CN106677529A - Structure and construction method of reserved hole PVC sleeve mould - Google Patents

Structure and construction method of reserved hole PVC sleeve mould Download PDF

Info

Publication number
CN106677529A
CN106677529A CN201611185194.2A CN201611185194A CN106677529A CN 106677529 A CN106677529 A CN 106677529A CN 201611185194 A CN201611185194 A CN 201611185194A CN 106677529 A CN106677529 A CN 106677529A
Authority
CN
China
Prior art keywords
pvc
hole
cover plate
pvc sleeve
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611185194.2A
Other languages
Chinese (zh)
Inventor
郭建力
梁小南
高爱辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Shougang Construction Group Co Ltd
Original Assignee
Beijing Shougang Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Shougang Construction Group Co Ltd filed Critical Beijing Shougang Construction Group Co Ltd
Priority to CN201611185194.2A priority Critical patent/CN106677529A/en
Publication of CN106677529A publication Critical patent/CN106677529A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G15/00Forms or shutterings for making openings, cavities, slits, or channels
    • E04G15/04Cores for anchor holes or the like around anchors embedded in the concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses a structure and construction method of a reserved hole PVC sleeve mould and belongs to the technical field of building construction and prefabricated building construction. The structure comprises a double-layer PVC sleeve, a sealing wood cover plate and a footing fixing screw piece. The construction method comprises the steps that an axial notch is formed in the PVC sleeve; the footing fixing screw piece is provided, the mould sealing wood cover plate is provided, and a hole is punched in the center of the sealing wood cover plate; a reserved hole area is positioned on a floor bottom mould plate; the two ends of footing flat iron are fixed to a wood mould plate through self-tapping screws; the double-layer PVC sleeve mould is mounted, and a screw of the sealing wood cover plate penetrates out of the central circular hole of the cover plate, and is fixed to the PVC sleeve mould by mounting a gasket and fastening a nut; after final setting of concrete, the nut, the gasket, the cover plate and the footing fixing piece are dismounted through tools such as a straight screw driver and a spanner; and the straight screw driver is inserted downward to loosen the PVC sleeve mould from the axial notch of the PVC sleeve and the PVC sleeve mould is taken out. The structure and construction method have the advantages that material obtaining for the PVC sleeve is convenient, repeated recycling is achieved, construction cost is saved, energy consumption is reduced, dismounting is quick and convenient, the construction process is accelerated, the construction quality is guaranteed, and construction cost is reduced.

Description

A kind of hole to be provided PVC ferrule molds construction and construction method
Technical field
The invention belongs to construction, assembled architecture technical field of construction, more particularly to a kind of hole to be provided PVC sleeve pipes Mold structure and construction method, it is adaptable to kitchen, a kind of hole to be provided PVC ferrule molds construction of toilet, cast in place concrete plate and Construction method.
Background technology
With the lifting of building construction technology, green assembled arthitecutral structure is greatly developed in kitchen, the cast-in-place building of toilet In plate work progress, when plumbing pipe reserved opening needs the hole of reserved 50mm to 250mm on concrete cast-in-place slab.Generally The hole to be reserved with iron pipe or template assembly, pre-buried hole iron wire suitable for reading is fixed with reinforcing bar, template, pre- after concrete final set Box out built-in pipe or template assembly remove difficult, and it is uneconomical applicable that destructible loosens surface concrete.Reserve after concrete construction Typically there is dimensional discrepancy at hole, needs the secondary chisel that picks to repair, and affects construction presentation quality, expense of taking a lot of work to expect uneconomical environmental protection.
The content of the invention
It is an object of the invention to provide a kind of hole to be provided PVC ferrule molds construction and construction method, solve existing pre- Above-mentioned assembly and disassembly in box out construction are except difficulty, and it is uneconomical applicable that destructible loosens surface concrete.Hole to be provided after concrete construction Mouthful typically have dimensional discrepancy, need the secondary chisel that picks to repair, affect construction presentation quality, expense of taking a lot of work expect uneconomical environmentally friendly defect and Deficiency, the present invention adopts the construction method of bilayer PVC ferrule molds, and processing and fabricating is easy, input cost is relatively low and uses operation Simplicity, can effectively solve the problem that cast-in-situ floor hole to be provided dimensional discrepancy, the technical problem of the bad dismounting of concrete final set rear sleeve.
The present invention, according to the reserved caliber size of construction drawing, determines PVC ferrule molds on cast in place concrete plate end template The physical dimension of caliber;Make the corresponding caliber of pre-buried PVC ferrule molds;Line setting is reserved on concrete slab end template The centrage of hole area size, PVC ferrule molds fixation footing screw rod part is fixed in band iron two ends thread tapping and plank sheathing; Seal closure overwood die cap plate after double-deck hole reservation mould is installed, footing fixture screw mandrel is passed from the circular hole of wooden cover plate, installs pad Piece tightens nut fastening;Casting concrete, lower nut, pad are first unloaded after concrete final set with instruments such as slotted point screwdriver, spanners Piece, wooden cover plate, footing fixture, afterwards with slotted point screwdriver from PVC sleeve pipe axially opens under insert and loosen pre-buried PVC sleeve pipes Mould, will promote out in its mould rotation.Construction technical schemes comprise the steps:
(1) PVC sleeve pipes axial cut-outs;
(2) wooden cover plate is sealed;
(3) footing standing screw part;
(4) hole to be provided zone location on concrete slab end template;
(5) footing standing screw part is fixed with concrete slab end template;
(6) bilayer PVC ferrule molds;
(7) seal wooden cover plate screws to pass from wooden cover plate center hole, installs that pad tightens nut and PVC sleeve pipes are fastened.
(8) concrete construction;
(9) PVC ferrule molds are removed after concrete final set.
In step (1), making is correspondingly arranged corresponding PVC sleeves with the hole to be provided caliber, including:Pair of lamina is provided PVC sleeve pipes, the caliber of described sleeve pipe is equal to the caliber of hole to be provided, after determining sleeve pipe caliber, in the PVC sleeve pipes axially cutting Logical joint-cutting, in the axial width of slit 10mm of a PVC sleeve pipes, in the axial width of slit of the 2nd PVC sleeve pipes 20mm, so that the PVC sleeve pipes joint-cutting is easy to the fast and easy after concrete final set to remove PVC ferrule molds;Described first Sleeve pipe and the second sleeve-assembled bilayer PVC ferrule molds, it is arranged in a crossed manner with the double-deck PVC sleeve pipes axial direction joint-cutting.
In step (2), there is provided the making of the sealing wooden cover plate, the size of the wooden cover plate covers corresponding to the PVC The diameter of pipe is arranged so that the wooden cover plate covers the opening of described sleeve pipe, and the wooden cover plate central opens circular hole.
It is described that the footing standing screw part is provided in step (3), including:The drilling of one band iron two ends is provided, it is described flat Thread tapping is installed at ferrum two ends, and the length of the harness cord screw rod is more than the length of the PVC sleeves, there is provided a setting-up piece and spiral shell Mother, adapts to the harness cord screw rod, in order to PVC sleeve pipes and the cover plate of locking in the setting-up piece and nut.
In step (4), will be according to construction drawing hole to be provided size dimension, in the described pre- of the concrete slab end template Box out zone location.
It is described to fix footing screw rod part in band iron two ends thread tapping in step (5), it is fixed on concrete slab end template On.
In step (6), the footing standing screw part is by the hole to be provided on double-deck PVC sleeve pipes and concrete slab end template Region is corresponding.
In step (7), the footing standing screw alignment wooden cover plate center drilling is buckled on the opening of PVC sleeve pipes, so Afterwards screw rod will be screwed on the pad and nut band under clockwise direction, until PVC sets are screwed into fastening with tube cover plate.
In step (8), the concrete pouring construction.
In step (9), PVC ferrule molds are removed after the concrete final set, unloaded with slotted point screwdriver, Wrench Lower nut, pad, cover plate, footing fixture, are inserted under the incision of PVC sleeve pipes axial direction with slotted point screwdriver and loosen PVC sleeve pipes Mould takes out.
The present invention provides a kind of hole to be provided PVC ferrule molds construction and construction method, by PVC mould footing standing screw parts After the double-deck PVC sleeve pipes and the cover plate, tighten nut and be connected and fixed on concrete slab end template.Mold height ratio Cast-in-place plate surface is higher by 50mm, so as to effectively prevent the concrete sleeve pipe for pouring.PVC ferrule molds make structure and apply Work method is popular easy to learn, and constructing operation is simple, ensure that hole to be provided position and dimension of opening are not accurately shifted.
The PVC ferrule molds are drawn materials and facilitate handy, repeatable to be used in turn saving construction cost reducing energy consumption, PVC sleeve pipes Each ingredient installing/dismounting of mould is efficient and convenient, accelerates construction speed and ensure that construction quality, saves Project Cost.
The present invention is by job site practical application reasonable in design, processing and fabricating and practical easy to operate and construction party Method is simple, and presentation quality effect is good, and the constructing operation that the existing reserved cavity construction method of energy effectively solving is present is inconvenient, material wave Expense can not be reused, and hole to be provided construction quality is difficult the problems such as ensureing.
Below by drawings and Examples, the technology and construction method of the present invention are described in further detail.
Description of the drawings
Below in conjunction with the accompanying drawings the present invention will be further described with embodiment.
Fig. 1 is hole to be provided PVC ferrule molds structure middle sleeve axial cut-outs schematic diagram of the present invention;
Fig. 2 is inner sleeve axial cut-outs schematic diagram in hole to be provided PVC ferrule mold structures of the present invention;
Fig. 3 is bilayer sleeve assembling schematic diagram in hole to be provided PVC ferrule mold structures of the present invention;
Fig. 4 is that wooden cover plate and perforate schematic diagram are sealed in hole to be provided PVC ferrule mold structures of the present invention;
Fig. 5 is footing standing screw part schematic diagram in hole to be provided PVC ferrule mold structures of the present invention;
Fig. 6 is the fixed footing spiral shell rod schematic representation of assembling in hole to be provided PVC ferrule mold structures of the present invention;
Fig. 7 is that bilayer PVC sleeve pipe schematic diagrams are assembled in hole to be provided PVC ferrule mold structures of the present invention;
Fig. 8 is the wooden cover plate schematic diagram of assembling sealing in hole to be provided PVC ferrule mold structures of the present invention.
Fig. 9 is that PVC sleeve pipe overall structure diagrams are assembled in hole to be provided PVC ferrule mold structures of the present invention.
In figure:Sleeve pipe axial cut-outs -1;Inner sleeve axial cut-outs -2;Bilayer sleeve assembling -3;Sealing wooden cover plate and perforate- 4;Footing standing screw -5;The fixed footing screw rod -6 of assembling;) assembling bilayer PVC sleeve pipes -7;Assembling sealing wooden cover plate -8;Assembling PVC sleeves overall structure -9.
Specific embodiment
Structure of the invention is understood and applies example and is illustrated, illustrated below in conjunction with drawings and Examples.
In embodiment as shown in Figure 1, Figure 2, Figure 3 shows.
A, the caliber of described sleeve pipe is equal to the caliber of hole to be provided, axially cutting in the PVC sleeve pipes after determining sleeve pipe caliber One logical joint-cutting, in the axial width of slit 10mm of a PVC sleeve pipes, a PVC sleeve pipe height 200mm in embodiment, The axial width of slit 20mm of the 2nd PVC sleeve pipes, the 2nd PVC sleeve pipe height 230mm in embodiment, in the first sleeve With the second sleeve-assembled bilayer PVC ferrule molds, it is arranged in a crossed manner with double-deck PVC sleeve pipes axial direction joint-cutting.
In embodiment as shown in Figure 4.
B, the wooden cover plate length is 200mm, and width is 200mm, and the wooden cover plate central opens φ 18mm circular holes.
As shown in Figure 5 in embodiment.
C, the band iron length is 150mm, and width is 40mm, and thickness is 5mm, and φ 4mm circular holes, two ends peace are opened in band iron two ends Dress φ 2.5mm thread tappings, the harness cord screw diameter φ 14mm, spiro rod length 280mm, there is provided a corresponding setting-up piece and spiral shell It is female.
With reference to shown in Fig. 1 to Fig. 9, the invention provides a kind of construction method of hole to be provided PVC ferrule molds in floor, Comprise the steps:
Step one, according to construction drawing the mould caliber corresponding with the hole to be provided size is made, using toothless saw, the One cuts PVC sleeve pipes are axially logical, and the 2nd PVC sleeve pipes are axially logical to cut a joint-cutting, for assembling bilayer PVC ferrule molds, using PVC The Material Strength and deformable flexible of sleeve pipe, adds axial cut-outs, is easy to mould installion convenient disassembly.
Step 2, there is provided a set of pipe mold wooden cover plate, using normal wood template construct, wooden cover plate size correspondence ferrule mold Caliber width goes out 25mm so that wooden cover plate can cover ferrule mold caliber mouth, wooden cover plate and wherein circular hole is opened in heart position.
Step 3, there is provided the T-shaped footing fixture of a welding production, there is provided one with the band steel of sleeve die caliber equal length, Circular hole is beaten at band steel two ends, there is provided a harness cord screw rod, harness cord spiro rod length is greater than the length of sleeve die, the center of band iron length T-shaped footing fixture is welded into harness cord screw rod, there is provided a self threading pin 2, there is provided one, a pad, one, nut, harness cord spiral shell Bar fastening sleeve mould and wooden cover plate.
Step 4, there is provided cast in place concrete plate end template, according to construction drawing physical dimension in described concrete floor Line setting hole to be provided regional center point in template, determines the pipe diameter size size of hole to be provided.
Step 5, in the present embodiment, PVC ferrule molds assemble each part, first according to the position size of hole to be provided caliber Size, footing fixture is fixed on concrete slab end template in band iron two ends thread tapping, installs PVC ferrule molds, Wooden cover plate, pad, nut are penetrated on harness cord screw rod successively, then by the nut screwing clamping and dies plate tap one.
Step 6, the construction of casting concrete plate.
Step 7, carries out PVC ferrule mold dismountings after concrete final set, including:Dismounting nut, pad, remove wooden cover plate, Thread tapping, footing fixture on dismounting fixture, is then inserted under the incision of PVC sleeve pipes axial direction with slotted point screwdriver and is loosened Pre-buried PVC ferrule molds, will promote out on its mould.
A kind of hole to be provided PVC ferrule molds construction and construction method that the present invention is provided, are had using the material of PVC sleeve pipes There is certain intensity and elastic characteristic, using fixed footing screw rod part fixing PVC sleeve, 50mm to 250mm can be met in construction Hole to be provided construction.The repeatable utilization of hole reservation mould is realized, in an axially cutting joint-cutting of PVC sleeves, is easy to concrete Remove after final set efficient and convenient.
The present invention has been described in detail above in association with accompanying drawing embodiment, it is every substantially right according to the technology of the present invention method Any modification change is made in above example, the protection domain of the technology of the present invention method is belonged to.

Claims (10)

1. a kind of hole to be provided PVC ferrule molds construction and construction method, including double-deck PVC sleeve pipes, sealing wooden cover plate, fixed footing Screw rod part, it is characterised in that:Comprise the steps:
(1) PVC sleeve pipes axial cut-outs;
(2) wooden cover plate is sealed;
(3) footing standing screw part;
(4) hole to be provided zone location on concrete slab end template;
(5) footing standing screw part is fixed with concrete slab end template;
(6) bilayer PVC ferrule molds;
(7) seal wooden cover plate screws to pass from wooden cover plate center hole, installs that pad tightens nut and PVC sleeve pipes are fastened.
(8) concrete construction;
(9) PVC ferrule molds are removed after concrete final set.
2. hole to be provided PVC ferrule molds according to claim 1 are constructed and construction method, it is characterised in that:In step (1) In, making is correspondingly arranged corresponding PVC sleeves with the hole to be provided caliber, including:Pair of lamina PVC sleeve pipes, described sleeve pipe are provided Caliber be equal to the caliber of hole to be provided, after determining sleeve pipe caliber, in the axially cutting logical joint-cutting of the PVC sleeve pipes, described the The axial width of slit 10mm of one PVC sleeve pipes, in the axial width of slit 20mm of the 2nd PVC sleeve pipes, for PVC sets Pipe joint-cutting is easy to the fast and easy after concrete final set to remove PVC ferrule molds;In the first sleeve and the second sleeve-assembled Double-deck PVC ferrule molds, it is arranged in a crossed manner with the double-deck PVC sleeve pipes axial direction joint-cutting.
3. hole to be provided PVC ferrule molds according to claim 1 are constructed and construction method, it is characterised in that in step (2) In, there is provided the making of the sealing wooden cover plate, the size of the wooden cover plate is arranged corresponding to the diameter of the PVC sleeve pipes so that The wooden cover plate covers the opening of described sleeve pipe, and the wooden cover plate central opens circular hole.
4. hole to be provided PVC ferrule molds according to claim 1 are constructed and construction method, it is characterised in that in step (3) In, it is described that the footing standing screw part is provided, including:Band iron two ends drilling is provided, thread tapping is installed at the band iron two ends, Length of the length of the harness cord screw rod more than the PVC sleeves a, there is provided setting-up piece and nut, in the setting-up piece and Nut adapts to the harness cord screw rod, in order to PVC sleeve pipes and the cover plate of locking.
5. hole to be provided PVC ferrule molds according to claim 1 are constructed and construction method, it is characterised in that in step (4) In, will be according to construction drawing hole to be provided size dimension, in the hole to be provided zone location of the concrete slab end template.
6. hole to be provided PVC ferrule molds according to claim 1 are constructed and construction method, it is characterised in that in step (5) In, it is described to fix footing screw rod part in band iron two ends thread tapping, it is fixed on concrete slab end template.
7. the construction method of hole to be provided PVC ferrule molds according to claim 6, it is characterised in that in step (6), The footing standing screw part is corresponding with the hole to be provided region on concrete slab end template by double-deck PVC sleeve pipes.
8. hole to be provided PVC ferrule molds according to claim 1 are constructed and construction method, it is characterised in that in step (7) In, footing standing screw alignment wooden cover plate center drilling is buckled on the opening of PVC sleeve pipes, then screw rod by the pad and Screw under clockwise direction on nut band, until PVC sets are screwed into fastening with tube cover plate.
9. hole to be provided PVC ferrule molds according to claim 1 are constructed and construction method, it is characterised in that in step (8) In, the concrete pouring construction.
10. hole to be provided PVC ferrule molds according to claim 1 are constructed and construction method, it is characterised in that in step (9) in, PVC ferrule molds are removed after the concrete final set, with slotted point screwdriver, Wrench lower nut, pad, lid is unloaded Plate, footing fixture, are inserted under the incision of PVC sleeve pipes axial direction with slotted point screwdriver and loosen the taking-up of PVC ferrule molds.
CN201611185194.2A 2016-12-20 2016-12-20 Structure and construction method of reserved hole PVC sleeve mould Pending CN106677529A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611185194.2A CN106677529A (en) 2016-12-20 2016-12-20 Structure and construction method of reserved hole PVC sleeve mould

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611185194.2A CN106677529A (en) 2016-12-20 2016-12-20 Structure and construction method of reserved hole PVC sleeve mould

Publications (1)

Publication Number Publication Date
CN106677529A true CN106677529A (en) 2017-05-17

Family

ID=58869922

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611185194.2A Pending CN106677529A (en) 2016-12-20 2016-12-20 Structure and construction method of reserved hole PVC sleeve mould

Country Status (1)

Country Link
CN (1) CN106677529A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113445677A (en) * 2021-07-07 2021-09-28 中建八局第四建设有限公司 Shaping construction method for concrete at root of shaped roof ventilating cap
CN114704085A (en) * 2022-04-29 2022-07-05 山西三建集团有限公司 Construction method of through pipe reserved hole on cast-in-place concrete floor plate
CN115075554A (en) * 2022-07-21 2022-09-20 中国十七冶集团有限公司 Combined floor slab opening reservation device and use method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2849423B1 (en) * 1978-11-14 1980-05-14 Mikado Eng Anchoring device to be embedded in concrete
CN204435869U (en) * 2015-02-15 2015-07-01 中城建第十三工程局有限公司 The outspoken form removal system of floor slab preformed hole
CN204703509U (en) * 2015-06-04 2015-10-14 中国新兴建设开发总公司 A kind of portable sleeve pipe of self-retaining
CN105781104A (en) * 2016-05-04 2016-07-20 北京住总第三开发建设有限公司 Top plate reserved hole construction form and construction method thereof
CN205654089U (en) * 2016-05-20 2016-10-19 甘肃第四建设集团有限责任公司 Pipeline is worn floor and is reserved hole positioner

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2849423B1 (en) * 1978-11-14 1980-05-14 Mikado Eng Anchoring device to be embedded in concrete
CN204435869U (en) * 2015-02-15 2015-07-01 中城建第十三工程局有限公司 The outspoken form removal system of floor slab preformed hole
CN204703509U (en) * 2015-06-04 2015-10-14 中国新兴建设开发总公司 A kind of portable sleeve pipe of self-retaining
CN105781104A (en) * 2016-05-04 2016-07-20 北京住总第三开发建设有限公司 Top plate reserved hole construction form and construction method thereof
CN205654089U (en) * 2016-05-20 2016-10-19 甘肃第四建设集团有限责任公司 Pipeline is worn floor and is reserved hole positioner

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113445677A (en) * 2021-07-07 2021-09-28 中建八局第四建设有限公司 Shaping construction method for concrete at root of shaped roof ventilating cap
CN114704085A (en) * 2022-04-29 2022-07-05 山西三建集团有限公司 Construction method of through pipe reserved hole on cast-in-place concrete floor plate
CN115075554A (en) * 2022-07-21 2022-09-20 中国十七冶集团有限公司 Combined floor slab opening reservation device and use method

Similar Documents

Publication Publication Date Title
CN106677529A (en) Structure and construction method of reserved hole PVC sleeve mould
CN208702140U (en) A kind of shear wall joint part formwork reinforcement structure
CN102296812A (en) Building template molding structure, fastening piece and building template construction method
CN107762139A (en) Cast-in-place concrete haunch wall aluminium alloy chamfering formwork supporting adn fixing device and method
CN107237493A (en) Quickly remove formula and reserve device in concrete floor hole
CN101545319B (en) Split bolt for concrete template and using method of same
CN208884988U (en) A kind of fixed device of wall pouring mould and wall pouring mould
CN112576031A (en) Reusable reserved hole reservation device and construction method
CN205875736U (en) Sectional type shear force wall is to drawing sealing screw
CN213868925U (en) A design mould that is used for cast-in-place floor pipeline to reserve entrance to a cave
CN101832025B (en) Sealing up screw
CN211007665U (en) Repeatedly usable's roof reserves entrance to a cave mould
CN107268978B (en) The fixed device of towering structure constructor's row ladder sustaining wall and construction method
CN207004018U (en) Quickly remove formula and reserve device in concrete floor hole
CN106948599A (en) A kind of split bolt and its application method
CN100485151C (en) Water stop screw rod
CN208329188U (en) A kind of elimination construction error wall lacing wire component
CN203097290U (en) Assembled type split bolt
CN213626680U (en) Water stop pull rod structure for subway construction
CN109958281A (en) Reinforcing device for building construction and application
JP3112704U (en) Sleeve reinforcement bracket
CN206942120U (en) A kind of pre-embedded device of builder's jack
CN201162352Y (en) Water stop screw
CN114753630A (en) Cast-in-place side formwork reinforcing structure and method for top of prefabricated outer wall
CN201714093U (en) Turn-around tie bolt used in construction of concrete wall form

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170517

WD01 Invention patent application deemed withdrawn after publication