CN106499194A - The erection method of high-rise frame steel construction measuring instrument - Google Patents

The erection method of high-rise frame steel construction measuring instrument Download PDF

Info

Publication number
CN106499194A
CN106499194A CN201610948848.6A CN201610948848A CN106499194A CN 106499194 A CN106499194 A CN 106499194A CN 201610948848 A CN201610948848 A CN 201610948848A CN 106499194 A CN106499194 A CN 106499194A
Authority
CN
China
Prior art keywords
steel
measuring instrument
frame
construction
steel column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610948848.6A
Other languages
Chinese (zh)
Inventor
李成杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN201610948848.6A priority Critical patent/CN106499194A/en
Publication of CN106499194A publication Critical patent/CN106499194A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16MFRAMES, CASINGS OR BEDS OF ENGINES, MACHINES OR APPARATUS, NOT SPECIFIC TO ENGINES, MACHINES OR APPARATUS PROVIDED FOR ELSEWHERE; STANDS; SUPPORTS
    • F16M11/00Stands or trestles as supports for apparatus or articles placed thereon ; Stands for scientific apparatus such as gravitational force meters
    • F16M11/02Heads
    • F16M11/04Means for attachment of apparatus; Means allowing adjustment of the apparatus relatively to the stand

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention relates to a kind of erection method of high-rise frame steel construction measuring instrument, comprises the steps:Carry out section framework steel column and the construction of associated frame members steel girder erection under framework;For installation frame structure the superiors platform steel beam position chooses a steel column 1800Scope sets up the temporary operating platform of width 1m;Arrange in the connection otic placode of framework steel column upper end and horizontal shore is installed;Measuring instrument is set up using horizontal shore;Record is measured to the perpendicularity of installation steel structure frame, axle alignment and its elevation data by measuring instrument;According to surveying record data for the steel structure frame that has installed is adjusted correction;Remove horizontal shore and its operating platform.The present invention is applied to a kind of method that high-rise frame steel construction measuring instrument is installed, and simple structure is easy to carry, easy installation and removal, reduces construction cost, improves efficiency of construction.

Description

The erection method of high-rise frame steel construction measuring instrument
Technical field:
The present invention relates to a kind of construction techniques, specifically, is to be related to a kind of frame of high-rise frame steel construction measuring instrument Equipment, method and installation construction device.
Background technology:
There are following two methods the position that measuring instrument sets up during live conventional construction, i.e.,:One measuring instrument is positioned over Firm ground;Its two measuring instrument is positioned over the scope of operation.
But for high-rise steel structure framework girder steel, framework steel column erecting bed, usually scene elder generation installation frame structure, so Construct afterwards framework platform floor support plate+concrete, and often frame structure is prior to more than 6 ~ 9 layers of construction operation floor face that is, two Person is asynchronous construction, is that this is surveyed for the measurement work of framework steel column, steel girder erection is accomplished by setting up using existing structure Measuring appratus are operated, so as to correct the perpendicularity of installation steel structure frame, axle alignment and its elevation data, for The record numerical value set up measured by instrument of measuring instrument carries out structural adjustment correction, finally carries out each installation according to construction technology The bolt weldering operation of node, then transferring next procedure carries out floor support plate+concrete construction operation.
Work is measured in the floor support plate+concrete-steel beams place platform for not having to construct, following two are perhaps had The mode of kind is selected i.e.:
One, the situation for setting up operating platform in measurement position;
Two, the interim situation for making support operating platform is placed in measurement position;
Above both approaches are then limited in some complex environment engineerings, it is impossible to meet execution conditions or be constructed into This is excessive it is not recommended that taking, its reason is analyzed as follows respectively:
First method arranges workmen to set up operating platform in installation position using steel scaffold tubes and its wooden springboard, this Any is set up this and carries out the presence of certain potential safety hazard and its risk in high-altitude, and material requirement will not necessarily be lacked, and steel But quickly, this is accomplished by substantial amounts of material is constantly set up and is increased operating platform structure installation progress.Still more operating platform Set up and remove, high cost and uneconomical, this scheme is general it is not recommended that choosing.
Second method is placed steel construction and makes support temporarily to complete construction task, and this point makes support itself temporarily Limited by the construction of height and safety and required, construction is had certain security risk.Above-mentioned falsework is also required to utilize back and forth Crane is shifted, quantities greatly, high cost and uneconomical, this scheme proposalses are inadvisable.
Content of the invention:
For above-mentioned deficiency of the prior art, the present invention provides a kind of simple structure, the high-rise frame steel of easy installation and removal The erection method of structure measurement instrument.
The technical solution used in the present invention is:
A kind of erection method of high-rise frame steel construction measuring instrument, comprises the steps:
Step 1, carries out lower section steel structure frame steel column and the construction of associated frame members steel girder erection;
Step 2, for installation frame structure the superiors platform steel beam position chooses a steel column 1800Scope sets up radius 1m Simple temporary operating platform;
Step 3, arranges in the connection otic placode of framework steel column upper end and installs horizontal shore;Measuring instrument is set up on horizontal shore Device;
Step 4, is carried out to the perpendicularity of installation steel structure frame, axle alignment and its elevation data by measuring instrument Surveying record;
Step 5, according to surveying record data for the steel structure frame that has installed is adjusted correction;
Step 6, removes horizontal shore and its operating platform;
Step 7, carries out each bolt weldering operation for installing node, concrete construction operation according to construction process requirement.
The horizontal shore includes rectangular horizontal plate and angle steel;The rectangular horizontal plate is by bolt and the side of angle steel Surface is connected;Another side of the angle steel is connected with the installing hole of framework steel column upper end connection otic placode by bolt.
The structure of the installation frame the superiors platform steel beam position chooses a steel column, using the steel column top 900Four Individual direction or 1800In the connection of both direction, any side monolithic connection otic placode of section steel column is used as the fulcrum for setting up instrument.
The columnar projections are bolt, and bolt end is connected with the screwed hole of rectangular horizontal plate.
The beneficial effect of hinge structure of the present invention:
The installation method of high-rise frame steel construction measuring instrument of the present invention, simple structure are easy to carry, easy installation and removal, drop Low construction cost, improves efficiency of construction.
Description of the drawings:
Fig. 1 is the structural representation of the erection method of high-rise frame steel construction measuring instrument of the present invention;
Fig. 2 is the A-A cross section structure diagrams of Fig. 1;
Fig. 3 is the B-B structural representations of Fig. 2;
Fig. 4 is that measuring apparatus set up rectangular horizontal plate structure schematic diagram.
Critical piece symbol description in accompanying drawing:
In figure:
1st, measuring apparatus set up rectangular horizontal plate
2nd, angle cleat
3rd, connection otic placode
4th, connecting bolt
5th, measuring instrument(All kinds of measuring instruments:Level meter, total powerstation, theodolite etc.)
6th, framework steel column
7th, temporary operating platform
8th, platform framework girder steel.
Specific embodiment:
Referring to the drawings and embodiment the present invention will be described in detail:
Accompanying drawing 1-4 understands that a kind of erection method of high-rise frame steel construction measuring instrument comprises the steps:
Step 1, carries out lower section steel structure frame steel column and the construction of associated frame members steel girder erection;
Step 2, for installation frame structure the superiors platform steel beam position chooses a steel column 1800Scope sets up radius 1m Simple temporary operating platform;
Step 3, arranges in the connection otic placode of framework steel column upper end and installs horizontal shore;Measuring instrument is set up on horizontal shore Device;
Step 4, is carried out to the perpendicularity of installation steel structure frame, axle alignment and its elevation data by measuring instrument Surveying record;
Step 5, according to surveying record data for the steel structure frame that has installed is adjusted correction;
Step 6, removes horizontal shore and its operating platform;
Step 7, carries out each bolt weldering operation for installing node, concrete construction operation according to construction process requirement.
The horizontal shore includes rectangular horizontal plate and angle steel;The rectangular horizontal plate is by bolt and the side of angle steel Surface is connected;The another side of the angle steel is connected with the installing hole of framework steel column upper end connection otic placode by bolt, institute State rectangular horizontal plate and be provided with rectangle installing hole, for installing detecting instrument and being connected with connection otic placode.
The structure of the installation frame the superiors platform steel beam position chooses a steel column, using the steel column top 900Four Individual direction or 1800In the connection of both direction, any side monolithic connection otic placode of section steel column is used as the fulcrum for setting up instrument.
The columnar projections are bolt, and bolt end is connected with the screwed hole of rectangular horizontal plate.
It should be noted is that:No matter steel structure column section is any form(H profile steel post, cross steel column, steel pipe column Or special-shaped steel column etc.)The upper and lower merogenesis of its steel column routinely needs four groups of interim otic placodes(Regular situation branch is in steel column end 900Four Individual direction or 1800The each group connecting plate of both direction)Bolt connection is carried out, treats to save steel column butt joint mouth up and down to be welded to connect finishing, And detect qualified after the interim otic placode of cutting disassembling immediately, we are exactly the one of which using lower segmented column top otic placode(According to existing Field physical location is chosen)Carry out erection instrument and measure operation.
The installation method of high-rise frame steel construction measuring instrument of the present invention and erecting device, simple structure, are easy to carry, peace Dress convenient disassembly, reduces construction cost, improves efficiency of construction.
The above, is only presently preferred embodiments of the present invention, not the structure of the present invention is made any pro forma Limit.Any simple modification, equivalent variations and modification that every technical spirit according to the present invention is made to above example, Belong in the range of technical scheme.

Claims (4)

1. a kind of erection method of high-rise frame steel construction measuring instrument, comprises the steps:
Step 1, carries out lower section steel structure frame steel column and the construction of associated frame members steel girder erection;
Step 2, for installation frame structure the superiors platform steel beam position chooses a steel column 1800Scope sets up radius 1m's Simple temporary operating platform;
It is characterized in that:
Step 3, arranges in the connection otic placode of framework steel column upper end and installs horizontal shore;Measuring instrument is set up on horizontal shore Device;
Step 4, by measuring instrument to the perpendicularity of installation steel structure frame steel column and framework girder steel, axle alignment and Its elevation data measures record;
Step 5, according to surveying record data for the steel structure frame that has installed is adjusted correction;
Step 6, removes horizontal shore and its operating platform;
Step 7, carries out each bolt weldering operation for installing node, concrete construction operation according to construction process requirement.
2. the installation method of high-rise frame steel construction measuring instrument according to claim 1, it is characterised in that:The level Support includes rectangular horizontal plate and angle steel;The rectangular horizontal plate is connected with a side surface of angle steel by bolt;The angle The another side of steel is connected with the installing hole of framework steel column upper end connection otic placode by bolt.
3. the erection method of high-rise frame steel construction measuring instrument according to claim 2, it is characterised in that:Described install Frame structure the superiors platform steel beam position chooses a steel column, using the steel column top 900Four direction or 1800Both direction Connection on save any side monolithic connection otic placode of steel column as the fulcrum for setting up instrument.
4. the erection method of high-rise frame steel construction measuring instrument according to claim 3, it is characterised in that:The column is convex It is bolt to rise, and bolt end is connected with the screwed hole of rectangular horizontal plate.
CN201610948848.6A 2016-10-26 2016-10-26 The erection method of high-rise frame steel construction measuring instrument Pending CN106499194A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610948848.6A CN106499194A (en) 2016-10-26 2016-10-26 The erection method of high-rise frame steel construction measuring instrument

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610948848.6A CN106499194A (en) 2016-10-26 2016-10-26 The erection method of high-rise frame steel construction measuring instrument

Publications (1)

Publication Number Publication Date
CN106499194A true CN106499194A (en) 2017-03-15

Family

ID=58322990

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610948848.6A Pending CN106499194A (en) 2016-10-26 2016-10-26 The erection method of high-rise frame steel construction measuring instrument

Country Status (1)

Country Link
CN (1) CN106499194A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09203210A (en) * 1996-01-29 1997-08-05 Penta Ocean Constr Co Ltd Mounting device of structural steel erection perpendicular measurement means
JP2001032527A (en) * 1999-07-19 2001-02-06 Matsumoto Komuten:Kk Reerecting device and method for long member
CN102465601A (en) * 2010-11-17 2012-05-23 五冶集团上海有限公司 Method for installing main body frame steel structure of benzene hydrogenation project
CN102704693A (en) * 2012-06-06 2012-10-03 绍兴县现代建筑工程有限公司 Construction method of ultra-high layer steel structure in low-temperature environment

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09203210A (en) * 1996-01-29 1997-08-05 Penta Ocean Constr Co Ltd Mounting device of structural steel erection perpendicular measurement means
JP2001032527A (en) * 1999-07-19 2001-02-06 Matsumoto Komuten:Kk Reerecting device and method for long member
CN102465601A (en) * 2010-11-17 2012-05-23 五冶集团上海有限公司 Method for installing main body frame steel structure of benzene hydrogenation project
CN102704693A (en) * 2012-06-06 2012-10-03 绍兴县现代建筑工程有限公司 Construction method of ultra-high layer steel structure in low-temperature environment

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《建筑技术》 *

Similar Documents

Publication Publication Date Title
CN109056548B (en) Steel arch construction method
CN105019639B (en) Overhead cantilever formwork and its construction method
CN104088467B (en) A kind of large Steel Cantilever truss structure high-altitude construction Deformation monitoring method
EP3786605B1 (en) Construction method for a cantilever beam on a central pier
CN102787560B (en) Integrated construction method of support of large cantilevered capping beam and vertical column
CN108678398B (en) Pre-assembly method for steel structure truss of reinforced layer of super high-rise building
CN110006674A (en) A kind of monitoring method of high form-tie assembly Instability real-time early warning
CN113463522A (en) Auxiliary device and method for bent cap construction
CN106223623A (en) Steel construction box arched roof truss installation method
CN115977401A (en) High-altitude installation method for steel structure
CN105423880B (en) A kind of method for hanging main push-towing rope measurement deflection of bridge span
CN112096090B (en) Large-span space pipe truss single-point support butt joint step-by-step unloading device and construction method
CN106351246A (en) Installing method of the integral sleeve of a kind of T -bolt (diameter <= 48mm)
CN105735228B (en) High-lift tooth climbs formula ship lift rack system construction method and installation accuracy control method
CN111549815A (en) Steel structure foundation bolt pre-embedding construction method
CN106499194A (en) The erection method of high-rise frame steel construction measuring instrument
CN103174155A (en) Reverse construction method for erecting steel column and pouring concrete foundation later and steel support for construction
CN116446293A (en) Construction method of concrete beam cable guide pipe of cable-stayed bridge
CN108179749B (en) Lattice column positioner and positioning method thereof
CN104831928A (en) Construction method for high-altitude large-span concrete connected structure formwork supporting steel platform
CN104964674A (en) Control net used for large structure building size
CN212077591U (en) Component hoisting walking foundation under complex environment of large railway station house
CN105113542B (en) Underground station construction overhanging system and underground station construction method
CN208366235U (en) The device of splice sections lateral displacement and Vertical Settlement at wide bridge fulcrum is spelled in a kind of measurement
CN110205944A (en) A kind of observation platform device suitable for Large Span Bridges girder steel construction survey

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170315

RJ01 Rejection of invention patent application after publication