CN106570624A - Economy management system - Google Patents

Economy management system Download PDF

Info

Publication number
CN106570624A
CN106570624A CN201610948039.5A CN201610948039A CN106570624A CN 106570624 A CN106570624 A CN 106570624A CN 201610948039 A CN201610948039 A CN 201610948039A CN 106570624 A CN106570624 A CN 106570624A
Authority
CN
China
Prior art keywords
module
data
result
project
analysis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610948039.5A
Other languages
Chinese (zh)
Inventor
李菲菲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Northeast Electric Power University
Original Assignee
Northeast Dianli University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Northeast Dianli University filed Critical Northeast Dianli University
Priority to CN201610948039.5A priority Critical patent/CN106570624A/en
Publication of CN106570624A publication Critical patent/CN106570624A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06313Resource planning in a project environment
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0635Risk analysis of enterprise or organisation activities
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0637Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q40/00Finance; Insurance; Tax strategies; Processing of corporate or income taxes

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • Theoretical Computer Science (AREA)
  • Educational Administration (AREA)
  • General Business, Economics & Management (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Accounting & Taxation (AREA)
  • Finance (AREA)
  • Technology Law (AREA)
  • Financial Or Insurance-Related Operations Such As Payment And Settlement (AREA)

Abstract

The invention relates to an economy management system which comprises a man-machine operation module, an identity identification module, a data processing module, an integrated accounting module, an enterprise control index establishing module, a comparison analysis module, a risk evaluation module, a function evaluation module, an artificial expert decision module, a simulated analysis module and a central processor. The system can avoid different vulnerabilities in the economy management process, and can provide different treatment decisions according to different conditions, each input data includes identity information of one who inputs the data, the data can be traced back, the data is evaluated in different aspects, requirements for enterprises manager management by relates staff are ensured, voucher data is input automatically in the form an electronic voucher, the system is capable of data arrangement and filing as well as accounting, the workload of workers is reduced greatly, each financial decision can be enforced in a simulated manner via a mathematical model, and reference basis is provided for making a final financial decision.

Description

A kind of economic management system
Technical field
The present invention relates to Financial cost control field, and in particular to a kind of economic management system.
Background technology
In prior art, for the economic management of enterprise often adopts various regulations systems by related personnel or relevant departments Spend with electrical form manually to be controlled, this mode will can not realize economic management control truly, because people Will there is many leaks in the link of work operation.Also, this manually operated mode also prevent relevant persons in charge from and When obtain relevant information during cost control, it is impossible to timely and effective management and decision-making are implemented to economic management control process; And can not effectively realize management and information sharing to economic management control process.And returning in economic management process data Class is required to artificially carry out, and considerably increases the workload of staff, and is easily caused the filing of data and malfunction, while voucher Deng adopting paper document, the inquiry difficulty of file is big, and the typing of all Credential datas is also, using artificial, further to increase The workload of staff.
Meanwhile, during economic management, all of economic decision-making directly will be carried out, to a certain degree once determining On be easily caused economic decision-making error and the loss that causes enterprise great.
The content of the invention
It is an object of the present invention to provide a kind of economic management system, what is occurred during can avoiding economic management is various Leak, while different process decision-makings can be provided according to different situations, the typing of each data carries the body of typing people Part information, is realized the trackability of data, data is estimated using many aspects, it is ensured that related personnel is to business manager The demand of management, while in the form of electronic certificate, realizing the automatic input of Credential data, system carries data compilation and returns Shelves and accounting function, significantly reduce the workload of staff, and each financial decision can be carried out by mathematical model Simulation is implemented, and the formulation for final financial decision provides scientific basis.
To realize that the technical scheme that goal of the invention is taken is:
A kind of economic management system, is characterized in that, it includes:
One human-machine operation module, the human-machine operation module include:Picture input module, voice input module and word input mould Block, for carrying out being input into identification authentication data and the related text data occurred in business administration and business process and voucher Data, and the identification authentication data of input is sent to into identification module, by the related text data and Credential data of input Be sent to data processing module, comprehensive accounting module and simulation analysis module, at the same be additionally operable to input data call instruction and its His control command;
One identification module, the identification module is for completing user identity according to received identification authentication data Identification, and recognition result is sent to into central processing unit;
One data processing module, the data processing module is for will be the text data for receiving and Credential data corresponding with which Put on file storage is completed according to default algorithm after the identity identification information labelling of user;
One comprehensive accounting module, the comprehensive accounting module for according to default algorithm from received text data and with Corresponding data are excavated in identification in card data, complete enterprise in business administration and the synthetic nucleus of the occurred expense cost of business process Calculate, and generate various forms;Data identification module is set inside, for carrying out the identification of data on voucher classification voucher;
One enterprise's Con trolling index sets up module, and enterprise's Con trolling index sets up module for setting up Controlling Inner Enterprise index;
One relative analyses module, the relative analyses module are used for the accounting knot for contrasting internal control index and comprehensive accounting module Really, monitor in real time index completeness, and final report is generated, analysis result and final report are sent to into human expert decision model Block, functional evaluation module, risk evaluation module;
One risk evaluation module, the risk evaluation module are used to receive the result after relative analyses module analysis and final accounts report Accuse, complete risk assessment, and assessment result is sent to the mobile terminal specified;
One functional evaluation module, the functional evaluation module be used to receive relative analyses module analysis after result and final accounts report Accuse, and the examination & verification assessment of each Position Responsibility is completed according to default algorithm, and the structure of examination & verification assessment is sent to the shifting specified Dynamic terminal;
One human expert decision-making module, the human expert decision-making module are used to receive the result after the analysis of relative analyses module And final report, and expert decision-making is given for the result after analysis;
One simulation analysis module, the simulation analysis module is for being looked forward to according to received text data and Credential data The foundation of industry economic mathematical model, and the simulation analysis of each decision scheme are completed as needed;
One central processing unit, the central processing unit carry out opening for System Privileges for the identification result that basis is received Put;For according to information call instruction, the data message needed for people being called from corresponding data base, it is sent to display screen and enters Row shows;For adding user, deleting user, password modification, rights management.
Preferably, the data processing module includes:
Data compilation module, for eliminating the redundant content and institute's input data and data that exist between received data Conflict content in storehouse between legacy data;
Data markers module, for the received data for completing typesetting are matched with the identification result of input, And the time is input into by labelling each data, it is subsequently sent to data locking module;
Data locking module, for suitable position is found in data base for the data after the completion of labelling, and finds phase for which Likelihood data point, sets up which with the relation between similarity number strong point.
Preferably, the data locking module realizes data locking based on facet technology, by calculating different pieces of information art Facet distance between language is being accurately positioned data;In location data, corresponding term is selected under the constraint of known facet, with This if chosen successfully, returns corresponding data completing the description to desired data;If selecting unsuccessful, system The similarity of term will be calculated according to synonymicon and concept distance map, form new location information.
Preferably, the data compilation module adopts EKA algorithms and AKF algorithms, the redundant content to adopt Redundancy functions are purged, specifically, in redundancy functions, respectively by k1And k2In knowledge element take out e1And e2, so by e1And e2In X, Y and relation R are taken out and are compared and contrast xe respectively1, xe2, ye1, ye2, will be with phase With the element entry deletion of content, and retain original relation r value, relation is merged with not deleted item.
Preferably, the data base includes
Real-time data base, for being stored in the real time data that business administration and business process occur;
Historical data base, for preserving the data for expiring in real-time data base but needing persistence.
Preferably, the risk evaluation module includes
Graphic plotting module, for drawing and monitoring the various curve charts drawn according to the related data of input;
Regression Calculation module, for carrying out regression Calculation to the curve chart drawn by different functions;
Forecast analysis module, for receiving the result after relative analyses module analysis, and is carried out with default risk assessment index After contrast, risk assessment is completed;And
Economic conditions health discrimination module, for the result of risk assessment and default alarm index are carried out economic conditions health The assessment of situation, if unhealthy, sends alarm.
Preferably, the simulation analysis module includes
Mathematical Models module, for carrying out enterprise Jing according to received text data and Credential data by Flac3D The foundation of Ji mathematical model;
Virtual parameter module, can reach the corresponding result of direct access or information object by the insertion in the mathematical model set up Logical block;
Virtual parameter start module, for Mathematical Models module in each element opening relationships after, in specified scope It is interior that parameter is changed, so as to drive various simulating analysis to carry out calculating solution for different parameters;
Simulation analysis analog module, inside sets various simulating analysis and simulation analysis algorithm;
The virtual parameter start module performs simulation analysis module by circulating, and result is fed back to simulation analysis module, imitates True analysis module extracts result, and sends the result to the virtual parameter module, and the virtual parameter module receives result simultaneously Automatically show result data.
Preferably, also including a general management of projects module, including
Collect project cost payout message audit module, in business administration and business process, tracking, monitoring the project implementation Situation, pays the bill to Project contract and other direct costs carries out Macro or mass analysis;
Project cost object relative analyses module, for being collected by paying information to project cost, relative analyses project mesh Mark cost, cost objective of identifying project whether there is deviation, if there is no deviation, then continue tracking, monitored item purpose progress; Such as there is deviation, then call variance analyses unit to carry out variance analyses;
Variance analyses module, for when deviation occurs in project cost object, carrying out variance analyses, finds out and the concrete of deviation occurs Reason, and person liable's information of correlation;
Module is formulated in deviation measure, for, after project cost variance reason is found out, formulating corresponding satisfactory after correcting for deviation, Draft forming correction report;Project Cost Plan adjustment unit, for according to correction scheme, adjusted iterm cost planning is described Project Cost Plan includes the project plan of collecting and project funds expenditure plan;
Project cost quarterly report compiling module, for according to the indices in project cost quarterly report, carrying out data collection and analysis, And project cost quarterly report is worked out on request;
Trend analysiss module, for the result according to cost planning pre-adjustment, is analyzed to project cost trend, clearly may The change that exist or can affect;When objective cost is had influence on, comprehensive Change Control Procedure need to be entered;One is carried out if not As cost planning update;
Project cost budget update module, for being determined according to project cost budget adjustment result and project cost budget adjustment Other work plans are adjusted;
Other work plan update modules, for the renewal according to project cost budget, update respective project work plan.
Preferably, the identification module adopts vena metacarpea data identification means and vocal print data identification means.
Preferably, it is input into after being imaged after the vena metacarpea data are scanned by infrared vena metacarpea scanning recognition device; The voice print database is the vocal print feature that the user obtained in the voice of specific authentication text is read aloud from the user of typing.
The invention has the advantages that:
The various leaks occurred during economic management can be avoided, while different places can be provided according to different situations Reason decision-making, the typing of each data carry the identity information of typing people, realize the trackability of data, using many aspects Data are estimated, it is ensured that the demand that related personnel is managed to business manager, while in the form of electronic certificate, realizing The automatic input of Credential data, system carry data compilation filing and adjust function, significantly reduce the work of staff Amount, and each financial decision can be simulated enforcement by mathematical model, the formulation for final financial decision provides ginseng The foundation of the property examined.
Description of the drawings
Fig. 1 is a kind of structured flowchart of economic management system of the embodiment of the present invention.
Specific embodiment
In order that objects and advantages of the present invention become more apparent, with reference to embodiments the present invention is carried out further in detail Explanation.It should be appreciated that specific embodiment described herein is not intended to limit the present invention only to explain the present invention.
As shown in figure 1, a kind of economic management system is embodiments provided, including:
Human-machine operation module, including picture input module, voice input module and word input module, are used to carry out for input Identification authentication data and all related text datas occurred in business administration and business process and Credential data, and will be defeated The identification authentication data for entering is sent to identification module, and the related text data and Credential data of input are sent at data Reason module, comprehensive accounting module and simulation analysis module, while being additionally operable to input data call instruction and other control commands;
Identification module, for the identification of user identity is completed according to received identification authentication data, and identification is tied Fruit is sent to central processing unit;
Data processing module, for by the text data for the receiving and Credential data identity identification information of its corresponding user Put on file storage is completed according to default algorithm after labelling;
Comprehensive accounting module, for recognizing that from received text data and Credential data excavation is right according to default algorithm The data answered, complete enterprise in business administration and the comprehensive accounting of the occurred expense cost of business process, and generate various forms; Data identification module is set inside, for carrying out the identification of data on voucher classification voucher;
Enterprise's Con trolling index sets up module, for setting up Controlling Inner Enterprise index;
Relative analyses module, for contrasting the accounting result of internal control index and comprehensive accounting module, monitor in real time index is complete Cheng Du, and generate final report, by analysis result and final report be sent to human expert decision-making module, functional evaluation module, Risk evaluation module;
Risk evaluation module, for receiving result and final report after relative analyses module analysis, completes risk assessment, and will Assessment result is sent to the mobile terminal specified;
Functional evaluation module, for receiving result and final report after relative analyses module analysis, and according to default algorithm The examination & verification assessment of each Position Responsibility is completed, and the structure of examination & verification assessment is sent to the mobile terminal specified;
Human expert decision-making module, for receiving result and final report after the analysis of relative analyses module, and for analysis Result afterwards provides expert decision-making;
Simulation analysis module, for carrying out building for business economic mathematical model according to received text data and Credential data It is vertical, and the simulation analysis of each decision scheme are completed as needed;
Central processing unit, for the opening for carrying out System Privileges according to the identification result for receiving;For being adjusted according to information With order, the data message needed for people is called from corresponding data base, be sent to display screen and shown;Use for adding Family, deletion user, password modification, rights management;
Preferably, the data processing module includes
Data compilation module, for eliminating the redundant content and institute's input data and data that exist between received data Conflict content in storehouse between legacy data;
Data markers module, for the received data for completing typesetting are matched with the identification result of input, And the time is input into by labelling each data, it is subsequently sent to data locking module;
Data locking module, for suitable position is found in data base for the data after the completion of labelling, and finds phase for which Likelihood data point, sets up which with the relation between similarity number strong point.
The data locking module realizes data locking based on facet technology, by calculating the quarter between different pieces of information term Identity distance is from being accurately positioned data;In location data, corresponding term is selected under the constraint of known facet, completed with this Description to desired data, if chosen successfully, returns corresponding data;If selecting unsuccessful, system will be according to same Adopted word dictionary and concept distance map calculate the similarity of term, form new location information.
The data compilation module adopts EKA algorithms and AKF algorithms, the redundant content to enter using redundancy functions Row is removed, specifically, in redundancy functions, respectively by k1And k2In knowledge element take out e1And e2, so by e1And e2 In X, Y and relation R are taken out and are compared and contrast xe respectively1, xe2, ye1, ye2, the element entry with identical content is deleted Remove, and retain original relation r value, relation is merged with not deleted item.
The data base includes
Real-time data base, for being stored in the real time data that business administration and business process occur;
Historical data base, for preserving the data for expiring in real-time data base but needing persistence.
Preferably, the risk evaluation module includes
Graphic plotting module, for drawing and monitoring the various curve charts drawn according to the related data of input;
Regression Calculation module, for carrying out regression Calculation to the curve chart drawn by different functions;
Forecast analysis module, for receiving the result after relative analyses module analysis, and is carried out with default risk assessment index After contrast, risk assessment is completed;And
Economic conditions health discrimination module, for the result of risk assessment and default alarm index are carried out economic conditions health The assessment of situation, if unhealthy, sends alarm.
Preferably, the simulation analysis module includes
Mathematical Models module, for carrying out enterprise Jing according to received text data and Credential data by Flac3D The foundation of Ji mathematical model;
Virtual parameter module, can reach the corresponding result of direct access or information object by the insertion in the mathematical model set up Logical block;
Virtual parameter start module, for Mathematical Models module in each element opening relationships after, in specified scope It is interior that parameter is changed, so as to drive various simulating analysis to carry out calculating solution for different parameters;
Simulation analysis analog module, inside sets various simulating analysis and simulation analysis algorithm;
The virtual parameter start module performs simulation analysis module by circulating, and result is fed back to simulation analysis module, imitates True analysis module extracts result, and sends the result to the virtual parameter module, and the virtual parameter module receives result simultaneously Automatically show result data.
Also include a general management of projects module, including
Collect project cost payout message audit module, in business administration and business process, tracking, monitoring the project implementation Situation, pays the bill to Project contract and other direct costs carries out Macro or mass analysis;
Project cost object relative analyses module, for being collected by paying information to project cost, relative analyses project mesh Mark cost, cost objective of identifying project whether there is deviation, if there is no deviation, then continue tracking, monitored item purpose progress; Such as there is deviation, then call variance analyses unit to carry out variance analyses;
Variance analyses module, for when deviation occurs in project cost object, carrying out variance analyses, finds out and the concrete of deviation occurs Reason, and person liable's information of correlation;
Module is formulated in deviation measure, for, after project cost variance reason is found out, formulating corresponding satisfactory after correcting for deviation, Draft forming correction report;Project Cost Plan adjustment unit, for according to correction scheme, adjusted iterm cost planning is described Project Cost Plan includes the project plan of collecting and project funds expenditure plan;
Project cost quarterly report compiling module, for according to the indices in project cost quarterly report, carrying out data collection and analysis, And project cost quarterly report is worked out on request;
Trend analysiss module, for the result according to cost planning pre-adjustment, is analyzed to project cost trend, clearly may The change that exist or can affect;When objective cost is had influence on, comprehensive Change Control Procedure need to be entered;One is carried out if not As cost planning update;
Project cost budget update module, for being determined according to project cost budget adjustment result and project cost budget adjustment Other work plans are adjusted;
Other work plan update modules, for the renewal according to project cost budget, update respective project work plan.
The identification module adopts vena metacarpea data identification means and vocal print data identification means.
The vena metacarpea data are input into after being imaged after being scanned by infrared vena metacarpea scanning recognition device;The vocal print Data are the vocal print feature that the user obtained in the voice of specific authentication text is read aloud from the user of typing.
Originally the principle for being embodied as vena metacarpea authentication module is:
Palm as life entity living a part when, the near infrared light that the hemoglobin in palm vein can be launched by device is inhaled Receive, collection imaging;If human body loses life or palm and is divided out from human body, palm is become as non-living body, it is impossible to filled Collection imaging is put, then cannot carry out identification.
The above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, under the premise without departing from the principles of the invention, some improvements and modifications can also be made, these improvements and modifications also should It is considered as protection scope of the present invention.

Claims (10)

1. a kind of economic management system, it is characterised in that it includes:
One human-machine operation module, the human-machine operation module include:Picture input module, voice input module and word input mould Block, for carrying out being input into identification authentication data and the related text data occurred in business administration and business process and voucher Data, and the identification authentication data of input is sent to into identification module, by the related text data and Credential data of input Be sent to data processing module, comprehensive accounting module and simulation analysis module, at the same be additionally operable to input data call instruction and its His control command;
One identification module, the identification module is for completing user identity according to received identification authentication data Identification, and recognition result is sent to into central processing unit;
One data processing module, the data processing module is for will be the text data for receiving and Credential data corresponding with which Put on file storage is completed according to default algorithm after the identity identification information labelling of user;
One comprehensive accounting module, the comprehensive accounting module for according to default algorithm from received text data and with Corresponding data are excavated in identification in card data, complete enterprise in business administration and the synthetic nucleus of the occurred expense cost of business process Calculate, and generate various forms;Data identification module is set inside, for carrying out the identification of data on voucher classification voucher;
One enterprise's Con trolling index sets up module, and enterprise's Con trolling index sets up module for setting up Controlling Inner Enterprise index;
One relative analyses module, the relative analyses module are used for the accounting knot for contrasting internal control index and comprehensive accounting module Really, monitor in real time index completeness, and final report is generated, analysis result and final report are sent to into human expert decision model Block, functional evaluation module, risk evaluation module;
One risk evaluation module, the risk evaluation module are used to receive the result after relative analyses module analysis and final accounts report Accuse, complete risk assessment, and assessment result is sent to the mobile terminal specified;
One functional evaluation module, the functional evaluation module be used to receive relative analyses module analysis after result and final accounts report Accuse, and the examination & verification assessment of each Position Responsibility is completed according to default algorithm, and the structure of examination & verification assessment is sent to the shifting specified Dynamic terminal;
One human expert decision-making module, the human expert decision-making module are used to receive the result after the analysis of relative analyses module And final report, and expert decision-making is given for the result after analysis;
One simulation analysis module, the simulation analysis module is for being looked forward to according to received text data and Credential data The foundation of industry economic mathematical model, and the simulation analysis of each decision scheme are completed as needed;
One central processing unit, the central processing unit carry out opening for System Privileges for the identification result that basis is received Put;
For according to information call instruction, the data message needed for people being called from corresponding data base, display screen is sent to Shown;For adding user, deleting user, password modification, rights management.
2. a kind of economic management system according to claim 1, it is characterised in that the data processing module includes:Number According to sorting module, data markers module and data locating module, the data compilation module is used to eliminate received data Between the redundant content that exists and the content that conflicts between institute's input data and legacy data in data base;The data markers Module is for the received data for completing typesetting are matched with the identification result of input, and labelling each data The time being input into, it is subsequently sent to data locking module;The data locking module is used to exist for the data after the completion of labelling Suitable position is found in data base, and similarity number strong point is found for which, set up which with the relation between similarity number strong point.
3. a kind of economic management system according to claim 2, it is characterised in that the data locking module is based on facet Technology is accurately positioned data by calculating the facet distance between different pieces of information term realizing data locking;In location data When, corresponding term is selected under the constraint of known facet, the description to desired data is completed with this, if chosen successfully, Corresponding data are returned then;If selecting unsuccessful, system will calculate term according to synonymicon and concept distance map Similarity, forms new location information.
4. a kind of economic management system according to claim 2, it is characterised in that the data compilation module adopts EKA Algorithm and AKF algorithms, the redundant content are purged using redundancy functions, specifically, in redundancy functions In, respectively by k1And k2In knowledge element take out e1And e2, so by e1And e2In X, Y and relation R are taken out and are compared simultaneously Xe is contrasted respectively1, xe2, ye1, ye2, by the element entry deletion with identical content, and retain original relation r value, by relation with It is not deleted item to merge.
5. a kind of economic management system according to claim 1, it is characterised in that the data base includes:Real time data Storehouse and historical data base, the real-time data base are used to be stored in the real time data that business administration and business process occur;
The historical data base expires in being used to preserve real-time data base but needs the data of persistence.
6. a kind of economic management system according to claim 1, it is characterised in that the risk evaluation module includes:Figure Shape drafting module, regression Calculation module, forecast analysis module and economic conditions health discrimination module, the graphic plotting module For drawing and monitoring the various curve charts drawn according to the related data of input;The regression Calculation module is used for by difference The curve chart drawn by function pair carries out regression Calculation;After the forecast analysis module is used to receive relative analyses module analysis As a result, after and being contrasted with default risk assessment index, complete risk assessment;The economic conditions health discrimination module is used In the assessment that the result of risk assessment and default alarm index are carried out economic conditions health status, if unhealthy, send Alarm.
7. a kind of economic management system according to claim 1, it is characterised in that the simulation analysis module includes:Number Model building module, virtual parameter module, virtual parameter start module and simulation analysis analog module are learned, the mathematical model is built Formwork erection block is used to carry out the building of business economic mathematical model according to received text data and Credential data by Flac3D It is vertical;The virtual parameter module can reach the corresponding result of direct access or information mesh by the insertion in the mathematical model set up Target logical block;The virtual parameter start module for Mathematical Models module in each element opening relationships after, Parameter is changed in specified scope, ask so as to drive various simulating analysis calculating to be carried out for different parameters Solution;Various simulating analysis and simulation analysis algorithm are set in the simulation analysis analog module;The virtual parameter makees dynamic model Result is fed back to simulation analysis module by circulating execution simulation analysis module by block, and simulation analysis module extracts result, and will As a result the virtual parameter module is sent to, the virtual parameter module receives result and shows automatically result data.
8. a kind of economic management system according to claim 1, it is characterised in that also including a general management of projects mould Block, it is described to include including general management of projects module:Collect project cost payout message audit module, project cost object contrast Module, trend analysiss module, project cost quarterly report compiling module, trend are formulated in analysis module, variance analyses module, deviation measure Analysis module, project cost budget update module and other work plan update modules, collect project cost payout message audit Module is for, in business administration and business process, tracking, monitoring project implementation status are paid the bill to Project contract and other are straight It is connected into;The project cost object relative analyses module is for the remittance by information is paid to project cost Always, relative analyses project objective cost, cost objective of identifying project whether there is deviation, if there is no deviation, then continue with Track, monitored item purpose progress;Such as there is deviation, then call variance analyses unit to carry out variance analyses;The variance analyses module For when deviation occurs in project cost object, carrying out variance analyses, the concrete reason for deviation occur, and the duty of correlation are found out Appoint personal information;The deviation measure formulates module for, after project cost variance reason is found out, formulating corresponding for deviation Satisfactory after correcting, draft to be formed correction report;Project Cost Plan adjustment unit, for according to correction scheme, adjusted iterm into This plan, the Project Cost Plan include the project plan of collecting and project funds expenditure plan;The project cost quarterly report is compiled Molding block is used for according to the indices in project cost quarterly report, carries out data collection and analysis, and work out on request project into This quarterly report;The trend analysiss module, for the result according to cost planning pre-adjustment, is analyzed to project cost trend, The change that clearly there may be or can affect;When objective cost is had influence on, comprehensive Change Control Procedure need to be entered;If no Then carry out general cost planning to update;The project cost budget update module, for being tied according to project cost budget adjustment Fruit and project cost budget adjustment determine that other work plans are adjusted;Described other work plan update modules, for basis The renewal of project cost budget, updates respective project work plan.
9. a kind of economic management system according to claim 1, it is characterised in that the identification module is quiet using the palm Arteries and veins data identification means and vocal print data identification means.
10. a kind of economic management system according to claim 9, it is characterised in that the vena metacarpea data are by infrared Vena metacarpea scanning recognition device is input into after being imaged after being scanned;The voice print database is to read aloud specific authentication from the user of typing The vocal print feature of the user obtained in the voice of text.
CN201610948039.5A 2016-10-26 2016-10-26 Economy management system Pending CN106570624A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610948039.5A CN106570624A (en) 2016-10-26 2016-10-26 Economy management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610948039.5A CN106570624A (en) 2016-10-26 2016-10-26 Economy management system

Publications (1)

Publication Number Publication Date
CN106570624A true CN106570624A (en) 2017-04-19

Family

ID=58536563

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610948039.5A Pending CN106570624A (en) 2016-10-26 2016-10-26 Economy management system

Country Status (1)

Country Link
CN (1) CN106570624A (en)

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107103423A (en) * 2017-04-24 2017-08-29 广西民族师范学院 One kind integrates budgeted financial system
CN107230102A (en) * 2017-05-13 2017-10-03 吉林工程技术师范学院 A kind of electronic publication publishing system
CN107274281A (en) * 2017-06-10 2017-10-20 杨建慧 A kind of Accounting network system
CN107301219A (en) * 2017-06-16 2017-10-27 杭州凯达电力建设有限公司 A kind of Electric Power Network Planning data management system
CN107330611A (en) * 2017-06-28 2017-11-07 谢萍 A kind of economic management system
CN107403308A (en) * 2017-08-07 2017-11-28 广州美捷软件有限公司 Data managing method, system, computer-readable recording medium and computer equipment
CN107423607A (en) * 2017-07-19 2017-12-01 南阳师范学院 A kind of data of financial transaction safety management system
CN107609081A (en) * 2017-08-29 2018-01-19 河南职业技术学院 A kind of Financial Information audit management system
CN107993010A (en) * 2017-12-02 2018-05-04 中科钢研节能科技有限公司 A kind of project responsible investigation automatic analysis system and automatic analysis method
CN108198063A (en) * 2018-01-20 2018-06-22 菏泽学院 A kind of financial management system
CN108492345A (en) * 2018-01-24 2018-09-04 西安理工大学 A kind of data block division methods based on change of scale
CN108897997A (en) * 2018-06-25 2018-11-27 武汉凡果信息技术股份有限公司 A kind of financial security system and its management method
CN109284914A (en) * 2018-09-07 2019-01-29 西安航空职业技术学院 A kind of economic management cost control system
CN109785104A (en) * 2019-01-23 2019-05-21 常州市第二人民医院 A kind of financial data management method and system
CN110297905A (en) * 2019-06-27 2019-10-01 郑州铁路职业技术学院 A kind of computer system for economic management analysis data
CN111046103A (en) * 2019-11-29 2020-04-21 微创(上海)网络技术股份有限公司 Decision method for distributed concurrent data processing tasks
CN111402021A (en) * 2020-03-09 2020-07-10 济源职业技术学院 Financial risk early warning management system
CN111415100A (en) * 2020-04-15 2020-07-14 湖南化工职业技术学院(湖南工业高级技工学校) Economic management cost control system
CN111709594A (en) * 2019-08-15 2020-09-25 河南工业贸易职业学院(河南省粮食干部学校) Economic management data analysis system
CN111754094A (en) * 2020-06-15 2020-10-09 苏州工业园区服务外包职业学院 Intelligent economic management system of distribution integration
CN111898885A (en) * 2020-07-16 2020-11-06 广东金宇恒软件科技有限公司 Collective economic management and supervisory systems
US11320918B2 (en) 2018-09-21 2022-05-03 Hefei Boe Optoelectronics Technology Co., Ltd. Active touch pen, touch input system and method of driving the same

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104881753A (en) * 2015-06-04 2015-09-02 中共安阳市委党校 Control system of internal economic management cost of enterprise
CN105335820A (en) * 2015-10-16 2016-02-17 新乡学院 Economic management system
CN105701598A (en) * 2015-12-25 2016-06-22 中国石油大学(华东) Economic management cost control system
CN105975826A (en) * 2016-04-20 2016-09-28 中国石油大学(华东) Enterprise economic management information security system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104881753A (en) * 2015-06-04 2015-09-02 中共安阳市委党校 Control system of internal economic management cost of enterprise
CN105335820A (en) * 2015-10-16 2016-02-17 新乡学院 Economic management system
CN105701598A (en) * 2015-12-25 2016-06-22 中国石油大学(华东) Economic management cost control system
CN105975826A (en) * 2016-04-20 2016-09-28 中国石油大学(华东) Enterprise economic management information security system

Cited By (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107103423A (en) * 2017-04-24 2017-08-29 广西民族师范学院 One kind integrates budgeted financial system
CN107230102A (en) * 2017-05-13 2017-10-03 吉林工程技术师范学院 A kind of electronic publication publishing system
CN107274281A (en) * 2017-06-10 2017-10-20 杨建慧 A kind of Accounting network system
CN107301219A (en) * 2017-06-16 2017-10-27 杭州凯达电力建设有限公司 A kind of Electric Power Network Planning data management system
CN107330611A (en) * 2017-06-28 2017-11-07 谢萍 A kind of economic management system
CN107423607A (en) * 2017-07-19 2017-12-01 南阳师范学院 A kind of data of financial transaction safety management system
CN107403308B (en) * 2017-08-07 2021-05-25 广州美捷软件有限公司 Data management method, system, computer readable storage medium and computer device
CN107403308A (en) * 2017-08-07 2017-11-28 广州美捷软件有限公司 Data managing method, system, computer-readable recording medium and computer equipment
CN107609081A (en) * 2017-08-29 2018-01-19 河南职业技术学院 A kind of Financial Information audit management system
CN107993010A (en) * 2017-12-02 2018-05-04 中科钢研节能科技有限公司 A kind of project responsible investigation automatic analysis system and automatic analysis method
CN107993010B (en) * 2017-12-02 2022-05-06 中科钢研节能科技有限公司 Project due diligence automatic analysis system and automatic analysis method
CN108198063A (en) * 2018-01-20 2018-06-22 菏泽学院 A kind of financial management system
CN108492345A (en) * 2018-01-24 2018-09-04 西安理工大学 A kind of data block division methods based on change of scale
CN108897997A (en) * 2018-06-25 2018-11-27 武汉凡果信息技术股份有限公司 A kind of financial security system and its management method
CN109284914A (en) * 2018-09-07 2019-01-29 西安航空职业技术学院 A kind of economic management cost control system
US11320918B2 (en) 2018-09-21 2022-05-03 Hefei Boe Optoelectronics Technology Co., Ltd. Active touch pen, touch input system and method of driving the same
CN109785104A (en) * 2019-01-23 2019-05-21 常州市第二人民医院 A kind of financial data management method and system
CN110297905A (en) * 2019-06-27 2019-10-01 郑州铁路职业技术学院 A kind of computer system for economic management analysis data
CN111709594A (en) * 2019-08-15 2020-09-25 河南工业贸易职业学院(河南省粮食干部学校) Economic management data analysis system
CN111046103A (en) * 2019-11-29 2020-04-21 微创(上海)网络技术股份有限公司 Decision method for distributed concurrent data processing tasks
CN111402021A (en) * 2020-03-09 2020-07-10 济源职业技术学院 Financial risk early warning management system
CN111415100A (en) * 2020-04-15 2020-07-14 湖南化工职业技术学院(湖南工业高级技工学校) Economic management cost control system
CN111754094A (en) * 2020-06-15 2020-10-09 苏州工业园区服务外包职业学院 Intelligent economic management system of distribution integration
CN111898885A (en) * 2020-07-16 2020-11-06 广东金宇恒软件科技有限公司 Collective economic management and supervisory systems
CN111898885B (en) * 2020-07-16 2024-05-24 广东金宇恒软件科技有限公司 Collective economic management and supervision system

Similar Documents

Publication Publication Date Title
CN106570624A (en) Economy management system
CN105913527B (en) Visitor's two dimensional code intelligent verification system and verification method based on cell cloud
CN106897568A (en) The treating method and apparatus of case history structuring
CN106203940A (en) Business administration overall evaluation system
CN105701598A (en) Economic management cost control system
US20140226874A1 (en) Method And System To Authenticate An Object
CN110322147A (en) A kind of Project Supervision approaches to IM and system
CN108564207A (en) Architectural engineering intelligence Authorize to Bid based on BIM manages system
CN107111811A (en) For the prediction based on model for the optimum convenience measurement for authorizing transaction
JP2018045340A (en) Immigration inspection system and method
CN109978870A (en) Method and apparatus for output information
CN110689443A (en) Insurance data processing method and device, storage medium and server
CN110603558A (en) System and method for managing fraud detection in a financial transaction system
CN109859085A (en) Safe early warning method and Related product
CN106264545A (en) Step recognition method and device
CN110852714A (en) Salary improvement data management system applied to decoration service platform
CN114066584A (en) Method and device for risk prevention and control of block chain
CN113822645A (en) Interview management system, equipment and computer medium
CN115049217A (en) Method and device for generating travel strategy, computer equipment and storage medium
CN111667583B (en) Intelligent passing verification system based on gate
CN115081920A (en) Attendance check attendance check scheduling management method, system, equipment and storage medium
CN115204893A (en) Face recognition method and device for electronic payment and computer equipment
Aydemir et al. Exploring alternative designs for sociotechnical systems
CN114547053A (en) System-based data processing method and device, computer equipment and storage medium
CN112766871A (en) Capital issuing system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170419

RJ01 Rejection of invention patent application after publication