CN106499047B - Pit structure installation method - Google Patents

Pit structure installation method Download PDF

Info

Publication number
CN106499047B
CN106499047B CN201611107746.8A CN201611107746A CN106499047B CN 106499047 B CN106499047 B CN 106499047B CN 201611107746 A CN201611107746 A CN 201611107746A CN 106499047 B CN106499047 B CN 106499047B
Authority
CN
China
Prior art keywords
interconnecting piece
pit
installation method
support portion
structure installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611107746.8A
Other languages
Chinese (zh)
Other versions
CN106499047A (en
Inventor
***
胡国良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tongxiang Tengfei Home Textile Co ltd
Original Assignee
Ningbo Ever Elevator Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Ever Elevator Technology Development Co Ltd filed Critical Ningbo Ever Elevator Technology Development Co Ltd
Priority to CN201611107746.8A priority Critical patent/CN106499047B/en
Publication of CN106499047A publication Critical patent/CN106499047A/en
Application granted granted Critical
Publication of CN106499047B publication Critical patent/CN106499047B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/0007Base structures; Cellars

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The present invention provides a kind of pit structure installation method.The pit structure installation method includes the following steps: that being poured concrete sets up pit cushion cap, provides foundation bolt and anchor nut, the anchor nut is embedded on pit cushion cap, then the mounting foot bolt in anchor nut;Interconnecting piece is provided, the interconnecting piece connects two adjacent foundation bolts;Support portion is provided, the support portion is connect with the interconnecting piece;Casting concrete again makes concrete cover the connection bolt.The support portion that pit structure installation method of the invention uses is made of Steel material, enhances the structural of pit structure;The support portion and the interconnecting piece are integrally formed or are articulated on the interconnecting piece, which is connected firmly, and construction cost is low, and bearing capacity is strong, is not in obscission;The foundation bolt and the interconnecting piece are enclosed sealing structure simultaneously, are less prone to running pulp, good seepage-proof property.

Description

Pit structure installation method
Technical field
The present invention relates to elevator shaft fields, and in particular to the pit structure installation method of elevator shaft.
Background technique
Aging blocks building in, sometimes according to production, life needs, it is necessary to add elevator building outside, outside building elevator build in Except aging blocks, need to build the hoistway outside independently of building, therefore hoistway frame is stable and firm particularly significant.Pit structure from Well pit stretches out, and connection hoistway frame and pit cushion cap, pit structure and being bonded for hoistway frame are related to entire hoistway Stablize safety, pit structure is one of the important composition component of elevator shaft construction.In the prior art, hoistway frame is held with pit Platform framework of steel reinforcement directly welds, and after-pouring concrete covers pit structure and hoistway frame weld, completes hoistway frame and bottom with this Cheat the connection of structure.
This kind of pit structure mounting means is excessively coarse simple, there is connection shakiness, be easy to cause stand-off error, is difficult to entangle Inclined problem.
Summary of the invention
Present invention solves the technical problem that be to improve that a kind of structural behaviour is good, and construction cost is low, the strong bottom of bearing capacity Cheat structure installation method.
Technical scheme is as follows:
A kind of pit structure installation method, includes the following steps,
Step S1, casting concrete sets up pit cushion cap, provides foundation bolt and anchor nut, and the anchor nut is embedding On pit cushion cap, the then mounting foot bolt in the anchor nut;
Step S2, the first steel plate for having several the first mounting holes is provided, first steel plate is fixed in the lower margin At the top of bolt;
Step S3, the height for adjusting foundation bolt, makes the first steel plate height in same level;
Step S4, interconnecting piece is provided, the interconnecting piece connects two adjacent foundation bolts;
Step S5, support portion is provided, the support portion is connect with the interconnecting piece;
Step S6, the hoistway frame that bottom has the second steel plate is provided, second steel plate has several the second mounting holes, passes through It connects bolt to connect the second steel plate of hoistway frame and the first steel plate, fixed hoistway frame;
Step S7, casting concrete again makes concrete cover the connection bolt.
Preferably, the support portion is extended to form from the top of the interconnecting piece towards the pit cushion cap outer rim side.
Preferably, the support portion is articulated with the top of the interconnecting piece.
Preferably, the support portion is up-side down triangle.
Preferably, the foundation bolt and the interconnecting piece are enclosed the receiving of a sealing at the top of the pit cushion cap Slot.
Preferably, the angle of the support portion and the interconnecting piece is 30 ° to 60 °.
Preferably, the quantity of first mounting hole and second mounting hole is four.
Preferably, the interconnecting piece is material of rectangular channel, and end is welded and fixed with the foundation bolt.
Preferably, sealing joint strip is equipped in the container, the sealing joint strip is set to the interconnecting piece and the lower margin The junction of bolt.
Compared with the relevant technologies, pit structure installation method provided by the invention is had the following beneficial effects:
One, the support portion that pit structure installation method of the invention uses is made of Steel material, enhances pit structure It is structural;The support portion and the interconnecting piece are integrally formed or are articulated on the interconnecting piece, which is connected firmly, and applies Work is at low cost, and bearing capacity is strong, is not in obscission;Foundation bolt and the interconnecting piece are enclosed sealing knot simultaneously Structure is less prone to running pulp, good seepage-proof property.
Two, the hoistway frame in the prior art and the bottom are replaced by the close bolt of the first steel plate and the second steel plate The framework of steel reinforcement of hole cushion cap directly welds, and has not only improved the stability and intensity of connection, but also reduce the subsequent mixed mud that pours and apply Stand-off error caused by work is beneficial to the hoistway frame and is bonded with the accurate of the pit cushion cap.
Detailed description of the invention
Fig. 1 is the step flow chart of pit structure installation method of the present invention;
Fig. 2 is a kind of top view of embodiment of pit structure shown in Fig. 1;
Fig. 3 is a kind of stereogram exploded view of embodiment of pit structure shown in Fig. 1.
Specific embodiment
The invention will be further described with embodiment with reference to the accompanying drawing.
Fig. 1 to Fig. 3 is please referred to, Fig. 1 is the step flow chart of pit structure installation method of the present invention;Fig. 2 is Fig. 1 institute Show a kind of top view of embodiment of pit structure;Fig. 3 is a kind of stereogram exploded view of embodiment of pit structure shown in Fig. 1.
The pit structure installation method, includes the following steps,
Step S1, casting concrete sets up pit cushion cap 3, provides foundation bolt 111 and anchor nut 113, will describedly Foot nut 113 is embedded on pit cushion cap 3, then the mounting foot bolt 111 in anchor nut 113;
Step S2, the first steel plate 116 for having several the first mounting holes 1161 is provided, first steel plate 116 is affixed In 111 top of foundation bolt;
Step S3, the height for adjusting foundation bolt 111, makes 116 height of the first steel plate in same level;
Step S4, interconnecting piece 115 is provided, the interconnecting piece 115 connects two adjacent foundation bolts 111;
Step S5, support portion 117 is provided, the support portion 117 is connect with the interconnecting piece 115;
Step S6, the hoistway frame 2 that bottom has the second steel plate 21 is provided, second steel plate 21 has several second mounting holes 211, the second steel plate 21 of hoistway frame 2 and the first steel plate 116 are connected by connection bolt, fixed hoistway frame 2;
Step S7, casting concrete again makes concrete cover the connection bolt.
The pit structure 1 is for connecting hoistway frame 2 and pit cushion cap 3 comprising the pit on pit cushion cap is solid Determine device 11.
The fixed device 11 of the pit include several anchor nuts 113 for being embedded at the pit cushion cap 3, be bolted in it is described Foundation bolt 111 in anchor nut 113, the interconnecting piece 115 for connecting two adjacent foundation bolts 111 and with the interconnecting piece 115 The support portion 117 of connection.Specifically, the interconnecting piece 115 is material of rectangular channel, end and the foundation bolt 111 are welded It is fixed.
Further, the quantity of the foundation bolt 111, the anchor nut 113 and the interconnecting piece 115 is four A, four interconnecting pieces are separately connected four foundation bolts 111.
In the present embodiment, the support portion 117 is from the top of the interconnecting piece 115 towards 3 outer rim of pit cushion cap Side extends to form.
The support portion 117 is up-side down triangle, which is conducive to the apical support using triangle in foundation pit, and Increase bearing area, further increases the stability that the fixed device 11 of the pit copes with geological disaster.
The foundation bolt 111 is enclosed the receiving of a sealing with the interconnecting piece 115 at the top of the pit cushion cap 3 Slot 100, the container 100 are used for concrete perfusion.
Preferably, sealing joint strip is equipped in the container, the sealing joint strip is set to the interconnecting piece and the lower margin The junction of bolt.Increase sealing joint strip and further increases the leakproofness of the container 100.
During concrete perfusion, the foundation bolt 111 is enclosed sealing structure with the interconnecting piece 115, no Easily there is running pulp, good seepage-proof property.
The angle of the support portion 117 and the interconnecting piece 115 is 30 ° to 60 °, installs the fixed device 11 of the pit, The angle degree of the support portion 117 and the interconnecting piece 115 can be adjusted to different according to the specific geologic structure on installation ground Angle initialization.
The fixed device 11 of the pit further includes the first steel plate 116.First steel plate 116 is fixed in the foundation bolt 111 tops, there are four the first mounting holes 1161 for the formation of the first steel plate 116.
The hoistway frame 2 includes the second steel plate 21, and there are four the second mounting holes 211 for the formation of the second steel plate 21.
First steel plate 116 and second steel plate 21 abut and first mounting hole 1161 and described second is installed 211 position of hole is corresponding, and the connection bolt-through is set to first mounting hole 1161 and second mounting hole 211, passes through First steel plate 116 is set to same level, reused by the mutual adjusting of the foundation bolt 111 and anchor nut 113 Connection bolt is fixedly connected with the hoistway frame 2 and the fixed device 11 of the pit.
In another alternate embodiment of the invention, the support portion is articulated with the top of the interconnecting piece, the structure The production and installation for being conducive to equipment adjust the support portion and institute after being installed the fixed device of pit by articulated structure The different degree of interconnecting piece is stated, then the two is welded and fixed.
Compared with the relevant technologies, pit structure installation method provided by the invention is had the following beneficial effects:
One, the support portion that pit structure installation method of the invention uses is made of Steel material, enhances pit structure It is structural;The support portion and the interconnecting piece are integrally formed or are articulated on the interconnecting piece, which is connected firmly, and applies Work is at low cost, and bearing capacity is strong, is not in obscission;The foundation bolt and the interconnecting piece are enclosed sealing simultaneously Structure is less prone to running pulp, good seepage-proof property.
Two, the hoistway frame in the prior art and the bottom are replaced by the close bolt of the first steel plate and the second steel plate The framework of steel reinforcement of hole cushion cap directly welds, and has not only improved the stability and intensity of connection, but also reduce the subsequent mixed mud that pours and apply Stand-off error caused by work is beneficial to the hoistway frame and is bonded with the accurate of the pit cushion cap.
The above description is only an embodiment of the present invention, is not intended to limit the scope of the invention, all to utilize this hair Equivalent structure or equivalent flow shift made by bright specification and accompanying drawing content is applied directly or indirectly in other relevant skills Art field, is included within the scope of the present invention.

Claims (9)

1. a kind of pit structure installation method, it is characterised in that: include the following steps,
Step S1, casting concrete sets up pit cushion cap, provides foundation bolt and anchor nut, the anchor nut is embedded at On pit cushion cap, the then mounting foot bolt in the anchor nut;
Step S2, the first steel plate for having several the first mounting holes is provided, first steel plate is fixed in the foundation bolt Top;
Step S3, the height for adjusting foundation bolt, makes the first steel plate height in same level;
Step S4, interconnecting piece is provided, the interconnecting piece connects two adjacent foundation bolts;
Step S5, support portion is provided, the support portion is connect with the interconnecting piece;
Step S6, the hoistway frame that bottom has the second steel plate is provided, second steel plate has several the second mounting holes, passes through connection Bolt connects the second steel plate of hoistway frame and the first steel plate, fixed hoistway frame;
Step S7, casting concrete again makes concrete cover the connection bolt.
2. pit structure installation method according to claim 1, it is characterised in that: the support portion is from the interconnecting piece Top is extended to form towards the pit cushion cap outer rim side.
3. pit structure installation method according to claim 1, it is characterised in that: the support portion is articulated with the connection The top in portion.
4. pit structure installation method according to claim 1, it is characterised in that: the support portion is up-side down triangle.
5. pit structure installation method according to claim 1, it is characterised in that: the foundation bolt and the interconnecting piece The container of a sealing is enclosed at the top of the pit cushion cap.
6. pit structure installation method according to claim 5, it is characterised in that: be equipped with sealant in the container Item, the sealing joint strip are set to the junction of the interconnecting piece and the foundation bolt.
7. pit structure installation method according to claim 2, it is characterised in that: the support portion and the interconnecting piece Angle is 30 ° to 60 °.
8. pit structure installation method according to claim 1, it is characterised in that: first mounting hole and described second The quantity of mounting hole is four.
9. pit structure installation method according to claim 1, it is characterised in that: the interconnecting piece is material of rectangular channel, Its end is welded and fixed with the foundation bolt.
CN201611107746.8A 2016-12-06 2016-12-06 Pit structure installation method Active CN106499047B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611107746.8A CN106499047B (en) 2016-12-06 2016-12-06 Pit structure installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611107746.8A CN106499047B (en) 2016-12-06 2016-12-06 Pit structure installation method

Publications (2)

Publication Number Publication Date
CN106499047A CN106499047A (en) 2017-03-15
CN106499047B true CN106499047B (en) 2019-01-29

Family

ID=58330462

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611107746.8A Active CN106499047B (en) 2016-12-06 2016-12-06 Pit structure installation method

Country Status (1)

Country Link
CN (1) CN106499047B (en)

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009263102A (en) * 2008-04-25 2009-11-12 Toshiba Elevator Co Ltd Buffer stand mounting structure of elevator
CN202245617U (en) * 2011-01-04 2012-05-30 张向阳 Elevator well wall assembled by adopting combined type derricks
CN104340813B (en) * 2014-10-30 2016-09-14 中国建筑股份有限公司 A kind of installation construction method for elevator

Also Published As

Publication number Publication date
CN106499047A (en) 2017-03-15

Similar Documents

Publication Publication Date Title
CN108005401A (en) A kind of support and change method of the column of existing frame structure base isolation reinforcement
CN106499047B (en) Pit structure installation method
JP5635048B2 (en) Basics for installing solar panels
CN209053036U (en) A kind of freeway guardrail support prefabricated component and its layout stracture
CN205100235U (en) Antidumping formula street lamp foundation structure suitable for bridge
CN110792042A (en) Anti-overturning reinforcing method for rectangular single-column pier bridge
CN202099879U (en) Box type steel pedestal supporting base with shear key
KR101282333B1 (en) Cross-type supporting structure and method for super-structure of bridge
CN104060845B (en) A kind of steel column temporary fixing structure and construction method thereof
CN103850275B (en) A kind of anti-horizontal shear force hydraulic detection device of foundation pile
CN207079467U (en) A kind of backing plate height-adjustable supports
CN105064217A (en) Mortar leakage preventing device for bridge cap beam bottom mold
CN204920244U (en) Supporting structure of large -span steel construction segmentation hoist and mount
CN206396887U (en) Pit structure
CN203603264U (en) Externally-wrapped pillar base
JP3671155B2 (en) Pile foundation structure
CN204040496U (en) A kind of steel column temporary fixing structure
CN107761955A (en) H profile steel supporting frame structure node
CN106638937B (en) Pit structure and its installation method
CN110700122A (en) A antidumping reinforced structure for rectangle single-column mound bridge
CN205654104U (en) Steel construction lifting platform
CN202627014U (en) Concrete foundation structure of tower crane
CN206396778U (en) Pit structure
CN106499048B (en) Pit structure installation method
KR20080057438A (en) Steel tube footing method for adjustment with a height of calumn

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20191025

Address after: 314513, Dongsheng Street, Quanzhou Town, Jiaxing, Zhejiang, Tongxiang

Patentee after: TONGXIANG TENGFEI QUILT WADDING CO.,LTD.

Address before: 315040 room 233-3, building, No. 66, academician Road, high tech Zone, Zhejiang, Ningbo, China

Patentee before: NINGBO YONGLIANG ELEVATOR TECHNOLOGY DEVELOPMENT CO.,LTD.

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 314513, Dongsheng Street, Quanzhou Town, Jiaxing, Zhejiang, Tongxiang

Patentee after: Tongxiang Tengfei Home Textile Co.,Ltd.

Address before: 314513, Dongsheng Street, Quanzhou Town, Jiaxing, Zhejiang, Tongxiang

Patentee before: TONGXIANG TENGFEI QUILT WADDING Co.,Ltd.

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Pit structure installation method

Effective date of registration: 20211202

Granted publication date: 20190129

Pledgee: Zhejiang Tongxiang Rural Commercial Bank Co.,Ltd. Zhouquan Branch

Pledgor: Tongxiang Tengfei Home Textile Co.,Ltd.

Registration number: Y2021330002445

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20230907

Granted publication date: 20190129

Pledgee: Zhejiang Tongxiang Rural Commercial Bank Co.,Ltd. Zhouquan Branch

Pledgor: Tongxiang Tengfei Home Textile Co.,Ltd.

Registration number: Y2021330002445

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Installation method of pit structure

Effective date of registration: 20230924

Granted publication date: 20190129

Pledgee: Zhejiang Tongxiang Rural Commercial Bank Co.,Ltd. Zhouquan Branch

Pledgor: Tongxiang Tengfei Home Textile Co.,Ltd.

Registration number: Y2023330002103