CN106658531A - Method for acquiring 4G communication base station construction engineering parameters - Google Patents

Method for acquiring 4G communication base station construction engineering parameters Download PDF

Info

Publication number
CN106658531A
CN106658531A CN201610884262.8A CN201610884262A CN106658531A CN 106658531 A CN106658531 A CN 106658531A CN 201610884262 A CN201610884262 A CN 201610884262A CN 106658531 A CN106658531 A CN 106658531A
Authority
CN
China
Prior art keywords
base station
unmanned plane
work ginseng
antenna
ginseng
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610884262.8A
Other languages
Chinese (zh)
Other versions
CN106658531B (en
Inventor
王保银
莫冲
钟兆雄
曾志
林琳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGDONG SOUTHERN TELECOM PLANNING CONSULTING AND DESIGN INSTITUTE Co Ltd
Original Assignee
GUANGDONG SOUTHERN TELECOM PLANNING CONSULTING AND DESIGN INSTITUTE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGDONG SOUTHERN TELECOM PLANNING CONSULTING AND DESIGN INSTITUTE Co Ltd filed Critical GUANGDONG SOUTHERN TELECOM PLANNING CONSULTING AND DESIGN INSTITUTE Co Ltd
Priority to CN201610884262.8A priority Critical patent/CN106658531B/en
Publication of CN106658531A publication Critical patent/CN106658531A/en
Application granted granted Critical
Publication of CN106658531B publication Critical patent/CN106658531B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W16/00Network planning, e.g. coverage or traffic planning tools; Network deployment, e.g. resource partitioning or cells structures
    • H04W16/18Network planning tools

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The invention discloses a method for acquiring 4G communication base station construction engineering parameters. Base station latitude and longitude engineering parameters are determined through multi-position test flight of an unmanned aerial vehicle and comparison and selection of the construction conditions and the coverage effects on the spot; and the base station antenna hanging height h, the base station direction angle theta and the antenna downward inclination angle alpha are selected through the geometrical relationship of the sight distance center and the coverage edge of the unmanned aerial vehicle. Base station information acquisition is performed through the unmanned aerial vehicle by aiming at the exact requirements of the 4G network structure, and the most appropriate engineering parameter combinations meeting the network structure are calculated so that the data are accurate, the consistency of construction and the expected effect can be realized, the network quality can be guaranteed and the construction efficiency of the 4G base station can be enhanced.

Description

A kind of method that acquisition 4G communication base stations build work ginseng
[technical field]
The present invention relates to communication base station construction, more particularly to a kind of method that acquisition 4G communication base stations build work ginseng.
[background technology]
The 4G user of current three big operator has broken through 700,000,000,4G base stations scale and has reached 1,600,000, and with 4G business Constantly promote, it is contemplated that will completely replace existing 2G/3G networks in the year two thousand twenty 4G networks, and become the main carrying of voice-and-data Net, base station scale reaches 5,000,000.In recent years, application of the unmanned plane in industry, agricultural, national defence, brings considerable benefit.
4G overall performance of network is most important to the sensation influence of client, and the interference of 4G networks is essentially from adjacent with frequency Area, so 4G networkings are put forward higher requirement to work ginseng accuracy.The construction of 4G base stations must be with the environment phase of periphery Match, and the existing base station of periphery blends matching.
Tradition obtains the method for 4G base station constructions work ginseng and mainly carries out estimating row by map and engineering experience, to periphery Stop and accurately all cannot specifically consider, therefore Jing is often unable to reach target after the completion of construction.
[content of the invention]
The technical problem to be solved in the present invention is to provide that a kind of data are accurate, exploitativeness is good, efficiency high, can realize building If the method that the acquisition 4G communication base station consistent with Expected Results builds work ginseng.
In order to solve above-mentioned technical problem, the technical solution used in the present invention is that one kind obtains 4G communication base stations and builds work The method of ginseng, is taken a flight test by unmanned plane multiposition, on the spot than selecting construction condition and coverage effect, determines that latitude and longitude of base station work is joined; By the way that unmanned aerial vehicle vision is away from center and covers the geometrical relationship at edge come under the high h of selection of base stations antenna extension, base station deflection θ and antenna Inclination alpha.
The method that above-described acquisition 4G communication base stations build work ginseng, latitude and longitude of base station work joins prioritizing selection apart from road Distance it is less, be accessible to, and unmanned plane joins the less position of flying height H surely, wherein unmanned plane is joined flying height H and is surely In unmanned plane position, unobstructed minimum flying height in the visual field of unmanned plane to coverage goal is made.
The method that above-described acquisition 4G communication base stations build work ginseng, unmanned plane is joined flying height H and is taken the photograph for unmanned plane surely Unmanned plane during flying height during coincident is covered with base station as the center line of the panorama sketch of device.
The method that above-described acquisition 4G communication base stations build work ginseng, described panorama sketch is unmanned plane camera head mirror During 30 ° or 60 ° of head angle of depression β values, from horizontal direction from 0 ° of north orientation, clap 12 with 30 ° of spacer rings and close to figure and the figure that takes a crane shot downwards Into picture.
The method that above-described acquisition 4G communication base stations build work ginseng, unmanned plane joins flying height H more than base station day surely Line hangs high h, and in h height, base station covers edge without continuous stop to unmanned plane in fringe field of view.
The method that above-described acquisition 4G communication base stations build work ginseng, base station deflection θ is by base station coverage goal and base Relative position of standing determination, at least one;Each base station deflection θ one group of work ginseng of correspondence, described one group of work ginseng includes unmanned plane Surely join flying height H, antenna for base station and hang high h and Downtilt α.
The method that above-described acquisition 4G communication base stations build work ginseng, in described one group of work ginseng, meets H × ctg (β)=h × ctg (α);For the base station for possessing multiple base station deflection coverage directions, antenna for base station hangs high h and takes each base station direction The corresponding antenna for base station in angle hangs the maximum of senior middle school.
The method that above-described acquisition 4G communication base stations build work ginseng, newly-built base station is first with worst base station direction Angle θ, joins flying height H, the order of the high h and Downtilt α of antenna for base station extension and determines first group of work ginseng surely according to unmanned plane;So Afterwards fixed base stations antenna hangs high h, with secondary severe base station deflection θ, determines next group of work ginseng.
The method that above-described acquisition 4G communication base stations build work ginseng, the antenna of the base station of co-located existing shaft tower hangs high h For constant, first with worst base station deflection θ, the order for joining flying height H and Downtilt α surely according to unmanned plane is true Fixed first group of work ginseng;Then with secondary severe base station deflection θ, next group of work ginseng is determined.
The method that above-described acquisition 4G communication base stations build work ginseng, when work ginseng in existing network adjacent area is optimized and revised, it is ensured that this The panorama sketch center line that area's unmanned plane is joined under flying height H1 surely is joined in the panorama sketch under flying height H2 surely with adjacent area unmanned plane Heart line is tangent, then determines that the antenna for base station of local area hangs high h1 and Downtilt α 1 successively, the antenna for base station of adjacent area hang high h2 and Downtilt α 2.
The present invention obtains exact requirements of the method for 4G network structures that 4G communication base stations build work ginseng, by unmanned plane Carry out base station information acquiring, calculate and meet the ginseng combination of network structure most suitable work, data are accurate, can realize building with it is pre- Phase effect is consistent, it is ensured that network quality, improves the construction efficiency of 4G base stations.
[description of the drawings]
With reference to the accompanying drawings and detailed description the present invention is further detailed explanation.
Fig. 1 is the schematic diagram that embodiment of the present invention unmanned plane joins longitude and latitude in 4G base station selections work.
Fig. 2 is the schematic diagram that the embodiment of the present invention determines unmanned plane assisting in flying height parameter and base station coverage direction.
Fig. 3 is that the embodiment of the present invention determines that 4G antenna for base station hangs the schematic diagram of high and angle of declination work ginseng.
Fig. 4 is the schematic diagram of embodiment of the present invention 4G base station adjacent area work ginseng optimization.
[specific embodiment]
4G base station constructions work ginseng (engineering parameter) includes latitude and longitude of base station (Lng, Lat), and the antenna of base station hangs high h, base station Deflection θ and Downtilt α, totally 4.
4 works ginseng can all variables also may specify wherein several constants.Antenna for base station hangs the scope of high h, 3 meters of < h 100 meters of <;The scope of base station deflection θ is, 360 ° of 0 °≤θ <;The scope of cell angle of declination α is, 30 ° of 0 °≤α <;Unmanned plane Surveying height H is, 100 meters of 500 meters of < H <;Unmanned plane camera lens angle of depression β, 30 ° or 60 ° of value;Panorama sketch Pic is unmanned plane 0 ° of horizontal direction north orientation plays 30 ° of spacer rings and claps 12 to figure plus 90 ° of panorama sketch taken a crane shot synthesized by figure during the β of the camera lens angle of depression.
The present invention is taken a flight test by unmanned plane multiposition, on the spot than selecting construction condition and coverage effect, determines latitude and longitude of base station (Lng, Lat) work is joined, by the way that unmanned aerial vehicle vision is away from center and covers the geometrical relationship at edge come selected meet particular kind of relationship one group Or multigroup antenna for base station hangs high h, base station deflection θ and Downtilt α.
Wherein, for latitude and longitude of base station (Lng, Lat), on the premise of legal conjunction rule, prioritizing selection road is accessible to, And unmanned plane joins the less position of flying height H surely.Wherein, unmanned plane is joined flying height H and is surely, in position, unmanned plane The unobstructed minimum flying height in the visual field, meanwhile, unmanned plane joins the center line that flying height H is so that the panorama sketch of acquisition surely With the unmanned plane during flying height that base station covers coincident.
The unobstructed farsighted coverage goal i.e. in the screen of unmanned plane in the above-mentioned unmanned plane visual field, not by centre Trees or building are blocked;Or camera function is used, there is the coverage goal of distant place on photo, rather than tree nearby can only be photographed Wood and building.
Wherein, the realization of panorama sketch center line has two methods:
1st, in optical center black, either pastel level draws a line (or replacing above being attached to color stripes), The part that black line so in the screen display of unmanned plane is covered is exactly the position of center line.
2nd, to ring bat figure in photoshop with scale movement come corresponding horizontal line behind seizure center.
Base station covers and is determined that before edge construction base station, and base station farthest covers the position that (service) is arrived;Unmanned plane rises After flying, adjustment height can cause the center line for marking and coverage goal to overlap.
Wherein, the relation for determining ginseng flying height H h high with the antenna of base station extension of unmanned plane is need to meet H >=h, and nobody Machine covering edge in base station in height h fringe field of view is unobstructed or stops without continuous.
Unmanned plane base station in height h fringe field of view covers and can see at a distance in the unobstructed screen for referring to unmanned plane in edge Coverage goal, rather than blocked by middle trees or building;Or camera function is used, there is the covering mesh of distant place on photo Mark, rather than trees nearby and building can only be discharged to.Farsighted coverage goal is exhausted big in the screen of unmanned plane Partly when (more than 80%), it is believed that unmanned plane base station in height h fringe field of view covers edge without continuous stop, When without preferably selecting, using unmanned plane, base station covers edge without continuous stop in height h fringe field of view for this.
Wherein, deflection θ determines by base station coverage goal and base station relative position, can be one or more, typically Less than 4, each deflection θ one group of work of correspondence joins (H, h, α).
Wherein, the cell work ginseng h and α of correspondence direction angle θ, need to meet the requirement of H × ctg (β)=h × ctg (α).
Newly-built base station parameter determines that determine the worst directions of θ 1 of condition according to preferential, with θ 1, H1, the order of h, α 1 is true Fixed first group of work ginseng;Then h is fixed, to the secondary directions of severe θ 2, with θ 2, H2, the order of α 2 determines second group of work ginseng, with such Push away.
Inclement condition refers to the number of obstacle and the height of obstacle between coverage goal and base station to distinguish, base station Position be more difficult to be immediately seen coverage goal it is more severe.
The base station parameter determination process of co-located existing shaft tower is that preferential to determine the worst directions of θ 1 of condition, h is constant, According to θ 1, H1, the orders of α 1 determine first group of work ginseng;It is then determined that the work ginseng in the secondary directions of severe θ 2, according to θ 2, H2, the orders of α 2 are really Fixed second group of work ginseng;, by that analogy.
Wherein, work ginseng in existing network adjacent area is optimized and revised, the deflection cells of this cell θ 1 and adjacent area θ 2 deflection cells should First ensure that panorama Pic1 center line of the unmanned plane at H1 is tangent with the Pic2 center lines at neighbor base station H2, then determine successively h1,α1,h2,α2。
In order that the objects, technical solutions and advantages of the present invention become more apparent, it is right below in conjunction with drawings and Examples The present invention is further elaborated.It should be appreciated that specific embodiment described herein is only to explain the present invention, and It is not used in the restriction present invention.
Following examples of the present invention propose a kind of method that utilization unmanned plane obtains 4G base station constructions work ginseng, mainly include Following aspect:The participation in the election of latitude and longitude of base station (Lng, Lat) work is fixed, unmanned plane joins height H surely and base station deflection θ is selected, base station day Line hangs the determination that high h and angle of declination α determines, Neighborhood Optimization work is joined.Describe in detail respectively below in conjunction with the accompanying drawings.
(1) participation in the election of latitude and longitude of base station work is fixed:
On the premise of laws and regulations are allowed, the position (longitude and latitude work ginseng) of base station should consider difficulty of construction, net The factors such as network covering quality, construction costs, preferred easy construction covers perfect, the rational position of cost.
As shown in figure 1, carrying out addressing on same seat mountain, position one is S1 apart from the distance of road, and position two is apart from road Distance is S2, S1<S2;In addition, when reaching edge all standing, flying height of the unmanned plane 1 in position one is H1, unmanned plane 2 exists Position and flying height be H2.If S1<S2, and H1<H2, then optimum position one is base station location, is obtained at position one Longitude and latitude (Lng, Lat), take determine base station longitude and latitude work ginseng.
Above-mentioned edge is the farthest coverage goal in the base station having determined before base station construction, can be certain building or Certain section etc..
The multiple positions of unmanned plane during flying can be utilized in addressing, many sets of plan are selected, is guaranteed as far as possible apart from road distance S, covers edge destination flight flying height H and is optimal simultaneously, is defined as final scheme.
(2) unmanned plane joins height H surely and base station deflection θ is selected:
1) unmanned plane joins height H surely:
Unmanned plane is used for determining the shooting angle of depression (lens shooting direction and the horizontal direction of the height H by unmanned plane of work ginseng Angle) and coverage goal determine that the present invention is β (in base according to the conventional coverage distance in 4G base stations, the angle of depression for choosing unmanned plane jointly When covering radius of standing is less than 400 meters, β=60 °, when base station covering radius is more than 400 meters, β=30 °).
As shown in Fig. 2 the flying height of adjustment unmanned plane so that unmanned plane visual angle center line and covering coincident, take The ginseng of determining for determining unmanned plane is highly H.
2) deflection θ in base station is selected:
The deflection θ of base station should according to coverage goal (coverage goal is that base station will cover the object to be serviced in other words, To determine before base station construction) and base station relative position determining, the deflections of θ 1 in such as Fig. 2 cover North-East Bound road, Base station location coverage direction is N35 ° with the deflection of positive north;The deflections of θ 2 cover residential block, base station location coverage direction with The deflection of positive north is N160 °;The deflections of θ 3 cover west to road, are with the deflection of positive north in base station location coverage direction N250°.Base station deflection is positioned over regional center, 65 ° of horizontal half-power angle, and angle interval is generally kept between deflection More than 65 °.
(3) antenna for base station is hung high h and angle of declination α and is determined
As shown in figure 3, after unmanned plane is joined H and determined surely, can be according to the relational expression of H × ctg (β)=h × ctg (α) come really Determine base station antenna and hang high h and angle of declination α.
For newly-built base station, the preferential antenna for determining most severe cell θ 1 of coverage condition hangs high and angle of declination, it is determined that because It is plain mainly to include coverage effect, construction efficiency.What the high h of extension of antenna considered to properly increase barrier evades degree, can pass through 30 ° of unmanned plane angle of depression Flight meets to ensure;α 1 is calculated according to H × ctg (β)=h × ctg (α) after h determines. After the h of most severe cell θ 1 of first group of coverage condition determines, the demand covered according to secondary severe cell θ 2 determines H2, then protects in h Hold it is constant on the premise of calculate α 2, obtain by that analogy other coverage directions work ginseng combination.
Wherein, coverage effect refers to the quality and difficulty or ease of mobile phone reception signal after the completion of construction;Construction efficiency refers to that construction is difficult Easy degree and investment height.
For the co-located station of existing network, according to the height of optional antenna mounting platform, determine that antenna hangs high h, optimal antenna is embraced Bar position leaves the worst cell of coverage condition for, and by unmanned plane auxiliary parameter H is determined, by H × ctg (β)=h × ctg (α) calculating the α of each cell respectively.
(5) determination of Neighborhood Optimization work ginseng:
Unmanned plane based on above-mentioned work ginseng determination method, determines that respectively needs are carried out in the Neighborhood Optimization of 4G base stations Unmanned plane assisting in flying the height parameter H1 and H2 of the adjacent cell of optimization, needs to increase an optimal conditions in Neighborhood Optimization For:Guarantee that panorama Pic1 center line of the unmanned plane at H1 is tangent with the Pic2 center lines at neighbor base station H2.
For the optimization of many adjacent areas, the Neighborhood Optimization of two minizones is can be decomposed into, principle is as shown in Figure 4.
Can pay the utmost attention to be adjusted coverage direction angle θ to obtain optimal tangent effect, pass through after θ determines H1 × ctg (β 1)=h2 × ctg (α 1) and H2 × ctg (β)=h2 × ctg (α 2) tries to achieve respectively the optimization that adjacent cell meets condition Work ginseng set, then the ginseng set of multigroup Neighborhood Optimization work is sought common ground, it is excellent that the selection work ginseng combination in common factor can meet adjacent area The demand of change, should be noted that in the process the adjustable work parameter amount of the adjustable work parameter amount of newly-built station and co-located station is different , should determine constant with variable to carry out rational Optimal Parameters selection according to actual conditions.
Because horizontal half-power angle is 65 °, as long as the target in the range of positive and negative 32.5 ° of θ directions can be by Cover, so the requirement that θ there can be a small amount of adjustment space, adjustment can exactly meet covering and can make unmanned plane in θ side To center line it is tangent with adjacent area.
H1 × ctg (β 1)=h2 × ctg (α 1) and H2 × ctg (β 2)=h2 × ctg (α 2) is referred to and is being met tangent relation Afterwards, H1, β 1 and H2, β 2 become fixed value, and according to the concrete condition adjustment antenna of two base stations high h1, h2 and angle of declination α 1, α are hung 2, but the work ginseng after adjustment will meet both the above equation;So each h1 1 α 1 of correspondence, but h1 can be selected, as long as α 1 and then becomes, and meeting equation just can be with;As h2 is also with α 2.
With unmanned plane product development and legal provisions it is perfect, unmanned plane product will for other field bring it is new should With greatly promoting the efficiency of industry;The present invention by unmanned plane product the communications industry application and practice, it is believed that nothing It is man-machine to bring being substantially improved for efficiency for 4G base stations Large scale construction.
The visualization of unmanned plane and image conversion characteristic, are that the model of radio communication is set up and propagated correction and provides the foundation number According to;The base position geography information of the collectable part of unmanned plane, can be to provide base for base station construction with matching for surrounding enviroment Plinth data;The action convenience of unmanned plane, the scheme that can provide various dimensions for base station construction is referred to and result simulation.The present invention Above example using unmanned plane with above-mentioned characteristic, reached and gathered on the spot, the accurate effect of data, it is possible to achieve build with Expected Results is consistent.

Claims (10)

1. a kind of method that acquisition 4G communication base stations build work ginseng, it is characterised in that taken a flight test by unmanned plane multiposition, compared on the spot Construction condition and coverage effect are selected, determines that latitude and longitude of base station work is joined;Closed by geometry of the unmanned aerial vehicle vision away from center and covering edge System carrys out selection of base stations antenna and hangs high h, base station deflection θ and Downtilt α.
2. the method that acquisition 4G communication base stations according to claim 1 build work ginseng, it is characterised in that latitude and longitude of base station work Ginseng prioritizing selection is less apart from the distance of road, is accessible to, and unmanned plane joins the less position of flying height H surely, wherein without Man-machine flying height H of joining surely is unobstructed minimum winged in the visual field for make unmanned plane to coverage goal in unmanned plane position Row height.
3. the method that acquisition 4G communication base stations according to claim 2 build work ginseng, it is characterised in that unmanned plane is joined winged surely Row height H covers unmanned plane during flying height during coincident for the center line of the panorama sketch of unmanned plane camera head with base station.
4. the method that acquisition 4G communication base stations according to claim 2 build work ginseng, it is characterised in that described panorama sketch For 30 ° or 60 ° of the unmanned plane camera head lens angle of depression β value when, from horizontal direction from 0 ° of north orientation, with 30 ° of spacer rings 12 are clapped To the picture that figure synthesizes with the figure that takes a crane shot downwards.
5. the method that acquisition 4G communication base stations according to claim 4 build work ginseng, it is characterised in that unmanned plane is joined winged surely Row height H hangs high h more than antenna for base station, and in h height, base station covers edge without continuous stop to unmanned plane in fringe field of view.
6. the method that acquisition 4G communication base stations according to claim 5 build work ginseng, it is characterised in that base station deflection θ Determined by base station coverage goal and base station relative position, at least one;Each base station deflection θ one group of work ginseng of correspondence, it is described One group of work ginseng includes that unmanned plane is joined flying height H, antenna for base station and hangs high h and Downtilt α surely.
7. the method that acquisition 4G communication base stations according to claim 6 build work ginseng, it is characterised in that at described a group In work ginseng, H × ctg (β)=h × ctg (α) is met;For the base station for possessing multiple base station deflection coverage directions, antenna for base station Hang high h and take the maximum that the corresponding antenna for base station of each base station deflection hangs senior middle school.
8. the method that acquisition 4G communication base stations according to claim 6 build work ginseng, it is characterised in that newly-built base station is first With worst base station deflection θ, join flying height H, antenna for base station surely according to unmanned plane and hang the suitable of high h and Downtilt α Sequence determines first group of work ginseng;Then fixed base stations antenna hangs high h, with secondary severe base station deflection θ, determines next group of work ginseng.
9. the method that acquisition 4G communication base stations according to claim 6 build work ginseng, it is characterised in that co-located existing shaft tower The antenna of base station to hang high h be constant, first with worst base station deflection θ, according to unmanned plane flying height H and day are joined surely The order of line angle of declination α determines first group of work ginseng;Then with secondary severe base station deflection θ, next group of work ginseng is determined.
10. the method that acquisition 4G communication base stations according to claim 6 build work ginseng, it is characterised in that existing network adjacent area work When ginseng is optimized and revised, it is ensured that the panorama sketch center line that local area unmanned plane is joined under flying height H1 surely joins flight surely with adjacent area unmanned plane Panorama sketch center line under height H2 is tangent, then determines that the antenna for base station of local area hangs high h1 and Downtilt α 1, adjacent area successively Antenna for base station hang high h2 and Downtilt α 2.
CN201610884262.8A 2016-10-10 2016-10-10 Method for obtaining construction parameters of 4G communication base station Active CN106658531B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610884262.8A CN106658531B (en) 2016-10-10 2016-10-10 Method for obtaining construction parameters of 4G communication base station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610884262.8A CN106658531B (en) 2016-10-10 2016-10-10 Method for obtaining construction parameters of 4G communication base station

Publications (2)

Publication Number Publication Date
CN106658531A true CN106658531A (en) 2017-05-10
CN106658531B CN106658531B (en) 2020-10-30

Family

ID=58853744

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610884262.8A Active CN106658531B (en) 2016-10-10 2016-10-10 Method for obtaining construction parameters of 4G communication base station

Country Status (1)

Country Link
CN (1) CN106658531B (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107040933A (en) * 2017-05-16 2017-08-11 三维通信股份有限公司 A kind of mobile communication base station panorama operational system
CN107222467A (en) * 2017-05-16 2017-09-29 三维通信股份有限公司 A kind of implementation method of mobile communication base station panorama operational system
CN107238373A (en) * 2017-05-18 2017-10-10 诺优信息技术(上海)有限公司 Unmanned plane aerial photography measures the method and system of antenna for base station engineering parameter
CN108572379A (en) * 2018-04-27 2018-09-25 陈亮 Communication base station siting investigation system and method based on unmanned plane
CN109579774A (en) * 2018-11-06 2019-04-05 五邑大学 A kind of Downtilt measurement method based on depth example segmentation network
CN109756914A (en) * 2017-11-03 2019-05-14 ***通信有限公司研究院 Neighbor relationship management method, network side equipment and terminal
CN110636102A (en) * 2019-07-13 2019-12-31 天宇经纬(北京)科技有限公司 Unmanned aerial vehicle communication system and method based on 4G/5G wireless network
CN111405597A (en) * 2020-02-26 2020-07-10 中通服建设有限公司 Method and system for automatically monitoring base station antenna coverage variation
CN111629329A (en) * 2020-06-05 2020-09-04 中国民用航空飞行学院 Method and device for signal transmission by using 5G antenna and unmanned aerial vehicle system
WO2021114842A1 (en) * 2019-12-10 2021-06-17 中移(成都)信息通信科技有限公司 Signal continuous coverage method, device and apparatus for target area, and antenna system
CN114423016A (en) * 2021-12-30 2022-04-29 中国电信股份有限公司 Method and device for determining planning parameters of base station
CN114466367A (en) * 2021-12-17 2022-05-10 中国联合网络通信集团有限公司 Antenna hanging height calibration method and device
CN114520982A (en) * 2020-11-19 2022-05-20 中国联合网络通信集团有限公司 Cell coverage detection method, device and system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2854463A1 (en) * 2013-09-30 2015-04-01 Alcatel Lucent Position finding apparatus for a mobile station, vehicle, method, and computer program thereof
CN204948365U (en) * 2015-08-18 2016-01-06 中睿通信规划设计有限公司 A kind of LTE base station three-dimensional planning of remote control, reconnaissance and survey system
CN205430612U (en) * 2016-02-19 2016-08-03 中国电信股份有限公司广州分公司 On --spot auxiliary system that checks and accepts in LTE basic station
WO2016140985A1 (en) * 2015-03-02 2016-09-09 Izak Van Cruyningen Flight planning for unmanned aerial tower inspection

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2854463A1 (en) * 2013-09-30 2015-04-01 Alcatel Lucent Position finding apparatus for a mobile station, vehicle, method, and computer program thereof
WO2016140985A1 (en) * 2015-03-02 2016-09-09 Izak Van Cruyningen Flight planning for unmanned aerial tower inspection
CN204948365U (en) * 2015-08-18 2016-01-06 中睿通信规划设计有限公司 A kind of LTE base station three-dimensional planning of remote control, reconnaissance and survey system
CN205430612U (en) * 2016-02-19 2016-08-03 中国电信股份有限公司广州分公司 On --spot auxiliary system that checks and accepts in LTE basic station

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
Z. GACOVSKI等: "Fuzzy decision-making for selection of mobile base station location", 《28TH INTERNATIONAL CONFERENCE ON INFORMATION TECHNOLOGY INTERFACES, 2006》 *
王博申等: "无人机在通信勘察领域的应用研究", 《中国新通信》 *
王欣玥等: "4G时代无人机在勘察设计中的应用前景展望", 《移动通信》 *

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107222467A (en) * 2017-05-16 2017-09-29 三维通信股份有限公司 A kind of implementation method of mobile communication base station panorama operational system
CN107222467B (en) * 2017-05-16 2020-05-26 三维通信股份有限公司 Method for realizing mobile communication base station panoramic operation and maintenance system
CN107040933B (en) * 2017-05-16 2023-07-04 三维通信股份有限公司 Panoramic operation and maintenance system of mobile communication base station
CN107040933A (en) * 2017-05-16 2017-08-11 三维通信股份有限公司 A kind of mobile communication base station panorama operational system
CN107238373A (en) * 2017-05-18 2017-10-10 诺优信息技术(上海)有限公司 Unmanned plane aerial photography measures the method and system of antenna for base station engineering parameter
CN109756914A (en) * 2017-11-03 2019-05-14 ***通信有限公司研究院 Neighbor relationship management method, network side equipment and terminal
CN109756914B (en) * 2017-11-03 2022-06-07 ***通信有限公司研究院 Neighbor relation management method, network side equipment and terminal
CN108572379A (en) * 2018-04-27 2018-09-25 陈亮 Communication base station siting investigation system and method based on unmanned plane
CN108572379B (en) * 2018-04-27 2022-02-08 陈亮 Communication base station site selection exploration method based on unmanned aerial vehicle
CN109579774A (en) * 2018-11-06 2019-04-05 五邑大学 A kind of Downtilt measurement method based on depth example segmentation network
CN110636102B (en) * 2019-07-13 2022-05-13 天宇经纬(北京)科技有限公司 Unmanned aerial vehicle communication system and method based on 4G/5G wireless network
CN110636102A (en) * 2019-07-13 2019-12-31 天宇经纬(北京)科技有限公司 Unmanned aerial vehicle communication system and method based on 4G/5G wireless network
WO2021114842A1 (en) * 2019-12-10 2021-06-17 中移(成都)信息通信科技有限公司 Signal continuous coverage method, device and apparatus for target area, and antenna system
CN111405597A (en) * 2020-02-26 2020-07-10 中通服建设有限公司 Method and system for automatically monitoring base station antenna coverage variation
CN111629329A (en) * 2020-06-05 2020-09-04 中国民用航空飞行学院 Method and device for signal transmission by using 5G antenna and unmanned aerial vehicle system
CN114520982A (en) * 2020-11-19 2022-05-20 中国联合网络通信集团有限公司 Cell coverage detection method, device and system
CN114520982B (en) * 2020-11-19 2023-07-25 中国联合网络通信集团有限公司 Method, device and system for detecting cell coverage
CN114466367A (en) * 2021-12-17 2022-05-10 中国联合网络通信集团有限公司 Antenna hanging height calibration method and device
CN114466367B (en) * 2021-12-17 2023-09-08 中国联合网络通信集团有限公司 Antenna hanging height calibration method and device
CN114423016A (en) * 2021-12-30 2022-04-29 中国电信股份有限公司 Method and device for determining planning parameters of base station
CN114423016B (en) * 2021-12-30 2024-04-30 中国电信股份有限公司 Method and device for determining planning parameters of base station

Also Published As

Publication number Publication date
CN106658531B (en) 2020-10-30

Similar Documents

Publication Publication Date Title
CN106658531A (en) Method for acquiring 4G communication base station construction engineering parameters
CN110243354B (en) Dynamic monitoring method and system for urban illegal building
CN112470092B (en) Surveying and mapping system, surveying and mapping method, device, equipment and medium
CN108983248A (en) It is a kind of that vehicle localization method is joined based on the net of 3D laser radar and V2X
CN103424113B (en) Indoor positioning and navigating method of mobile terminal based on image recognition technology
CN102509902B (en) Base station antenna information acquisition device, method thereof and base station antenna
CN107247458A (en) UAV Video image object alignment system, localization method and cloud platform control method
WO2020145309A1 (en) Installation candidate presenting method, installation candidate presenting device, and program
CN107222467A (en) A kind of implementation method of mobile communication base station panorama operational system
CN106153050A (en) A kind of indoor locating system based on beacon and method
CN109495899A (en) Parameter optimization method, device, electronic equipment and the storage medium of antenna
CN106710293A (en) Dynamic and intelligent vehicle guidance method for underground parking lot
CN108964830B (en) Unmanned aerial vehicle interference positioning system
CN103414872B (en) A kind of target location drives the method for Pan/Tilt/Zoom camera
AU2018449839B2 (en) Surveying and mapping method and device
CN102647725B (en) Method and device for determining neighbor cell priority in neighbor cell planning
CN106991681A (en) A kind of fire boundary vector information extract real-time and method for visualizing and system
CN107238373A (en) Unmanned plane aerial photography measures the method and system of antenna for base station engineering parameter
US11044613B2 (en) Method of processing image, computer-readable storage medium recording method, and apparatus for processing image
CN111536946A (en) Town layout planning terrain surveying and mapping method
CN106932801A (en) It is a kind of for the hand-held earth station of unmanned plane and surveying and drawing location method
CN109286946A (en) Based on without the mobile communication indoor method for optimizing wireless network and system for relying on positioning
CN107567003A (en) Interference detection method and system and aircraft and controller
CN109167688B (en) Geographical monitoring platform for wireless network optimization analysis and implementation method
CN104602249B (en) A kind of method and device for determining cell relations

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant