- Publication number
- CN106759421A CN106759421A CN201710162291.8A CN201710162291A CN106759421A CN 106759421 A CN106759421 A CN 106759421A CN 201710162291 A CN201710162291 A CN 201710162291A CN 106759421 A CN106759421 A CN 106759421A
- Authority
- CN
- China
- Prior art keywords
- basis
- chain
- chain knife
- knife
- ground
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F3/00—Dredgers; Soil-shifting machines
- E02F3/04—Dredgers; Soil-shifting machines mechanically-driven
- E02F3/08—Dredgers; Soil-shifting machines mechanically-driven with digging elements on an endless chain
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
The combination unit and its construction method being connected with basic top when being a kind of construction proposed by the present invention, the combination unit 2A being connected with the top of basis 1 during its construction includes chain knife actuating unit 2A 1, spoil disposal device 2A 2 and frame 2A 3, device 2A 1 and device 2A 2 are installed on frame 2A 3, device 2A 1 and basis 1A and the composition chain type of chain knife 3 excavating gear 4, basic 1A is the frame of chain type excavating gear 4A;The bottom of basis 1A is provided with the chain knife 3 for excavating ground during construction, chain knife 3 only excavates the ground of basis 1A bottoms, device 2A and basis 1A tops link into an integrated entity, the drive chain knives 3 of device 2A 1 run along the track on basic 1A, chain knife 3 excavates the ground of basic 1 bottom, and the ground band that will have been excavated, to top, device 2A 2 separates the ground that chain knife 3 is brought up from basic 1A bottoms with chain knife 3, and device 2A synchronously declines together with basic 1A.Advantage:With the combination unit for excavating foundation bottom ground, prefabrication basis, construction is simple, short construction period, low cost on basis itself.
Description
Technical field
The present invention relates to the combination unit and its construction method that are connected with basic top during a kind of construction, belong to building work
Journey foundation construction technical field.
Background technology
Existing large foundation technology is using overall excavation construction mode, and long construction period, labour intensity is big, working environment peace
Whole step is poor.
The content of the invention
A kind of combination unit and its construction method being connected with basic top when being construction proposed by the present invention, its purpose is intended to
The defect for overcoming prior art to exist, its major advantage:Basis itself is with the combination unit for excavating foundation bottom ground, factory
Prefabricated foundation, construction is simple, short construction period, low cost.
Technical solution of the invention:The combination unit 2 being connected with the top of basis 1 during construction includes chain knife power transmission
Device 2-1, spoil disposal device 2-2 and frame 2-3, device 2-1 and device 2-2 are installed on frame 2-3, device 2-1 and
Basis 1 and the composition chain type of chain knife 3 excavating gear 4, basis 1 is the frame of chain type excavating gear 4, and the bottom on basis 1 sets during construction
There is the chain knife 3 for excavating ground, chain knife 3 only excavates the ground of basic 1 bottom, and chain knife 3 is by chain 3-1 and is fixed on chain 3-1
Cutter 3-2 composition;During construction, device 2 links into an integrated entity with the top of basis 1, and device 2-1 drive chains knife 3 is along on basis 1
Track runs, and chain knife 3 excavates the ground of basic 1 bottom, and the ground band that will have been excavated is to top, and device 2-2 is by chain knife 3 from base
The ground that the bottom of plinth 1 is brought up is separated with chain knife 3, and device 2 declines as basis 1 is synchronous together.
Device 2-1 is made up of chain driving device for cutter 2-1-1, chain knife tensioning apparatus 2-1-2 and sprocket wheel 2-1-3, and basis 1 is one
Word basis 1A, one word basis 1A is provided with the chain type excavating gear 4A for excavating basis 1A bottom rock-soils, the i.e. machine of device 2A during construction
Frame is provided with a device 2A-1;The combination foundation 1B that basis is made up of several word bases 1A, each word basis 1A
It is equipped with the chain type excavating gear 4A for only excavating respective foundation bottom ground, i.e. the frame 2B-3 of device 2B and is provided with several dresses
Put 2A-1.
Advantages of the present invention:Basis itself is with the combination unit for excavating foundation bottom ground, prefabrication basis, construction
Simply, short construction period, low cost.
Brief description of the drawings
Fig. 1 is that basis 1 is the structural representation of word basis 1A, is also basic 1A tops connection combination apparatus 2A, basis
The structural representation of the chain knife 3 for excavating ground is arranged at 1A bottoms, is also that the side cover on the basis 1 of the bottom belt basil 6 is constituted with chain knife 3
Chain-linked conveyer structural representation, be also by actuating unit 2A-1, spoil disposal device 2A-2 and frame 2A-3 groups
Into combination unit 2A structural representation;
Fig. 2 is the A direction views of Fig. 1, is also that the structure for constituting chain type excavating gear 4A by device 2A-1 and basis 1A and chain knife 3 is shown
It is intended to;
Fig. 3 is the B direction views of Fig. 1(Removal chain knife 3), be also by chain driving device for cutter 2-1-1, chain knife tensioning apparatus 2-1-2 and
The structural representation of the actuating unit 2A-1 of sprocket wheel 2-1-3 compositions;
Fig. 4 is the C-C views of Fig. 1, is also the section view of the frame 2A-3 for combining the unit 2A, is also mud channel device 5
The structural representation of mud channel 5-1;
Fig. 5 is the D-D views of Fig. 1, is also the structural representation of the swivel 5-2 on foundation bottom 1A-1;
Fig. 6 is the structural representation of chain knife 3, is also the structural representation of chain 3-1 and cutter 3-2, is also by A crossed joints 3-1-
The structural representation of the crossed joint of the chain 3-1 of 1 and B crossed joints 3-1-2 compositions, is also knot that chain 3-1 realizes curvature of space
Structure schematic diagram;
Fig. 7 is that basis 1 is the structural representation of combination foundation 1B, is also combination foundation 1B tops connection combination apparatus 2B, combination
The structural representation of the chain knife 3 for excavating ground is arranged at basic 1B bottoms;
Fig. 8 is the A direction views of Fig. 7, is also to be made up of actuating unit 2B-1, spoil disposal device 2B-2 and frame 2B-3
The structural representation of 2B is combined the unit, is also that chain type excavating gear 4A is constituted by device 2B-1 and combination foundation 1B and chain knife 3
Structural representation;
Fig. 9 is the B direction views of Fig. 7(Removal chain knife 3), be also by chain driving device for cutter 2-1-1, chain knife tensioning apparatus 2-1-2 and
The structural representation of the actuating unit 2B-1 of sprocket wheel 2-1-3 compositions;
Figure 10 is the C-C views of Fig. 7, is also the section view of the frame 2B-3 for combining the unit 2B, is also mud channel device 5
The structural representation of mud channel 5-1;
Figure 11 is first paragraph(I.e. bottom section)The structural representation of combination foundation 1B-1 prefabricated components, is also first paragraph(I.e. bottom section)Combination
Basic 1B-1 installs the structural representation of chain knife 3 and squatting position at the scene;
Figure 12 is the structural representation that is connected with the top of first paragraph combination foundation 1B-1 of bottom of the frame 2B-3 in device 2B,
It is also structural representation that the chain knife 3 of device 2B bottoms is connected with the chain knife 3 at the top of first paragraph combination foundation 1B-1;
Figure 13 is that device 2-1-1 drives chain knife 3 to be run along the track on basic 1B, and chain knife 3 excavates first paragraph basis 1B-1 bottoms
The ground in portion, device 2B synchronously drops to the structural representation of setting position with first paragraph basis 1B-1 together;
Figure 14 is the structural representation after device 2B is removed from the 1B-1 of first paragraph basis;
Figure 15 is the structural representation that the bottom of second segment basis 1B-2 is connected with the top of first paragraph basis 1B-1, be also by
The structural representation that the chain knife 3 of second segment basis 1B-2 bottoms is connected with the chain knife 3 at the top of the 1B-1 of first paragraph basis;
Figure 16 is the structural representation that is connected with the top of second segment basis 1B-2 of bottom of the frame 2B-3 in device 2B, is also
The structural representation that the chain knife 3 of device 2B bottoms is connected with the chain knife 3 at the top of the 1B-2 of second segment basis;
Figure 17 is that device 2-1-1 drives chain knife 3 to be run along the track on basic 1B, and chain knife 3 excavates first paragraph basis 1B-1 bottoms
The ground in portion, and the ground band that will have been excavated is to the structural representation of top, is also device 2B, first paragraph basis 1B-1 and second
Section basis 1B-2 synchronously drops to the structural representation of setting position together;
Figure 18 is that device 2B is separated the structural representation after removing from the 1B-2 of second segment basis;
After Figure 19 is the position that basic 1B drops to setting, the structural representation of the concrete perfusion of chain knife 3 is extracted out.
In figure 1 is basis, is divided to 1A and 1B two kinds of structures;1A is word basis;1A-1 is first paragraph(I.e. bottom section)One word
Basis;1A-2 is the word of second segment one basis;1B is combination foundation, is made up of several word bases 1A;1B-1 is first paragraph
(I.e. bottom section)Combination foundation;1B-2 is second segment combination foundation;2 combination units being connected with the top of basis 1 when being construction, including
Chain knife actuating unit 2-1, spoil disposal device 2-2 and frame 2-3;It is connected with a word basis 1A tops when 2A is construction
Combination unit, including chain knife actuating unit 2A-1, spoil disposal device 2A-2 and frame 2A-3;2B be construction when with combine
The combination unit of basic 1B tops connection, including chain knife actuating unit 2B-1, spoil disposal device 2B-2 and frame 2B-
3;2-1 is the actuating unit of chain knife, by chain driving device for cutter 2-1-1, chain knife tensioning apparatus 2-1-2 and sprocket wheel 2-1-3 groups
Into;2A-1 is the actuating unit of word basis 1A upper chain knifes, by chain driving device for cutter 2-1-1, chain knife tensioning apparatus 2-1-2
Constituted with sprocket wheel 2-1-3;2B-1 is the actuating unit of combination foundation 1B upper chain knifes, by chain driving device for cutter 2-1-1, chain knife
Tensioning apparatus 2-1-2 and sprocket wheel 2-1-3 is constituted;2-1-1 is chain driving device for cutter;2-1-2 is chain knife tensioning apparatus;2-1-3 is
Sprocket wheel;2-2 is 2 spoil disposal devices of combination unit;2A-2 is the spoil disposal device for combining the unit 2A;2B-2 is combination unit
The spoil disposal device of 2B;2-3 is the frame of combination unit 2;2A-3 is the frame for combining the unit 2A;2B-3 is combination unit 2B
Frame;3 is the chain knife for excavating ground, is made up of chain 3-1 and the cutter 3-2 being fixed on chain 3-1;3-1 is composition chain
The chain of knife 3;3-1-1 is the A crossed joints for constituting chain crossed joint;3-1-2 is the B crossed joints for constituting chain crossed joint;3-2 is
The cutter of composition chain knife 3;4 is chain type excavating gear, is made up of device 2-1 and basis 1 and chain knife 3;4A is to excavate basis 1A bottoms
The chain type excavating gear of portion's ground;5 is mud channel device;5-1 is the mud channel on the frame 2-3 in device 2;5-2 is
Swivel on foundation bottom 1-1;6 is the side cover on the basis 1 of the bottom belt basil.
Specific embodiment
The combination unit 2 being connected with the top of basis 1 during construction includes chain knife actuating unit 2-1, spoil disposal device
2-2 and frame 2-3, device 2-1 and device 2-2 are installed on frame 2-3, and device 2-1 and basis 1 and chain knife 3 constitute chain type
Excavating gear 4, basis 1 is the frame of chain type excavating gear 4, and the bottom on basis 1 is provided with the chain knife 3 for excavating ground, chain during construction
Knife 3 only excavates the ground of basic 1 bottom, and chain knife 3 is made up of chain 3-1 and the cutter 3-2 being fixed on chain 3-1;During construction,
Device 2 links into an integrated entity with the top of basis 1, and device 2-1 drive chains knife 3 runs along the track on basis 1, and chain knife 3 excavates base
The ground of the bottom of plinth 1, and the ground that the ground band that will have been excavated brings chain knife 3 up from basic 1 bottom to top, device 2-2
Separated with chain knife 3, device 2 declines as basis 1 is synchronous together.
Described device 2-1 is made up of chain driving device for cutter 2-1-1, chain knife tensioning apparatus 2-1-2 and sprocket wheel 2-1-3.
Described basis 1 is word basis 1A, and one word basis 1A is provided with the chain type for excavating basis 1A bottom rock-soils during construction
The frame 2A-3 of excavating gear 4A, i.e. device 2A is provided with a device 2A-1.
The combination foundation 1B that described basis is made up of several word bases 1A, each word basis 1A is equipped with only
Excavate the chain type excavating gear 4A of respective foundation bottom ground, i.e. the frame 2B-3 of device 2B and be provided with several devices 2A-1.
Frame 2-3 in described device 2 includes mud channel device 5, and mud channel 5-1 sprays with the mud of foundation bottom
Mouth 5-2 is connected.
Described construction method point Ru Xia Walk it is rapid:
1)In factory's segmentation or integral prefabricated basic 1;
2)By first paragraph(I.e. bottom section)Basic 1-1 is transported to scene, installs chain knife 3;
3)The bottom of the frame 2-3 in device 2 is connected with the top of first paragraph basis 1-1, by the chain knife 3 of the bottom of device 2 with
Chain knife 3 at the top of the 1-1 of first paragraph basis is connected, composition chain type excavating gear 4, by the mud channel 5-1 and first of the bottom of device 2
Mud channel 5-1 at the top of section basis 1-1 is connected;
4)Starter 2-1-1, device 2-1-1 drive chain knife 3 to be run along the track on basic 1-1, and chain knife 3 excavates first paragraph
The ground of basic 1-1 bottoms, and the ground band that will have been excavated, to top, device 2-2 brings chain knife 3 up from basic 1-1 bottoms
Ground separated with chain knife 3;
5)Device 2 synchronously drops to setting position together with first paragraph basis 1-1;
6)Removed after device 2 is separated with first paragraph basis 1-1;
7)The bottom of second segment basis 1-2 is connected with the top of first paragraph basis 1-1, by the chain of second segment basis 1-2 bottoms
Knife 3 is connected with the chain knife 3 at the top of the 1-1 of first paragraph basis, by the mud channel 5-1 of second segment basis 1-2 bottoms and first paragraph base
Mud channel 5-1 at the top of plinth 1-1 is connected;
8)The bottom of the frame 2-3 in device 2 is connected with the top of second segment basis 1-2, by the chain knife 3 of the bottom of device 2 with
Chain knife 3 at the top of the 1-2 of second segment basis is connected, composition chain type excavating gear 4;By the mud channel 5-1 and second of the bottom of device 2
Mud channel 5-1 at the top of section basis 1-2 is connected;
9)Starter 2-1-1, device 2-1-1 drive chain knife 3 to be run along the track on basis 1, and chain knife 3 excavates first paragraph base
The ground of plinth 1-1 bottoms, and the ground band that will have been excavated, to top, device 2-2 brings chain knife 3 up from basic 1-1 bottoms
Ground is separated with chain knife 3;
10)Device 2, first paragraph basis 1-1 and second segment basis 1-2 synchronously drop to setting position together;
11)Removed after device 2 is separated with second segment basis 1-2;
Repeat above-mentioned 7)、8)、9)、10), after the connection for completing each section of basis and the position for dropping to setting, extract chain knife 3 out and irrigate
Concrete.
Frame 2-3 in described device 2 is the construction operation platform on basis 1.
The present invention is further described below in conjunction with the accompanying drawings:
As shown in Figure 1, Figure 2 with shown in Fig. 6, basis 1 is word basis 1A, the combination unit being connected with a word basis 1A tops during construction
2A includes chain knife actuating unit 2A-1, spoil disposal device 2A-2 and frame 2A-3, and device 2A-1 and device 2A-2 pacify
On frame 2A-3, the device 2A-1 and word basis 1A and composition chain type excavating gear 4A of chain knife 3, word basis 1A is chain type
The frame of excavating gear 4A, one word basis 1A is provided with the chain type excavating gear 4A for excavating a word basis 1A bottom rock-soils during construction,
I.e. the frame 2A-3 of device 2A is provided with a device 2A-1;The bottom of one word basis 1A is provided with the chain knife for excavating ground during construction
3, chain knife 3 only excavates the ground of word basis 1A bottoms, and chain knife 3 is by chain 3-1 and the cutter 3-2 groups being fixed on chain 3-1
Into;During construction, device 2A and word basis 1A tops link into an integrated entity, and device 2A-1 drive chains knife 3 is along on the 1A of word basis
Track operation, chain knife 3 excavates the ground of word basis 1A bottoms, and the ground band that will have been excavated to top, device 2A-2 generals
The ground that chain knife 3 is brought up from word basis 1A bottoms is separated with chain knife 3, and device 2A is with word basis 1A together synchronization
Drop.
As shown in figure 3, basis 1 be word basis 1A, device 2A-1 by chain driving device for cutter 2-1-1, chain knife tensioning apparatus
2-1-2 and sprocket wheel 2-1-3 is constituted.
As shown in Figure 4 and Figure 5, basis 1 is word basis 1A, and the frame 2A-3 in device 2A includes mud channel device 5,
Mud channel 5-1 is connected with the swivel 5-2 of basis 1A bottoms.
As shown in Fig. 7~Figure 10, basis 1 is combination foundation 1B, and combination foundation 1B is made up of several word bases 1A,
Each word basis 1A is equipped with the chain type excavating gear 4A for only excavating respective foundation bottom ground, i.e. the frame 2B-3 of device 2B
It is provided with several devices 2A-1.
As shown in Figure 11~Figure 19, basis 1 is combination foundation 1B, construction method point Ru Xia Walk it is rapid:
1)Prefabricated composite basis 1B is segmented in factory;
2)By first paragraph(I.e. bottom section)Basic 1B-1 is transported to scene, installs chain knife 3;
3)The bottom of the frame 2B-3 in device 2B is connected with the top of first paragraph basis 1B-1, by the chain knife of device 2B bottoms
3 are connected with the chain knife 3 at the top of the 1B-1 of first paragraph basis, chain type excavating gear 4A are constituted, by the mud channel 5-1 of device 2A bottoms
It is connected with the mud channel 5-1 at the top of the 1B-1 of first paragraph basis;
4)Starter 2-1-1, device 2-1-1 drive track operation of the chain knife 3 on the basis of, and chain knife 3 excavates first paragraph base
The ground of plinth 1B-1 bottoms, and the ground band that will have been excavated, to top, device 2B-2 brings chain knife 3 up from basic 1B-1 bottoms
Ground separated with chain knife 3;
5)Device 2B synchronously drops to setting position together with first paragraph basis 1B-1;
6)Device 2B is separated with first paragraph basis 1B-1 and is removed;
7)The bottom of second segment basis 1B-2 is connected with the top of first paragraph basis 1B-1, by second segment basis 1B-2 bottoms
Chain knife 3 is connected with the chain knife 3 at the top of the 1B-1 of first paragraph basis, by the mud channel 5-1 and first of second segment basis 1B-2 bottoms
Mud channel 5-1 at the top of section basis 1B-1 is connected;
8)The bottom of the frame 2B-3 in device 2B is connected with the top of second segment basis 1B-2, by the chain knife of device 2B bottoms
3 are connected with the chain knife 3 at the top of the 1B-2 of second segment basis, composition chain type excavating gear 4A;By the mud channel 5-1 of device 2B bottoms
It is connected with the mud channel 5-1 at the top of the 1B-2 of second segment basis;
9)Starter 2-1-1, device 2-1-1 drive chain knife 3 to be run along the track on basic 1B, and chain knife 3 excavates first paragraph
The ground of basic 1B-1 bottoms, and the ground band that will have been excavated, to top, device 2B-2 is by chain knife 3 from basic 1B-1 bottom belt
The ground for coming is separated with chain knife 3,;
10)Device 2B, first paragraph basis 1B-1 and second segment basis 1B-2 synchronously drop to setting position together;
11)Device 2B is separated with second segment basis 1B-2 and is removed;
Repeat above-mentioned 7)、8)、9)、10), after the connection for completing each section of basis and the position for dropping to setting, extract chain knife 3 out and irrigate
Concrete.
Claims (7)
1. the combination unit being connected with basic top during a kind of construction, it is characterized in that during construction and basis(1)The group of top connection
Attach together and put(2)Including chain knife actuating unit(2-1), spoil disposal device(2-2)And frame(2-3), device(2-1)And dress
Put(2-2)It is installed in frame(2-3)On, device(2-1)And basis(1)And chain knife(3)Composition chain type excavating gear(4), base
Plinth(1)It is chain type excavating gear(4)Frame, during construction basis(1)Bottom be provided with excavate ground chain knife(3), chain knife(3)
Only excavate basis(1)The ground of bottom, chain knife(3)By chain(3-1)Be fixed on chain(3-1)On cutter(3-2)Composition;
During construction, device(2)With basis(1)Top links into an integrated entity, device(2-1)Drive chain knife(3)Along basis(1)On track
Operation, chain knife(3)Excavate basis(1)The ground of bottom, and the ground band that will have been excavated is to top, device(2-2)By chain knife(3)
From basis(1)The ground that bottom is brought up and chain knife(3)Separate, device(2)With basis(1)It is synchronous together to decline.
2. the combination unit being connected with basic top during a kind of construction according to claim 1, it is characterized in that described dress
Put(2-1)By chain driving device for cutter(2-1-1), chain knife tensioning apparatus(2-1-2)And sprocket wheel(2-1-3)Composition.
3. the combination unit being connected with basic top during a kind of construction according to claim 1, it is characterized in that described base
Plinth(1)It is word basis(1A), one word basis during construction(1A)It is provided with excavation basis(1A)The chain type excavating gear of bottom rock-soil
(4A), i.e. device(2A)Frame (2A-3) be provided with a device(2A-1).
4. the combination unit being connected with basic top during a kind of construction according to claim 3, it is characterized in that described base
Plinth is by several words basis(1A)The combination foundation of composition(1B), each word basis(1A)It is equipped with and only excavate respective base
The chain type excavating gear of plinth bottom rock-soil(4A), i.e. device(2B)Frame(2B-3)It is provided with several devices(2A-1).
5. the combination unit being connected with basic top during a kind of construction according to claim 1, it is characterized in that described dress
Put(2)In frame(2-3)Including mud channel device(5), mud channel(5-1)With the swivel of foundation bottom(5-2)
It is connected.
6. the combination unit construction method being connected with basic top during a kind of construction according to claim 1, it is characterized in that institute
The construction method stated point Ru Xia Walk it is rapid:
1)On factory's segmentation or integral prefabricated basis(1);
2)By first paragraph(I.e. bottom section)Basis(1-1)Scene is transported to, chain knife is installed(3);
3)By device(2)In frame(2-3)Bottom and first paragraph basis(1-1)Top be connected, by device(2)Bottom
Chain knife(3)With first paragraph basis(1-1)The chain knife at top(3)It is connected, constitutes chain type excavating gear(4), by device(2)Bottom
Mud channel(5-1)With first paragraph basis (1-1)The mud channel at top(5-1)It is connected;
4)Starter(2-1-1), device(2-1-1)Drive chain knife(3)Along basis(1-1)On track operation, chain knife(3)
Excavate first paragraph basis(1-1)The ground of bottom, and the ground band that will have been excavated is to top, device(2-2)By chain knife(3)From base
Plinth(1-1)The ground that bottom is brought up and chain knife(3)Separate;
5)Device(2)With first paragraph basis(1-1)It is synchronous together to drop to setting position;
6)By device(2)With first paragraph basis(1-1)Removed after separation;
7)By second segment basis(1-2)Bottom and first paragraph basis(1-1)Top be connected, by second segment basis(1-2)Bottom
The chain knife in portion(3)With first paragraph basis(1-1)The chain knife at top(3)It is connected, by second segment basis(1-2)The mud channel of bottom
(5-1)With first paragraph basis(1-1)The mud channel at top(5-1)It is connected;
8)By device(2)In frame(2-3)Bottom and second segment basis(1-2)Top be connected, by device(2)Bottom
Chain knife(3)With second segment basis(1-2)The chain knife at top(3)It is connected, constitutes chain type excavating gear(4);By device(2)Bottom
Mud channel(5-1)With second segment basis(1-2)The mud channel at top(5-1)It is connected;
9)Starter(2-1-1), device(2-1-1)Drive chain knife(3)Along basis(1)On track operation, chain knife(3)Dig
Pick first paragraph basis(1-1)The ground of bottom, and the ground band that will have been excavated is to top, device(2-2)By chain knife(3)From basis
(1-1)The ground that bottom is brought up and chain knife(3)Separate;
10)Device(2), first paragraph basis(1-1)With second segment basis(1-2)It is synchronous together to drop to setting position;
11)By device(2)With second segment basis (1-2)Removed after separation;
Repeat above-mentioned 7)、8)、9)、10), after the connection for completing each section of basis and the position for dropping to setting, extract chain knife out(3)Fill
Note concrete.
7. the combination unit being connected with basic top during a kind of construction according to claim 1, it is characterized in that described dress
Put(2)In frame(2-3)It is basis(1)Construction operation platform.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710162291.8A CN106759421A (en) | 2017-03-17 | 2017-03-17 | The combination unit and its construction method being connected with basic top during a kind of construction |
PCT/CN2018/079250 WO2018166516A1 (en) | 2017-03-17 | 2018-03-16 | Composite device connected with top of foundation during construction and construction method therefor |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710162291.8A CN106759421A (en) | 2017-03-17 | 2017-03-17 | The combination unit and its construction method being connected with basic top during a kind of construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106759421A true CN106759421A (en) | 2017-05-31 |
Family
ID=58967003
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710162291.8A Pending CN106759421A (en) | 2017-03-17 | 2017-03-17 | The combination unit and its construction method being connected with basic top during a kind of construction |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN106759421A (en) |
WO (1) | WO2018166516A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2018166516A1 (en) * | 2017-03-17 | 2018-09-20 | 王燏斌 | Composite device connected with top of foundation during construction and construction method therefor |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH04179726A (en) * | 1990-11-13 | 1992-06-26 | Kazutoshi Isachi | Wall member in simplified underground continuous wall construction method and simplified underground continuous wall construction method using the same |
CN1130704A (en) * | 1995-03-08 | 1996-09-11 | 肖冠英 | Traction shuttle running type hydraulic dredger |
CN103306262A (en) * | 2013-07-10 | 2013-09-18 | 上海隧道工程股份有限公司 | Stirring type excavator bucket device and construction method for improving waste soil |
CN207047879U (en) * | 2017-03-17 | 2018-02-27 | 王燏斌 | The combination unit and its construction method being connected during a kind of construction with basic top |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5985021A (en) * | 1982-11-05 | 1984-05-16 | Kajima Corp | Method and apparatus for construction of underground continuous wall |
JPS62233328A (en) * | 1986-04-01 | 1987-10-13 | Fusao Sakano | Method and apparatus for setting retaining wall by excavator |
JPH07113214B2 (en) * | 1992-04-01 | 1995-12-06 | トーメン建機株式会社 | Excavation device for underground wall and construction method using the device |
CN2823340Y (en) * | 2005-10-31 | 2006-10-04 | 丁国忠 | Weather ditching device |
JP2010101025A (en) * | 2008-10-21 | 2010-05-06 | Honmagumi:Kk | Construction method and construction apparatus for diaphragm wall |
CN106759421A (en) * | 2017-03-17 | 2017-05-31 | 王燏斌 | The combination unit and its construction method being connected with basic top during a kind of construction |
-
2017
- 2017-03-17 CN CN201710162291.8A patent/CN106759421A/en active Pending
-
2018
- 2018-03-16 WO PCT/CN2018/079250 patent/WO2018166516A1/en active Application Filing
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH04179726A (en) * | 1990-11-13 | 1992-06-26 | Kazutoshi Isachi | Wall member in simplified underground continuous wall construction method and simplified underground continuous wall construction method using the same |
CN1130704A (en) * | 1995-03-08 | 1996-09-11 | 肖冠英 | Traction shuttle running type hydraulic dredger |
CN103306262A (en) * | 2013-07-10 | 2013-09-18 | 上海隧道工程股份有限公司 | Stirring type excavator bucket device and construction method for improving waste soil |
CN207047879U (en) * | 2017-03-17 | 2018-02-27 | 王燏斌 | The combination unit and its construction method being connected during a kind of construction with basic top |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2018166516A1 (en) * | 2017-03-17 | 2018-09-20 | 王燏斌 | Composite device connected with top of foundation during construction and construction method therefor |
Also Published As
Publication number | Publication date |
---|---|
WO2018166516A1 (en) | 2018-09-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106677245A (en) | Foundation construction device and construction method thereof | |
CN105075489B (en) | Self-propelled pseudo-ginseng harvester | |
CN201690784U (en) | Self-propelled rootstalk combine | |
CN107059877A (en) | Basis and its construction method of the bottom with chain knife during a kind of construction | |
CN105284267B (en) | A kind of small-sized pseudo-ginseng cropper of Liftable type | |
WO2018166519A1 (en) | Bridge building device and construction method therefor | |
CN207047879U (en) | The combination unit and its construction method being connected during a kind of construction with basic top | |
CN106759421A (en) | The combination unit and its construction method being connected with basic top during a kind of construction | |
CN105780837B (en) | The continuous method for digging and its excavating gear of diaphram wall | |
CN106759464A (en) | A kind of hypogee and its construction method | |
WO2018133711A1 (en) | Pier foundation and construction method therefor | |
CN109183601A (en) | Telescopic intelligent multifunctional inverted arch trestle and the construction method with the trestle | |
WO2018133744A1 (en) | Trench-cutting device for underground construction and working method thereof | |
CN207047928U (en) | A kind of foundation construction device | |
CN106759460A (en) | A kind of constructing device and its construction method for bank basis | |
RU2326244C1 (en) | Thick flat-seam coal mining method by irregular areas with limited resource and weak roof of seam | |
CN106801435A (en) | A kind of deep water foundation and constructing device and its construction method | |
CN106759106A (en) | A kind of constructing device and its construction method for revetment | |
CN104982137A (en) | Single-caterpillar-band pseudo-ginseng combine harvester | |
CN207974146U (en) | A kind of shallow embedding pipe gallery engineering integrative construction device | |
CN106836192A (en) | A kind of assembled subterranean wall and its construction method | |
CN107859030A (en) | A kind of groover and its construction method for subterranean wall construction | |
CN106801430A (en) | A kind of workboat and its construction method for foundation in water | |
CN207228106U (en) | A kind of footing excavation device for casting | |
CN106612925B (en) | Asparagus harvester |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 214000 No. 226, Xi Da Road, Mei Cun town, Xin Wu District, Wuxi, Jiangsu Applicant after: Wang Yubin Address before: 214000 Xinhua Road 121, Meishan Town, Wuxi New District, Jiangsu Applicant before: Wang Yubin |
|
CB02 | Change of applicant information | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20170531 |
|
WD01 | Invention patent application deemed withdrawn after publication |