CN106774237A - A kind of observing and controlling remote control sluggish detection method and its system - Google Patents

A kind of observing and controlling remote control sluggish detection method and its system Download PDF

Info

Publication number
CN106774237A
CN106774237A CN201611013957.5A CN201611013957A CN106774237A CN 106774237 A CN106774237 A CN 106774237A CN 201611013957 A CN201611013957 A CN 201611013957A CN 106774237 A CN106774237 A CN 106774237A
Authority
CN
China
Prior art keywords
remote control
main website
interchanger
observing
sluggish
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611013957.5A
Other languages
Chinese (zh)
Inventor
李睿宜
杨威
王化鹏
巨建勋
张金虎
姜佳宁
韩峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Electric Power Research Institute of State Grid Jilin Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Electric Power Research Institute of State Grid Jilin Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, China Electric Power Research Institute Co Ltd CEPRI, Electric Power Research Institute of State Grid Jilin Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201611013957.5A priority Critical patent/CN106774237A/en
Publication of CN106774237A publication Critical patent/CN106774237A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B23/00Testing or monitoring of control systems or parts thereof
    • G05B23/02Electric testing or monitoring
    • G05B23/0205Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
    • G05B23/0208Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterized by the configuration of the monitoring system
    • G05B23/0213Modular or universal configuration of the monitoring system, e.g. monitoring system having modules that may be combined to build monitoring program; monitoring system that can be applied to legacy systems; adaptable monitoring system; using different communication protocols
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/20Pc systems
    • G05B2219/24Pc safety
    • G05B2219/24065Real time diagnostics

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Selective Calling Equipment (AREA)

Abstract

The present invention relates to a kind of observing and controlling remote control sluggish detection method and its system, this method includes:Remote control selection, remote control to be returned to school and perform three steps with remote control.Record that remote control selection, remote control are returned to school and remote control performs three message times on detecting system Network Analyzer, wherein the time of the remote control writ of execution is recorded as into T0, the remote control writ of execution issues rear measure and control device road remote control node closure, and what is sealed in opens into generation 0>1 displacement is formed to be sent in a report, and Network Analyzer records report, the SOE markers checked in report, is recorded as T1, then it is △ T=T1 T0 that remote control time delay is sluggish.The present invention can improve the degree of accuracy of test, reduce test job amount, and switch remote control can effectively shorten accident treatment and grid switching operation time when dispatching accident treatment and recovering power transmission, improve electric network reliability.

Description

A kind of observing and controlling remote control sluggish detection method and its system
Technical field
The present invention relates to Electric Power Automation Equipment technical field of measurement and test, and in particular to a kind of sluggish detection side of observing and controlling remote control Method and its system.
Background technology
Remote control is exactly that distant place research object is controlled.Measure and control device sends control and refers to by channel to controlled device Order, controlled device completes corresponding actions according to control instruction.Hysteresis phenomenon refers to the state (being generally mainly physical phenomenon) of a system, Input not only with system instantly is relevant, more can be different because of the approach of its past input process, and has different results.In other words Say, a system is by after the running of a certain import pathway, even if gaining input value same during initial state, state can not Return to its initial.Modern society is more and more stronger to the dependence of power system, and the safe operation of power system is to ensureing national warp The normal operation of Ji all departments has and its important meaning.In Operation of Electric Systems, measure and control device is mainly used in prison in real time Line segregation, transformer bay depending on power plant or transformer station are every, data of whole station and signal collecting and controlling breaker, disconnecting link Division.It is very big in power plant or application in substations data, measure and control device is debugged before charging operation with lookup electric power event in operation When barrier problem needs measure and control device to send the instruction of semaphore, measurement amount and control command, engineering commissioning staff is generally required Connect electrical lead, operation tester adds of ac, DC quantity to device, take a large amount of manpower and materials, the working time compared with It is long, so needing the electric power observation and control device to have analog remote signaling, remote measurement, distant control function.The break-make and make-and-break time of circuit mainly depend on It is sluggish in remote control.Transformer station is the assembly place of transmission and disttrbution, the important step in power system.As power system regulates and controls one The development of bodyization work, it is desirable to which transformer station all realizes unattended.Required belonging to area in dispatch automated system 35kV and above transformer station all access monitoring system, realize the remote monitoring to unattended operation transformer station and control.At this In work, how to prevent to put into operation transformer substation remote-control experiment maloperation and remote control response time, it is ensured that personal safety and Equipment steady operation, prevents, because of the power outage that remote control causes, just to become the most important thing, and operation of power networks must be made safer, It is reliable.
Progress, scientific and technological development, status more and more higher of the power automation in network system, to electric power with society The most important index of system ----safety also has requirement higher.Most important safety problem is exactly distant in power automatic system Control, starts with from power automatic system operational outfit at this stage, the remote control principles of the existing operational outfit of analysis, then furthers investigate distant The safety problem for existing is controlled, in conjunction with automative control theory, the sluggish high-precision detection method of remote control and system is proposed.It is existing Method of testing error is big, and the remote control sluggishness response time cannot correct accurate testing.
The content of the invention
To make up above-mentioned deficiency of the prior art, it is an object of the invention to provide a kind of sluggish detection side of observing and controlling remote control Method and its system, detection method of the invention and systematic error are small, and the remote control sluggishness response time is correct, accurate testing.
The purpose of the present invention is realized using following technical proposals:
The present invention provides a kind of observing and controlling remote control sluggish detection method, and it is theed improvement is that, the detection method includes Following step:
(1) remote control selection;
(2) remote control is returned to school;
(3) remote control is performed.
Further, in the step (1), when measure and control device receives the remote control select command of client main website transmission, CPU Line program treatment can be entered to measure and control device.
Further, in the step (2), transformer substation end is received and processes backward client main website through CPU and sends check Signal;Client main website is received after signal, and the docking collection of letters number is checked, if it is determined that errorless, and display is returned to school correct.It is described Client main website sends remote control execute instruction to interchanger;The interchanger returns to remote control and returns to school signal to client main website;Institute Interchanger is stated to Network Analyzer sending action time signal;The interchanger carries out interacting for actuating signal with measure and control device; The signal when standard clock source is to the transmission pair of Network Analyzer, interchanger and measure and control device.
Further, in the step (3), after remote control is returned to school correctly, represent straighforward operation and perform state into remote control, Control centre's monitoring personnel performs order and performs order to transformer substation end sending action by remote control;Conversely, i.e. measure and control device Switch does not respond or returns to school unsuccessful, and when regulation and control center operations staff remote control is performed, it is comprehensive that client main website can receive plant stand end The signal that automated system is returned is closed, if in 30s, being not received by signal, remote control is represented and is performed baulk.
Further, remote control selection, remote control are recorded on Network Analyzer to return to school and remote control three message times of execution, its The middle time by the remote control writ of execution is recorded as T0, and the remote control writ of execution issues rear measure and control device road remote control node closure, serial ports Open into generation 0>1 displacement is formed to be sent in a report, and Network Analyzer records report, the SOE markers checked in report, record It is T1, then it is △ T=T1-T0 that remote control time delay is sluggish.
Further, measure and control device only has remote control to perform sluggishness △ T>0, the remote control that remote control selection, execution are not carried out is slow Stagnant △ T=0, if remote control success △ T>0, facilitate deciding on whether remote control succeeds.
The present invention also provides a kind of observing and controlling remote control sluggish detecting system, and the detecting system is connected with transformer substation end;Its The improvement is that, the system includes client main website, Network Analyzer, interchanger, measure and control device and standard clock source;Institute Network Analyzer, interchanger and measure and control device is stated to be connected with client main website respectively;The standard clock source divides with network respectively The connection of analyzer, interchanger and measure and control device;The Network Analyzer, interchanger and measure and control device are sequentially connected.
Further, the transformer substation end is received and processes backward client main website through CPU and sends check signal;The visitor Hu Duan main websites send remote control execute instruction to interchanger;The interchanger returns to remote control and returns to school signal to client main website;It is described Interchanger is to Network Analyzer sending action time signal;The interchanger carries out interacting for actuating signal with measure and control device;Institute Signal when stating standard clock source to the transmission pair of Network Analyzer, interchanger and measure and control device.
Further, recorded on the Network Analyzer remote control selection, remote control return to school with remote control perform three messages when Between, wherein the time of the remote control writ of execution is recorded as into T0, the remote control writ of execution issues rear measure and control device road remote control node closure, string Mouthful open into generation 0>1 displacement is formed to be sent in a report, and Network Analyzer records report, the SOE markers checked in report, T1 is recorded as, then it is △ T=T1-T0 that remote control time delay is sluggish.
Further, the measure and control device includes writing register, drive circuit, read register, property relay and object Relay;Register, drive circuit, read register and the object relay write is sequentially connected;It is described to write register and object Relay is connected with client main website;The property relay is connected with client main website and object relay respectively;Distant During control is returned to school, client main website is preset to write the outlet that register BCH code is sequentially delivered to drive circuit and object relay, And after the outlet combined floodgate separating brake by the execution of client main website to property relay, returned to school to visitor to read register by object relay Hu Duan main websites run succeeded.
In order to some aspects to the embodiment for disclosing have a basic understanding, simple summary is shown below is.Should Summarized section is not extensive overview, nor to determine key/critical component or describe the protection domain of these embodiments. Its sole purpose is that some concepts are presented with simple form, in this, as the preamble of following detailed description.
Compared with immediate prior art, the excellent effect that the technical scheme that the present invention is provided has is:
The present invention provides a kind of observing and controlling remote control sluggish detection method and detecting system, the sluggish method of existing test remote control Error is big, the remote control sluggishness response time cannot correct accurate testing, the degree of accuracy of test can be improved with the method, reduce survey Examination workload, switch remote control can effectively shorten accident treatment and back brake behaviour when dispatching accident treatment and recovering power transmission Make the time, improve electric network reliability.Generally, it will be respectively remote control selection, remote control by three processes to implement remote control operation Return to school, remote control is performed.When measure and control device receives the remote control select command of main website transmission, CPU can enter line program treatment to device, then Sent to main website end and check signal, main website terminates the collection of letters number afterwards, it is checked.
Remote control process is that dispatching automation master station is short sends remotely-controlled object and property (divide, close) to transformer substation end first Predetermined order, transformer substation end is received and processes backward main website end through CPU and sends check signal.Main website termination receives check signal Afterwards, compare with transmitting order to lower levels, next step remote control configuration processor entered by display under conditions of check is errorless " returning to school correct ", Now dispatching and monitoring personnel can perform order and perform order to transformer substation end sending action by remote control.
According to the test of stopwatch method is commonly used for before the deficiencies in the prior art, test improve reliability with the inventive method now Property, accuracy.The present invention may also reach up the following property of telecommand:
1. promptness:The instruction that detection and control terminal sends must be sent within the permissible time controlled breaker and every Leave pass and perform in time.
2. accuracy:The characteristics of due to TT&C system, receive whether signal side cannot accurately make response to signal, and Accurately order cannot be obtained may produce catastrophic consequence, it is therefore necessary to which the accuracy to signal makes certain guarantor Card.
3. confidentiality:If telecommand is intercepted and captured by hacker etc., may be by hacker using equipment malfunction tripping etc., same meeting Influence the operation of safety.
Brief description of the drawings
Fig. 1 is the remote control process flow chart one that the present invention is provided;
Fig. 2 is the remote control process flowchart 2 that the present invention is provided;
Fig. 3 is the structured flowchart of the detecting system of the observing and controlling remote control sluggishness that the present invention is provided.
Specific embodiment
Specific embodiment of the invention is described in further detail below in conjunction with the accompanying drawings.
The following description and drawings fully show specific embodiments of the present invention, to enable those skilled in the art to Put into practice them.Other embodiments can include structure, logic, it is electric, process and it is other changes.Embodiment Only represent possible change.Unless explicitly requested, otherwise single component and function are optional, and the order for operating can be with Change.The part of some embodiments and feature can be included in or replace part and the feature of other embodiments.This hair The scope of bright embodiment includes the gamut of claims, and all obtainable of claims is equal to Thing.Herein, these embodiments of the invention can individually or generally be represented that this is only with term " invention " For convenience, and if in fact disclosing the invention more than, it is not meant to automatically limit the scope of the application to appoint What single invention or inventive concept.
The present invention provides a kind of observing and controlling remote control sluggish detection method, comprises the steps:
(1) remote control selection;
(2) remote control is returned to school;
(3) remote control is performed.
Specifically:
When measure and control device receives the remote control select command of main website transmission, CPU can enter line program treatment to it, then to main website End sends checks signal, and main website terminates the collection of letters number afterwards, it is checked.If it is determined that it is errorless, can show and return to school correctly.That , also just representing straighforward operation can enter execution state.Conversely, when regulation and control center operations staff performs remote control, main website end meeting The signal that plant stand end complex automatic system is returned is received, if in certain hour, being not received by signal, remote control is also just represented Operation failure.In successful rate of remote control problem not high, remote control tripping failure proportion is highest, is secondly exactly that remote control is missed The failure problems such as dynamic and operation failure.And the situation of this failure performance is mainly switch and does not respond or return to school unsuccessful Deng.
By the remote control node of measure and control device to be tested seal in the device certain all the way in open entry loop, make on client utility The control block of energy this report, on switches by the Port Mirroring of client utility to a net point port, makes to can confirm that network analysis It is normal when instrument and measure and control device pair.Operation is remotely controlled to measure and control device by client utility:Selection>Return to school>Perform, This three message times can be recorded on Network Analyzer, wherein the time of the writ of execution is recorded as into T0, the writ of execution is surveyed after issuing Control device road remote control node closure, serial ports is opened into generation 0>1 displacement is formed to be sent in a report, and net branch records the report Accuse, the SOE markers checked in this report is recorded as T1, then remote control time delay △ T=T1-T0.
The closed loop test in measure and control device straighforward operation delay test system is formd, can be recorded using Network Analyzer Message time is tested, and detection environment, detection method are intuitively easy-to-use.Save human and material resources, space cost.
The present invention also provides a kind of observing and controlling remote control sluggish detecting system, and detecting system is connected with transformer substation end;The system System includes client main website, Network Analyzer, interchanger, measure and control device and standard clock source;The Network Analyzer, interchanger It is connected with client main website respectively with measure and control device;The standard clock source is filled with Network Analyzer, interchanger and observing and controlling respectively Put connection;The Network Analyzer, interchanger and measure and control device are sequentially connected, and its structured flowchart is as shown in Figure 3.
Transformer substation end is received and processes backward client main website through CPU and sends check signal;The client main website is to friendship Change planes and send remote control execute instruction;The interchanger returns to remote control and returns to school signal to client main website;The interchanger is to network Analyzer sending action time signal;The interchanger carries out interacting for actuating signal with measure and control device;The standard clock source Signal during to the transmission pair of Network Analyzer, interchanger and measure and control device.
The sluggish test of measure and control device remote signal, can reflect the disposal ability and relay of the CPU of measure and control device Sensitivity.
According to Fig. 1, the measure and control device includes writing register, drive circuit, read register, property relay and right As relay;Register, drive circuit, read register and the object relay write is sequentially connected;The register and right write As relay is connected with client main website;The property relay is connected with client main website and object relay respectively; During remote control is returned to school, client main website is preset to be write register BCH code and is sequentially delivered to going out for drive circuit and object relay Mouthful, and after performing outlet combined floodgate separating brake to property relay by client main website, returned to school to read register by object relay Run succeeded to client main website.Remote control process be client main website it is preset write register BCH code to drive circuit to object after Electrical equipment outlet is returned to school to client by object relay after performing relay outlet combined floodgate separating brake by client utility to read register End runs succeeded.
Observing and controlling remote control sluggish detection method and system, is carried out by client utility to measure and control device according to Fig. 2 Straighforward operation:Selection>Return to school>Perform, remote control selection, remote control are recorded on the Network Analyzer and is returned to school and remote control execution three Message time, wherein the time of the remote control writ of execution is recorded as into T0, the remote control writ of execution issues the rear measure and control device road remote control node Closure, what is sealed in opens into generation 0>1 displacement is formed to be sent in a report, and Network Analyzer records report, checks in report SOE markers, is recorded as T1, then it is △ T=T1-T0 that remote control time delay is sluggish.
Embodiment
With reference to the product drawing of tape label, following content is illustrated:
1) clock, interchanger
2) clock gives the equipment time service such as interchanger;
A. the remote control node of measure and control device seal in the device certain all the way in open entry loop, the report is enabled on client utility The control block of announcement, on switches by the Port Mirroring of client utility to a net point port, make to can confirm that Network Analyzer and It is normal during measure and control device pair
B. these components, part must connect and compose electrical circuit.
3) during clock pair, interchanger packets forwarding.
4) select>Return to school>Perform, remote control selection, remote control are recorded on the Network Analyzer and is returned to school and remote control execution three Bar message time, wherein the time of the remote control writ of execution is recorded as into T0, the remote control writ of execution issues the rear measure and control device road remote control section Point closure, what is sealed in opens into generation 0>1 displacement is formed to be sent in a report, and Network Analyzer records report, checks in report SOE markers, be recorded as T1, then it is △ T=T1-T0 that remote control time delay is sluggish.
The present invention provides a kind of observing and controlling remote control sluggish detection method and detecting system, the sluggish method of existing test remote control Error is big, the remote control sluggishness response time cannot correct accurate testing, the degree of accuracy of test can be improved with the method, reduce survey Examination workload, switch remote control can effectively shorten accident treatment and back brake behaviour when dispatching accident treatment and recovering power transmission Make the time, improve electric network reliability.
The above embodiments are merely illustrative of the technical solutions of the present invention rather than its limitations, although with reference to above-described embodiment pair The present invention has been described in detail, and those of ordinary skill in the art can still enter to specific embodiment of the invention Row modification or equivalent, these are applying without departing from any modification of spirit and scope of the invention or equivalent Within pending claims of the invention.

Claims (10)

1. the sluggish detection method of a kind of observing and controlling remote control, it is characterised in that the detection method comprises the steps:
(1) remote control selection;
(2) remote control is returned to school;
(3) remote control is performed.
2. the sluggish detection method of observing and controlling remote control as claimed in claim 1, it is characterised in that in the step (1), work as observing and controlling Device receives the remote control select command of client main website transmission, and CPU can enter line program treatment to measure and control device.
3. the sluggish detection method of observing and controlling remote control as claimed in claim 1, it is characterised in that in the step (2), transformer station End receives and processes backward client main website through CPU and sends check signal;Client main website is received after signal, the docking collection of letters number Checked, if it is determined that errorless, display is returned to school correct.The client main website sends remote control execute instruction to interchanger;Institute State interchanger and return to remote control to client main website and return to school signal;The interchanger is to Network Analyzer sending action time signal; The interchanger carries out interacting for actuating signal with measure and control device;The standard clock source is to Network Analyzer, interchanger and survey Signal during control device transmission pair.
4. the sluggish detection method of observing and controlling remote control as claimed in claim 1, it is characterised in that in the step (3), work as remote control After returning to school correctly, represent straighforward operation and perform state into remote control, control centre's monitoring personnel performs order to change by remote control Power station end sending action performs order;Conversely, the switch of i.e. measure and control device does not respond or returns to school unsuccessful, regulation and control center operations When personnel's remote control is performed, client main website can receive the signal that plant stand end complex automatic system is returned, if in 30s, do not had Signal is received, remote control is represented and is performed baulk.
5. the sluggish detection method of observing and controlling remote control as claimed in claim 4, it is characterised in that recorded on Network Analyzer distant Control selection, remote control to be returned to school and perform three message times with remote control, wherein the time of the remote control writ of execution is recorded as into T0, remote control is performed Order issues rear measure and control device road remote control node closure, and serial ports is opened into generation 0>1 displacement is formed to be sent in a report, network point Analyzer records report, the SOE markers checked in report, is recorded as T1, then it is △ T=T1-T0 that remote control time delay is sluggish.
6. the sluggish detection method of observing and controlling remote control as claimed in claim 5, it is characterised in that measure and control device only has remote control to perform Sluggish △ T>0, the remote control sluggishness △ T=0 that remote control selection, execution are not carried out, if remote control success △ T>0, facilitate deciding on distant Whether control succeeds.
7. a kind of sluggish detecting system of observing and controlling remote control, the detecting system is connected with transformer substation end;Characterized in that, the system System includes client main website, Network Analyzer, interchanger, measure and control device and standard clock source;The Network Analyzer, interchanger It is connected with client main website respectively with measure and control device;The standard clock source is filled with Network Analyzer, interchanger and observing and controlling respectively Put connection;The Network Analyzer, interchanger and measure and control device are sequentially connected.
8. the sluggish detecting system of observing and controlling remote control as claimed in claim 7, it is characterised in that the transformer substation end is received and passed through The backward client main website of CPU treatment sends check signal;The client main website sends remote control execute instruction to interchanger;It is described Interchanger returns to remote control and returns to school signal to client main website;The interchanger is to Network Analyzer sending action time signal;Institute State interchanger carries out interacting for actuating signal with measure and control device;The standard clock source is to Network Analyzer, interchanger and observing and controlling Signal during device transmission pair.
9. the sluggish detecting system of observing and controlling remote control as claimed in claim 8, it is characterised in that recorded on the Network Analyzer Lower remote control selection, remote control to be returned to school and perform three message times with remote control, wherein the time of the remote control writ of execution is recorded as into T0, remote control The writ of execution issues rear measure and control device road remote control node closure, and serial ports is opened into generation 0>1 displacement is formed to be sent in a report, net Network analyzer records report, the SOE markers checked in report, is recorded as T1, then it is △ T=T1-T0 that remote control time delay is sluggish.
10. the sluggish detecting system of observing and controlling remote control as claimed in claim 7, it is characterised in that the measure and control device includes writing Register, drive circuit, read register, property relay and object relay;It is described to write register, drive circuit, read deposit Device and object relay are sequentially connected;Register and the object relay write is connected with client main website;The property after Electrical equipment is connected with client main website and object relay respectively;During remote control is returned to school, client main website is preset to write register BCH code is sequentially delivered to the outlet of drive circuit and object relay, and performs property relay by client main website After mouth combined floodgate separating brake, returned to school by object relay to read register and run succeeded to client main website.
CN201611013957.5A 2016-11-18 2016-11-18 A kind of observing and controlling remote control sluggish detection method and its system Pending CN106774237A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611013957.5A CN106774237A (en) 2016-11-18 2016-11-18 A kind of observing and controlling remote control sluggish detection method and its system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611013957.5A CN106774237A (en) 2016-11-18 2016-11-18 A kind of observing and controlling remote control sluggish detection method and its system

Publications (1)

Publication Number Publication Date
CN106774237A true CN106774237A (en) 2017-05-31

Family

ID=58968869

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611013957.5A Pending CN106774237A (en) 2016-11-18 2016-11-18 A kind of observing and controlling remote control sluggish detection method and its system

Country Status (1)

Country Link
CN (1) CN106774237A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108398610A (en) * 2018-05-08 2018-08-14 许昌开普检测研究院股份有限公司 A kind of protective relaying device remote control response time Auto-Test System and method
CN110187258A (en) * 2019-05-13 2019-08-30 国网宁夏电力有限公司培训中心 A kind of measure and control device remote control circuit tester
CN112556749A (en) * 2020-11-30 2021-03-26 薛峰 Detection method for redundant measurement and control device
CN113419415A (en) * 2021-06-17 2021-09-21 中国电力科学研究院有限公司 Method and system for detecting centralized redundant standby mode of intelligent substation measurement and control system
CN113991839A (en) * 2021-10-15 2022-01-28 许继集团有限公司 Device and method for improving reliability of remote control output
CN114697241A (en) * 2022-04-07 2022-07-01 机械工业仪器仪表综合技术经济研究所 End-to-end time delay test system and method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2195117Y (en) * 1994-03-31 1995-04-19 吉林电业局 Microcomputerized sport monitor
CN201750226U (en) * 2010-08-12 2011-02-16 广东电网公司佛山供电局 Remote detecting system of substation
US20160006300A1 (en) * 2014-07-02 2016-01-07 Schneider Electric Industries Sas Remote terminal unit modular equipment
CN105759150A (en) * 2016-04-11 2016-07-13 国网江苏省电力公司电力科学研究院 Test system and method for transformer substation secondary device prefabricated cabin

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2195117Y (en) * 1994-03-31 1995-04-19 吉林电业局 Microcomputerized sport monitor
CN201750226U (en) * 2010-08-12 2011-02-16 广东电网公司佛山供电局 Remote detecting system of substation
US20160006300A1 (en) * 2014-07-02 2016-01-07 Schneider Electric Industries Sas Remote terminal unit modular equipment
CN105759150A (en) * 2016-04-11 2016-07-13 国网江苏省电力公司电力科学研究院 Test system and method for transformer substation secondary device prefabricated cabin

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
陈国华: "一起遥控缺陷的分析与处理", 《技术交流》 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108398610A (en) * 2018-05-08 2018-08-14 许昌开普检测研究院股份有限公司 A kind of protective relaying device remote control response time Auto-Test System and method
CN110187258A (en) * 2019-05-13 2019-08-30 国网宁夏电力有限公司培训中心 A kind of measure and control device remote control circuit tester
CN110187258B (en) * 2019-05-13 2024-04-02 国网宁夏电力有限公司培训中心 Remote control loop tester of measurement and control device
CN112556749A (en) * 2020-11-30 2021-03-26 薛峰 Detection method for redundant measurement and control device
CN113419415A (en) * 2021-06-17 2021-09-21 中国电力科学研究院有限公司 Method and system for detecting centralized redundant standby mode of intelligent substation measurement and control system
CN113419415B (en) * 2021-06-17 2023-09-19 中国电力科学研究院有限公司 Centralized redundant standby mode detection method and system for intelligent substation measurement and control system
CN113991839A (en) * 2021-10-15 2022-01-28 许继集团有限公司 Device and method for improving reliability of remote control output
CN113991839B (en) * 2021-10-15 2023-11-14 许继集团有限公司 Device and method for improving remote control opening reliability
CN114697241A (en) * 2022-04-07 2022-07-01 机械工业仪器仪表综合技术经济研究所 End-to-end time delay test system and method
CN114697241B (en) * 2022-04-07 2023-09-12 机械工业仪器仪表综合技术经济研究所 End-to-end time delay test system and method

Similar Documents

Publication Publication Date Title
CN106774237A (en) A kind of observing and controlling remote control sluggish detection method and its system
CN102937685B (en) The integrated testing platform of a kind of transformer station based on Real-time Simulation Technology
CN103076520A (en) Dynamic analogue simulation detection platform and analogue simulation method for secondary system of intelligent substation
CN106124935A (en) Middle and low voltage network Fault Locating Method
CN107884711A (en) Breaker method of testing and terminal
CN105116246B (en) A kind of operation of power networks protection on-line analysis method
CN110568284B (en) Intelligent substation one-key sequential control automatic test verification method, device and system
CN105158718B (en) A kind of fault detector integrated test facility and test system
CN108512730B (en) Intelligent substation telecontrol system equipment testing method, device and system
CN106921522B (en) Networking information model detection device of intelligent substation network message recording and analyzing device
CN107257304B (en) Telecontrol point-aligning-free configuration test system
CN113343446B (en) Data analysis and verification method and system for transformer substation monitoring system
CN105759150B (en) A kind of test system and method for substation secondary device prefabricated cabin
CN105573283A (en) Transformer station equipment function association database establishing method and event association information group filtering method
CN110174564A (en) The filed detection system and its detection method of equipment for monitoring power quality access main website
CN110763937A (en) Intelligent substation test platform and method based on electromagnetic transient real-time simulation
Deliyannides et al. Design criteria for an integrated microprocessor-based substation protection and control system
CN104638761B (en) Packet sensing and packet simulation verification based GOOSE (generic object oriented substation event) virtual terminal connection method
CN102707174B (en) Detection system and method of operation state of resistor type superconductive current limiter
CN104795804A (en) Auxiliary relay protection monitoring processing system and processing method thereof
CN109634849B (en) Visual signal interaction intelligent substation reconstruction and extension virtual testing device and method
CN105549418B (en) The SCD of intelligent substation communicates debugging system
CN105467233B (en) Intelligent substation local reaying protection test system
CN203350429U (en) On-line real-time error monitoring system for alternating current sampling measurement apparatus
CN208924243U (en) A kind of homologous test macro of transformer station's signal

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170531