CN106776328A - A kind of method that BUG is associated with test case - Google Patents
A kind of method that BUG is associated with test case Download PDFInfo
- Publication number
- CN106776328A CN106776328A CN201611191794.XA CN201611191794A CN106776328A CN 106776328 A CN106776328 A CN 106776328A CN 201611191794 A CN201611191794 A CN 201611191794A CN 106776328 A CN106776328 A CN 106776328A
- Authority
- CN
- China
- Prior art keywords
- bug
- test case
- test
- typing
- implementation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/36—Preventing errors by testing or debugging software
- G06F11/362—Software debugging
- G06F11/3644—Software debugging by instrumenting at runtime
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/36—Preventing errors by testing or debugging software
- G06F11/362—Software debugging
- G06F11/366—Software debugging using diagnostics
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/36—Preventing errors by testing or debugging software
- G06F11/3668—Software testing
- G06F11/3672—Test management
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Computer Hardware Design (AREA)
- Quality & Reliability (AREA)
- Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Debugging And Monitoring (AREA)
Abstract
The technical scheme of a kind of method associated with test case the invention provides BUG, the BUG typing entrances in the program during implementation of test cases:A. have found and the BUG of typing management system, the typing of the typing BUG numberings existed below in implementation of test cases expected results;B., behind implementation of test cases expected results there is the entrance for jumping to BUG input interfaces in newfound BUG during implementation of test cases, and the BUG of new typing is automatically associated in test case and automatic jumps to test case and performs the page;Can check that last time performs the BUG states of association during implementation of test cases.
Description
Technical field
It is easy to more intuitively check the state for having found BUG during subsequent execution the present invention relates to a kind of
The method that BUG is associated with test case.
Background technology
In the prior art, known technology is during implementation of test cases, if finding to work as in the process of implementation
Preceding undiscovered BUG, will exit use-case execution, switch the BUG typing pages, then can just continue executing with test case, this mistake
Cheng Buneng is directly redirected, excessively complicated.This is the weak point existing for prior art.
The content of the invention
The purpose of the present invention provides a kind of BUG and is associated with test case aiming at the deficiency existing for prior art
Method, the method can from test case perform the page jump directly to the BUG typing pages, continued executing with after typing test use
Example, and BUG directly can be associated with the use-case, make test case implementation procedure eased.
This programme is achieved by the following technical measures:1. a kind of method that BUG is associated with test case, it is special
Levy is to comprise the following steps:
1)Implementation of test cases;
2)During implementation of test cases, if it find that BUG, judges whether BUG is new BUG, if new BUG,
Then enter step 3), if not new BUG, then into step 4)
3)BUG typings entrance behind the expected results of implementation of test cases correspondence step enters the BUG typing pages, and typing is protected
The execution page of test case is jumped back to after depositing;
4)The direct correlation BUG numberings after the expected results of implementation of test cases.
Described step 4)In for the BUG numberings that associate, when next time performs can according to BUG numberings it is directly perceived show it is current
BUG states.
Described BUG states include BUG numbering Show Color As of the BUG unconfirmed in test case has been associated, and have confirmed that
Unresolved BUG numbering Show Color B, have solved BUG numbering Show Color C, have verified that and complete and close BUG numbering Show Colors
D, so in test round below, the color that checking can number when performing history according to BUG is intuitively judged very much
The state of current BUG.
Described step 3)In the BUG of new typing be associated with the test case.
The beneficial effect of this programme can be learnt according to the narration to such scheme, due to implementation of test cases in this scenario
When BUG typing entrances:A. have found and the BUG of typing management system, exist behind implementation of test cases expected results
Typing BUG numbering typing;B. newfound BUG during implementation of test cases, deposits behind implementation of test cases expected results
The entrance of BUG input interfaces is being jumped to, the BUG of new typing is automatically associated in test case and automatic jumps to test case
Perform the page;Can check that last time performs the BUG states of association during implementation of test cases:Each test case when being performed a plurality of times,
The current state of BUG is associated before can checking in round implementation procedure, for example:Display yellow BUG numberings unconfirmed, have confirmed that not
Display blueness BUG numberings are solved, has solved to show green BUG numberings, had verified that and complete and close display black BUG numberings.By
This is visible, and the present invention is compared with prior art, with prominent substantive distinguishing features and significantly progressive, its beneficial effect implemented
It is also obvious.
Specific embodiment
For the technical characterstic for illustrating this programme can be understood, below by a specific embodiment, and this programme is carried out
Illustrate.
The method that the BUG of this programme is associated with test case, it is characterised in that comprise the following steps:
1)Implementation of test cases;
2)During implementation of test cases, if it find that BUG, judges whether BUG is new BUG, if new BUG,
Then enter step 3), if not new BUG, then into step 4)
3)BUG typings entrance behind the expected results of implementation of test cases correspondence step enters the BUG typing pages, and typing is protected
The execution page of test case is jumped back to after depositing;The BUG of new typing is associated with the test case.
4)The direct correlation BUG numberings after the expected results of implementation of test cases.For the BUG numberings for associating, when next time performs
Current BUG states can intuitively be shown according to BUG numberings.Described BUG states include that BUG unconfirmed is associating test use
BUG numbering Show Color A in example, have confirmed that unresolved BUG numberings Show Color B, have solved BUG numbering Show Color C,
Checking is completed and closes BUG numbering Show Color D, so in test round below, can root when checking and perform history
The color numbered according to BUG intuitively judges the state of current BUG very much.
The present invention is not limited in above-mentioned specific embodiment, and those of ordinary skill in the art are in essential scope of the invention
Change, remodeling, addition or the replacement inside made, should also belong to protection scope of the present invention.
Claims (4)
1. a kind of method that BUG is associated with test case, it is characterised in that comprise the following steps:
1)Implementation of test cases;
2)During implementation of test cases, if it find that BUG, judges whether BUG is new BUG, if new BUG,
Then enter step 3), if not new BUG, then into step 4)
3)BUG typings entrance behind the expected results of implementation of test cases correspondence step enters the BUG typing pages, and typing is protected
The execution page of test case is jumped back to after depositing;
4)The direct correlation BUG numberings after the expected results of implementation of test cases.
2. the method that BUG according to claim 1 is associated with test case, it is characterized in that:Described step 4)In for
The BUG numberings of association, current BUG states can be intuitively shown when next time performs according to BUG numberings.
3. the method that BUG according to claim 2 is associated with test case, it is characterized in that:Described BUG states are included not
Confirm BUG numbering Show Color As of the BUG in test case has been associated, have confirmed that unresolved BUG numberings Show Color B, solved
Certainly BUG numberings Show Color C, has verified that and completes and close BUG numbering Show Color D, so in test round below, looks into
The color that seeing can number when performing history according to BUG intuitively judges the state of current BUG very much.
4. the method that BUG according to claim 1 and 2 is associated with test case, it is characterized in that:Described step 3)In it is new
The BUG of typing is associated with the test case.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611191794.XA CN106776328B (en) | 2016-12-21 | 2016-12-21 | A kind of BUG and the associated method of test case |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611191794.XA CN106776328B (en) | 2016-12-21 | 2016-12-21 | A kind of BUG and the associated method of test case |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106776328A true CN106776328A (en) | 2017-05-31 |
CN106776328B CN106776328B (en) | 2019-06-28 |
Family
ID=58896876
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611191794.XA Active CN106776328B (en) | 2016-12-21 | 2016-12-21 | A kind of BUG and the associated method of test case |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106776328B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109408380A (en) * | 2018-09-30 | 2019-03-01 | 北京金山安全软件有限公司 | Game system defect management method and device and electronic equipment |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101510172A (en) * | 2009-03-23 | 2009-08-19 | 金蝶软件(中国)有限公司 | Test system and method |
CN103634592A (en) * | 2013-12-09 | 2014-03-12 | 乐视致新电子科技(天津)有限公司 | Automatic test method and system for intelligent televisions |
US20140109053A1 (en) * | 2012-10-16 | 2014-04-17 | Microsoft | Identifying high impact bugs |
-
2016
- 2016-12-21 CN CN201611191794.XA patent/CN106776328B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101510172A (en) * | 2009-03-23 | 2009-08-19 | 金蝶软件(中国)有限公司 | Test system and method |
US20140109053A1 (en) * | 2012-10-16 | 2014-04-17 | Microsoft | Identifying high impact bugs |
CN103634592A (en) * | 2013-12-09 | 2014-03-12 | 乐视致新电子科技(天津)有限公司 | Automatic test method and system for intelligent televisions |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109408380A (en) * | 2018-09-30 | 2019-03-01 | 北京金山安全软件有限公司 | Game system defect management method and device and electronic equipment |
CN109408380B (en) * | 2018-09-30 | 2022-04-19 | 北京金山安全软件有限公司 | Game system defect management method and device and electronic equipment |
Also Published As
Publication number | Publication date |
---|---|
CN106776328B (en) | 2019-06-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103894350B (en) | The partial volume screening method for group matching of cylindrical lithium battery | |
CN105607937B (en) | A kind of hot patch method and apparatus | |
US20160345168A1 (en) | Physical cell identifier allocation method and apparatus | |
CN106407203A (en) | Method and device for identifying target terminal | |
CN105868589A (en) | Script encryption method, and script running method and device | |
CN106776328A (en) | A kind of method that BUG is associated with test case | |
CN106303709A (en) | A kind of Set Top Box and application program updating method, system | |
CN104852909A (en) | Attack detection rule opening method, and equipment | |
CN109977681A (en) | A kind of fuzz testing system of fuzz testing method and unmanned plane towards unmanned plane | |
CN104408372B (en) | A kind of mimicry application solutions system and method based on system reload | |
CN106021101A (en) | Method and device for testing mobile terminal | |
CN103929732B (en) | A kind of method and M2M gateways of management terminal peripheral hardware | |
CN106886446B (en) | Software source code verification method and device | |
CN101482596A (en) | Fast fault recognition method for multifactor industrial system | |
CN106533955B (en) | A kind of sequence number recognition methods based on network message | |
CN105653908A (en) | Implicit anti-debugging protection method | |
RU2010142001A (en) | PROGRAM PROTECTION METHOD | |
CN116069514B (en) | Deadlock avoidance method for flexible manufacturing system containing unreliable resources | |
CN108686369A (en) | A kind of weiqi play chess method and system | |
CN106598799A (en) | Fault injection simulation system and fault management system | |
CN104298418A (en) | Displaying method and device for application program and terminal | |
CN107194094A (en) | A kind of quick method that Color scheme is set in PCB design | |
CN105847018A (en) | Automatic network adapter repeated disabling and enabling realizing method | |
Gladston et al. | Test suite reduction using HGS based heuristic approach | |
CN108762826A (en) | Process hiding method and computer readable storage medium |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |