CN106787182A - Distribution fault processing method and system - Google Patents

Distribution fault processing method and system Download PDF

Info

Publication number
CN106787182A
CN106787182A CN201611130741.7A CN201611130741A CN106787182A CN 106787182 A CN106787182 A CN 106787182A CN 201611130741 A CN201611130741 A CN 201611130741A CN 106787182 A CN106787182 A CN 106787182A
Authority
CN
China
Prior art keywords
controller switching
server
switching equipment
line walking
distribution
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611130741.7A
Other languages
Chinese (zh)
Other versions
CN106787182B (en
Inventor
王丽莉
冯麟
聂其贵
张鹤赢
刘洪宇
李亚娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Weishan Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Weishan Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Weishan Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201611130741.7A priority Critical patent/CN106787182B/en
Publication of CN106787182A publication Critical patent/CN106787182A/en
Application granted granted Critical
Publication of CN106787182B publication Critical patent/CN106787182B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • H02J13/0017

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The present invention provides a kind of distribution fault processing method and system, is related to distribution technique field.System includes the server, power supply management terminal and the multiple mobile terminals that are in communication with each other, the positional information of each controller switching equipment, failure logging and newest repair time in the range of the distribution that is stored with server.Method includes:Server obtains power distribution rush-repair work order, the failure logging of each controller switching equipment and newest repair time in a plurality of distribution line where finding out the controller switching equipment for breaking down, and a plurality of distribution line, and thus delimits line walking scope;Server sends the request that has a power failure after line walking scope delimited to power supply management terminal;Power supply management terminal response has a power failure and asks, and power failure feedback information is sent to server;Server receives power failure feedback information, and all controller switching equipments in the range of line walking are divided into two groups, and generation inspection often assembles the line walking mission bit stream of electric equipment and is issued to different mobile terminals.

Description

Distribution fault processing method and system
Technical field
The present invention relates to distribution technique field, in particular to a kind of distribution fault processing method and system.
Background technology
In power distribution rush-repair work, need first to notify that marketing control centre has a power failure after receiving power distribution rush-repair work order, then pacify Row's line attendant's line walking is determining to cause the trouble point of this failure.In the prior art, power off notifying and line walking are all using artificial Mode is carried out, also, line walking is typically to carry out radioactive inspection centered on reporting for repairment a little, extremely inefficient.
The content of the invention
In view of this, the present invention provides a kind of distribution fault processing method and system, can intelligently delimit line walking scope, Send the request that has a power failure automatically after line walking scope delimited, and line walking times is distributed automatically according to the line walking scope delimited after power failure Business, improves the efficiency of distribution fault treatment.
To achieve these goals, present pre-ferred embodiments provide a kind of distribution fault processing method, are applied to distribution Fault processing system, the distribution fault processing system includes the server, power supply management terminal and the multiple movements that are in communication with each other Terminal, the positional information of each controller switching equipment, failure logging and newest repair time in the range of the distribution that is stored with the server, Methods described includes:
The server obtains power distribution rush-repair work order, and the power distribution rush-repair work order includes phenomenon of the failure, fault time and hair The controller switching equipment of raw failure;
The whois lookup go out the controller switching equipment for breaking down where a plurality of distribution line, and described a plurality of match somebody with somebody The failure logging of each controller switching equipment and newest repair time in electric line;
The server is according to the failure logging of each controller switching equipment and newest repair time in a plurality of distribution line Line walking scope delimited, and obtain the positional information of all controller switching equipments in the range of the line walking;
The server to power supply management terminal after line walking scope it is determined that send the request that has a power failure, the power failure request includes Power off time and power failure range, the power failure range include the line walking scope;
Have a power failure request described in the power supply management terminal response, and sends power failure feedback information to the server;And
The server receives the power failure feedback information, by all controller switching equipments in the range of the line walking be divided into Few two groups, generation inspection often assembles the line walking mission bit stream of electric equipment and is issued to different mobile terminals, the line walking task Information include the phenomenon of the failure, fault time and this assemble the positional information of each controller switching equipment in electric equipment.
Another preferred embodiment of the present invention provides a kind of distribution fault processing system, and the system includes the clothes being in communication with each other Business device, power supply management terminal and multiple mobile terminals, the position of each controller switching equipment in the range of the distribution that is stored with the server Information, failure logging and newest repair time;The server include repairing work order acquisition module, failure logging searching modul, Line walking scope delimited module, power failure request module and line walking task and issue module, and the power supply management terminal includes having a power failure and asks Seek respond module;
The repairing work order acquisition module, for obtaining power distribution rush-repair work order, when the work order includes phenomenon of the failure, failure Between and the controller switching equipment that breaks down;
The failure logging searching modul, a plurality of distribution wire where for finding out the controller switching equipment for breaking down The failure logging of each controller switching equipment and newest repair time in road, and a plurality of distribution line;
The line walking scope delimit module, for the failure logging according to each controller switching equipment in a plurality of distribution line And the newest repair time delimit line walking scope, and obtain the positional information of all controller switching equipments in the range of the line walking;
The power failure request module, it is described for being asked it is determined that sending to have a power failure to power supply management terminal after line walking scope The request that has a power failure includes power off time and power failure range, and the power failure range includes the line walking scope;
The power failure ask respond module, for responding the request that has a power failure, and sends the feedback that has a power failure to the server Information;
The line walking task issues module, for receiving the power failure feedback information, will be all in the range of the line walking Controller switching equipment is divided at least two groups, and generation inspection often assembles the line walking mission bit stream of electric equipment and is issued to different mobile ends End, the line walking mission bit stream include the phenomenon of the failure, fault time and this assemble the position of each controller switching equipment in electric equipment Confidence ceases.
Distribution fault processing method provided in an embodiment of the present invention and system can be according to the controller switching equipment institutes for breaking down The failure logging of each controller switching equipment and newest repair time in distribution line, intelligently delimit line walking scope, and according to draw Fixed line walking scope distributes line walking task automatically, and has a power failure from trend power supply management terminal request after line walking scope delimited. By above-mentioned design, the automation and intellectuality of distribution fault treatment are realized, substantially increase the efficiency of troubleshooting.
Brief description of the drawings
Technical scheme in order to illustrate more clearly the embodiments of the present invention, below will be attached to what is used needed for embodiment Figure is briefly described, it will be appreciated that the following drawings illustrate only certain embodiments of the present invention, thus be not construed as it is right The restriction of scope, for those of ordinary skill in the art, on the premise of not paying creative work, can also be according to this A little accompanying drawings obtain other related accompanying drawings.
Fig. 1 is a kind of connection block diagram of distribution fault processing system provided in an embodiment of the present invention.
Fig. 2 is a kind of block diagram of server provided in an embodiment of the present invention.
Fig. 3 is a kind of schematic flow sheet of distribution fault processing method provided in an embodiment of the present invention.
The sub-step schematic diagram of the step of Fig. 4 is shown in Fig. 3 S106.
Fig. 5 is the another schematic flow sheet of distribution fault processing method provided in an embodiment of the present invention.
Fig. 6 is the another schematic flow sheet of distribution fault processing method provided in an embodiment of the present invention..
Fig. 7 is the functional block diagram of distribution fault processing system provided in an embodiment of the present invention.
Fig. 8 is the another functional block diagram of distribution fault processing system provided in an embodiment of the present invention.
Fig. 9 is the another functional block diagram of distribution fault processing system provided in an embodiment of the present invention.
Icon:10- distribution fault processing systems;100- servers;110- memories;111- rushes to repair work order acquisition module; 112- failure logging searching moduls;113- line walkings scope delimit module;114- power failure request modules;115- line walking tasks issue mould Block;1151- controller switching equipments are grouped submodule;1152- line walkings task generates submodule;1153- line walking task sending submodules; 116- service information update modules;117- line walking interpretation of result modules;118- rushes to repair terminal deciding module;119- faulty equipments are believed Breath sending module;120- processors;130- communication units;140- display units;200- power supply management terminals;210- has a power failure and asks Respond module;300- mobile terminals;400- controller switching equipments;410- password authentication modules;420- display interfaces provide module;430- Service information typing module;500- networks.
Specific embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is A part of embodiment of the present invention, rather than whole embodiments.Present invention implementation generally described and illustrated in accompanying drawing herein The component of example can be arranged and designed with a variety of configurations.
Therefore, the detailed description of embodiments of the invention below to providing in the accompanying drawings is not intended to limit claimed The scope of the present invention, but be merely representative of selected embodiment of the invention.Based on the embodiment in the present invention, this area is common The every other embodiment that technical staff is obtained under the premise of creative work is not made, belongs to the model of present invention protection Enclose.
It should be noted that:Similar label and letter represents similar terms in following accompanying drawing, therefore, once a certain Xiang Yi It is defined in individual accompanying drawing, then it need not be further defined and explained in subsequent accompanying drawing.
As shown in figure 1, the invention provides a kind of distribution fault processing system 10, the distribution fault processing system 10 is wrapped Include server 100, power supply management terminal 200 and multiple mobile terminals 300 (is only shown in figure).Alternatively, the distribution Fault processing system 10 can also include each controller switching equipment 400 (is only shown in figure) in the range of distribution, and each distribution sets Standby 400 can communicate with the server 100.
Wherein, communication connection is set up by network 500 between each equipment in the distribution fault processing system 10, with Realize data interaction.
In the present embodiment, the server 100 may be, but not limited to, web (website) server, ftp (file Transfer protocol, FTP) server etc..The power supply management terminal 200, mobile terminal 300 and distribution Equipment 400 may be, but not limited to, smart mobile phone, PC (personal computer, PC), panel computer, individual Digital assistants (personal digital assistant, PDA), mobile internet surfing equipment (mobile Internet device, MID) etc..
The power supply management terminal 200 can be special power supply management platform, it is also possible to be stored in power supply management people Software service in the intelligent terminal that member carries with, the present embodiment is without limitation.The mobile terminal 300 can be with Communication apparatus that track walker or repair personnel carry with, each mobile terminal 300 that is stored with the server 100 it is logical Letter address, and it is possible to add the mailing address of new mobile terminal 300 manually in server 100.The controller switching equipment 400 are mounted in the range of distribution apparatus for electric power distribution in each distribution line, and be stored with each controller switching equipment in server 100 400 positional information.
The network 500 may be, but not limited to, cable network or wireless network.
As shown in Fig. 2 being the block diagram of the server 100 shown in Fig. 1.The server 100 includes memory 110th, processor 120, communication unit 130 and display unit 140.The memory 110, processor 120, communication unit 130 and Each element of display unit 140 is directly or indirectly electrically connected with each other, to realize the transmission or interaction of data.For example, this A little elements can be realized being electrically connected with by one or more communication bus or holding wire each other.
Wherein, the memory 110 may be, but not limited to, random access memory (Random Access Memory, RAM), read-only storage (Read Only Memory, ROM), programmable read only memory (Programmable Read-Only Memory, PROM), erasable read-only memory (Erasable Programmable Read-Only Memory, EPROM), electricallyerasable ROM (EEROM) (Electric Erasable Programmable Read-Only Memory, EEPROM) etc..
The memory 110 can be used to store software program and module, and processor 120 is held after execute instruction is received Row stores software program and module in the memory 110, so as to perform corresponding application of function and information processing.
The processor 120 can be a kind of IC chip, with information processing capability.The processor 120 can Being general processor, including central processing unit (Central Processing Unit, abbreviation CPU), network processing unit (Network Processor, abbreviation NP) etc..Can also be digital signal processor (DSP), application specific integrated circuit (ASIC), It is field programmable gate array (FPGA) or other PLDs, discrete gate or transistor logic, discrete hard Part component.Can realize or perform disclosed each method in the embodiment of the present invention, step and logic diagram.General processor Can be microprocessor or the processor 120 can also be any conventional processor etc..
The communication unit 130 is used to be set up in the distribution fault processing system 10 of server more than 100 by network 500 Communication connection between other equipment.The display unit 140 provides an interactive interface or use between server 100 and user In display image data.
It should be appreciated that the structure shown in Fig. 2 be only illustrate, server 100 can also include than shown in Fig. 2 it is more or Less component, or with the configuration different from shown in Fig. 2.Each component shown in Fig. 2 can using hardware, software or its Combination is realized.
It should be noted that the power supply management terminal 200, mobile terminal 300, controller switching equipment 400 and the present invention are implemented The function of each component each component corresponding with the server 100 disclosed in example and connected mode all same, but can compare The server 100 has more or less components.For example, the corresponding software journey that is stored with the controller switching equipment 400 Sequence and module, it is to be capable of achieving corresponding application of function to perform the software program and module.
Fig. 3 is referred to, is the schematic flow sheet of the distribution fault processing method that present pre-ferred embodiments are provided, the side Method can be applied to the distribution fault processing system 10 shown in Fig. 1.The idiographic flow and step shown in Fig. 3 will be carried out in detail below Thin description.
Step S101:Server 100 obtains power distribution rush-repair work order.
In the present embodiment, the power distribution rush-repair work order includes phenomenon of the failure, fault time and the controller switching equipment for breaking down 400.The controller switching equipment 400 for breaking down refers to the controller switching equipment 400 for being located at and reporting for repairment a little, and the phenomenon of the failure refers to be located to be reported for repairment The phenomenon of the failure of the controller switching equipment 400 of point, the fault time refers to positioned at when the controller switching equipment 400 for reporting for repairment a little breaks down Between.
Step S102:The server 100 finds out a plurality of distribution wire at the place of controller switching equipment 400 broken down The failure logging of each controller switching equipment 400 and newest repair time in road, and a plurality of distribution line.
According to the actual requirements, the reason for power supply trouble occurs in some controller switching equipment 400 has various, it may be possible to which the distribution sets Standby 400 occur in that failure, it is also possible to which other controller switching equipments 400 in the place distribution line of controller switching equipment 400 occur in that event Barrier.Therefore, it is necessary to include the distribution area of the controller switching equipment 400 for breaking down to one after power distribution rush-repair work order is received Domain carries out line walking, to find out the real controller switching equipment 400 for breaking down.
In the present embodiment, the positional information of each controller switching equipment 400, failure note in the range of the distribution that is stored with server 100 Record and newest repair time.Server 100 after the power distribution rush-repair work order is received, find out it is described break down match somebody with somebody Electric equipment 400, that is, positioned at a plurality of distribution line where the controller switching equipment 400 for reporting for repairment a little, and obtains every distribution line The failure logging of each controller switching equipment 400 and newest repair time.
Step S103:Failure logging of the server 100 according to each controller switching equipment 400 in a plurality of distribution line And the newest repair time delimit line walking scope, and obtain the positional information of all controller switching equipments 400 in the range of the line walking.
During implementation, server 100 is respectively the failure logging of controller switching equipment 400 and the newest repair time sets a weight Value, to characterize its importance degree for delimitation line walking scope.For example, when the failure logging more newest repair time is important, The weighted value of failure logging can be respectively 6, and the weighted value of newest repair time can be 4.
According to failure logging and the difference of newest repair time, the failure logging has different from the newest repair time Proportionality coefficient, for example, overhauled in failure logging situation can have, medium and bad three kinds of situations, for these three situations, can With three kinds of ratios 0.2,0.5 and 0.8 of correspondence.The newest repair time can be divided into three regions with the difference at current time, Such as, within three days, within five days and within ten days.These three different time differences can correspond to respectively three kinds of ratios 0.8, 0.5 and 0.2.
Server 100 can be that each controller switching equipment 400 is counted according to above-mentioned weighted value and the proportionality coefficient of each weighted value Calculate a corresponding judgement numerical value.Assuming that overhaul situation preferably in the failure logging of a certain controller switching equipment 400, the newest repair time With time difference at current time within five days, then it judges that numerical value is 6 × 0.8+4 × 0.2=5.6.Server 100 will be calculated The judgement numerical value for going out is compared with a predetermined threshold value, when the judgement numerical value reaches the predetermined threshold value, the distribution is set Standby 400 put line walking scope under.
After line walking scope delimited, server 100 obtains the position letter of all controller switching equipments 400 in the range of the line walking Breath, subsequently to carry out line walking.
Step S104:The server 100 to power supply management terminal 200 after line walking scope it is determined that send the request that has a power failure.
Wherein, the request that has a power failure includes power off time and power failure range, and the power failure range includes the line walking scope, That is, the power failure range can be identical with the line walking scope, it is also possible to more than the line walking scope.
Step S105:The power supply management terminal 200 responds the request that has a power failure, and stops to the transmission of the server 100 Electric feedback information.
Power supply management terminal 200 carries out corresponding power failure operation according to power failure request, and after the power failure operation is completed A power failure feedback information is sent to the server 100, so that server 100 carries out follow-up line walking.
Step S106:The server 100 receives the power failure feedback information, by all distribution in the range of the line walking Equipment 400 is divided at least two groups, and generation inspection often assembles the line walking mission bit stream of electric equipment 400 and is issued to different movements Terminal 300.
In the present embodiment, server 100 receives the power failure feedback information and can determine that and had a power failure in the range of line walking, Line walking work can be carried out.Server 100 according to the quantity of controller switching equipment in the range of line walking 400 and the difference of position, by line walking In the range of all controller switching equipments 400 be divided at least two groups, be specifically as follows two groups, three groups and more, the present embodiment pair This is not construed as limiting.
For it is above-mentioned it is each assemble electric equipment 400, server 100 generates corresponding line walking mission bit stream and is issued to movement Terminal 300.It is appreciated that the quantity of line walking mission bit stream is identical with the group number of controller switching equipment in the range of line walking 400.Also, patrol Corresponded between line mission bit stream and mobile terminal 300, therefore only part mobile terminal 300 can receive line walking task letter Breath, that is, each line attendant receives only most line walking mission bit streams.During implementation, can be according to the current work of line attendant Make condition selecting and line walking mission bit stream is sent to certain several mobile terminal 300.
Alternatively, as shown in figure 4, the step S106 can include step S201, step S202 and step S203 tri- Sub-steps.
Step S201:The server 100 draws a circle to approve at least all controller switching equipments 400 in the fault coverage respectively In two circles.
Wherein, the radius of the circle is preset value, can be by staff according to distribution scope sets itself, for example, 1 is public In.
Step S202:The line walking task letter of all controller switching equipments 400 that the generation of the server 100 is patrolled in each circle Breath, obtains at least two line walking mission bit streams.
Step S203:At least two line walkings mission bit stream is separately sent to different movements by the server 100 Terminal 300.
Wherein, each mobile terminal 300 would only receive a line walking mission bit stream, that is, each line attendant is only responsible for The line walking work of each controller switching equipment 400 in one circle.
Studied through inventor and found, a failure is probably the coefficient result of multiple faulty equipments, therefore during line walking, Line attendant is needed to be judged with reference to the situation of other controller switching equipments 400.But controller switching equipment 400 is numerous in the range of line walking, if A controller switching equipment 400 of often patrolling all directly is linked up with other line attendants, and the information for obtaining is not comprehensive, and operates fiber crops It is tired, inefficiency.
Alternatively, Fig. 5 is referred to, the distribution fault processing method can also include step S107, step S108, step S109 and step S110.
Step S107:Controller switching equipment 400 receives the encrypted message of user input, and by the encrypted message and preset password Information is compared.
Step S108:The controller switching equipment 400 is when the encrypted message is matched with the preset password information, there is provided one Display interface.
In the present embodiment, after line attendant is completed to the maintenance of a certain controller switching equipment 400, can be incited somebody to action by controller switching equipment 400 Service information uploads onto the server 100, so that the service information of controller switching equipment 400 that server 100 pairs has been overhauled is updated, And the whole controller switching equipments 400 in the range of line walking are issued to, so that line attendant is checked.The service information includes the distribution The identification information and operation conditions of equipment 400.
In order to avoid malice be input into or change, upload service information when, password authentification can be carried out, when password authentification into During work(, the controller switching equipment 400 provide a display interface, so that user carries out follow-up operation, for example upload service information or Check the service information of other controller switching equipments 400.
Step S109:The controller switching equipment 400 responds first operation of the user in the display interface, there is provided a maintenance letter Breath input window, obtains the service information that user is input into the service information input window, and be sent to the server 100。
Wherein, first operation can be the operation for uploading service information, and the user can be line attendant.For example, User can click on " upload service information " label on the display interface, and the controller switching equipment 400 responds described click and grasps Make, there is provided an input frame.The controller switching equipment 400 obtains the service information that line attendant is input into the input frame, and is sent to The server 100.
Step S110:The server 100 receives the service information that controller switching equipment 400 sends, and generation one shows the page, and The display page is sent to each controller switching equipment 400 in the fault coverage.
In the present embodiment, the server 100 often receives the service information that a controller switching equipment 400 sends, that is, carry out Update.Update mode is as follows:The generation of server 100 one shows the page, and the display page includes having been examined in the range of the line walking The service information of the controller switching equipment 400 repaiied.The server 100 is by under the service information after renewal, namely the display page The all controller switching equipments 400 in the range of the line walking are dealt into, so that line attendant checks.
Alternatively, after step S108, methods described can also be comprised the following steps:
The controller switching equipment 400 responds second operation of the user in the display interface, shows that the server 100 is newest The display page of transmission.
User described herein can be line attendant, and second operation can be to look at the operation of service information.For example, User can click on " checking complete overhaul information " label on the display interface, and the controller switching equipment 400 responds the click Operation, the display page of the newest transmission of display server 100.
Alternatively, refer to Fig. 6, the distribution fault processing method can also include step S111, step S112 and Step S113.
Step S111:The server 100 determines this according to the service information of each controller switching equipment 400 in the fault coverage The target faults equipment and fault type of secondary failure.
During implementation, server 100 determines according to the service information of each controller switching equipment 400 in the range of the line walking for eventually receiving The fault type of this failure and target faults equipment, the target faults equipment is to cause the actual fault point of this failure.
Step S112:The server 100 finds out the mobile terminal 300 matched with the fault type and is moved as repairing Dynamic terminal 300.
Step S113:The service information and positional information of target faults equipment are sent to described robbing by the server 100 Repair mobile terminal 300.
The fault type that different repair personnel is good at solution is different, therefore, it can according to the fault type choosing for analyzing Select repair personnel.That is, the mobile terminal 300 that selection matches with the fault type is used as repairing mobile terminal 300, and will The service information and positional information of target faults equipment are sent to the repairing mobile terminal 300.
Alternatively, the server 100 can also detect the quantity of the target faults equipment, be set in the target faults When standby quantity reaches two, the service information and positional information of the target faults equipment are sent to different repairing movements Terminal 300.
Fig. 7 is referred to, is that another preferred embodiment of the invention also provides a kind of distribution fault processing system 10.The system Including the server 100, power supply management terminal 200 and the multiple mobile terminals 300 that are in communication with each other, stored in the server 100 There are the positional information of each controller switching equipment 400 in the range of distribution, failure logging and newest repair time.
The server 100 includes that repairing work order acquisition module 111, failure logging searching modul 112, line walking scope delimited Module 113, power failure request module 114 and line walking task issue module 115, and the power supply management terminal 200 includes having a power failure and asks Seek respond module 210.
Wherein, the repairing work order acquisition module 111 is used to obtain power distribution rush-repair work order, and the work order is existing including failure As, fault time and the controller switching equipment 400 for breaking down.Description on the repairing work order acquisition module 111 can specifically be joined The detailed description to step S101 in Fig. 3 is examined, that is, step S101 can be performed by the repairing work order acquisition module 111.
The failure logging searching modul 112 is used to find out a plurality of of the place of controller switching equipment 400 broken down The failure logging of each controller switching equipment 400 and newest repair time in distribution line, and a plurality of distribution line.On described The description of failure logging searching modul 112 specifically refers to the detailed description to the step S102 in Fig. 3, that is, step S102 Can be performed by the failure logging searching modul 112.
The line walking scope delimit module 113 for the event according to each controller switching equipment 400 in a plurality of distribution line Barrier record and newest repair time delimit line walking scope, and obtain the position letter of all controller switching equipments 400 in the range of the line walking Breath.The description for delimiting module 113 on the line walking scope specifically refers to the detailed description to the step S103 in Fig. 3, That is, step S103 can delimit module 113 and perform by the line walking scope.
The power failure request module 114 is used to be asked it is determined that sending to have a power failure to power supply management terminal 200 after line walking scope, The request that has a power failure includes power off time and power failure range, and the power failure range includes the line walking scope.On the power failure The description of request module 114 specifically refers to the detailed description to the step S104 in Fig. 3, that is, step S104 can be by institute Power failure request module 114 is stated to perform.
The power failure ask respond module 210 is used to respond the request that has a power failure, and sends power failure to the server 100 Feedback information.Description on the power failure ask respond module 210 specifically refers to the detailed of S105 the step of to shown in Fig. 3 Thin description, that is, step S105 can be performed by the power failure ask respond module 210.
The line walking task issues module 115 for receiving the power failure feedback information, by the institute in the range of the line walking There is controller switching equipment 400 to be divided at least two groups, generation inspection often assembles the line walking mission bit stream of electric equipment 400 and is issued to difference Mobile terminal 300, the line walking mission bit stream includes the phenomenon of the failure, fault time and during this assembles electric equipment 400 The positional information of each controller switching equipment 400.
The description for issuing module 115 on the line walking task specifically refers to the detailed of S106 the step of shown in Fig. 3 Description, that is, step S106 can issue module 115 by the line walking task performing.
Alternatively, the line walking task issues module 115 includes controller switching equipment packet submodule 1151, the generation of line walking task Submodule 1152 and line walking task sending submodule 1153.
Wherein, the controller switching equipment packet submodule 1151 is used for all controller switching equipments 400 in the fault coverage Draw a circle to approve respectively at least two circles, the radius of the circle is preset value.On controller switching equipment packet submodule 1151 Description specifically refers to the detailed description of S201 the step of to shown in Fig. 4, that is, step S201 can be by the controller switching equipment Packet submodule 1151 is performed.
The line walking task generation submodule 1152 is used to generate the line walking of all controller switching equipments 400 patrolled in each circle Mission bit stream, obtains at least two line walking mission bit streams.Description on line walking task generation submodule 1152 specifically may be used The step of shown in reference pair Fig. 4 S202 detailed description, that is, step S202 can by the line walking task generate submodule 1152 perform.
The line walking task sending submodule 1153 is used to be separately sent at least two line walkings mission bit stream not Same mobile terminal 300.Description on the line walking task sending submodule 1153 is specifically referred to the step shown in Fig. 4 The detailed description of rapid S203, that is, step S203 can be performed by the line walking task sending submodule 1153.
Alternatively, Fig. 8 is referred to, the distribution fault processing system 10 also includes that each distribution in the range of the distribution sets Standby 400, each controller switching equipment 400 in the range of the distribution can be communicated with the server 100, and the controller switching equipment 400 is wrapped Include password authentication module 410, display interface and module 420 and service information typing module 430 are provided, the server 100 is also Including service information update module 116.
Wherein, the password authentication module 410 is used to receiving the encrypted message of user input, and by the encrypted message with Preset password information is compared.The step of description on the password authentication module 410 is specifically referred to shown in Fig. 5 S107 Detailed description, that is, step S107 can be performed by the password authentication module 410.
The display interface provides module 420 to be used to, when the encrypted message is matched with the preset password information, carry For a display interface.The step of description for providing module 420 on the display interface is specifically referred to shown in Fig. 5 S108 Detailed description, that is, step S108 can by the display interface provide module 420 perform.
The service information typing module 430 is used to respond first operation of the user in the display interface, there is provided an inspection Information input window is repaiied, the service information that user is input into the service information input window is obtained, and be sent to the service Device 100, the service information includes the identification information and operation conditions of the controller switching equipment 400.
Description on the service information typing module 430 specifically refers to the detailed of S109 the step of to shown in Fig. 5 Thin description, that is, step S109 can be performed by the service information typing module 430.
The service information update module 116 is used to receive the service information of the transmission of controller switching equipment 400, and generates a display The page, the display page includes the service information of controller switching equipment 400 overhauled in the fault coverage, and by the display The page is sent to each controller switching equipment 400 in the fault coverage.
Description on the service information update module 116 specifically refers to the detailed of S110 the step of to shown in Fig. 5 Thin description, that is, step S110 can be performed by the service information update module 116.
Alternatively, the controller switching equipment 400 also includes service information display module, and the service information display module is used for Response user shows the display page in the second operation of the display interface.On the service information display module Description specifically refers to the related content in foregoing description.
Alternatively, Fig. 9 is referred to, the server 100 also includes that line walking interpretation of result module 117, repairing terminal determine Module 118 and faulty equipment information sending module 119.
The line walking interpretation of result module 117 is used for the service information according to each controller switching equipment 400 in the fault coverage It is determined that causing the target faults equipment and fault type of this failure.Description tool on the line walking interpretation of result module 117 Body refers to the detailed description to the step S111 shown in Fig. 6, that is, step S111 can be by the line walking interpretation of result module 117 perform.
The repairing terminal deciding module 118 is used to find out the conduct of mobile terminal 300 matched with the fault type Repairing mobile terminal 300, be stored with each fault type and the matching relationship of each mobile terminal 300 in the server 100.On The description of the repairing terminal deciding module 118 specifically refers to the detailed description of S112 the step of to shown in Fig. 6, that is, Step S112 can be performed by the repairing terminal deciding module 118.
The faulty equipment information sending module 119 is used to send the service information of target faults equipment and positional information To the repairing mobile terminal 300.Description on the faulty equipment information sending module 119 is specifically referred to in Fig. 6 The detailed description of shown step S113, that is, step S113 can be performed by the faulty equipment information sending module 119.
In sum, the distribution fault processing method and system that the present invention is provided can be according to the controller switching equipments for breaking down The failure logging of each controller switching equipment 400 and newest repair time in 400 place distribution lines, line walking scope intelligently delimited, And ask power failure from trend power supply management terminal 200 after line walking scope delimited.By above-mentioned design, realize at distribution fault The automation and intellectuality of reason, substantially increase the efficiency of troubleshooting.Also, during line walking, line attendant can pass through Controller switching equipment 400 uploads service information, so that the service information of controller switching equipment 400 that server 100 will have been overhauled is updated to every One station power distribution equipment 400, so that line attendant is checked, so as to more accurately find out real faulty equipment.
In several embodiments that the embodiment of the present invention is provided, it should be understood that disclosed system and method, also may be used To realize by another way.System and method embodiment described above is only schematical, for example, in accompanying drawing Flow chart and block diagram show that the system of multiple embodiments of the invention, the possibility of method and computer program product are realized Architectural framework, function and operation.At this point, each square frame in flow chart or block diagram can represent module, a program A part for section or code a, part for the module, program segment or code is used to realize patrolling for regulation comprising one or more Collect the executable instruction of function.It should also be noted that in some implementations as replacement, the function of being marked in square frame Can occur with different from the order marked in accompanying drawing.For example, two continuous square frames can essentially be held substantially in parallel OK, they can also be performed in the opposite order sometimes, and this is depending on involved function.It is also noted that block diagram and/or The combination of the square frame in each square frame and block diagram and/or flow chart in flow chart, can use the function of performing regulation or dynamic The special hardware based system made is realized, or can be realized with the combination of computer instruction with specialized hardware.
In addition, each functional module in each embodiment of the invention can integrate to form an independent portion Divide, or modules individualism, it is also possible to which two or more modules are integrated to form an independent part.
The preferred embodiments of the present invention are the foregoing is only, is not intended to limit the invention, for the skill of this area For art personnel, the present invention can have various modifications and variations.It is all within the spirit and principles in the present invention, made any repair Change, equivalent, improvement etc., should be included within the scope of the present invention.

Claims (10)

1. a kind of distribution fault processing method, it is characterised in that be applied to distribution fault processing system, the distribution fault treatment System includes the server, power supply management terminal and the multiple mobile terminals that are in communication with each other, and be stored with distribution model in the server Positional information, failure logging and the newest repair time of interior each controller switching equipment are enclosed, methods described includes:
The server obtains power distribution rush-repair work order, and the power distribution rush-repair work order includes phenomenon of the failure, fault time and event occurs The controller switching equipment of barrier;
The whois lookup go out the controller switching equipment for breaking down where a plurality of distribution line, and a plurality of distribution wire The failure logging of each controller switching equipment and newest repair time in road;
The server delimited according to the failure logging of each controller switching equipment in a plurality of distribution line and newest repair time Line walking scope, and obtain the positional information of all controller switching equipments in the range of the line walking;
The server to power supply management terminal after line walking scope it is determined that send the request that has a power failure, the request that has a power failure includes having a power failure Time and power failure range, the power failure range include the line walking scope;
Have a power failure request described in the power supply management terminal response, and sends power failure feedback information to the server;And
The server receives the power failure feedback information, and all controller switching equipments in the range of the line walking are divided into at least two Group, generation inspection often assembles the line walking mission bit stream of electric equipment and is issued to different mobile terminals, the line walking mission bit stream Including the phenomenon of the failure, fault time and this assemble the positional information of each controller switching equipment in electric equipment.
2. method according to claim 1, it is characterised in that the distribution fault processing system also includes the distribution model Interior each controller switching equipment is enclosed, each controller switching equipment in the range of the distribution can also be wrapped with the server communication, methods described Include:
Controller switching equipment receives the encrypted message of user input, and the encrypted message and preset password information are compared;
The controller switching equipment is when the encrypted message is matched with the preset password information, there is provided a display interface;
First operation of the controller switching equipment response user in the display interface, there is provided a service information input window, obtains The service information that user is input into the service information input window, and the server is sent to, the service information includes The identification information and operation conditions of the controller switching equipment;And
The server receives the service information that controller switching equipment sends, and generation one shows the page, and the display page is sent To each controller switching equipment in the fault coverage, the display page includes the controller switching equipment overhauled in the range of the line walking Service information.
3. method according to claim 2, it is characterised in that the step of the controller switching equipment provides a display interface it Afterwards, methods described also includes:
The controller switching equipment response user shows the display of the newest transmission of server in the second operation of the display interface The page.
4. method according to claim 2, it is characterised in that methods described also includes:
The server determines that the target faults of this failure set according to the service information of each controller switching equipment in the fault coverage Standby and fault type;
The whois lookup goes out the mobile terminal matched with the fault type as repairing mobile terminal, in the server Be stored with each fault type and the matching relationship of each mobile terminal;And
The service information and positional information of target faults equipment are sent to the repairing mobile terminal by the server.
5. method according to claim 1, it is characterised in that the server is by all distribution in the range of the line walking Equipment is divided at least two groups, and generation inspection often assembles the line walking mission bit stream of electric equipment and is issued to different mobile terminals Step, including:
The server draws a circle to approve at least two circles all controller switching equipments in the fault coverage respectively, and the half of the circle Footpath is preset value;
The line walking mission bit stream of all controller switching equipments that the server generation is patrolled in each circle, obtains at least two line walkings and appoints Business information;And
At least two line walkings mission bit stream is separately sent to different mobile terminals by the server.
6. a kind of distribution fault processing system, it is characterised in that the system includes the server, the power supply management end that are in communication with each other End and multiple mobile terminal, the positional information of each controller switching equipment in the range of the distribution that is stored with the server, failure logging and The newest repair time;The server includes that repairing work order acquisition module, failure logging searching modul, line walking scope delimit mould Block, power failure request module and line walking task issue module, and the power supply management terminal includes power failure ask respond module;
The repairing work order acquisition module, for obtaining power distribution rush-repair work order, the work order include phenomenon of the failure, fault time and The controller switching equipment for breaking down;
The failure logging searching modul, a plurality of distribution line where for finding out the controller switching equipment for breaking down, And the failure logging of each controller switching equipment and newest repair time in a plurality of distribution line;
The line walking scope delimit module, for according to the failure logging of each controller switching equipment in a plurality of distribution line and most The new repair time delimit line walking scope, and obtain the positional information of all controller switching equipments in the range of the line walking;
The power failure request module, for it is determined that sending have a power failure request, the power failure to power supply management terminal after line walking scope Request includes power off time and power failure range, and the power failure range includes the line walking scope;
The power failure ask respond module, for responding the request that has a power failure, and sends power failure feedback information to the server;
The line walking task issues module, for receiving the power failure feedback information, by all distribution in the range of the line walking Equipment is divided at least two groups, and generation inspection often assembles the line walking mission bit stream of electric equipment and is issued to different mobile terminals, The line walking mission bit stream includes that the phenomenon of the failure, fault time and the position for assembling each controller switching equipment in electric equipment are believed Breath.
7. system according to claim 6, it is characterised in that the distribution fault processing system also includes the distribution model Interior each controller switching equipment is enclosed, each controller switching equipment in the range of the distribution can be with the server communication, the controller switching equipment Module and service information typing module are provided including password authentication module, display interface, the server also includes that maintenance is believed Breath update module;
The password authentication module, the encrypted message for receiving user input, and the encrypted message and preset password are believed Breath is compared;
The display interface provides module, for when the encrypted message is matched with the preset password information, there is provided one shows Show interface;
The service information typing module, for responding first operation of the user in the display interface, there is provided a service information Input window, obtains the service information that user is input into the service information input window, and is sent to the server, described Service information includes the identification information and operation conditions of the controller switching equipment;
The service information update module, the service information for receiving controller switching equipment transmission, and a display page is generated, it is described The display page includes the service information of the controller switching equipment overhauled in the fault coverage, and the display page is sent into institute State each controller switching equipment in fault coverage.
8. system according to claim 7, it is characterised in that the controller switching equipment also includes service information display module;
The service information display module, for responding second operation of the user in the display interface, shows the display page Face.
9. system according to claim 7, it is characterised in that the server also includes line walking interpretation of result module, robs Repair terminal deciding module, faulty equipment information sending module;
The line walking interpretation of result module, determines to cause this for the service information according to each controller switching equipment in the fault coverage The target faults equipment and fault type of secondary failure;
The repairing terminal deciding module, it is mobile eventually as repairing for finding out the mobile terminal matched with the fault type End, be stored with each fault type and the matching relationship of each mobile terminal in the server;
The faulty equipment information sending module, it is described for the service information and positional information of target faults equipment to be sent to Repairing mobile terminal.
10. system according to claim 6, it is characterised in that the line walking task issues module includes controller switching equipment point Group submodule, line walking task generation submodule and line walking task sending submodule;
The controller switching equipment is grouped submodule, for all controller switching equipments in the fault coverage to be drawn a circle to approve at least two respectively In individual circle, the radius of the circle is preset value;
The line walking task generates submodule, the line walking mission bit stream for generating all controller switching equipments patrolled in each circle, Obtain at least two line walking mission bit streams;
The line walking task sending submodule, at least two line walkings mission bit stream to be separately sent into different movements Terminal.
CN201611130741.7A 2016-12-09 2016-12-09 Distribution fault processing method and system Expired - Fee Related CN106787182B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611130741.7A CN106787182B (en) 2016-12-09 2016-12-09 Distribution fault processing method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611130741.7A CN106787182B (en) 2016-12-09 2016-12-09 Distribution fault processing method and system

Publications (2)

Publication Number Publication Date
CN106787182A true CN106787182A (en) 2017-05-31
CN106787182B CN106787182B (en) 2019-06-04

Family

ID=58874935

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611130741.7A Expired - Fee Related CN106787182B (en) 2016-12-09 2016-12-09 Distribution fault processing method and system

Country Status (1)

Country Link
CN (1) CN106787182B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108492395A (en) * 2018-03-12 2018-09-04 广东电网有限责任公司中山供电局 A kind of cruising inspection system and method for the power matching network equipment based on RFID
CN108646659A (en) * 2018-07-05 2018-10-12 北京智行者科技有限公司 A kind of emergency processing method
CN109426865A (en) * 2017-08-25 2019-03-05 许继集团有限公司 A kind of charging pile intelligent maintaining personnel matching process and device
CN110335368A (en) * 2019-04-03 2019-10-15 中国联合网络通信集团有限公司 Computer room method for inspecting and device
CN111079953A (en) * 2019-11-14 2020-04-28 中国公路工程咨询集团有限公司 Method, device and equipment for managing highway equipment
CN112564275A (en) * 2020-11-11 2021-03-26 武汉欧博尔电力有限公司 Technical method of energy-saving automatic power distribution management system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102097861A (en) * 2010-12-13 2011-06-15 山东电力集团公司泰安供电公司 Electrical intelligent emergency repair terminal
JP2016153739A (en) * 2015-02-20 2016-08-25 株式会社Nttファシリティーズ Power supply system, power supply quality monitoring device, power supply monitoring method, and program
CN105914879A (en) * 2016-05-05 2016-08-31 泉州亿兴电力有限公司 Distribution equipment inspection tour system and method
CN106295810A (en) * 2016-07-25 2017-01-04 国网山东省电力公司青岛供电公司 A kind of troublshooting work order distributing method and device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102097861A (en) * 2010-12-13 2011-06-15 山东电力集团公司泰安供电公司 Electrical intelligent emergency repair terminal
JP2016153739A (en) * 2015-02-20 2016-08-25 株式会社Nttファシリティーズ Power supply system, power supply quality monitoring device, power supply monitoring method, and program
CN105914879A (en) * 2016-05-05 2016-08-31 泉州亿兴电力有限公司 Distribution equipment inspection tour system and method
CN106295810A (en) * 2016-07-25 2017-01-04 国网山东省电力公司青岛供电公司 A kind of troublshooting work order distributing method and device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张明等: "配网抢修***的研究", 《电工技术》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109426865A (en) * 2017-08-25 2019-03-05 许继集团有限公司 A kind of charging pile intelligent maintaining personnel matching process and device
CN108492395A (en) * 2018-03-12 2018-09-04 广东电网有限责任公司中山供电局 A kind of cruising inspection system and method for the power matching network equipment based on RFID
CN108646659A (en) * 2018-07-05 2018-10-12 北京智行者科技有限公司 A kind of emergency processing method
CN110335368A (en) * 2019-04-03 2019-10-15 中国联合网络通信集团有限公司 Computer room method for inspecting and device
CN111079953A (en) * 2019-11-14 2020-04-28 中国公路工程咨询集团有限公司 Method, device and equipment for managing highway equipment
CN112564275A (en) * 2020-11-11 2021-03-26 武汉欧博尔电力有限公司 Technical method of energy-saving automatic power distribution management system

Also Published As

Publication number Publication date
CN106787182B (en) 2019-06-04

Similar Documents

Publication Publication Date Title
CN106787182A (en) Distribution fault processing method and system
CN1991652B (en) Automatic remote monitoring and diagnostics system and communication method for communicating between a programmable logic controller and a central unit
CN113580986B (en) Monitoring method and device for charging pile equipment
CN106888106A (en) The extensive detecting system of IT assets in intelligent grid
CN104952117B (en) A kind of attendance management method
CN106951966A (en) Device management method and system
CN109525614A (en) Industrial cloud operational system
CN105914879A (en) Distribution equipment inspection tour system and method
CN104025516A (en) Systems and methods of remote communication
CN110086697A (en) Household electrical appliances fault handling method and device
CN104126182A (en) Systems and methods of remote communication
CN107203816A (en) A kind of trouble hunting method and system of secondary equipment in power system
CN101609407A (en) Detection method based on the full station model file coupling of publisher/subscriber's pattern
CN106534067B (en) A kind of intelligent control method and system based on Internet of Things
Ranjbar et al. Design of an iot-based system for smart maintenance of medical equipment
US8615574B2 (en) System for controlling and managing network apparatus and method thereof
CN106447242A (en) Power consumption service acceptance time limit management method and device
CN103616877A (en) Monitoring diagnostic method and system for energy pipe network
CN105354769A (en) Data processing method and device used for power distribution network equipment
CN101512450B (en) Data recording device
CN108023740A (en) The indicating risk method and apparatus of exception information in monitoring
CN106202425A (en) Data processing method and device and mobile terminal
CN116319492A (en) Switch testing method and device, storage medium and electronic equipment
CN108460468A (en) It is a kind of public to become failure event management method and device
CN108306286A (en) A kind of power distribution network active forewarning workform management method and device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190604

Termination date: 20191209

CF01 Termination of patent right due to non-payment of annual fee