CN106638619B - A kind of pattern foundation pit supporting structure building structure - Google Patents

A kind of pattern foundation pit supporting structure building structure Download PDF

Info

Publication number
CN106638619B
CN106638619B CN201611185759.7A CN201611185759A CN106638619B CN 106638619 B CN106638619 B CN 106638619B CN 201611185759 A CN201611185759 A CN 201611185759A CN 106638619 B CN106638619 B CN 106638619B
Authority
CN
China
Prior art keywords
foundation pit
cement mixing
prestressed concrete
concrete prefabricated
building structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611185759.7A
Other languages
Chinese (zh)
Other versions
CN106638619A (en
Inventor
王志华
余鹏涛
苏少妍
刘须收
卢宝华
王依璞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201611185759.7A priority Critical patent/CN106638619B/en
Publication of CN106638619A publication Critical patent/CN106638619A/en
Application granted granted Critical
Publication of CN106638619B publication Critical patent/CN106638619B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/12Restraining of underground water by damming or interrupting the passage of underground water
    • E02D19/18Restraining of underground water by damming or interrupting the passage of underground water by making use of sealing aprons, e.g. diaphragms made from bituminous or clay material
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/30Miscellaneous comprising anchoring details

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The present invention provides a kind of pattern foundation pit supporting structure building structure, belong to Base hole supporting technology field, including armored concrete crown beam, multiple cement mixing methods, multiple prestressed concrete prefabricated tubular piles, multiple anchor poles and reinforced mesh, multiple cement mixing methods are arranged along foundation pit inner wall continuous uniform, spacer sleeve is equipped with multiple tensioning rings to two neighboring prestressed concrete prefabricated tubular pile in the height direction, the setting of tensioning ring is so that prestressed concrete prefabricated tubular pile uniform force, reliability enhancing, and prestressed concrete prefabricated tubular pile tensile strength and safety coefficient are high, the setting of prestressed concrete prefabricated tubular pile is so that whole building structure is more firm, stress is reliable, water-stagnating effect is good, it is easy for construction, both it had been suitble to the foundation pit in big place, it is suitble to construction site smaller again, there is the foundation pit of building at edge.

Description

A kind of pattern foundation pit supporting structure building structure
Technical field
The invention belongs to Base hole supporting technology fields, and in particular to a kind of pattern foundation pit supporting structure building structure.
Background technique
With the fast development of economic construction of China, urban skyscraper is emerged in multitude, and embedded depth of foundation is increasing, adjoint There are many deep basal pits.Since City Building is intensive, foundation pit ambient environmental conditions are complicated, in many cases, foundation pit week It encloses that there is existing buildings, therefore supporting building structure usually is set on foundation pit periphery to guarantee deep basal pit and close on existing The safety of building.
Currently, the supporting construction of foundation pit generally uses Cement-soil Gravity enclosure wall, cast-in-situ bored pile or vertical type steel pipe Preceding supporting construction.Without support in Cement-soil Gravity enclosure wall hole, Bit andits control ability is poor, and construction quality is difficult to control;Drilling Bored concrete pile cost for shallow foundation pit is high, and the later period eats support and must remove, and influences to construct;Supporting construction steel pipe before vertical type steel pipe Preceding support is arranged inside foundation pit, has to the construction in foundation pit to support and stepping down before steel pipe, causes adverse effect to construction.
In conclusion existing supporting building structure is not able to satisfy existing foundation pit ambient environmental conditions complexity, particularly base There are requirements when existing building group to foundation pit around hole.
Summary of the invention
In order to overcome the shortcomings of the prior art described above, the present invention provides a kind of pattern foundation pit supporting structure building structure.
To achieve the goals above, the invention provides the following technical scheme:
A kind of pattern foundation pit supporting structure building structure, including armored concrete crown beam, multiple cement mixing methods, multiple prestressing force are mixed Solidifying soil prefabricated tubular pile, multiple anchor poles and reinforced mesh;
Multiple cement mixing methods are uniformly arranged along foundation pit inner wall, are provided with reinforcing bar on the inside of the cement mixing method Mesh sheet, multiple cement mixing methods and multiple reinforced mesh constitute building structure frame, the building structure frame Interior to be filled with pea gravel concreten, the building structure frame and the pea gravel concreten form water-stop curtain, the water-stop curtain Offer inclined fixation hole in the soil layer in outside, described anchor pole one end be arranged on the inside of the water-stop curtain and by block with The water-stop curtain abuts, and the anchor pole other end tilts through the water-stop curtain and is mounted in the fixation hole, described Armored concrete crown beam is arranged in the cement mixing method upper end, and the reinforced concrete is protruded into the cement mixing method upper end In native crown beam;
The uniformly arrangement on the inside of the water-stop curtain of multiple prestressed concrete prefabricated tubular piles, it is two neighboring described Spacer sleeve is equipped with multiple tensioning rings to prestressed concrete prefabricated tubular pile in the height direction.
It further include multiple connection sleeves, the diameter and the cement mixing method of the connection sleeve or the prestressing force are mixed The outer diameter of solidifying soil prefabricated tubular pile is identical, and the connection sleeve is by the cement mixing method or the prestressed concrete prefabricated pipe Stake is connected two-by-two, extends the height of the cement mixing method or the prestressed concrete prefabricated tubular pile.
It preferably, further include fixing piece, the fixing piece includes fixed link and semicircular first lantern ring and the second lantern ring, First lantern ring and second lantern ring two sides are respectively arranged with link block, and screw hole is offered on the link block, described Fixed link is fixedly connected with first lantern ring, and the radius of first lantern ring and second lantern ring is stirred with the soil cement The radius for mixing stake is identical, and first lantern ring and second lantern ring connect and compose an annulus by the link block, described Annulus is socketed on the cement mixing method, and the fixed link is inserted into the soil layer on the outside of the water-stop curtain.
Preferably, preservative is coated in the anchor pole and the fixed link.
Preferably, the end of the anchor pole and the fixed link is provided with anchor structure.
Preferably, the fixing piece is anchor pole, and described anchor pole one end is arranged on the inside of the water-stop curtain and passes through block It is abutted with the water-stop curtain, the anchor pole other end is tiltedly mounted in the soil layer around the foundation pit.
Preferably, the connection sleeve is up to opening up less there are three screw hole, the cement mixing method or described pre- answers Power concrete precast pipe pile both ends offer and the matched mounting hole of the screw hole.
Preferably, prestressed concrete prefabricated tubular pile lower end is taper.
Preferably, the depth that the foundation pit bottom is protruded into prestressed concrete prefabricated tubular pile lower end is greater than the cement Native mixing pile protrudes into the depth of the foundation pit bottom.
Pattern foundation pit supporting structure building structure provided by the invention is structurally reasonable, including armored concrete crown beam, multiple soil cements stir Stake, multiple prestressed concrete prefabricated tubular piles, multiple anchor poles and reinforced mesh are mixed, multiple cement mixing methods connect along foundation pit inner wall Continuous uniformly arrangement, armored concrete crown beam are arranged in pre- cement mixing method upper end, and it is mixed that reinforcing bar is protruded into cement mixing method upper end On the inside of solidifying soil crown beam, multiple cement mixing methods and reinforced mesh constitute building structure frame, are filled in building structure frame Pea gravel concreten, building structure frame and pea gravel concreten form water-stop curtain, if being also arranged on cement mixing method solid Determine part, cement mixing method can be fixed on foundation pit inner wall by fixing piece, and entire water-stop curtain stress is reliable, and water-stagnating effect is good, It is easy for construction, and cement mixing method tensile strength and safety coefficient are high.Multiple prestressed concrete prefabricated tubular piles surround sealing Interval setting on the inside of curtain, spacer sleeve is equipped with multiple tensions to two neighboring prestressed concrete prefabricated tubular pile in the height direction Ring, the setting of tensioning ring is so that prestressed concrete prefabricated tubular pile uniform force, reliability enhancing.Prestressed concrete prefabricated pipe So that entire pattern foundation pit supporting structure building structure is more firm, stress intensity increases, and has not only been suitble to the foundation pit in big place, but also suitable for the setting of stake Close the foundation pit that construction site is smaller, there is building at edge.
Detailed description of the invention
Fig. 1 is the overlooking structure diagram of the pattern foundation pit supporting structure building structure of the embodiment of the present invention 1;
Fig. 2 is the schematic view of the front view of the pattern foundation pit supporting structure building structure of the embodiment of the present invention 1;
Fig. 3 is the overlooking structure diagram of the pattern foundation pit supporting structure building structure of the embodiment of the present invention 2;
Fig. 4 is the schematic view of the front view of the pattern foundation pit supporting structure building structure of the embodiment of the present invention 2;
Fig. 5 is the structural schematic diagram of fixing piece.
Specific embodiment
With reference to the accompanying drawing, further description of the specific embodiments of the present invention.Following embodiment is only used for more Technical solution of the present invention is clearly demonstrated, and not intended to limit the protection scope of the present invention.
Embodiment 1
It is specific as depicted in figs. 1 and 2 the present invention provides a kind of pattern foundation pit supporting structure building structure, including armored concrete hat Beam 1, multiple cement mixing methods 2, multiple prestressed concrete prefabricated tubular piles 3, multiple anchor poles 12 and reinforced mesh 8.
Multiple cement mixing methods 2 are uniformly arranged along 4 inner wall of foundation pit, are provided with reinforced mesh on the inside of cement mixing method 2 8, the setting of tensioning ring 2 is so that 2 uniform force of cement mixing method, reliability enhancing.Multiple cement mixing methods 2 and steel mesh Piece 8 constitutes building structure frame, is filled with pea gravel concreten 6, building structure frame and pea gravel concreten 6 in building structure frame Water-stop curtain is formed, inclined fixation hole is offered in the soil layer 10 on the outside of water-stop curtain, 12 one end of anchor pole is arranged in sealing curtain Curtain inside is simultaneously abutted by block with water-stop curtain, and 12 other end of anchor pole tilts through water-stop curtain and is mounted in fixation hole, Armored concrete crown beam 1 is arranged in 2 upper end of soil mixing pile, and 2 upper end of cement mixing method is protruded into armored concrete crown beam 1.
Multiple prestressed concrete prefabricated tubular piles 3 uniformly arrangement, two neighboring prestressed concrete on the inside of water-stop curtain Spacer sleeve is equipped with multiple tensioning rings 5 to native prefabricated tubular pile 3 in the height direction.The setting of prestressed concrete prefabricated tubular pile 3 so that Whole building structure is more firm, and stress intensity increases, and has not only been suitble to the foundation pit in big place, but also suitable construction site is smaller, edge There is the foundation pit of building.
It further, further include multiple connection sleeves 7, diameter and the cement mixing method 2 or prestressing force for connecting sleeve 7 are mixed The outer diameter of solidifying soil prefabricated tubular pile 3 is identical, can determine that cement mixing method 2 and prestressed concrete are pre- according to foundation depth demand Cement mixing method 2 or prestressed concrete prefabricated tubular pile 3 are connected two-by-two by connection sleeve 7, are prolonged by the quantity of tubulation stake 3 The height of long cement mixing method 2 or prestressed concrete prefabricated tubular pile 3.Meanwhile setting can also reduce single soil cement in this way The length of mixing pile 2 or prestressed concrete prefabricated tubular pile 3, convenient transportation and movement mitigate construction intensity.
In order to make cement mixing method 2 or prestressed concrete prefabricated tubular pile 3 connect firm, connector sleeve with sleeve 7 is connect Three screw holes 11 are at least offered on cylinder 7, cement mixing method 2 or 3 both ends of prestressed concrete prefabricated tubular pile offer With the matched mounting hole of screw hole 11, the quantity of screw hole is eight in the present embodiment, and eight screw holes are evenly distributed on connection On the side wall of sleeve 7.
In the present embodiment, 3 lower end of prestressed concrete prefabricated tubular pile is taper, so that prestressed concrete prefabricated tubular pile 3 It is easier to protrude into sub-surface, while being coated with preservative on anchor pole 12, the end of anchor pole 12 is provided with anchor structure, anchoring knot The compactness connected between anchor pole 12 and soil layer 10 can be improved in structure, improves the stability of whole building structure.
In the present embodiment, the depth that 4 bottom of foundation pit is protruded into 3 lower end of prestressed concrete prefabricated tubular pile is greater than Soil-cement The depth of 4 bottom of foundation pit is protruded into stake 2.
Embodiment 2
It as shown in Figures 3 to 5, further include fixing piece 9 in the present embodiment, fixing piece includes fixed link 9- in the present embodiment 3 and semicircular first lantern ring 9-1 and the second lantern ring 9-2, the first lantern ring 9-1 and the second two sides lantern ring 9-2 are respectively arranged with company Meet block 9-4, screw hole offered on link block 9-4, fixed link 9-3 is fixedly connected with the first lantern ring 9-1, the first lantern ring 9-1 and The radius of second lantern ring 9-2 is identical as the radius of soil mixing pile 2, and the first lantern ring 9-1 and the second lantern ring 9-2 pass through link block 9-4 connects and composes an annulus, and annulus is socketed on soil mixing pile 2, and fixed link 9-3 is inserted into the soil layer 10 on the outside of water-stop curtain It is interior.Cement mixing method 2 is fixed on 4 inner wall of foundation pit by fixing piece, and entire water-stop curtain stress is reliable, and water-stagnating effect is good, is applied Work is convenient, and 2 tensile strength of cement mixing method and safety coefficient are high.Meanwhile preservative, fixed link are coated on fixed link 9-3 The end of 9-3 is provided with anchor structure.Remaining structure is same as Example 1, and which is not described herein again.
Embodiment described above is merely preferred embodiments of the present invention, and the scope of protection of the present invention is not limited to this, Anyone skilled in the art within the technical scope of the present disclosure, the technical solution that can be become apparent to Simple change or equivalence replacement, all belong to the scope of protection of the present invention.

Claims (7)

1. a kind of pattern foundation pit supporting structure building structure, which is characterized in that including armored concrete crown beam (1), multiple cement mixing methods (2), multiple prestressed concrete prefabricated tubular piles (3), multiple anchor poles (12) and reinforced mesh (8);
Multiple cement mixing methods (2) are uniformly arranged along foundation pit (4) inner wall, setting on the inside of the cement mixing method (2) Have reinforced mesh (8), multiple cement mixing methods (2) and the reinforced mesh (8) constitute building structure frame, described to build Pea gravel concreten (6) are filled in building structure frame, the building structure frame and the pea gravel concreten (6) form sealing curtain Act, inclined fixation hole is offered in the soil layer (10) on the outside of the water-stop curtain, described anchor pole (12) one end is arranged described It is abutted on the inside of water-stop curtain and by block with the water-stop curtain, anchor pole (12) other end tilts through the sealing curtain Curtain is simultaneously mounted in the fixation hole, and the armored concrete crown beam (1) is arranged in the cement mixing method (2) upper end, institute Cement mixing method (2) upper end is stated to protrude into the armored concrete crown beam (1);
The uniformly arrangement on the inside of the water-stop curtain of multiple prestressed concrete prefabricated tubular piles (3), it is two neighboring described Spacer sleeve is equipped with multiple tensioning rings (5) to prestressed concrete prefabricated tubular pile (3) in the height direction;
It further include multiple connection sleeves (7), the diameter of connection sleeve (7) and the cement mixing method (2) or described pre- The outer diameter of prestressed concrete prefabricated tubular pile (3) is identical, and the connection sleeve (7) is by the cement mixing method (2) or described pre- Prestressed concrete prefabricated tubular pile (3) is connected two-by-two, extends the cement mixing method (2) or the prestressed concrete prefabricated pipe The height of stake (3).
2. pattern foundation pit supporting structure building structure according to claim 1, which is characterized in that further include fixing piece (9), the fixation Part (9) includes fixed link (9-3) and semicircular first lantern ring (9-1) and the second lantern ring (9-2), first lantern ring (9-1) It is respectively arranged with link block (9-4) with the second lantern ring (9-2) two sides, offers screw hole on the link block (9-4), institute It states fixed link (9-3) to be fixedly connected with first lantern ring (9-1), first lantern ring (9-1) and second lantern ring (9-2) Radius it is identical as the radius of the cement mixing method (2), first lantern ring (9-1) and second lantern ring (9-2) An annulus is connected and composed by the link block (9-4), the annulus is socketed on the cement mixing method (2), described Fixed link (9-3) is inserted into the soil layer (10) on the outside of the water-stop curtain.
3. pattern foundation pit supporting structure building structure according to claim 2, which is characterized in that the anchor pole (12) and the fixed link Preservative is coated on (9-3).
4. pattern foundation pit supporting structure building structure according to claim 2, which is characterized in that the anchor pole (12) and the fixed link The end of (9-3) is provided with anchor structure.
5. pattern foundation pit supporting structure building structure according to claim 1, which is characterized in that at least opened on the connection sleeve (7) If there are three screw hole (11), the cement mixing method (2) or the prestressed concrete prefabricated tubular pile (3) both ends are opened up Have and the screw hole (11) matched mounting hole.
6. pattern foundation pit supporting structure building structure according to claim 1, which is characterized in that the prestressed concrete prefabricated tubular pile (3) lower end is taper.
7. pattern foundation pit supporting structure building structure according to claim 1, which is characterized in that the prestressed concrete prefabricated tubular pile (3) depth that the foundation pit (4) bottom is protruded into lower end protrudes into the foundation pit (4) bottom greater than the cement mixing method (2) Depth.
CN201611185759.7A 2016-12-20 2016-12-20 A kind of pattern foundation pit supporting structure building structure Active CN106638619B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611185759.7A CN106638619B (en) 2016-12-20 2016-12-20 A kind of pattern foundation pit supporting structure building structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611185759.7A CN106638619B (en) 2016-12-20 2016-12-20 A kind of pattern foundation pit supporting structure building structure

Publications (2)

Publication Number Publication Date
CN106638619A CN106638619A (en) 2017-05-10
CN106638619B true CN106638619B (en) 2018-12-14

Family

ID=58834844

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611185759.7A Active CN106638619B (en) 2016-12-20 2016-12-20 A kind of pattern foundation pit supporting structure building structure

Country Status (1)

Country Link
CN (1) CN106638619B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107165173A (en) * 2017-07-18 2017-09-15 中冶华天南京工程技术有限公司 A kind of foundation pit supporting system and its construction method
CN108457279A (en) * 2018-03-21 2018-08-28 中国建筑第六工程局有限公司 A kind of foundation pit enclosure structure cast-in-situ bored pile collapse hole in-situ treatment method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1332296A (en) * 2001-08-16 2002-01-23 吕怀民 Construction process of retaining wall with inner anchoring wall
CN203238642U (en) * 2013-03-19 2013-10-16 深圳市工勘岩土工程有限公司 Supporting retaining wall of foundation pit
CN104074197A (en) * 2014-03-20 2014-10-01 温州大学 Large-diameter thin-walled tubular pile composite anchor rod type foundation pit support structure and construction method thereof
CN104563129A (en) * 2014-12-31 2015-04-29 云南建工基础工程有限责任公司 Double-row pile structure with cored horizontal rotary jet grouting pile on pile body
CN204780990U (en) * 2015-06-11 2015-11-18 云南建工基础工程有限责任公司 Combined type retaining wall structure
JP2016089478A (en) * 2014-11-05 2016-05-23 ヒロセ株式会社 Frame structure of earth retaining wall

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1332296A (en) * 2001-08-16 2002-01-23 吕怀民 Construction process of retaining wall with inner anchoring wall
CN203238642U (en) * 2013-03-19 2013-10-16 深圳市工勘岩土工程有限公司 Supporting retaining wall of foundation pit
CN104074197A (en) * 2014-03-20 2014-10-01 温州大学 Large-diameter thin-walled tubular pile composite anchor rod type foundation pit support structure and construction method thereof
JP2016089478A (en) * 2014-11-05 2016-05-23 ヒロセ株式会社 Frame structure of earth retaining wall
CN104563129A (en) * 2014-12-31 2015-04-29 云南建工基础工程有限责任公司 Double-row pile structure with cored horizontal rotary jet grouting pile on pile body
CN204780990U (en) * 2015-06-11 2015-11-18 云南建工基础工程有限责任公司 Combined type retaining wall structure

Also Published As

Publication number Publication date
CN106638619A (en) 2017-05-10

Similar Documents

Publication Publication Date Title
CN101487355B (en) Telegraph pole and its mounting and fixing method
CN107974933B (en) The precast assembly bridge pier anti-seismic structure and its construction method of built-in replaceable viscous damper and energy consumption reinforcing bar
US11274412B2 (en) Reinforcement structures for tensionless concrete pier foundations and methods of constructing the same
CN103510540B (en) Mortar flag stone retaining wall reinforcement construction method and structure thereof
CN106836492A (en) A kind of group frame-embedded faced wall Lateral Resistant System
CN107435338A (en) Overhead transmission line concrete precast pipe pile cushion cap attachment means
CN106638619B (en) A kind of pattern foundation pit supporting structure building structure
CN105220714A (en) Core compound prestress pile tube float Structure construction method filled with by built-in anchor cable
CN201665875U (en) Light gravity-type anti-earthquake concrete retaining wall
CN209353363U (en) Steel concrete compound tube and foundation connection joint structure
CN207739130U (en) A kind of concrete-filled double skin steel tube bridge pier
CN206769200U (en) First wear formula post stretching vertical prestressing cast-in-place concrete rod structure
CN205531668U (en) Bored concrete pile basis assembled enclosure
CN112575789A (en) Diagonal space truss foundation pit inner support system
CN110029685A (en) A kind of pile drawing anchor barricade fabricated construction
CN206599917U (en) A kind of precast concrete column of assembled with steel fastener
CN206256452U (en) A kind of pattern foundation pit supporting structure barricade
CN205591210U (en) Formula cast member and construction assembly are spliced to underground
CN108677731A (en) A kind of the rotary splicing structure and joining method of bent cap and bridge pier
CN207143937U (en) A kind of prestressed concrete pipe pile pile top
CN208965391U (en) A kind of latching mechanism of steel plate combination beam and support
CN113152446A (en) Multi-section type prestressed hollow pile and construction method thereof
CN208219667U (en) Foundation pit supporting construction based on campshed and inner support
CN111244825A (en) Road-crossing cable laying structure and construction method thereof
CN214695555U (en) Pile foundation structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Wang Zhihua

Inventor after: Yu Pengtao

Inventor after: Su Shaoyan

Inventor after: Liu Xushou

Inventor after: Lu Baohua

Inventor after: Wang Yipu

Inventor before: Wang Zhihua

Inventor before: Yu Pengtao

Inventor before: Su Shaoyan

Inventor before: Liu Xushou

Inventor before: Lu Baohua

Inventor before: Wang Yipu