CN106499048A - Pit structure installation method - Google Patents

Pit structure installation method Download PDF

Info

Publication number
CN106499048A
CN106499048A CN201611113024.3A CN201611113024A CN106499048A CN 106499048 A CN106499048 A CN 106499048A CN 201611113024 A CN201611113024 A CN 201611113024A CN 106499048 A CN106499048 A CN 106499048A
Authority
CN
China
Prior art keywords
cushion cap
steel plate
installation method
pit
pit structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611113024.3A
Other languages
Chinese (zh)
Other versions
CN106499048B (en
Inventor
***
胡国良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang canyuan Home Textile Co., Ltd
Original Assignee
Ningbo Ever Elevator Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Ever Elevator Technology Development Co Ltd filed Critical Ningbo Ever Elevator Technology Development Co Ltd
Priority to CN201611113024.3A priority Critical patent/CN106499048B/en
Publication of CN106499048A publication Critical patent/CN106499048A/en
Application granted granted Critical
Publication of CN106499048B publication Critical patent/CN106499048B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/0007Base structures; Cellars

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The present invention provides a kind of pit structure installation method.The pit structure installation method comprises the steps:Foundation ditch is provided, and concrete is poured into a mould in foundation ditch and sets up the first cushion cap;Multiple support bars are provided, the bottom of multiple support bars is fixed in first cushion cap;The second cushion cap is provided, the top that second cushion cap is fixed in multiple support bars;Pit link, the top that the pit link is fixed in second cushion cap are provided;To casting concrete in foundation ditch, the excessively described pit link of concrete cover is made.The pit structure installation method, the second cushion cap is set up on first cushion cap and connects the support bar of first cushion cap and the second cushion cap, and the support bar has stretching structure, the levelness of second cushion cap can be adjusted, solve the problems, such as elevator pit structure use time long and produce foundation ditch subside, cushion cap deformation.

Description

Pit structure installation method
Technical field
The present invention relates to elevator hoistways field, and in particular to the pit structure installation method of elevator hoistways.
Background technology
Aging blocks building in, sometimes according to production, life needs, it is necessary to add elevator outside building, outside building elevator build in Outside aging blocks, need to build the hoistway independently of building beyond the region of objective existence, therefore hoistway frame is stable firmly particularly significant.Pit structure from Well pit stretches out, and the firm annexation of connection hoistway frame and pit cushion cap, pit structure and hoistway frame is to whole hoistway Stable safety, pit structure are one of important composition components of elevator hoistways construction.In the prior art, hoistway frame bottom and bottom Hole cushion cap framework of steel reinforcement is directly welded, and after-pouring concrete is covered at pit structure and hoistway frame bottom welding, completes well with this Road frame and the connection of pit structure.
This kind of pit structure mounting means is excessively coarse simple, there is connection shakiness, easily causes stand-off error, is difficult to entangle Inclined problem.
Content of the invention
Present invention solves the technical problem that being to improve a kind of simple structure convenience, stable connection, stand-off error little Yi to correct Pit structure installation method.
The present invention provides a kind of pit structure installation method, comprises the steps:
Step S1, there is provided foundation ditch, in foundation ditch pours into a mould concrete and sets up the first cushion cap;
The bottom of multiple support bars is fixed in first cushion cap by step S2, there is provided multiple support bars;
Step S3, there is provided the second cushion cap, the top that second cushion cap is fixed in multiple support bars;
Step S4, there is provided pit link, the top that the pit link is fixed in second cushion cap;
Step S5, to casting concrete in foundation ditch, makes the excessively described pit link of concrete cover.
Preferably, the installation method of the pit link, comprises the steps;
Step S41, there is provided foundation bolt and anchor nut, the anchor nut is fixed on second cushion cap, is connect , in the anchor nut, the foundation bolt is installed;
First steel plate is fixed in the lower margin spiral shell by step S42, there is provided the first steel plate of multiple first installing holes of tool At the top of bolt;
Step S43, adjusts the height of the foundation bolt, makes the first steel plate height in same level;
Step S44, there is provided bottom has the hoistway frame of the second steel plate, second steel plate has multiple second installing holes, passes through Second steel plate of hoistway frame and the first steel plate are connected by connecting bolt, to fix hoistway frame.
Preferably, in step s3, the height of the support bar is adjusted, second cushion cap and plane-parallel is made.
Preferably, the second cushion cap described in multiple they sup-ports is suspended at the top of first cushion cap, and described first Size of the size of cushion cap and the central axis and first cushion cap of second cushion cap more than second cushion cap.
Preferably, the support bar includes connecting first cushion cap and has the first support bar of first through hole, connection institute State the second cushion cap and have the second support bar and fix bar of the second through hole, one end of the second support bar is inserted in described first In support bar, and the first through hole and second lead to the hole site are relative, the fix bar be inserted in the first through hole and Second through hole simultaneously runs through the first support bar and the second support bar.
Preferably, the quantity of the support bar is four, is respectively arranged on four drift angles of first cushion cap.
Preferably, first steel plate is fixed at the top of the foundation bolt, and first steel plate is formed with four first Installing hole.
Preferably, second steel plate is formed with four the second installing holes.
Preferably, first steel plate and second steel plate are abutted and first installing hole and second installing hole Position is corresponding, and the connecting bolt is through located at first installing hole and second installing hole.
Compared with correlation technique, the pit structure installation method that the present invention is provided has the advantages that:
First, the second cushion cap is set up on first cushion cap and connects the support bar of first cushion cap and the second cushion cap, And the support bar has stretching structure, the levelness of second cushion cap can be adjusted, solve elevator pit structure use time Foundation ditch that is long and producing is subside, the problem of cushion cap deformation.
2nd, the hoistway frame of the prior art and the bottom are replaced by the tight bolt of the first steel plate and the second steel plate The framework of steel reinforcement of hole cushion cap is directly welded, and has both improve fixed stability and intensity, is reduced again The stand-off error that work is caused, is conducive to the hoistway frame to be connected with the accurate firm of the pit cushion cap.
Description of the drawings
The step of Fig. 1 is pit structure installation method of the present invention flow chart;
Fig. 2 is the three-dimensional exploded view of pit structure of the present invention;
The step of Fig. 3 is the installation method of pit link of the present invention flow chart.
Specific embodiment
The invention will be further described with embodiment below in conjunction with the accompanying drawings.
A kind of pit structure installation method, please refers to Fig. 1 and Fig. 2, and wherein, Fig. 1 is installed for pit structure 1 of the present invention The step of method flow chart;Fig. 2 is the three-dimensional exploded view of pit structure of the present invention.The pit structure installation method includes as follows Step:
Step S1, there is provided foundation ditch, in foundation ditch pours into a mould concrete and sets up the first cushion cap 13;
The bottom of multiple support bars 10 is fixed in first cushion cap 13 by step S2, there is provided multiple support bars 10;
In the present embodiment, the quantity of the support bar 10 is four, is respectively arranged on four tops of first cushion cap 13 Angle.
Step S3, there is provided the second cushion cap 15, the top that second cushion cap 15 is fixed in multiple support bars 10;
Specifically, multiple support bars 10 support second cushion cap 15 to be suspended at the top of first cushion cap 13, institute The size that the first cushion cap 13 is stated with the central axis and first cushion cap 13 of second cushion cap 15 is held more than described second The size of platform 15.
The support bar 10 includes connecting first cushion cap 13 and has the first support bar 101 of first through hole 1011, connects Connect second cushion cap 15 and have the second support bar 103 and fix bar 105 of the second through hole 1031, the second support bar 103 One end be inserted in the first support bar 101, and the first through hole 1011 and 1031 position of the second through hole are relative, The fix bar 105 is inserted in the first through hole 1011 and second through hole 1031 and through the first support bar 101 With the second support bar 103.
The distance of the first support bar 101 is inserted by arranging the second support bar 103, reaches regulation support bar 10 Height, make second cushion cap 15 and plane-parallel.
Step S4, there is provided pit link 11, the top that the pit link 11 is fixed in second cushion cap 15;
Step S5, to casting concrete in foundation ditch, makes the excessively described pit link 11 of concrete cover.
Please in conjunction with flow chart the step of refering to Fig. 3, Fig. 3 is the installation method of pit link of the present invention.The pit The installation method of link, comprises the steps;
The anchor nut 113 is fixed in the second cushion cap by step S41, there is provided foundation bolt 111 and anchor nut 113 On 15, the foundation bolt 111 is installed in the anchor nut 113 then;
Step S42, there is provided the first steel plate 115 of multiple first installing holes 1151 of tool, first steel plate 115 is fixed in At the top of the foundation bolt 111;
Step S43, adjusts the height of the foundation bolt 111, makes 115 height of the first steel plate in same level;
Step S44, there is provided bottom has the hoistway frame 2 of the second steel plate 21, second steel plate 21 has multiple second installing holes 211, second steel plate 21 and the first steel plate 115 of hoistway frame 2 are connected by connecting bolt, to fix hoistway frame 2.
Specifically, the pit link 11 includes foundation bolt 111, anchor nut 113 and the first steel plate 115, described Anchor nut 113 is fixed on second cushion cap 15, and the foundation bolt 111 is plugged in the anchor nut 113.
Further, the foundation bolt 111, the quantity of the anchor nut 113 are also four, the anchor nut 113 four drift angles for being embedded at second cushion cap 15.
First steel plate 115 is fixed at the top of the foundation bolt 111, and first steel plate 115 is formed with four One installing hole 1151;The hoistway frame 2 includes that the second steel plate 21, second steel plate 21 are formed with four the second installing holes 211.
First steel plate 115 and second steel plate 21 are abutted and first installing hole 1151 and described second is installed 211 position of hole is corresponding, and the connecting bolt passes through through located at first installing hole 1151 and second installing hole 211 The foundation bolt 111 and the mutual regulation of anchor nut 113, by first steel plate 115 located at same level, reuse Connecting bolt is fixedly connected the hoistway frame 2 and the pit link 11.
Compared with correlation technique, the pit structure installation method that the present invention is provided has the advantages that:
First, the second cushion cap is set up on first cushion cap and connects the support bar of first cushion cap and the second cushion cap, And the support bar has stretching structure, the levelness of second cushion cap can be adjusted, solve elevator pit structure use time Foundation ditch that is long and producing is subside, the problem of cushion cap deformation.
2nd, the hoistway frame of the prior art and the bottom are replaced by the tight bolt of the first steel plate and the second steel plate The framework of steel reinforcement of hole cushion cap is directly welded, and has both improve fixed stability and intensity, is reduced again The stand-off error that work is caused, is conducive to the hoistway frame to be connected with the accurate firm of the pit cushion cap.
Embodiments of the invention are the foregoing is only, the scope of the claims of the present invention is not thereby limited, every using this Equivalent structure or equivalent flow conversion that bright description and accompanying drawing content are made, or directly or indirectly it is used in other related skills Art field, is included within the scope of the present invention.

Claims (9)

1. a kind of pit structure installation method, this are applied to the pit structure for installing elevator hoistways frame, it is characterised in that include as Lower step:
Step S1, there is provided foundation ditch, in foundation ditch pours into a mould concrete and sets up the first cushion cap;
The bottom of multiple support bars is fixed in first cushion cap by step S2, there is provided multiple support bars;
Step S3, there is provided the second cushion cap, the top that second cushion cap is fixed in multiple support bars;
Step S4, there is provided pit link, the top that the pit link is fixed in second cushion cap;
Step S5, to casting concrete in foundation ditch, makes the excessively described pit link of concrete cover.
2. pit structure installation method according to claim 1, it is characterised in that:Step S4, comprises the steps;
Step S41, there is provided foundation bolt and anchor nut, the anchor nut is fixed on second cushion cap, is then existed The foundation bolt is installed in the anchor nut;
First steel plate is fixed in the foundation bolt top by step S42, there is provided the first steel plate of multiple first installing holes of tool Portion;
Step S43, adjusts the height of the foundation bolt, makes the first steel plate height in same level;
Step S44, there is provided bottom has the hoistway frame of the second steel plate, second steel plate has multiple second installing holes, by connection Second steel plate of hoistway frame and the first steel plate are connected by bolt, to fix hoistway frame.
3. pit structure installation method according to claim 1, it is characterised in that:In step s3, the support is adjusted The height of bar, makes second cushion cap and plane-parallel.
4. pit structure installation method according to claim 1, it is characterised in that:Described in multiple they sup-ports Two cushion caps are suspended at the top of first cushion cap, the central axis and described first of first cushion cap and second cushion cap Size of the size of cushion cap more than second cushion cap.
5. pit structure installation method according to claim 1, it is characterised in that:The support bar includes connecting described One cushion cap simultaneously has the first support bar of first through hole, connects second cushion cap and have second support bar and the fixation of the second through hole Bar, one end of the second support bar are inserted in the first support bar, and the first through hole and the second through hole position Put relative, the fix bar is inserted in the first through hole and second through hole and runs through the first support bar and described the Two support bars.
6. pit structure installation method according to claim 1, it is characterised in that:The quantity of the support bar is four, It is respectively arranged on four drift angles of first cushion cap.
7. pit structure installation method according to claim 2, it is characterised in that:First steel plate is fixed in describedly At the top of foot bolt, first steel plate is formed with four the first installing holes.
8. pit structure installation method according to claim 7, it is characterised in that:Second steel plate is formed with four Two installing holes.
9. pit structure installation method according to claim 8, it is characterised in that:First steel plate and second steel Plate is abutted and first installing hole is corresponding with second position of mounting hole, and the connecting bolt runs through located at the described first peace Dress hole and second installing hole.
CN201611113024.3A 2016-12-06 2016-12-06 Pit structure installation method Active CN106499048B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611113024.3A CN106499048B (en) 2016-12-06 2016-12-06 Pit structure installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611113024.3A CN106499048B (en) 2016-12-06 2016-12-06 Pit structure installation method

Publications (2)

Publication Number Publication Date
CN106499048A true CN106499048A (en) 2017-03-15
CN106499048B CN106499048B (en) 2019-08-16

Family

ID=58329568

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611113024.3A Active CN106499048B (en) 2016-12-06 2016-12-06 Pit structure installation method

Country Status (1)

Country Link
CN (1) CN106499048B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006298611A (en) * 2005-04-22 2006-11-02 Mitsubishi Electric Corp Buffer device for elevator
CN202245617U (en) * 2011-01-04 2012-05-30 张向阳 Elevator well wall assembled by adopting combined type derricks
CN104340813A (en) * 2014-10-30 2015-02-11 中国建筑股份有限公司 Construction method of elevator mounting
CN106044466A (en) * 2016-08-12 2016-10-26 山东富士制御电梯有限公司 Levelness adjusting device for steel structure well for elevator

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006298611A (en) * 2005-04-22 2006-11-02 Mitsubishi Electric Corp Buffer device for elevator
CN202245617U (en) * 2011-01-04 2012-05-30 张向阳 Elevator well wall assembled by adopting combined type derricks
CN104340813A (en) * 2014-10-30 2015-02-11 中国建筑股份有限公司 Construction method of elevator mounting
CN106044466A (en) * 2016-08-12 2016-10-26 山东富士制御电梯有限公司 Levelness adjusting device for steel structure well for elevator

Also Published As

Publication number Publication date
CN106499048B (en) 2019-08-16

Similar Documents

Publication Publication Date Title
CN105113388B (en) Formwork and bracket combining structure of vase pier of viaduct and application method
CN206308654U (en) Prefabricated assembled railing
CN205205667U (en) Bearing bracket device
CN105317052B (en) Tower crane foundation bolt fixing method
CN105464216A (en) Construction method for ultrahigh oblique post with super-large cross section based on integral lifting formwork reinforcing system
CN107476583A (en) A kind of concrete assembled building builds construction method
CN206589121U (en) It is a kind of to be used for precast beam, the diaphragm plate horizontal reinforcement mounting and positioning device of plate
KR101204966B1 (en) Construction method for confine concrete member of steel plate girder with reinforced bending moment
KR20140056900A (en) The jackup device for the extension and floor increase, the jackup system using this
CN106592623B (en) Pit structure installation method
CN112609842A (en) Super high-rise steel column base structure and construction method thereof
CN106150105A (en) A kind of stiffened column installation method
CN105220793B (en) Precast concrete and shear wall module and preparation method thereof with the component
CN106499048A (en) Pit structure installation method
CN202265906U (en) Fixing device for anchor bolts of embedded type steel tube concrete column feet
CN2915808Y (en) Steel pipe combined structure elevator shaft bracket
CN212026316U (en) Foundation bolt fixing device
KR101181493B1 (en) Improved support system
CN206396778U (en) Pit structure
CN114876209A (en) Steel reinforced beam sectional construction method for limited hoisting
CN212612045U (en) Cushion cap reserved rib positioning frame
CN107313509A (en) The installation method of special-shaped tubular steel structure
CN106638937B (en) Pit structure and its installation method
CN206396887U (en) Pit structure
CN206396780U (en) Pit structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20191029

Address after: 314513 quchbon village, zhouquan Town, Tongxiang City, Jiaxing, Zhejiang

Patentee after: Zhejiang canyuan Home Textile Co., Ltd

Address before: 315040 room 233-3, building, No. 66, academician Road, high tech Zone, Zhejiang, Ningbo, China

Patentee before: Ningbo ever Elevator Technology Development Co., Ltd.