CN103806916A - Process for constructing shield rapid inspection shaft - Google Patents
Process for constructing shield rapid inspection shaft Download PDFInfo
- Publication number
- CN103806916A CN103806916A CN201210439972.1A CN201210439972A CN103806916A CN 103806916 A CN103806916 A CN 103806916A CN 201210439972 A CN201210439972 A CN 201210439972A CN 103806916 A CN103806916 A CN 103806916A
- Authority
- CN
- China
- Prior art keywords
- vertical shaft
- shield
- shaft
- construction
- snap close
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
Description
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210439972.1A CN103806916A (en) | 2012-11-07 | 2012-11-07 | Process for constructing shield rapid inspection shaft |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210439972.1A CN103806916A (en) | 2012-11-07 | 2012-11-07 | Process for constructing shield rapid inspection shaft |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103806916A true CN103806916A (en) | 2014-05-21 |
Family
ID=50704245
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210439972.1A Pending CN103806916A (en) | 2012-11-07 | 2012-11-07 | Process for constructing shield rapid inspection shaft |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103806916A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108643917A (en) * | 2018-05-16 | 2018-10-12 | 北京中地盾构工程技术研究院有限公司 | Half backfill formula shield cutter inspection-pit assembly construction method |
CN108678751A (en) * | 2018-05-16 | 2018-10-19 | 北京中地盾构工程技术研究院有限公司 | The shield cutter inspection-pit assembly construction method excavated after first jacking |
CN108708736A (en) * | 2018-05-16 | 2018-10-26 | 北京中地盾构工程技术研究院有限公司 | Shield cutter inspection-pit assembly construction method |
CN108708727A (en) * | 2018-05-16 | 2018-10-26 | 北京中地盾构工程技术研究院有限公司 | The shield cutter inspection-pit assembly construction method of jacking after half excavation |
CN110748354A (en) * | 2019-12-10 | 2020-02-04 | 中铁十四局集团隧道工程有限公司 | Construction method of assembled shield maintenance well |
CN110924949A (en) * | 2019-12-10 | 2020-03-27 | 中铁十四局集团隧道工程有限公司 | Assembled shield structure manhole system |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101251016A (en) * | 2008-04-02 | 2008-08-27 | 上海隧道工程股份有限公司 | Method for forming shield tunnel construction maintenance surroundings |
JP4806370B2 (en) * | 2007-04-06 | 2011-11-02 | 飛島建設株式会社 | Vertical shaft construction method |
CN102239309A (en) * | 2009-05-08 | 2011-11-09 | 海瑞克股份公司 | Method for erecting an underground construction |
CN102305082A (en) * | 2011-07-23 | 2012-01-04 | 中铁十二局集团第二工程有限公司 | Method for relieving and cutterhead repairing of shield machine in weathering groove |
-
2012
- 2012-11-07 CN CN201210439972.1A patent/CN103806916A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4806370B2 (en) * | 2007-04-06 | 2011-11-02 | 飛島建設株式会社 | Vertical shaft construction method |
CN101251016A (en) * | 2008-04-02 | 2008-08-27 | 上海隧道工程股份有限公司 | Method for forming shield tunnel construction maintenance surroundings |
CN102239309A (en) * | 2009-05-08 | 2011-11-09 | 海瑞克股份公司 | Method for erecting an underground construction |
CN102305082A (en) * | 2011-07-23 | 2012-01-04 | 中铁十二局集团第二工程有限公司 | Method for relieving and cutterhead repairing of shield machine in weathering groove |
Non-Patent Citations (2)
Title |
---|
张兆军等: "复杂条件下盾构改造竖井的设计与施工", 《隧道建设》, vol. 29, no. 6, 31 December 2009 (2009-12-31) * |
杨保琦等: "盾构检修井快速施工方法探讨", 《铁道建筑技术》, no. 2, 31 December 2011 (2011-12-31), pages 72 - 73 * |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108643917A (en) * | 2018-05-16 | 2018-10-12 | 北京中地盾构工程技术研究院有限公司 | Half backfill formula shield cutter inspection-pit assembly construction method |
CN108678751A (en) * | 2018-05-16 | 2018-10-19 | 北京中地盾构工程技术研究院有限公司 | The shield cutter inspection-pit assembly construction method excavated after first jacking |
CN108708736A (en) * | 2018-05-16 | 2018-10-26 | 北京中地盾构工程技术研究院有限公司 | Shield cutter inspection-pit assembly construction method |
CN108708727A (en) * | 2018-05-16 | 2018-10-26 | 北京中地盾构工程技术研究院有限公司 | The shield cutter inspection-pit assembly construction method of jacking after half excavation |
CN108708736B (en) * | 2018-05-16 | 2019-12-27 | 北京中地盾构工程技术研究院有限公司 | Shield cutter head manhole assembly type construction method |
CN108708727B (en) * | 2018-05-16 | 2019-12-31 | 北京中地盾构工程技术研究院有限公司 | Half-excavation rear-jacking shield cutter head manhole assembly type construction method |
CN108678751B (en) * | 2018-05-16 | 2020-04-07 | 北京中地盾构工程技术研究院有限公司 | Assembly type construction method of shield cutter head manhole by jacking and excavating firstly |
CN110748354A (en) * | 2019-12-10 | 2020-02-04 | 中铁十四局集团隧道工程有限公司 | Construction method of assembled shield maintenance well |
CN110924949A (en) * | 2019-12-10 | 2020-03-27 | 中铁十四局集团隧道工程有限公司 | Assembled shield structure manhole system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103806916A (en) | Process for constructing shield rapid inspection shaft | |
CN105317459B (en) | A kind of subregion placement method for being used to control tight roof large area caving disaster | |
CN103195455B (en) | Weak geological environment large cross-section tunnel construction supporting system and construction method | |
CN100487224C (en) | Rapid construction method for small-section abrupt change tunnel to large-section tunnel | |
CN106401645B (en) | A kind of deep high stress tunnel pressure relief support control method for coordinating based on drilling release | |
CN106522963A (en) | Stuck machine extricating method for TBM during tunnel construction | |
CN102926757A (en) | Construction method of two-sidestep and four-step excavation support of weak large-span tunnel of mountain ridge | |
CN103306713A (en) | Networked reinforcement method for cross-layer drilling of outburst coal seam | |
CN106869936A (en) | It is a kind of to be suitable to the surface mining new method of steep slope topography | |
CN105239598A (en) | Integral sinking construction method for well-type full-automatic stereo garage | |
CN103993885A (en) | Construction method for underground excavation tunnel side-direction hole opening supporting system | |
CN104141500B (en) | One hardens sand and gravel stratum cavern con struction method | |
CN103643958A (en) | Construction method for excavating weak surrounding rock tunnel by hydraulic breaking hammer | |
CN102797468B (en) | Minimum over-burden originating method for shield tunnel | |
CN102410031B (en) | Underground space structure constructed by pile wall construction method | |
CN110905536A (en) | Construction method for receiving complex stratum earth pressure shield in underground excavation tunnel | |
Guo et al. | Fracturing mechanisms and deformation characteristics of rock surrounding the gate during gob-side entry retention through roof pre-fracturing | |
CN207934910U (en) | A kind of newly built tunnels closely on across existing tunnel anti-floating reinforcement system | |
CN104612722B (en) | Tunnel gate strengthening method for starting and arriving of annular shield or annular pushing pipe | |
CN104863183B (en) | Damping pilework and construction method is isolated in large cross-section tunnel proximity architecture construction | |
Fan et al. | Opencast to underground iron ore mining method | |
CN106522972A (en) | Tunnel boring machine (TBM) cutterhead and shield jamming processing method | |
CN104453915A (en) | Large-section vertical shaft pre-grouting reinforcement quick excavation method | |
CN205422731U (en) | Excavation structure of subway shield zone hard rock changeover portion | |
CN202187735U (en) | Bored pile tubular drill for fishing residue |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C53 | Correction of patent of invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Guo Caixia Inventor after: Ma Fuli Inventor after: Shi Leilei Inventor after: Yang Baoqi Inventor after: Zhang Chunjie Inventor after: Zhang Jianglong Inventor before: Liu Qiduo Inventor before: Chen Xilin Inventor before: Jiang Xueqiang Inventor before: Shi Leilei Inventor before: Lu Changgen Inventor before: Shi Yajun Inventor before: Hu Jianjun Inventor before: Guo Caixia |
|
COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: LIU QIDUO CHEN XILIN JIANG XUEQIANG SHI LEILEI LU CHANGGEN SHI YAJUN HU JIANJUN GUO CAIXIA TO: GUO CAIXIA MA FULI SHI LEILEI YANG BAOQI ZHANG CHUNJIE ZHANG JIANGLONG |
|
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20140521 |