uses scaffold tubes by every block of steel Intermediolateral column in template is linked to be overall structure, is connected between every piece of steel form and intermediolateral column mounted thereto for adjusting The telescopic support adjusting rod of steel form radian, between support adjusting rod and steel form and support adjusting rod and intermediolateral column it Between connected by pin rotation, the support adjusting rod is symmetrically distributed in the radial two sides of intermediolateral column;Support is adjusted to adjust The length of bar so that corresponding steel form is rotated along the axis of itself, checked always when adjusting the radian of steel form steel form with The distance between roofing plank sheathing, to adjust roofing concrete molding radian and roofing concrete thickness to be poured at any time;
D, the installation template mobile mechanism on steel form: pattern movement mechanism includes driving shaft and driven shaft, in the driving shaft Be cased on the driven shaft with the same number of gear of the slide rail, the driving shaft and driven shaft are separately mounted to The top and bottom end of steel form after assembling are equipped with the driving electricity for driving the driving shaft rotation on the steel form Gear is fixed on where it with after the engagement of corresponding slide rail by pin by machine by the gear on driving shaft and driven shaft On driving shaft or driven shaft;
E, plate vibrator is installed on assembled steel form: is selected according to different concrete plate thickness and the area of steel form assembly Appropriate number of plate vibrator is taken, and plate vibrator is arranged in the back of assembled steel form in the form of multiple lines and multiple rows Face;
F, it checks pattern movement mechanism: after installing plate vibrator, debugging driving motor, the steering of driving motor is adjusted to The state in the same direction with steel form direction of travel;Driving motor is existed after the completion of turning to adjustment to driving motor energization with debugging steel form Walking on slide rail, it is ensured that steady walking of the steel form on slide rail;
G, roofing concrete is carried out after the completion of pattern movement mechanism pours work: when carrying out concreting to roofing under It is supreme to pour, plate vibrator is opened when pouring, driving motor is opened after concreting to certain altitude, makes a group steel loading Template moves up, and adjusts concreting speed by controlling the movement speed of steel form;
H, after the completion of the region roofing where steel form pours, steel form is integrally hung to using tower crane by next casting area, It repeats step f and checks pattern movement mechanism, and repeat the concreting of step g from the bottom to top to roofing progress, until entire Roofing pours completion;After the completion of roofing concrete pours, after concrete reaches some strength, steel form is removed, by punching block Plate is transported to next construction area and reuses.
2. the concrete construction method of Curved Roof according to claim 1, characterized in that in step a, the fixation Support uses rubber hold-down support, and the hold-down support is fixedly mounted on roofing plank sheathing by steel nail.
3. the concrete construction method of Curved Roof according to claim 1, characterized in that in step c, the centre The connection structure of column and steel form are as follows: the back side of every piece of steel form is provided with fixed card slot, intermediolateral column is inserted into fixed card slot And intermediolateral column is fixedly mounted in the fixed card slot by pin.
4. the concrete construction method of Curved Roof according to claim 1, characterized in that in step c, adjusting steel It is symmetrically adjusted to intermediolateral column direction simultaneously when template radian from two sides.
5. the concrete construction method of Curved Roof according to claim 1, characterized in that the driving motor and master It is connected between moving axis by chain.
6. the concrete construction method of Curved Roof according to claim 1, characterized in that in step f, to punching block When the walking of plate is debugged, when gear sideslip on driving shaft or the gear sideslip on driven shaft, driving shaft and sliding are checked The verticality and driven shaft of guide rail and the verticality of slide rail, by adjusting the position or part of driving shaft or driven shaft The measure of adjustment slide rail position ensures engaging for gear and slide rail.
CN201611090429.XA 2016-12-01 2016-12-01 The concrete construction method of Curved Roof Active CN106836662B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611090429.XA CN106836662B (en) 2016-12-01 2016-12-01 The concrete construction method of Curved Roof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611090429.XA CN106836662B (en) 2016-12-01 2016-12-01 The concrete construction method of Curved Roof

Publications (2)

Publication Number Publication Date
CN106836662A CN106836662A (en) 2017-06-13
CN106836662B true CN106836662B (en) 2019-01-29

Family

ID=59146222

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611090429.XA Active CN106836662B (en) 2016-12-01 2016-12-01 The concrete construction method of Curved Roof

Country Status (1)

Country Link
CN (1) CN106836662B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107700829A (en) * 2017-09-26 2018-02-16 中建局集团建设发展有限公司 Pulley suspension large form realizes the constructing device that the huge post of wide-angle inclined in two-way is tiltedly climbed
CN111878098B (en) * 2020-07-31 2022-10-04 中交隧道工程局有限公司 Concrete pouring device and method for shield starting base
CN113914626B (en) * 2021-09-29 2022-12-23 临沂市政集团有限公司 Municipal works are with cast-in-place concrete template vibrating device
CN113957757B (en) * 2021-11-16 2024-07-16 中国二十冶集团有限公司 Rail bolt positioning device and rail bolt construction method
CN114033107B (en) * 2021-12-15 2023-04-18 山西五建集团有限公司 Slope roof concrete pouring method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000274073A (en) * 1999-03-26 2000-10-03 Kaneso Co Ltd Cutting die body holding device for drain
CN202347840U (en) * 2011-12-10 2012-07-25 齐冀鲁 Adjustable arc-shaped steel moulding plate
CN202401755U (en) * 2011-11-21 2012-08-29 中冶天工集团有限公司 Curvature-adjustable concrete construction steel mould
CN203145445U (en) * 2013-04-11 2013-08-21 大连大学 Shaping plate for civil construction
CN203160099U (en) * 2013-04-08 2013-08-28 中铁十局集团建筑工程有限公司 Dual-curve-surface concrete pavement steel mold plate
CN204983643U (en) * 2015-08-04 2016-01-20 天津市兴业龙祥建设工程有限公司 Ramp type concrete roof formwork system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000274073A (en) * 1999-03-26 2000-10-03 Kaneso Co Ltd Cutting die body holding device for drain
CN202401755U (en) * 2011-11-21 2012-08-29 中冶天工集团有限公司 Curvature-adjustable concrete construction steel mould
CN202347840U (en) * 2011-12-10 2012-07-25 齐冀鲁 Adjustable arc-shaped steel moulding plate
CN203160099U (en) * 2013-04-08 2013-08-28 中铁十局集团建筑工程有限公司 Dual-curve-surface concrete pavement steel mold plate
CN203145445U (en) * 2013-04-11 2013-08-21 大连大学 Shaping plate for civil construction
CN204983643U (en) * 2015-08-04 2016-01-20 天津市兴业龙祥建设工程有限公司 Ramp type concrete roof formwork system

Also Published As

Publication number Publication date
CN106836662A (en) 2017-06-13

Similar Documents

Publication Publication Date Title
CN106836662B (en) The concrete construction method of Curved Roof
CN105715052A (en) 3D room printer and printing method for printing concrete at construction site and room
US11518419B1 (en) Continuous serpentine concrete beamway forming system and a method for creating a hollow continuous serpentine concrete beamway
CN101793006A (en) Construction method for rapid construction of support cast-in-situ continuous beam
CN105293315B (en) A kind of hanging device of assembled architecture prefabricated components
CN108590008B (en) Construction method of cast-in-place concrete for folding roof
CN106013233A (en) Slippage system used for underground pipe rack cast-in-place construction and construction method of slippage system
CN105089184B (en) Multi-curved concrete hollow modelling wall construction method and rhombic hollow structure formwork
CN206158190U (en) Concrete placement system
CN110485299A (en) A kind of concrete box beam forms mortar leakage prevention device
CN103883088B (en) A kind of inclined slope roof concrete working device and method
CN106948274A (en) A kind of adjacent high pier circulation of bridge pours climb construction machinery and construction technology
US3477108A (en) House prefabricating machine
CN110984480B (en) Prefabricated post owner muscle positioning fixing device
CN202401753U (en) Sliding die device
CN108677722A (en) Hollow High Pier with Thin Wall stub top section construction technology
CN204530499U (en) For the automatic travelling device of highway bridge prefabrication beam slab concrete distributing
CN206987334U (en) Multi-angle regulation concrete blinding
CN107268842A (en) Wall formwork for placing device is led in a kind of lightgage steel joist
CN106351673A (en) Wall building formwork applicable to intelligent construction of vertical shaft
CN215907021U (en) Concrete prefabricated part for constructional engineering construction
CN103850435A (en) Hoisting framework device capable of replacing support framework and used for frame construction building concrete floor
CN107034890A (en) City integrated piping lane 3D printer
CN105298118B (en) The template that a kind of cast-in-place concrete stair is marked time
CN108271553A (en) A kind of river slope surface deadwood tendril automation trimmer

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant