CN106522972A - Tunnel boring machine (TBM) cutterhead and shield jamming processing method - Google Patents
Tunnel boring machine (TBM) cutterhead and shield jamming processing method Download PDFInfo
- Publication number
- CN106522972A CN106522972A CN201611035722.6A CN201611035722A CN106522972A CN 106522972 A CN106522972 A CN 106522972A CN 201611035722 A CN201611035722 A CN 201611035722A CN 106522972 A CN106522972 A CN 106522972A
- Authority
- CN
- China
- Prior art keywords
- annular
- pilot tunnel
- little pilot
- shield
- tbm
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000003672 processing method Methods 0.000 title claims abstract description 13
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 32
- 239000010959 steel Substances 0.000 claims abstract description 32
- 238000000034 method Methods 0.000 claims abstract description 13
- 238000010276 construction Methods 0.000 claims abstract description 8
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 4
- 238000009412 basement excavation Methods 0.000 claims description 8
- 239000011435 rock Substances 0.000 claims description 7
- 230000001360 synchronised effect Effects 0.000 claims description 6
- 230000010412 perfusion Effects 0.000 claims description 3
- 230000002787 reinforcement Effects 0.000 claims description 3
- 238000007789 sealing Methods 0.000 claims description 3
- 238000005476 soldering Methods 0.000 claims description 3
- 238000006243 chemical reaction Methods 0.000 claims description 2
- 238000007569 slipcasting Methods 0.000 claims description 2
- NMFHJNAPXOMSRX-PUPDPRJKSA-N [(1r)-3-(3,4-dimethoxyphenyl)-1-[3-(2-morpholin-4-ylethoxy)phenyl]propyl] (2s)-1-[(2s)-2-(3,4,5-trimethoxyphenyl)butanoyl]piperidine-2-carboxylate Chemical compound C([C@@H](OC(=O)[C@@H]1CCCCN1C(=O)[C@@H](CC)C=1C=C(OC)C(OC)=C(OC)C=1)C=1C=C(OCCN2CCOCC2)C=CC=1)CC1=CC=C(OC)C(OC)=C1 NMFHJNAPXOMSRX-PUPDPRJKSA-N 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 1
- 239000002002 slurry Substances 0.000 description 1
- 230000005641 tunneling Effects 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
- E21D11/107—Reinforcing elements therefor; Holders for the reinforcing elements
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/14—Lining predominantly with metal
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/14—Lining predominantly with metal
- E21D11/18—Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/001—Improving soil or rock, e.g. by freezing; Injections
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Civil Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Soil Sciences (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
The invention discloses a tunnel boring machine (TBM) cutterhead and shield jamming processing method. The method comprises the following steps that (1) a longitudinal small pilot tunnel is excavated; (2) a plurality of annular small pilot tunnels are excavated along the longitudinal small pilot tunnel; (3) supporting and reinforcing are conducted through a steel structure; and (4) a TBM slowly tunnels and passes through a fault zone. The method has the advantages of being fast and convenient to implement, small in number of construction steps, safe and reliable. The method is adopted to conduct release operation on a cutterhead and a shield of the TBM, operation is safe, and the jammed cutterhead and a jammed shield machine of the TBM can be released in an extremely short time, so that cost is reduced, and time is shortened.
Description
Technical field
The present invention relates to a kind of processing method, particularly a kind of TBM cutterheads and shield card machine processing method.
Background technology
At present, during big tunnel, for efficient, environmentally friendly and safe consideration, widely used TBM is dug
Pick.But, as geology affects, when tunneling construction passes through unfavorable geology section, Jing is often extremely broken due to country rock, causes TBM
Cutterhead and shield occur by card phenomenon.After some TBM card machines accidents occur, as TBM failures of getting rid of poverty yield TBM and are changed
Line process, causes greatly loss.
The content of the invention
It is an object of the invention to provide a kind of TBM cutterheads that the de- cutterheads of TBM and shield quick and convenient can be made to get rid of poverty and
Shield card machine processing method.
The purpose of the present invention realized by such technical scheme, a kind of TBM cutterheads and shield card machine processing method,
Methods described comprises the steps:
(1), excavate the little pilot tunnel in longitudinal direction;
Hand excavation's longitudinally little pilot tunnel, synchronous vertical longitudinal little pilot tunnel gate are carried out from the metastable position of shield afterbody country rock
Steelframe, the little pilot tunnel in longitudinal direction pass through slump Cha Ti areas.
(2), along some annular little pilot tunnels of the little pilot drive in longitudinal direction;
Will be shield and cutterhead little by some annular little pilot tunnels, subregion excavation section by section annular is divided into by the little pilot tunnel in the longitudinal direction excavated
Pilot tunnel, synchronous is found annular little pilot tunnel gate steelframe, and annular little pilot tunnel gate steel frame column bottom welding is on shield, until opening
Supporting is dug to requiring position.
(3), supporting and reinforcing carried out by steel construction;
(4), TBM slowly driving by shear-zone.
By the annular little pilot tunnel being excavated, outer annular steel arch is erected in annular little pilot tunnel gate steelframe below the crossbeam
Frame and internal layer annular steel arch-shelf, and the configuration reinforcement between outer annular steel arch-shelf and internal layer annular steel arch-shelf as needed;
In soldering and sealing steel plate on the inside of internal layer steel arch-shelf, outer annular steel arch-shelf and internal layer annular steel arch-shelf, concrete perfusion backfill is closely knit, treats
After concrete strength reaches design requirement, gate steel frame column is cut off, interim gate steelframe support system is completed to final annular
Steelframe support system is changed.
Wherein, in order to improve safety, forward grouting anchor pile slip casting is performed before the little pilot tunnel in longitudinal direction and annular little pilot drive,
Reinforce front country rock.
As a result of above-mentioned technical proposal, the present invention has the advantages that quick and convenient, construction procedure is few, safe and reliable,
Process of getting rid of poverty is carried out to the cutterhead and shield of TBM using the method, not only safe operation, but also can be within the extremely short time
To be got rid of poverty by the TBM cutterheads and shield of card, saved cost and time.
Description of the drawings
The description of the drawings of the present invention is as follows:
Fig. 1:The TBM cutterheads and shield of the present invention is got rid of poverty and excavates gib gate steelframe layout diagram;
Fig. 2:The TBM cutterheads and shield of the present invention is got rid of poverty steelframe elevational schematic view;
Fig. 3:The present invention TBM cutterheads and shield get rid of poverty after supporting schematic diagram.
Specific embodiment
Below in conjunction with the accompanying drawings the specific embodiment of the present invention is described in further detail, but the present invention does not limit to
In these embodiments, any improvement or replacement on the present embodiment essence spirit still falls within the claims in the present invention wanted
Seek the scope of protection.
Embodiment 1:As shown in Figure 1, 2, 3, a kind of TBM cutterheads and shield card machine processing method, methods described includes as follows
Step:
(1), excavate the little pilot tunnel in longitudinal direction;
(2), excavate some annular little pilot tunnels along the little pilot tunnel in longitudinal direction;
(3), supporting and reinforcing carried out by steel construction;
(4), TBM slowly driving by shear-zone.
Wherein, above-mentioned(1)In step, its concrete operations is as follows:Enter pedestrian from the metastable position of 1 afterbody country rock of shield
Work excavates the little pilot tunnel 2 in longitudinal direction, and synchronous is found the little pilot tunnel gate steelframe 3 in longitudinal direction, and the little pilot tunnel 1 in longitudinal direction passes through slump Cha Ti areas 11.
Wherein, above-mentioned(2)In step, its concrete operations is as follows:By the little pilot tunnel 2 in the longitudinal direction excavated by shield 1 and knife
Disk 4 founds annular little pilot tunnel gate steel by some annular little pilot tunnels 5, the little pilot tunnel 5 of subregion excavation section by section annular, synchronous propping up is divided longitudinally into
Frame 6, annular little 6 column bottom of pilot tunnel gate steelframe are welded on shield 1, until excavation supporting is to requiring position.
Wherein, above-mentioned(3)In step, its concrete operations is as follows:It is by the annular little pilot tunnel 5 being excavated, little in annular
Outer annular steel arch-shelf 8 and internal layer annular steel arch-shelf 9 are erected below pilot tunnel gate steelframe crossbeam 7, and as needed in outer layer ring
Configuration reinforcement between shape steel arch-shelf 8 and internal layer annular steel arch-shelf 9;In 9 inner side soldering and sealing steel plate of internal layer steel arch-shelf, outer annular steel arch
Frame 8 and internal layer annular steel arch-shelf 9 in concrete perfusion 10 backfill it is closely knit, after 10 intensity of concrete reaches design requirement, excision
Gate steel frame column, completes interim gate steelframe support system to final annular steelframe support system conversion.
In order to improve construction safety, forward grouting anchor pile note is performed before the little pilot tunnel 2 in longitudinal direction and annular little pilot tunnel 5 are excavated
Slurry, reinforces front country rock.
In the present invention, the place that gets rid of poverty quickly and easily can will be carried out by the TBM cutterheads and shield of card by said method
Reason, it is ensured that the construction period, reduce cost.The method shortens the engineering time of 2 months than the existing method of getting rid of poverty.
Claims (5)
1. a kind of TBM cutterheads and shield card machine processing method, is characterized in that, methods described comprises the steps:
(1), excavate the little pilot tunnel in longitudinal direction;
(2), along some annular little pilot tunnels of the little pilot drive in longitudinal direction;
(3), supporting and reinforcing carried out by steel construction
(4), TBM slowly driving by shear-zone.
2. TBM cutterheads as claimed in claim 1 and shield card machine processing method, is characterized in that, described(1)In step, its tool
Gymnastics is made as follows:From shield(1)The metastable position of afterbody country rock carries out hand excavation's longitudinally little pilot tunnel(2), synchronous Zhi Li
The little pilot tunnel gate steelframe in longitudinal direction(3), the little pilot tunnel in longitudinal direction(1)Through slump Cha Ti areas(11).
3. TBM cutterheads as claimed in claim 2 and shield card machine processing method, is characterized in that, described(2)In step, its tool
Gymnastics is made as follows:By the little pilot tunnel in the longitudinal direction excavated(2)By shield(1)And cutterhead(4)By being divided longitudinally into, some annulars are little to be led
Hole(5), the little pilot tunnel of subregion excavation section by section annular(5), synchronous is found annular little pilot tunnel gate steelframe(6), annular little pilot tunnel gate
Steelframe(6)Column bottom is welded on shield(1)On, until excavation supporting is to requiring position.
4. TBM cutterheads as claimed in claim 3 and shield card machine processing method, is characterized in that:Described(3)In step, its tool
Gymnastics is made as follows:By the annular little pilot tunnel being excavated(5), in annular little pilot tunnel gate steelframe crossbeam(7)Lower section erects outer
The annular steel arch-shelf of layer(8)With internal layer annular steel arch-shelf(9), and as needed in outer annular steel arch-shelf(8)With internal layer annular steel
Bow member(9)Between configuration reinforcement;In internal layer steel arch-shelf(9)Inner side soldering and sealing steel plate, outer annular steel arch-shelf(8)With internal layer annular steel
Bow member(9)Interior concrete perfusion(10)Backfill is closely knit, treats concrete(10)After intensity reaches design requirement, excision gate steelframe stands
Post, completes interim gate steelframe support system to final annular steelframe support system conversion.
5. TBM cutterheads as claimed in claim 2 or claim 3 and shield card machine processing method, is characterized in that:In the little pilot tunnel in longitudinal direction(2)
With annular little pilot tunnel(5)Forward grouting anchor pile slip casting is performed before excavation, front country rock is reinforced(12).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611035722.6A CN106522972B (en) | 2016-11-23 | 2016-11-23 | A kind of TBM cutterheads and shield card machine processing method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611035722.6A CN106522972B (en) | 2016-11-23 | 2016-11-23 | A kind of TBM cutterheads and shield card machine processing method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106522972A true CN106522972A (en) | 2017-03-22 |
CN106522972B CN106522972B (en) | 2018-08-31 |
Family
ID=58356311
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611035722.6A Active CN106522972B (en) | 2016-11-23 | 2016-11-23 | A kind of TBM cutterheads and shield card machine processing method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106522972B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107893664A (en) * | 2017-11-10 | 2018-04-10 | 中铁工程装备集团有限公司 | A kind of double-shielded TBM shield body card machine Forecasting Methodology and system |
CN109779638A (en) * | 2018-12-28 | 2019-05-21 | 中国水利水电第四工程局有限公司 | A kind of double-shielded TBM card machine processing method |
CN110905538A (en) * | 2019-12-30 | 2020-03-24 | 中铁隧道局集团有限公司 | Construction method for TBM (Tunnel boring machine) of unfavorable geological section |
CN111119913A (en) * | 2020-02-24 | 2020-05-08 | 中铁二院工程集团有限责任公司 | TBM (tunnel boring machine) escaping processing method in tunnel construction and tunnel construction structure |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002038897A (en) * | 2000-07-24 | 2002-02-06 | Mitsubishi Heavy Ind Ltd | Tunnel construction method and device |
CN102305082A (en) * | 2011-07-23 | 2012-01-04 | 中铁十二局集团第二工程有限公司 | Method for relieving and cutterhead repairing of shield machine in weathering groove |
CN203499699U (en) * | 2013-09-27 | 2014-03-26 | 中国水电顾问集团贵阳勘测设计研究院 | Supporting structure of corrosion and collapse tunnel section |
CN104060999A (en) * | 2014-03-03 | 2014-09-24 | 中国水电顾问集团贵阳勘测设计研究院有限公司 | Method and structure for treating tunnel collapse |
CN104533451A (en) * | 2014-12-05 | 2015-04-22 | 中国电建集团成都勘测设计研究院有限公司 | Tunnel advance pre-supporting technology used in discrete gravelly soil and broken surrounding rock |
CN104975861A (en) * | 2015-07-21 | 2015-10-14 | 招商局重庆交通科研设计院有限公司 | Non-disturbance type supporting structure used for tunnel vault collapsed cavity processing |
CN105257301A (en) * | 2015-10-16 | 2016-01-20 | 中铁十局集团济南铁路工程有限公司 | Method for reinforcing collapse of weak surrounding rock of shallow embedded and mining tunnel |
CN105781562A (en) * | 2016-03-10 | 2016-07-20 | 黄河勘测规划设计有限公司 | Stuck machine extricating method for tunnel boring machine (TBM) during construction |
-
2016
- 2016-11-23 CN CN201611035722.6A patent/CN106522972B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002038897A (en) * | 2000-07-24 | 2002-02-06 | Mitsubishi Heavy Ind Ltd | Tunnel construction method and device |
CN102305082A (en) * | 2011-07-23 | 2012-01-04 | 中铁十二局集团第二工程有限公司 | Method for relieving and cutterhead repairing of shield machine in weathering groove |
CN203499699U (en) * | 2013-09-27 | 2014-03-26 | 中国水电顾问集团贵阳勘测设计研究院 | Supporting structure of corrosion and collapse tunnel section |
CN104060999A (en) * | 2014-03-03 | 2014-09-24 | 中国水电顾问集团贵阳勘测设计研究院有限公司 | Method and structure for treating tunnel collapse |
CN104533451A (en) * | 2014-12-05 | 2015-04-22 | 中国电建集团成都勘测设计研究院有限公司 | Tunnel advance pre-supporting technology used in discrete gravelly soil and broken surrounding rock |
CN104975861A (en) * | 2015-07-21 | 2015-10-14 | 招商局重庆交通科研设计院有限公司 | Non-disturbance type supporting structure used for tunnel vault collapsed cavity processing |
CN105257301A (en) * | 2015-10-16 | 2016-01-20 | 中铁十局集团济南铁路工程有限公司 | Method for reinforcing collapse of weak surrounding rock of shallow embedded and mining tunnel |
CN105781562A (en) * | 2016-03-10 | 2016-07-20 | 黄河勘测规划设计有限公司 | Stuck machine extricating method for tunnel boring machine (TBM) during construction |
Non-Patent Citations (1)
Title |
---|
张铸: "双护盾全断面掘进机卡机事故处理方案", 《科技情报开发与经济》 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107893664A (en) * | 2017-11-10 | 2018-04-10 | 中铁工程装备集团有限公司 | A kind of double-shielded TBM shield body card machine Forecasting Methodology and system |
CN109779638A (en) * | 2018-12-28 | 2019-05-21 | 中国水利水电第四工程局有限公司 | A kind of double-shielded TBM card machine processing method |
CN110905538A (en) * | 2019-12-30 | 2020-03-24 | 中铁隧道局集团有限公司 | Construction method for TBM (Tunnel boring machine) of unfavorable geological section |
CN111119913A (en) * | 2020-02-24 | 2020-05-08 | 中铁二院工程集团有限责任公司 | TBM (tunnel boring machine) escaping processing method in tunnel construction and tunnel construction structure |
CN111119913B (en) * | 2020-02-24 | 2024-05-17 | 中铁二院工程集团有限责任公司 | TBM escaping treatment method in tunnel construction and tunnel construction structure |
Also Published As
Publication number | Publication date |
---|---|
CN106522972B (en) | 2018-08-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106522963B (en) | A kind of TBM tunnel constructions card machine is got rid of poverty method | |
US10494924B2 (en) | Longwall mine construction method N00 | |
CN106522972A (en) | Tunnel boring machine (TBM) cutterhead and shield jamming processing method | |
CN101963060B (en) | Tunnel construction method based on steel tube arch-rib supporting structure | |
CN105781562B (en) | Card machine when tunnel boring machine is constructed is got rid of poverty method | |
AU2020100911A4 (en) | Shield structure for effectively controlling ground subsidence | |
CN112502723B (en) | Single-shield TBM blocking machine escaping construction method | |
CN103382844A (en) | Temporary support and permanent support parallel operation excavating technology and equipment for tracked hydraulic combined support | |
CN108798689A (en) | Combination type T BM and the driving method for realizing pilot heading and forward probe | |
CN111472801A (en) | Construction method for passing existing line under shallow-buried underground excavation drainage gallery | |
CN104612722B (en) | Tunnel gate strengthening method for starting and arriving of annular shield or annular pushing pipe | |
CN101082217A (en) | Excavation method of vertical hole | |
CN103806916A (en) | Process for constructing shield rapid inspection shaft | |
CN108222945A (en) | Utilize the construction method of main and auxiliary layering sap excavating extra-large cross-section Underground Subway Station | |
CN109882189B (en) | Horseshoe-shaped half-section shield machine suitable for fault fracture zone and construction method | |
CN206942770U (en) | A kind of shape of a hoof development machine promoted by crawler belt | |
CN205689213U (en) | Open type hard rock tunnel development machine | |
CN205400739U (en) | A double -deck shield structure for tunnel boring machine | |
CN205189880U (en) | Shield constructs to be assembled section of jurisdiction and crosses undercut tunnel construction structures | |
CN203769795U (en) | Tracked hydraulic combined bracket temporary support and permanent support parallel operation tunneling equipment | |
CN106285690B (en) | A kind of ultradeep well shaft bottom fine ore collection vertical shaft and its rapid construction method for protecting support | |
CN207348899U (en) | A kind of fully-mechanized mining working withdraws system | |
CN105863660B (en) | A kind of rock tunnel(ling) machine end face sword cutting type driving method and the no-dig technique rock tunnel(ling) machine using this method | |
CN206111194U (en) | Small -size TBM rock out machine device that starts fast | |
CN219974501U (en) | Step type shield device and construction shield system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |