CN106593297A - Straight hole drilling method for drilling machine - Google Patents
Straight hole drilling method for drilling machine Download PDFInfo
- Publication number
- CN106593297A CN106593297A CN201611162632.3A CN201611162632A CN106593297A CN 106593297 A CN106593297 A CN 106593297A CN 201611162632 A CN201611162632 A CN 201611162632A CN 106593297 A CN106593297 A CN 106593297A
- Authority
- CN
- China
- Prior art keywords
- drilling
- rod
- drill
- rig
- straight hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000005553 drilling Methods 0.000 title claims abstract description 140
- 238000000034 method Methods 0.000 title claims abstract description 22
- 238000005452 bending Methods 0.000 claims description 5
- 229910000831 Steel Inorganic materials 0.000 claims description 3
- 239000010959 steel Substances 0.000 claims description 3
- 239000003245 coal Substances 0.000 abstract description 5
- 238000007429 general method Methods 0.000 abstract 1
- 241001074085 Scophthalmus aquosus Species 0.000 description 5
- 239000011435 rock Substances 0.000 description 5
- 238000005520 cutting process Methods 0.000 description 4
- 230000000694 effects Effects 0.000 description 2
- 238000000605 extraction Methods 0.000 description 2
- 238000005086 pumping Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
- E21B17/02—Couplings; joints
- E21B17/04—Couplings; joints between rod or the like and bit or between rod and rod or the like
- E21B17/042—Threaded
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Mechanical Engineering (AREA)
- Earth Drilling (AREA)
Abstract
The invention provides a straight hole drilling method for a drilling machine, and the straight hole drilling method for the drilling machine is suitable for drilling a gas drainage borehole in an underground coal mine. A drill bit is arranged on a section of round drill rod to start hole drilling operation, after a borehole is drilled by the depth of one section of drill rod, a section of threaded drill rod of which the outer diameter is the same as that of the drill bit is connected with the drill bit, drilling continues to be conducted, a common round drill rod is connected after the threaded drill rod enters the borehole, and drilling is conducted according to a general method till the drill bit reaches the designated position. The straight hole drilling method has the advantages that the drilling trace is straight, operation is simple, and slagging is effective; the problem that the borehole deviates the preset trace due to the fact that the drill bit is unevenly stressed can be effectively solved; and meanwhile, the threaded drill rod is convenient to buy, the cost is low, and the drilling cost is low.
Description
Technical field
The present invention relates to a kind of rig drill straight hole drilling method, is particularly suited for the long range brill in the uneven area of country rock soft or hard
Enter the rig drill straight hole drilling method for using.
Background technology
Extraction is the fundamental way for solving the problems, such as coal mine gas, and the position of extraction borehole has very big shadow to gas pumping efficiency
Ring, the extracting result of China's coal-mine mash gas pumping drilling is very poor, reacted drilling physical location is big with design attitude deviation and asked
Topic.The major way for creeping at this stage is single type rod boring, and drilling rod is mainly circle, between the method drilling rod and the wall of a borehole
There is certain interval, when distance is crept into, because bit force is uneven, drilling rod starts to bent deviation drilling axis direction,
Drilling is difficult to reach specified location.
The content of the invention
Technical problem:The purpose of the present invention is to overcome the weak point in prior art, there is provided it is a kind of low cost, can have
Effect prevents the drilling method of drilling rod skew in drilling process.
Technical scheme:The rig drill straight hole drilling method of the present invention, comprises the steps:
Rig drill straight hole drilling method, is crept into using drill bit and drilling rod, and the drilling rod includes round drill rod and screw thread
Drilling rod, comprises the steps:
A, selection one save round drill rod as first segment drilling rod, drill bit are installed on first segment boring bar head, in first segment
Drilling rod afterbody is connected by connector with rig, and starts drilling;
B, when first segment drilling rod pierces drilling with drilling, stop drilling, by rig and first segment drilling rod portion from,
Threaded drillpipe is saved by connector connection one and is used as second section drilling rod, continue to creep into after rig is connected with threaded drillpipe;
C, when threaded drillpipe pierces drilling with drilling, stop drilling, rig is separated with threaded drillpipe, using connection
Part continues to connect a section round drill rod, continues to creep into;
D, continue to creep into drilling according to conventional drilling method, extend drilling rod using connector and round drill rod until reaching brill
Hole drill enters specified location, completes drilling.
Threaded drillpipe is identical with drilling rod internal diameter with typical circular drilling rod, and by internal thread or two ends the company of connection screw thread is provided with
Fitting connection fastening.Threaded drillpipe external diameter is identical with drill bit, and the two external diameter is bigger than round drill rod.Described threaded drillpipe is by empty circle
Post adds outside screw thread to constitute, and is made up of high strength steel, and bending strength is high, effectively prevents bit force from bending when uneven.
Screw thread on the threaded drillpipe is regular screw threads bar screw thread or king bolt screw thread, and the ridge of the king bolt screw thread is highly
For 10mm-30mm, when the crisp stability that can effectively improve drilling of drilling crag structure.
Beneficial effect:The present invention saves threaded bore by the connection one between first segment round drill rod and follow-up round drill rod
Bar, is effectively prevented the skew of drilling rod in drilling process, and drilling off-design position.When starting drilling, brill is determined
Enter angle to start to drill, drill bit enters country rock (coal body), drilling rod also into country rock (coal body), when this two sections drilling rod enters country rock
(coal body) afterwards boring direction determines.Because second section drilling rod is threaded drillpipe, its external diameter is identical with drill bit, thus drill hole inner wall and
Gap very little between it, effectively limits the swing with first-half drilling rod.When drill bit is subject to uneven power, drilling rod oriented can be received
The tendency of the little direction deflection of power, at this moment due to drilling rod and the wall of a borehole gap very little, drilling wall energy effectively gives drilling rod reaction
Power, causes drilling rod to swing and offset, it is therefore prevented that drill bit drilling direction shifts.Additionally, when drilling distance is very long, by
Large number of in drilling rod, drilling rod shakes unavoidably skew, and now first-half drilling rod is constrained by the wall of a borehole and cannot swung, firmly
It is determined that the direction of drill bit drilling, the swing of drilling rod below cannot affect drilling direction.Simultaneously, a large amount of drilling cuttings can be from brill
Head place discharges, and first segment drilling rod adopts typical circular drilling rod, and the resistance of itself big drilling cuttings in gap and between the wall of a borehole is little, drilling cuttings arrival the
During two section drilling rods, the flow of drilling cuttings is greatly reduced, and now the screw thread of threaded drillpipe can effective deslagging.If all adopting spiral shell
Line drilling rod, its drilling resistance can be very big, only second section drilling rod adopts threaded drillpipe, effective control drilling resistance.
Description of the drawings
Fig. 1 is the rod bit connection diagram of the present invention;
In figure:1- drilling country rocks, 2- drilling rods, 3- threaded drillpipes, 4- drillings, 5- round drill rods, 6- drill bits.
Specific embodiment
One embodiment of the present of invention is further described below in conjunction with the accompanying drawings:
As shown in figure 1, the rig drill straight hole drilling method of the present invention, is crept into, the brill using drill bit 6 and drilling rod 2
Bar 2 includes round drill rod 5 and threaded drillpipe 3, and threaded drillpipe 3 is identical with the internal diameter of drilling rod 5 with typical circular drilling rod 2, by interior spiral shell
Line or two ends are provided with the connector connection fastening of connection screw thread, and the external diameter of threaded drillpipe 3 is identical with drill bit 6, and the two external diameter is than circular
Drilling rod 5 is big.
Described threaded drillpipe 3 is added outside screw thread to constitute by hollow round column, is made up of high strength steel, and bending strength is high, has
Effect prevents bit force from bending when uneven.Screw thread on the threaded drillpipe 3 is regular screw threads bar screw thread or king bolt
Screw thread, the ridge of the king bolt screw thread is highly 10mm-30mm, and when creeping into, crag structure is crisp can to effectively improve drilling
Stability.
Comprise the steps:
A, selection one save round drill rod 5 as first segment drilling rod, drill bit 6 are installed on first segment boring bar head, first
Section drilling rod afterbody is connected by connector with rig, and starts drilling;
B, when first segment drilling rod pierces drilling 4 with drilling, stop drilling, by rig and first segment drilling rod portion
From, threaded drillpipe 3 is saved by connector connection one and is used as second section drilling rod, continue to creep into after rig is connected with threaded drillpipe 3;
C, when threaded drillpipe 3 with drilling pierce drilling 4 when, stop drilling, rig is separated with threaded drillpipe 3, utilization
Connector continues to connect a section round drill rod 2, continues to creep into;
D, continue to creep into drilling 4 according to conventional drilling method, extend drilling rod using connector and round drill rod 5 until reaching
Drilling drilling completes drilling to specified location.
Claims (5)
1. a kind of rig drill straight hole drilling method, using drill bit(6)And drilling rod(2)Crept into, the drilling rod(2)Including circle
Drilling rod(5)And threaded drillpipe(3), it is characterised in that comprise the steps:
A, selection one save round drill rod(5)As first segment drilling rod, drill bit is installed on first segment boring bar head(6), first
Section drilling rod afterbody is connected by connector with rig, and starts drilling;
B, when first segment drilling rod as drilling pierces drilling(4)When, stop drilling, by rig and first segment drilling rod portion from,
Threaded drillpipe is saved by connector connection one(3)As second section drilling rod, by rig and threaded drillpipe(3)Continue to bore after connection
Enter;
C, work as threaded drillpipe(3)As drilling pierces drilling(4)When, stop drilling, by rig and threaded drillpipe(3)Separate, profit
Continued to connect a section round drill rod with connector(2), continue to creep into;
D, according to conventional drilling method continue creep into drilling(4), using connector and round drill rod(5)Extend drilling rod until reaching
Drilling drilling completes drilling to specified location.
2. rig drill straight hole drilling method according to claim 1, it is characterised in that:Threaded drillpipe(3)And typical circular
Drilling rod(2)And drilling rod(5)Internal diameter is identical, and by internal thread or two ends the connector connection fastening of connection screw thread is provided with.
3. rig drill straight hole drilling method according to claim 1, it is characterised in that:Threaded drillpipe(3)External diameter and drill bit
(6)Identical, the two external diameter compares round drill rod(5)Greatly.
4. rig drill straight hole drilling method according to claim 1, it is characterised in that:Described threaded drillpipe(3)By sky
Cylinder adds outside screw thread to constitute, and is made up of high strength steel, and bending strength is high, effectively prevents bit force from occurring when uneven curved
It is bent.
5. rig drill straight hole drilling method according to claim 1, it is characterised in that:The threaded drillpipe(3)On spiral shell
Line is regular screw threads bar screw thread or king bolt screw thread, and the ridge of the king bolt screw thread is highly 10mm-30mm, works as drilling
Crag structure is crisp can to effectively improve the stability of drilling.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611162632.3A CN106593297A (en) | 2016-12-15 | 2016-12-15 | Straight hole drilling method for drilling machine |
PCT/CN2017/089970 WO2018107712A1 (en) | 2016-12-15 | 2017-06-26 | Straight hole drilling method for drilling machine |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611162632.3A CN106593297A (en) | 2016-12-15 | 2016-12-15 | Straight hole drilling method for drilling machine |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106593297A true CN106593297A (en) | 2017-04-26 |
Family
ID=58802874
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611162632.3A Pending CN106593297A (en) | 2016-12-15 | 2016-12-15 | Straight hole drilling method for drilling machine |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN106593297A (en) |
WO (1) | WO2018107712A1 (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107178310A (en) * | 2017-06-05 | 2017-09-19 | 柳州市怀才商贸有限公司 | A kind of magnetic tracks rig |
CN107386250A (en) * | 2017-06-30 | 2017-11-24 | 上海建工集团股份有限公司 | For reconnoitring the device and method of engineering geology |
WO2018107712A1 (en) * | 2016-12-15 | 2018-06-21 | 中国矿业大学 | Straight hole drilling method for drilling machine |
CN109184590A (en) * | 2018-11-19 | 2019-01-11 | 河南理工大学 | A kind of deep well drilling method and device |
CN114033326A (en) * | 2021-11-02 | 2022-02-11 | 中国矿业大学 | Push rod mounting and dismounting device and method for ground stress test |
CN115263208A (en) * | 2022-08-23 | 2022-11-01 | 华亭煤业集团有限责任公司 | Device for accurately collecting drilling cuttings at drilling position and drilling cuttings collecting method |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109472101B (en) * | 2018-11-21 | 2022-10-04 | 河南理工大学 | Fluid slag-discharging drilling method for deep well soft coal rock |
CN113153148B (en) * | 2021-04-07 | 2023-09-22 | 河南理工大学 | Blowout-preventing drill cutting and punching tool for outburst coal seam penetrating drilling |
CN113720938A (en) * | 2021-08-31 | 2021-11-30 | 西安科技大学 | Device and method for analyzing gas composition change in coal drilling process |
CN117759159B (en) * | 2024-01-05 | 2024-07-02 | 中煤科工集团重庆研究院有限公司 | Complicated roof major diameter drilling fracturing gas drainage device |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2034613U (en) * | 1988-02-06 | 1989-03-22 | 中南工业大学 | Guiding steady rod installation of drilling rod |
CN2121597U (en) * | 1990-05-31 | 1992-11-11 | 河南省许昌市水利科学研究所 | Pipe laying machine by drilling |
US6196598B1 (en) * | 1997-01-06 | 2001-03-06 | Boart Longyear, Inc. | Straight hole drilling system |
CN201778684U (en) * | 2010-09-19 | 2011-03-30 | 刘岩 | Multiple-effect strip-shaped diamond stabilizer |
CN102418477A (en) * | 2011-12-05 | 2012-04-18 | 山东新矿赵官能源有限责任公司 | Drill rod linear driller for mine gas drainage under suction and operation method of drill rod linear driller |
CN104343383A (en) * | 2014-10-08 | 2015-02-11 | 陕西师范大学 | Drilling device for earthen archaeological site |
CN204476327U (en) * | 2015-01-27 | 2015-07-15 | 长沙矿山研究院有限责任公司 | With the drilling tool of core barrel |
CN205036395U (en) * | 2015-09-18 | 2016-02-17 | 洛阳中岩工程材料有限公司 | Anchor anchor drilling is with direction device placed in middle |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3437649C1 (en) * | 1984-10-13 | 1985-12-05 | Injekta GmbH Bau- und Bodensanierung, 8200 Rosenheim | Device for releasing drill stems screwed to one another |
JP5036186B2 (en) * | 2006-01-26 | 2012-09-26 | セーブマシン株式会社 | Underground excavation method provided with switching joint means and apparatus |
CN201206425Y (en) * | 2008-05-15 | 2009-03-11 | 西部钻探吐哈钻井公司 | Anti-oblique make-up of string suitable for bad ground |
CN102828691A (en) * | 2012-08-01 | 2012-12-19 | 中国石油天然气集团公司 | Packed hole deviation control and near-drill-bit decompression compound way-type drilling unit |
CN103352718B (en) * | 2013-07-29 | 2015-07-15 | 河南理工大学 | Fully-sealed wind power slagging gas-drainage deep well drilling system and method |
CN204457434U (en) * | 2015-03-12 | 2015-07-08 | 四川川煤华荣能源股份有限公司大宝顶煤矿 | Probing anti-deflection device |
CN106593297A (en) * | 2016-12-15 | 2017-04-26 | 中国矿业大学 | Straight hole drilling method for drilling machine |
-
2016
- 2016-12-15 CN CN201611162632.3A patent/CN106593297A/en active Pending
-
2017
- 2017-06-26 WO PCT/CN2017/089970 patent/WO2018107712A1/en active Application Filing
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2034613U (en) * | 1988-02-06 | 1989-03-22 | 中南工业大学 | Guiding steady rod installation of drilling rod |
CN2121597U (en) * | 1990-05-31 | 1992-11-11 | 河南省许昌市水利科学研究所 | Pipe laying machine by drilling |
US6196598B1 (en) * | 1997-01-06 | 2001-03-06 | Boart Longyear, Inc. | Straight hole drilling system |
CN201778684U (en) * | 2010-09-19 | 2011-03-30 | 刘岩 | Multiple-effect strip-shaped diamond stabilizer |
CN102418477A (en) * | 2011-12-05 | 2012-04-18 | 山东新矿赵官能源有限责任公司 | Drill rod linear driller for mine gas drainage under suction and operation method of drill rod linear driller |
CN104343383A (en) * | 2014-10-08 | 2015-02-11 | 陕西师范大学 | Drilling device for earthen archaeological site |
CN204476327U (en) * | 2015-01-27 | 2015-07-15 | 长沙矿山研究院有限责任公司 | With the drilling tool of core barrel |
CN205036395U (en) * | 2015-09-18 | 2016-02-17 | 洛阳中岩工程材料有限公司 | Anchor anchor drilling is with direction device placed in middle |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2018107712A1 (en) * | 2016-12-15 | 2018-06-21 | 中国矿业大学 | Straight hole drilling method for drilling machine |
CN107178310A (en) * | 2017-06-05 | 2017-09-19 | 柳州市怀才商贸有限公司 | A kind of magnetic tracks rig |
CN107386250A (en) * | 2017-06-30 | 2017-11-24 | 上海建工集团股份有限公司 | For reconnoitring the device and method of engineering geology |
CN107386250B (en) * | 2017-06-30 | 2023-04-07 | 上海建工集团股份有限公司 | Device and method for surveying engineering geology |
CN109184590A (en) * | 2018-11-19 | 2019-01-11 | 河南理工大学 | A kind of deep well drilling method and device |
CN114033326A (en) * | 2021-11-02 | 2022-02-11 | 中国矿业大学 | Push rod mounting and dismounting device and method for ground stress test |
CN114033326B (en) * | 2021-11-02 | 2023-10-31 | 中国矿业大学 | Push rod mounting and dismounting device and method for ground stress test |
CN115263208A (en) * | 2022-08-23 | 2022-11-01 | 华亭煤业集团有限责任公司 | Device for accurately collecting drilling cuttings at drilling position and drilling cuttings collecting method |
CN115263208B (en) * | 2022-08-23 | 2024-03-19 | 华亭煤业集团有限责任公司 | Device and method for accurately collecting drilling cuttings in drilling position |
Also Published As
Publication number | Publication date |
---|---|
WO2018107712A1 (en) | 2018-06-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106593297A (en) | Straight hole drilling method for drilling machine | |
CN106368725A (en) | Pore-broadening self-rotating anchor rod and use method | |
CN102777162B (en) | Horizontal well directional fracturing device | |
CN105089499A (en) | Coal mine downhole hydraulic jet tree-shaped drill hole guide device and method | |
CN207017946U (en) | A kind of rig drill straight drill drilling rod combination | |
CN105952384A (en) | Hydraulic fracture orthogonal combination double-edge grooving drill bit | |
CN201588543U (en) | Radial well drilling device | |
CN102041965B (en) | Coal mine underground over-broken abnormal zone drilling method | |
CN104088598B (en) | Boring pressure release type lock of tool drilling fishing tool and method | |
CN210598857U (en) | Oil field drilling tool stabilizer | |
CN108086912A (en) | A kind of self-propelled high pressure water jet drill bit | |
CN207960501U (en) | Can fast drilling multistage drill bit | |
CN210118111U (en) | Single-action double-tube impact core drill | |
CN206860106U (en) | Tunnel catheter construction is with jacking sleeve pipe and tunnel catheter construction jacking mechanism | |
CN107630661A (en) | Can fast drilling multistage drill bit | |
CN203796177U (en) | Drilling tool | |
CN104863524B (en) | A kind of helical blade band pick drilling rod | |
CN213510457U (en) | Drill bit of underground coal mine drilling machine | |
CN210714466U (en) | Coal seam drilling is protected directly and is prevented oblique device | |
CN106837184A (en) | Broken screw thread deslagging base plate efficient drilling drill bit device in a kind of outer brill | |
CN102434096A (en) | Spiral percussion drill | |
CN201407000Y (en) | Centralizer ensuring pore-forming accuracy of drilling machine | |
CN202081835U (en) | Gas drainage drill pipe | |
CN110259503A (en) | A kind of expansion rock stratum high position horizontal bore gas pumping method | |
CN201723157U (en) | Inwards concave drilling bit of super-strong diamond composite sheet |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170426 |