CN106552894A - The enclosed hole-punching method of the high cylinder ring of GH99 alloys - Google Patents

The enclosed hole-punching method of the high cylinder ring of GH99 alloys Download PDF

Info

Publication number
CN106552894A
CN106552894A CN201611092430.6A CN201611092430A CN106552894A CN 106552894 A CN106552894 A CN 106552894A CN 201611092430 A CN201611092430 A CN 201611092430A CN 106552894 A CN106552894 A CN 106552894A
Authority
CN
China
Prior art keywords
drift
alloy
punching
alloy blanks
forging hammer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611092430.6A
Other languages
Chinese (zh)
Inventor
杨晋
孔凡立
雷静越
王莹
任腾飞
李艳红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
AVIC Guizhou Anda Aviation Forging Co Ltd
Original Assignee
Guizhou Anda Aviation Forging Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Anda Aviation Forging Co Ltd filed Critical Guizhou Anda Aviation Forging Co Ltd
Priority to CN201611092430.6A priority Critical patent/CN106552894A/en
Publication of CN106552894A publication Critical patent/CN106552894A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21JFORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
    • B21J5/00Methods for forging, hammering, or pressing; Special equipment or accessories therefor
    • B21J5/06Methods for forging, hammering, or pressing; Special equipment or accessories therefor for performing particular operations
    • B21J5/08Upsetting
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21JFORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
    • B21J1/00Preparing metal stock or similar ancillary operations prior, during or post forging, e.g. heating or cooling
    • B21J1/06Heating or cooling methods or arrangements specially adapted for performing forging or pressing operations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21JFORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
    • B21J13/00Details of machines for forging, pressing, or hammering
    • B21J13/02Dies or mountings therefor
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21JFORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
    • B21J5/00Methods for forging, hammering, or pressing; Special equipment or accessories therefor
    • B21J5/06Methods for forging, hammering, or pressing; Special equipment or accessories therefor for performing particular operations
    • B21J5/10Piercing billets

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Forging (AREA)

Abstract

The invention discloses a kind of enclosed hole-punching method of the high cylinder ring of GH99 alloys, its step is:Punching die is first designed, punching die outer wall has for fixed dovetail groove, in punching die, have the spacing disc of adjustment billet location, the punching in punching die of GH99 alloy blanks;Meanwhile, drain cap is designed, drain cap outer wall also has for fixed dovetail groove, and drain cap upper end limited location hole, GH99 alloy blanks are just placed on spacing control, in drain cap wash GH99 alloy blanks open, realize the high cylinder ring punching of GH99 alloys.The method has been prevented from blank end face and has drawn the defects such as material, deformation, improves the concordance of blank.The method is used for the punching of high cylinder ring.

Description

The enclosed hole-punching method of the high cylinder ring of GH99 alloys
Technical field
The present invention relates to a kind of hole-punching method, the more particularly to enclosed hole-punching method of the high cylinder ring of GH99 alloys.
Background technology
High cylinder ring is the revolving body parts that the fields such as Aero-Space often use, and the forging height is compared with wall thickness Greatly, generally using roll forming.Rolling generally refers to radial rolling, is reduction wall thickness, makes the process that internal-and external diameter is grown up, height Vary less;Even if state-of-the-art journal axle is two-way now rolls loop technique, also height can only be reduced by cone roller, and can not be good Control height is grown up.So in base, the height of blank to be typically designed to the height of equal or slightly larger than ring, then For high cylinder ring, blank end face is easily caused in punching and draws the defects such as material, deformation, affect forging quality.At present simultaneously Without good control method.
The content of the invention
The technical problem to be solved in the present invention is to provide a kind of method of employing enclosed punching, by designing enclosed perforating die Tool, is punched out to height ring in a mold, it is ensured that is not in that end face draws the defects such as material, deformation in punching, is improved forging Part quality.
To solve above-mentioned technical problem, the enclosed hole-punching method of the high cylinder ring of GH99 alloys of the present invention, its technical side Case is comprised the following steps:
GH99 alloys are cutting into into bar according to certain specification;GH99 alloy bar materials are heated to into 1130 ± 10 DEG C of guarantors Temperature, charging temperature≤700 DEG C;After heat penetration, GH99 alloy bar materials are placed on forcing press, drive forging hammer to enter GH99 alloy bar materials Row jumping-up is to preliminary dimension;GH99 alloy blanks after jumping-up are put in punching die, and is placed under forcing press together, punching The outer wall of mould has for fixed dovetail groove, prevents punching die and GH99 alloy blanks from moving with forging hammer, in punching die Spacing disc is placed with, the disc is designed according to the height of GH99 alloy blanks, makes to hold level with both hands on GH99 alloy blanks and punching die Together, it is ensured that forging hammer will not be collided with punching die in punching;Suitable drift is placed at center on GH99 alloy blanks, Drive forging hammer to push drift, drift is pressed in GH99 alloy blanks, is then taken out, forging hammer driving force Wherein, σSFor Real Flow Field stress under corresponding deformation temperature and speed, μ is friction factor, and S is base The contact area of material and drift, H are the depth that drift is pressed into blank;GH99 alloy blanks are taken out and are placed on drain cap, drain cap Outer wall also have for fixed dovetail groove, the upper end spacing hole of drain cap, the external diameter one of spacing hole size and GH99 alloy blanks Cause, GH99 alloy blanks are just placed in spacing hole;It is placed on after drift is inverted on the endoporus of GH99 alloy blanks, drives forging hammer Drift is pushed, drift is pressed in GH99 alloy blanks;Forging hammer is lifted, a cushion block is put on drift, then is driven forging hammer Cushion block is pushed, GH99 alloy blanks are washed open, cushion block, drift and punching core material are spilt from drain cap together, complete GH99 alloys Ring punching.
Compared with prior art, beneficial effects of the present invention are as follows:
The enclosed hole-punching method of the high cylinder ring of GH99 alloys of the present invention, by designing punching die, it is therefore prevented that blank End face draws the defects such as material, deformation, and blank need not carry out round as a ball shaping operation, reduces operating procedure and reduces operation hardly possible Degree, improves production efficiency.Blank is deformed in a mold, the improvement of its presentation quality, and billet size precision and Batch stability is improved.The spacing hole of drain cap can also prevent from occurring rushing during punching wait partially error, improve the consistent of blank Property.
Description of the drawings
With reference to the accompanying drawings and detailed description the present invention is described in further detail.
Fig. 1 is the structural representation of punching die.
Fig. 2 is the structural representation of disc.
Fig. 3 is drift press-in blank process schematic.
Fig. 4 is to be pressed into blank process schematic after drift is inverted.
Fig. 5 is the process schematic washed blank open using cushion block.
Specific embodiment
The enclosed hole-punching method for implementing the high cylinder ring of GH99 alloys of the present invention needs to provide forge furnace, pressure The equipment such as machine, mechanical hand.Its specific embodiment:
The main chemical elements content (percentage by weight) of the GH99 alloys is:C content≤0.08%, containing Cr amount 17.0% ~20.0%, 5.0%~8.0% is measured containing Co, measure 1.7% containing W amounts 5.0%~7.0%, containing Mo amounts 3.5%~4.5%, containing Al ~2.4%, 1.0%~1.5% is measured containing Ti, measure containing Fe amounts≤2.0%, containing B amounts≤0.005%, containing Ce amounts≤0.02%, containing Mg ≤ 0.01% ,≤0.4%, si content≤0.5%, P content≤0.015% are measured containing Mn ,≤0.015%, balance of Ni is measured containing S.
The step of this method, is as follows:
GH99 alloys are cutting into into bar according to certain specification;GH99 alloy bar materials are heated to into 1130 ± 10 DEG C of guarantors Temperature, charging temperature≤700 DEG C;After heat penetration, GH99 alloy bar materials are placed on forcing press, drive forging hammer to enter GH99 alloy bar materials Row jumping-up is to preliminary dimension;GH99 alloy blanks 4 after jumping-up are put in punching die 1, and is placed under forcing press together, rush The outer wall of punch die 1 has for fixed dovetail groove, prevents punching die 1 and GH99 alloy blanks 4 from moving with forging hammer, such as Fig. 1 It is shown, spacing disc 2 is placed with punching die 1, the disc 2 is designed according to the height of GH99 alloy blanks 4, makes GH99 alloy preforms Material 4 is concordant with 1 upper end of punching die, it is ensured that forging hammer will not be collided with punching die 1 in punching;On GH99 alloy blanks 4 Suitable drift 3 is placed at the center in face, is driven forging hammer to push drift 3, drift 3 is pressed in GH99 alloy blanks 4, Ran Houqu Go out, forging hammer driving forceWherein, σSShould for Real Flow Field under corresponding deformation temperature and speed Power, μ are friction factor, and S is the contact area of blank and drift, and H is the depth that drift is pressed into blank;By GH99 alloy blanks 4 Take out and be placed on drain cap 5, the outer wall of drain cap 5 also has for fixed dovetail groove, the upper end spacing hole of drain cap 5, spacing hole chi Very little consistent with the external diameter of GH99 alloy blanks 4, GH99 alloy blanks 4 are just placed in spacing hole;It is placed on after drift 3 is inverted On the endoporus of GH99 alloy blanks 4, drive forging hammer to push drift 3, drift 3 is pressed in GH99 alloy blanks 4;Forging hammer is lifted Rise, a cushion block 6 is put on drift 3, then drives forging hammer to push cushion block 6, GH99 alloy blanks 4 are washed open, cushion block 6, drift 3 And punching core material is spilt from drain cap 5 together, GH99 alloy rings punchings are completed.

Claims (1)

1. the enclosed hole-punching method of the high cylinder ring of a kind of GH99 alloys, it is characterised in that comprise the following steps:
GH99 alloys are cutting into into bar according to certain specification;GH99 alloy bar materials are heated to into 1130 ± 10 DEG C of insulations, dress Furnace temperature≤700 DEG C;After heat penetration, GH99 alloy bar materials are placed on forcing press, drive forging hammer upsetting to be carried out to GH99 alloy bar materials Slightly to preliminary dimension;GH99 alloy blanks after jumping-up are put in punching die, and is placed under forcing press together, punching die Outer wall have for fixed dovetail groove, prevent punching die and GH99 alloy blanks with forging hammer move, be placed with punching die Spacing disc, the disc are designed according to the height of GH99 alloy blanks, make GH99 alloy blanks concordant with punching die upper end, really Protect forging hammer to collide with punching die in punching;Suitable drift is placed at center on GH99 alloy blanks, drives forging Hammer pushes drift, drift is pressed in GH99 alloy blanks, is then taken out, forging hammer driving force Wherein, σSFor Real Flow Field stress under corresponding deformation temperature and speed, μ is friction factor, and S is the contact surface of blank and drift Product, H are the depth that drift is pressed into blank;GH99 alloy blanks are taken out and are placed on drain cap, the outer wall of drain cap also has for solid Fixed dovetail groove, the upper end spacing hole of drain cap, spacing hole size are consistent with the external diameter of GH99 alloy blanks, and GH99 alloy blanks are just It is placed in spacing hole well;It is placed on after drift is inverted on the endoporus of GH99 alloy blanks, drives forging hammer to push drift, by drift pressure Enter in GH99 alloy blanks;Forging hammer is lifted, a cushion block is put on drift, then is driven forging hammer to push cushion block, GH99 is closed Golden blank is washed open, and cushion block, drift and punching core material are spilt from drain cap together, completes GH99 alloy rings punchings.
CN201611092430.6A 2016-12-01 2016-12-01 The enclosed hole-punching method of the high cylinder ring of GH99 alloys Pending CN106552894A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611092430.6A CN106552894A (en) 2016-12-01 2016-12-01 The enclosed hole-punching method of the high cylinder ring of GH99 alloys

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611092430.6A CN106552894A (en) 2016-12-01 2016-12-01 The enclosed hole-punching method of the high cylinder ring of GH99 alloys

Publications (1)

Publication Number Publication Date
CN106552894A true CN106552894A (en) 2017-04-05

Family

ID=58445721

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611092430.6A Pending CN106552894A (en) 2016-12-01 2016-12-01 The enclosed hole-punching method of the high cylinder ring of GH99 alloys

Country Status (1)

Country Link
CN (1) CN106552894A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111215567A (en) * 2019-12-06 2020-06-02 陕西宏远航空锻造有限责任公司 Forging method for improving grain size of GH4099 high-temperature alloy thin-wall ring

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1736630A (en) * 2005-05-31 2006-02-22 太原科技大学 Method for producing circular cog hot forged from generator protective ring and mould
CN101391368A (en) * 2008-10-30 2009-03-25 江苏森威精锻有限公司 Machining method of deep-hole pin bush parts
DE102009016654A1 (en) * 2009-04-07 2010-10-14 Tekfor Cologne Gmbh Production process of pipe material
CN102248103A (en) * 2011-04-11 2011-11-23 徐州九鼎锻造科技有限公司 Large wind power flange cake base pressing and double punching complex technology
CN102294424A (en) * 2011-08-05 2011-12-28 太原科技大学 Forging method for preventing cracks from being generated by hot forging of Mn18Cr18N steel protecting ring
CN106001347A (en) * 2016-06-30 2016-10-12 安徽省瑞杰锻造有限责任公司 Foundation template forging process for inner and outer step forged piece

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1736630A (en) * 2005-05-31 2006-02-22 太原科技大学 Method for producing circular cog hot forged from generator protective ring and mould
CN101391368A (en) * 2008-10-30 2009-03-25 江苏森威精锻有限公司 Machining method of deep-hole pin bush parts
DE102009016654A1 (en) * 2009-04-07 2010-10-14 Tekfor Cologne Gmbh Production process of pipe material
CN102248103A (en) * 2011-04-11 2011-11-23 徐州九鼎锻造科技有限公司 Large wind power flange cake base pressing and double punching complex technology
CN102294424A (en) * 2011-08-05 2011-12-28 太原科技大学 Forging method for preventing cracks from being generated by hot forging of Mn18Cr18N steel protecting ring
CN106001347A (en) * 2016-06-30 2016-10-12 安徽省瑞杰锻造有限责任公司 Foundation template forging process for inner and outer step forged piece

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111215567A (en) * 2019-12-06 2020-06-02 陕西宏远航空锻造有限责任公司 Forging method for improving grain size of GH4099 high-temperature alloy thin-wall ring

Similar Documents

Publication Publication Date Title
CN108421951B (en) EMU driving device wheel hub forging production technique
US20140053623A1 (en) Hot extrusion method for producing a metal part, extrusion tool for implementation it and landing gear rod thus produced
EP2121221B1 (en) Method of making a powder metal forging
KR20060066629A (en) A large profile ring and method
JP4117896B2 (en) Manufacturing method of ring forging material
CN105382157A (en) Forming method for large special-shaped structural steel multi-step ring piece
CN210387405U (en) Tool die for hot forging and cold forging composite distribution plastic forming
CN112207215A (en) Forming method of multi-step large special-shaped ring piece
CN106734806A (en) The enclosed hole-punching method of 1Cr12Ni2WMoVNb steel cylinder ring high
CN106552894A (en) The enclosed hole-punching method of the high cylinder ring of GH99 alloys
KR20080102033A (en) Manufacturing method using of back pressure forming type cold working device for extruded forging workpiece
CN106552896A (en) The enclosed hole-punching method of the high cylinder ring of GH4169 alloys
CN106552895A (en) The enclosed hole-punching method of the high cylinder ring of GH141 alloys
CN104550584A (en) Roll forming method for cobalt-based superalloy thick-wall ring forgings
CN107414000A (en) The enclosed hole-punching method of aluminium alloy height cylinder ring
CN106583615A (en) Closed punching method for Ti55 alloy high-barrel ring piece
CN107570644A (en) The rolling and fetal membrane forging of the double flange semi-rings of bearing steel are unified into shape method
JP7336737B2 (en) Manufacturing method of inner and outer rings by hot former
RU2572687C1 (en) Method of production of steel forgings of ball valve half-casings
CN106623752A (en) Closed punching method of TC4 alloy high barrel ring part
CN106583613A (en) Closed punching method of GH188 alloy high cylinder ring piece
CN106734804A (en) The enclosed hole-punching method of GH907 alloys cylinder ring high
CN104550586A (en) Rolling and forming method for iron-based high-temperature alloy thick-walled ring forging
CN106623717A (en) Closed punching method for 1Cr13 type stainless steel high-drum ring piece
CN106799449A (en) The enclosed hole-punching method of beta titanium alloy cylinder ring high

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170405

WD01 Invention patent application deemed withdrawn after publication