CN106638619A - Foundation-pit support building structure - Google Patents

Foundation-pit support building structure Download PDF

Info

Publication number
CN106638619A
CN106638619A CN201611185759.7A CN201611185759A CN106638619A CN 106638619 A CN106638619 A CN 106638619A CN 201611185759 A CN201611185759 A CN 201611185759A CN 106638619 A CN106638619 A CN 106638619A
Authority
CN
China
Prior art keywords
building structure
cement mixing
prestressed concrete
concrete prefabricated
collar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611185759.7A
Other languages
Chinese (zh)
Other versions
CN106638619B (en
Inventor
王志华
余鹏涛
苏少妍
刘须收
卢宝华
王依璞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201611185759.7A priority Critical patent/CN106638619B/en
Publication of CN106638619A publication Critical patent/CN106638619A/en
Application granted granted Critical
Publication of CN106638619B publication Critical patent/CN106638619B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/12Restraining of underground water by damming or interrupting the passage of underground water
    • E02D19/18Restraining of underground water by damming or interrupting the passage of underground water by making use of sealing aprons, e.g. diaphragms made from bituminous or clay material
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/30Miscellaneous comprising anchoring details

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention provides a foundation-pit support building structure, and belongs to the technical field of foundation-pit supports. The foundation-pit support building structure comprises a reinforced concrete top beam, a plurality of cement soil mixing piles, a plurality of prestressed concrete prefabricated pipe piles, a plurality of anchor rods and a reinforced net sheet. The multiple cement soil mixing piles are continuously and evenly distributed along the inner wall of a foundation pit, and the two adjacent prestressed concrete prefabricated pipe piles are sleeved with a plurality of tensioning rings at intervals in the height direction, the prestressed concrete prefabricated pipe piles are evenly stressed through the tensioning rings, the reliability is enhanced, the tension-resistant strength and the safety factor of the prestressed concrete prefabricated pipe piles are high, the whole building structure is firmer through the prestressed concrete prefabricated pipe piles, stress is reliable, the water stopping effect is good, construction is convenient, and the foundation-pit support building structure is suitable for a large-site foundation pit and also suitable for a foundation pit with a small construction site and buildings on the edge.

Description

A kind of pattern foundation pit supporting structure building structure
Technical field
The invention belongs to Base hole supporting technology field, and in particular to a kind of pattern foundation pit supporting structure building structure.
Background technology
As the fast development of China's economic construction, urban skyscraper are emerged in multitude, embedded depth of foundation is increasing, adjoint Occur in that many deep basal pits.Because City Building is intensive, foundation ditch ambient environmental conditions are complicated, in many cases, foundation ditch week Enclose and there is existing building, thus generally foundation ditch periphery arrange supporting building structure come ensure deep basal pit and close on it is existing The safety of building.
At present, the supporting construction of foundation ditch typically adopts Cement-soil Gravity enclosure wall, cast-in-situ bored pile or vertical type steel pipe Front supporting construction.Without support in Cement-soil Gravity enclosure wall hole, Bit andits control ability, construction quality is difficult to control to;Drilling Bored concrete pile cost for shallow foundation pit is high, and the later stage eats support and must remove, and affects construction;Supporting construction steel pipe before vertical type steel pipe Front support is arranged on inside foundation ditch, is had to the construction in foundation ditch and is stepped down for support before steel pipe, and construction is had undesirable effect.
In sum, existing supporting building structure can not meet existing foundation ditch ambient environmental conditions complexity, particularly base Cheat the requirement to foundation ditch when around there is existing building group.
The content of the invention
In order to overcome the shortcomings of that above-mentioned prior art is present, the invention provides a kind of pattern foundation pit supporting structure building structure.
To achieve these goals, the present invention provides following technical scheme:
A kind of pattern foundation pit supporting structure building structure, including armored concrete Guan Liang, multiple cement mixing methods, multiple prestressing force is mixed Solidifying soil prefabricated tubular pile, multiple anchor poles and reinforced mesh;
Multiple cement mixing methods are uniformly arranged along foundation ditch inwall, and the cement mixing method inner side is provided with reinforcing bar Mesh sheet, multiple cement mixing methods and multiple reinforced mesh constitute building structure frame, the building structure frame It is interior filled with pea gravel concreten, the building structure frame and the pea gravel concreten form water-stop curtain, the water-stop curtain Offer inclined fixing hole in the soil layer in outside, described anchor pole one end be arranged on the water-stop curtain inner side and by block and The water-stop curtain is abutted, and the anchor pole other end tilts through the water-stop curtain and is arranged in the fixing hole, described Armored concrete Guan Liang is arranged on the cement mixing method upper end, and the reinforced concrete is stretched in the cement mixing method upper end In native Guan Liang;
Multiple prestressed concrete prefabricated tubular piles are two neighboring described around the uniform arrangement in water-stop curtain inner side Prestressed concrete prefabricated tubular pile is spaced in short transverse and is arranged with multiple tensioning rings.
Also include multiple branch sleeves, the diameter of the branch sleeve is mixed with the cement mixing method or the prestressing force The external diameter of solidifying soil prefabricated tubular pile is identical, and the branch sleeve is by the cement mixing method or the prestressed concrete prefabricated pipe Stake is connected two-by-two, extends the height of the cement mixing method or the prestressed concrete prefabricated tubular pile.
Preferably, also including fixture, the fixture includes fix bar and semicircular first collar and second collar, First collar and second collar both sides are respectively arranged with contiguous block, and screw hole is offered on the contiguous block, described Fix bar is fixedly connected with first collar, and the radius of first collar and second collar is stirred with the soil cement The radius for mixing stake is identical, and first collar and second collar connect and compose an annulus by the contiguous block, described Annulus is socketed on the cement mixing method, and the fix bar is inserted in the soil layer on the outside of the water-stop curtain.
Preferably, preservative is scribbled in the anchor pole and the fix bar.
Preferably, the end of the anchor pole and the fix bar is provided with anchor structure.
Preferably, the fixture is anchor pole, and described anchor pole one end is arranged on the water-stop curtain inner side and by block Abut with the water-stop curtain, the anchor pole other end is inclined and mounted in the soil layer around the foundation ditch.
Preferably, at least offer three screw holes on the branch sleeve, the cement mixing method or it is described it is pre- should Power concrete precast pipe pile two ends offer the installing hole matched with the screw hole.
Preferably, the prestressed concrete prefabricated tubular pile lower end is taper.
Preferably, the depth of the foundation ditch bottom is stretched into more than the cement in the prestressed concrete prefabricated tubular pile lower end Native mixing pile stretches into the depth of the foundation ditch bottom.
The pattern foundation pit supporting structure building structure that the present invention is provided is rational in infrastructure, including armored concrete Guan Liang, multiple soil cements are stirred Stake, multiple prestressed concrete prefabricated tubular piles, multiple anchor poles and reinforced mesh are mixed, multiple cement mixing methods connect along foundation ditch inwall Continuous uniform arrangement, armored concrete Guan Liang is arranged on pre- cement mixing method upper end, and cement mixing method upper end is stretched into reinforcing bar and mixed Solidifying soil Guan Liang inner side, multiple cement mixing methods and reinforced mesh constitute building structure frame, are filled with building structure frame Pea gravel concreten, building structure frame forms water-stop curtain with pea gravel concreten, if being also arranged with cement mixing method solid Determine part, fixture can be fixed on cement mixing method on foundation ditch inwall, and whole water-stop curtain stress reliability, stagnant water effect is good, Easy construction, and cement mixing method tensile strength and safety coefficient are high.Multiple prestressed concrete prefabricated tubular piles surround sealing Curtain clear width is arranged, and two neighboring prestressed concrete prefabricated tubular pile is spaced in short transverse and is arranged with multiple tensions Ring, the setting of tensioning ring causes prestressed concrete prefabricated tubular pile uniform force, reliability to strengthen.Prestressed concrete prefabricated pipe The setting of stake causes whole pattern foundation pit supporting structure building structure more to consolidate, and is increased by force intensity, is both adapted to the foundation ditch in big place, fits again Conjunction construction site is less, the foundation ditch that there is building at edge.
Description of the drawings
Fig. 1 is the overlooking the structure diagram of the pattern foundation pit supporting structure building structure of the embodiment of the present invention 1;
Fig. 2 is the main structure diagram of the pattern foundation pit supporting structure building structure of the embodiment of the present invention 1;
Fig. 3 is the overlooking the structure diagram of the pattern foundation pit supporting structure building structure of the embodiment of the present invention 2;
Fig. 4 is the main structure diagram of the pattern foundation pit supporting structure building structure of the embodiment of the present invention 2;
Fig. 5 is the structural representation of fixture.
Specific embodiment
Below in conjunction with the accompanying drawings, the specific embodiment of the present invention is further described.Following examples are only used for more Technical scheme is clearly demonstrated, and can not be limited the scope of the invention with this.
Embodiment 1
The invention provides a kind of pattern foundation pit supporting structure building structure, specifically as depicted in figs. 1 and 2, including armored concrete hat Beam 1, multiple cement mixing methods 2, multiple prestressed concrete prefabricated tubular piles 3, multiple anchor poles 12 and reinforced mesh 8.
Multiple cement mixing methods 2 are uniformly arranged along the inwall of foundation ditch 4, and the inner side of cement mixing method 2 is provided with reinforced mesh 8, the setting of tensioning ring 2 causes the uniform force of cement mixing method 2, reliability to strengthen.Multiple cement mixing methods 2 and bar-mat reinforcement Piece 8 is constituted and be filled with building structure frame, building structure frame pea gravel concreten 6, building structure frame and pea gravel concreten 6 Formed in water-stop curtain, the soil layer 10 on the outside of water-stop curtain and offer inclined fixing hole, the one end of anchor pole 12 is arranged on sealing curtain Curtain inner side is simultaneously abutted by block with water-stop curtain, and the other end of anchor pole 12 tilts through water-stop curtain and is arranged in fixing hole, Armored concrete Guan Liang 1 is arranged on the upper end of soil mixing pile 2, and the upper end of cement mixing method 2 is stretched in armored concrete Guan Liang 1.
Multiple prestressed concrete prefabricated tubular piles 3 are around the uniform arrangement in water-stop curtain inner side, two neighboring prestressed concrete Native prefabricated tubular pile 3 is spaced in short transverse and is arranged with multiple tensioning rings 5.The setting of prestressed concrete prefabricated tubular pile 3 is caused Whole building structure is more consolidated, and is increased by force intensity, is both adapted to the foundation ditch in big place, is adapted to that construction site is less, edge again There is the foundation ditch of building.
Further, also including multiple branch sleeves 7, the diameter of branch sleeve 7 is mixed with cement mixing method 2 or prestressing force The external diameter of solidifying soil prefabricated tubular pile 3 is identical, can determine that cement mixing method 2 and prestressed concrete are pre- according to foundation depth demand The quantity of tubulation stake 3, is two-by-two connected cement mixing method 2 or prestressed concrete prefabricated tubular pile 3 by branch sleeve 7, is prolonged The height of long cement mixing method 2 or prestressed concrete prefabricated tubular pile 3.Meanwhile, so arranging can also reduce single soil cement The length of mixing pile 2 or prestressed concrete prefabricated tubular pile 3, convenient transport and mobile, mitigation construction intensity.
In order that cement mixing method 2 or prestressed concrete prefabricated tubular pile 3 are connected firm with branch sleeve 7, adapter sleeve Three screw holes 11 are at least offered on cylinder 7, cement mixing method 2 or the two ends of prestressed concrete prefabricated tubular pile 3 offer The installing hole matched with screw hole 11, the quantity of screw hole is eight in the present embodiment, and eight screw holes are evenly distributed on connection On the side wall of sleeve 7.
In the present embodiment, the lower end of prestressed concrete prefabricated tubular pile 3 is taper so that prestressed concrete prefabricated tubular pile 3 It is easier to stretch into sub-surface, while scribbling preservative on anchor pole 12, the end of anchor pole 12 is provided with anchor structure, anchoring knot Structure can improve the compactness connected between anchor pole 12 and soil layer 10, improve the stability of whole building structure.
In the present embodiment, the lower end of prestressed concrete prefabricated tubular pile 3 stretches into the depth of the bottom of foundation ditch 4 and is more than Soil-cement The depth of the bottom of foundation ditch 4 is stretched in stake 2.
Embodiment 2
As shown in Figures 3 to 5, in the present embodiment, in the present embodiment, also including fixture 9, fixture includes fix bar 9- 3 and semicircular first collar 9-1 and the second collar 9-2, the first collar 9-1 and the second collar 9-2 both sides be respectively arranged with company Meet block 9-4, screw hole offered on contiguous block 9-4, fix bar 9-3 is fixedly connected with the first collar 9-1, the first collar 9-1 and The radius of the second collar 9-2 is identical with the radius of soil mixing pile 2, and the first collar 9-1 and the second collar 9-2 passes through contiguous block 9-4 connects and composes an annulus, and annulus is socketed on soil mixing pile 2, the soil layer 10 on the outside of fix bar 9-3 insertion water-stop curtain It is interior.Fixture is fixed on cement mixing method 2 on the inwall of foundation ditch 4, and whole water-stop curtain stress reliability, stagnant water effect is good, applies Work is convenient, and the tensile strength of cement mixing method 2 and safety coefficient are high.Meanwhile, preservative, fix bar are scribbled in fix bar 9-3 The end of 9-3 is provided with anchor structure.Remaining structure is same as Example 1, repeats no more here.
The embodiment described above only present invention preferably specific embodiment, protection scope of the present invention not limited to this, Any those of ordinary skill in the art in the technical scope of present disclosure, the technical scheme that can be become apparent to Simple change or equivalence replacement, belong to protection scope of the present invention.

Claims (8)

1. a kind of pattern foundation pit supporting structure building structure, it is characterised in that including armored concrete Guan Liang (1), multiple cement mixing methods (2), multiple prestressed concrete prefabricated tubular piles (3), multiple anchor poles (12) and reinforced mesh (8);
Multiple cement mixing methods (2) are uniformly arranged along foundation ditch (4) inwall, and cement mixing method (2) inner side is arranged There is reinforced mesh (8), multiple cement mixing methods (2) and the reinforced mesh (8) constitute building structure frame, described to build Pea gravel concreten (6) is filled with building structure framework, the building structure frame forms sealing curtain with the pea gravel concreten (6) Inclined fixing hole is offered in curtain, the soil layer (10) on the outside of the water-stop curtain, described anchor pole (12) one end is arranged on described Water-stop curtain inner side is simultaneously abutted by block with the water-stop curtain, and anchor pole (12) other end tilts through the sealing curtain Curtain is simultaneously arranged in the fixing hole, and the armored concrete Guan Liang (1) is arranged on the cement mixing method (2) upper end, institute State cement mixing method (2) upper end to stretch in the armored concrete Guan Liang (1);
Multiple prestressed concrete prefabricated tubular piles (3) are two neighboring described around the uniform arrangement in water-stop curtain inner side Prestressed concrete prefabricated tubular pile (3) is spaced in short transverse and is arranged with multiple tensioning rings (5).
2. pattern foundation pit supporting structure building structure according to claim 1, it is characterised in that also including multiple branch sleeves (7), institute State the diameter and the cement mixing method (2) or the external diameter phase of the prestressed concrete prefabricated tubular pile (3) of branch sleeve (7) Together, the branch sleeve (7) is two-by-two connected the cement mixing method (2) or the prestressed concrete prefabricated tubular pile (3), Extend the height of the cement mixing method (2) or the prestressed concrete prefabricated tubular pile (3).
3. pattern foundation pit supporting structure building structure according to claim 1, it is characterised in that also including fixture (9), the fixation Part (9) includes fix bar (9-3) and semicircular first collar (9-1) and second collar (9-2), first collar (9-1) Contiguous block (9-4) is respectively arranged with second collar (9-2) both sides, screw hole is offered on the contiguous block (9-4), institute State fix bar (9-3) to be fixedly connected with first collar (9-1), first collar (9-1) and second collar (9-2) Radius it is identical with the radius of the cement mixing method (2), first collar (9-1) and second collar (9-2) One annulus is connected and composed by the contiguous block (9-4), the annulus is socketed on the cement mixing method (2), described Fix bar (9-3) is inserted in the soil layer (10) on the outside of the water-stop curtain.
4. pattern foundation pit supporting structure building structure according to claim 3, it is characterised in that the anchor pole (12) and the fix bar (9-3) preservative is scribbled on.
5. pattern foundation pit supporting structure building structure according to claim 3, it is characterised in that the anchor pole (12) and the fix bar (9-3) end is provided with anchor structure.
6. pattern foundation pit supporting structure building structure according to claim 2, it is characterised in that at least open on the branch sleeve (7) Three screw holes (11) are provided with, the cement mixing method (2) or the prestressed concrete prefabricated tubular pile (3) two ends open up There is the installing hole matched with the screw hole (11).
7. pattern foundation pit supporting structure building structure according to claim 1, it is characterised in that the prestressed concrete prefabricated tubular pile (3) lower end is taper.
8. pattern foundation pit supporting structure building structure according to claim 1, it is characterised in that the prestressed concrete prefabricated tubular pile (3) lower end stretches into the depth of the foundation ditch (4) bottom and stretches into the foundation ditch (4) bottom more than the cement mixing method (2) Depth.
CN201611185759.7A 2016-12-20 2016-12-20 A kind of pattern foundation pit supporting structure building structure Active CN106638619B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611185759.7A CN106638619B (en) 2016-12-20 2016-12-20 A kind of pattern foundation pit supporting structure building structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611185759.7A CN106638619B (en) 2016-12-20 2016-12-20 A kind of pattern foundation pit supporting structure building structure

Publications (2)

Publication Number Publication Date
CN106638619A true CN106638619A (en) 2017-05-10
CN106638619B CN106638619B (en) 2018-12-14

Family

ID=58834844

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611185759.7A Active CN106638619B (en) 2016-12-20 2016-12-20 A kind of pattern foundation pit supporting structure building structure

Country Status (1)

Country Link
CN (1) CN106638619B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107165173A (en) * 2017-07-18 2017-09-15 中冶华天南京工程技术有限公司 A kind of foundation pit supporting system and its construction method
CN108457279A (en) * 2018-03-21 2018-08-28 中国建筑第六工程局有限公司 A kind of foundation pit enclosure structure cast-in-situ bored pile collapse hole in-situ treatment method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1332296A (en) * 2001-08-16 2002-01-23 吕怀民 Construction process of retaining wall with inner anchoring wall
CN203238642U (en) * 2013-03-19 2013-10-16 深圳市工勘岩土工程有限公司 Supporting retaining wall of foundation pit
CN104074197A (en) * 2014-03-20 2014-10-01 温州大学 Large-diameter thin-walled tubular pile composite anchor rod type foundation pit support structure and construction method thereof
CN104563129A (en) * 2014-12-31 2015-04-29 云南建工基础工程有限责任公司 Double-row pile structure with cored horizontal rotary jet grouting pile on pile body
CN204780990U (en) * 2015-06-11 2015-11-18 云南建工基础工程有限责任公司 Combined type retaining wall structure
JP2016089478A (en) * 2014-11-05 2016-05-23 ヒロセ株式会社 Frame structure of earth retaining wall

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1332296A (en) * 2001-08-16 2002-01-23 吕怀民 Construction process of retaining wall with inner anchoring wall
CN203238642U (en) * 2013-03-19 2013-10-16 深圳市工勘岩土工程有限公司 Supporting retaining wall of foundation pit
CN104074197A (en) * 2014-03-20 2014-10-01 温州大学 Large-diameter thin-walled tubular pile composite anchor rod type foundation pit support structure and construction method thereof
JP2016089478A (en) * 2014-11-05 2016-05-23 ヒロセ株式会社 Frame structure of earth retaining wall
CN104563129A (en) * 2014-12-31 2015-04-29 云南建工基础工程有限责任公司 Double-row pile structure with cored horizontal rotary jet grouting pile on pile body
CN204780990U (en) * 2015-06-11 2015-11-18 云南建工基础工程有限责任公司 Combined type retaining wall structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107165173A (en) * 2017-07-18 2017-09-15 中冶华天南京工程技术有限公司 A kind of foundation pit supporting system and its construction method
CN108457279A (en) * 2018-03-21 2018-08-28 中国建筑第六工程局有限公司 A kind of foundation pit enclosure structure cast-in-situ bored pile collapse hole in-situ treatment method

Also Published As

Publication number Publication date
CN106638619B (en) 2018-12-14

Similar Documents

Publication Publication Date Title
CA2205502C (en) Tensionless pier foundation
CN104652475B (en) A kind of truss-like retaining wall
CN111441343A (en) Mountain photovoltaic support micropore cast-in-place pile foundation system, construction method and application
CN105220714A (en) Core compound prestress pile tube float Structure construction method filled with by built-in anchor cable
CN112095656A (en) Tension-compression combined type prestressed anchor cable retaining wall structure
CN106638619A (en) Foundation-pit support building structure
CN201665875U (en) Light gravity-type anti-earthquake concrete retaining wall
CA2804702A1 (en) A fence post assembly
CN110656590B (en) Self-balancing stone arch bridge arch sheathing reinforcing method
CN110805049B (en) Construction method of mountain slope ultra-thickness spray anchor permanent supporting structure
CN109853537B (en) Prestressed pile and construction method thereof
CN201406687Y (en) Deep foundation pit supporting structure
CN114775692B (en) Reinforcing structure and reinforcing method for pavement around inspection well
CN206256452U (en) A kind of pattern foundation pit supporting structure barricade
CN206457838U (en) A kind of assembling type base for power transmission tower
CN214363508U (en) Foundation pit supporting structure
CN212052850U (en) Mountain area abutment and pier stud foundation structure
CN210368935U (en) Miniature pile structure, crown beam structure and miniature pile foundation pit supporting system
KR20130073336A (en) Pile structure and construction methods
WO2011105702A2 (en) Composite pile
CN211080280U (en) Large-diameter pile foundation enclosure miniature pile group
CN114197502A (en) Recyclable slope lamination green protection grid and construction method thereof
CN208219667U (en) Foundation pit supporting construction based on campshed and inner support
KR20100076933A (en) Stabilization of structure foundation by unite peg top and a steel pipe
CN111244825A (en) Road-crossing cable laying structure and construction method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Wang Zhihua

Inventor after: Yu Pengtao

Inventor after: Su Shaoyan

Inventor after: Liu Xushou

Inventor after: Lu Baohua

Inventor after: Wang Yipu

Inventor before: Wang Zhihua

Inventor before: Yu Pengtao

Inventor before: Su Shaoyan

Inventor before: Liu Xushou

Inventor before: Lu Baohua

Inventor before: Wang Yipu