CN106495028A - 用于装配式建筑施工的塔吊转换方法 - Google Patents

用于装配式建筑施工的塔吊转换方法 Download PDF

Info

Publication number
CN106495028A
CN106495028A CN201510563470.3A CN201510563470A CN106495028A CN 106495028 A CN106495028 A CN 106495028A CN 201510563470 A CN201510563470 A CN 201510563470A CN 106495028 A CN106495028 A CN 106495028A
Authority
CN
China
Prior art keywords
tower crane
attached wall
building
conversion method
assembled architecture
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510563470.3A
Other languages
English (en)
Inventor
范振江
周代杰
周曹国
姜云剑
刘峰
梁府
周遂林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Corp Ltd filed Critical Shanghai Baoye Group Corp Ltd
Priority to CN201510563470.3A priority Critical patent/CN106495028A/zh
Publication of CN106495028A publication Critical patent/CN106495028A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Jib Cranes (AREA)

Abstract

本发明设计建筑施工领域,具体为一种用于装配式建筑施工的塔吊转换方法;它包括设置在承台上的第一塔吊其特征是:包括下述步骤:步骤1、在第一塔吊的承台内预埋第二塔吊的支腿;步骤2、拆除第一塔吊;步骤3、安装第二塔吊并顶升至设计独立高度;步骤4、安装第二塔吊的第一道附墙,该附墙位于建筑物高度的30%处;步骤5、将第二塔吊的塔机顶升至建筑物高度的70%;步骤6、安装第二塔吊的第二道附墙,该附墙位于建筑物高度的60%处;步骤7、将第二塔吊顶升至最终设计高度。本装配式建筑塔吊转换方法在同一塔机基础上进行塔机转换施工,大大节约了施工成本,避免造成资源浪费。

Description

用于装配式建筑施工的塔吊转换方法
技术领域
本发明设计建筑施工领域,具体为一种用于装配式建筑施工的塔吊转换方法。
背景技术
在建筑结构施工中,通常一个塔吊基础选择一台适合的塔吊进行安装用于一次结构与二次结构施工,但某些特定建筑由于装配式预制构件重量大,一次结构施工中需用重型塔机,但二次结构施工仅需普通塔机即可,如此,在二次结构中沿用重型塔机将造成能效过高、资源浪费的问题。
发明内容
本发明的目的在于,提供一种塔吊的转换方法,使一个塔吊基础能够适用于两个塔机,从而降低施工成本。
为了达到上述目的,本发明是这样实现的:
一种用于装配式建筑施工的塔吊转换方法,它包括设置在承台上的第一塔吊包括下述步骤:
步骤1、在第一塔吊的承台内预埋第二塔吊的支腿;
步骤2、拆除第一塔吊;
步骤3、安装第二塔吊并顶升至设计独立高度;
步骤4、安装第二塔吊的第一道附墙,该附墙位于建筑物高度的30%处;
步骤5、将第二塔吊的塔机顶升至建筑物高度的70%;
步骤6、安装第二塔吊的第二道附墙,该附墙位于建筑物高度的60%处;
步骤7、将第二塔吊顶升至最终设计高度。
所述的用于装配式建筑施工的塔吊转换方法,安装第二塔吊时,建筑已封顶,应根据第二塔吊塔机附墙布置,调整脚手架位置,避开拉杆连接位置。
所述的用于装配式建筑施工的塔吊转换方法,还辅助汽车吊,在步骤6中用辅助汽车吊帮助安装第二塔吊的第二道附墙。
本装配式建筑塔吊转换方法在同一塔机基础上进行塔机转换施工,大大节约了施工成本,避免造成资源浪费。
具体实施方式
以下通过具体实施例进一步说明本发明。
在一次结构施工中使用TC7035塔机,在一次结构封顶时在原有基础上更换TC5610塔机,TC5610塔机要求一次安装至最终高度(70米),计划使用50吨汽车吊配合安装。本次建筑物最高点约为57米,要求塔机安装高度约为70米。TC7035塔机预计进行一次附着,附着高度约为43.5米,TC5610塔机预计安装2道附着,分别位于建筑物26.9米和43.7米位置。
根据工程需求,在TC7035塔机拆除后,在同基础安装1台TC5610塔机作为垂直起重工具,此时建筑物已结构封顶,脚手架未拆除。本次施工的TC5610塔机预埋支腿在TC7035的混凝土承台内。由于预埋支腿的尺寸问题,无法将TC5610预埋支腿布置在TC7035预埋支腿同心位置。同时考虑TC5610塔机安装后附着距离不超长,本次施工将TC5610预埋支腿于中心位置向建筑物方向水平移动600mm,使2套预埋支腿及基础节互不影响。TC5610塔机预埋支腿平移。
具体安拆流程
(1)正常拆除TC7035塔机
(2)安装并顶升至独立高度(40米)
(3)安装第一道附墙(26.9米处)
(4)塔机顶升至55米
(5)安装第二道附墙(43.7米处)
(6)顶升至最终高度(70米)
根据工况,由于安装塔机时,附着建筑已封顶,施工方应根据塔机附墙布置,调整脚手架位置,避开拉杆连接位置。
由于本次附墙安装,塔机本身因建筑无阻挡无法协助,需使用汽车吊辅助安装,第二道附墙高度为43.7米,根据汽车吊起重性能,最低要求使用50吨汽车吊(加副臂,臂长55米),且能保证能在塔机位置半径10米内站位。如站位超过10米,则需使用100吨汽车吊(加副臂,臂长70米)。

Claims (3)

1.一种用于装配式建筑施工的塔吊转换方法,它包括设置在承台上的第一塔吊其特征是:包括下述步骤:
步骤1、在第一塔吊的承台内预埋第二塔吊的支腿;
步骤2、拆除第一塔吊;
步骤3、安装第二塔吊并顶升至设计独立高度;
步骤4、安装第二塔吊的第一道附墙,该附墙位于建筑物高度的30%处;
步骤5、将第二塔吊的塔机顶升至建筑物高度的70%;
步骤6、安装第二塔吊的第二道附墙,该附墙位于建筑物高度的60%处;
步骤7、将第二塔吊顶升至最终设计高度。
2.根据权利要求1所述的用于装配式建筑施工的塔吊转换方法,其特征是:安装第二塔吊时,建筑已封顶,应根据第二塔吊塔机附墙布置,调整脚手架位置,避开拉杆连接位置。
3.根据权利要求1所述的用于装配式建筑施工的塔吊转换方法,其特征是:还辅助汽车吊,在步骤6中用辅助汽车吊帮助安装第二塔吊的第二道附墙。
CN201510563470.3A 2015-09-08 2015-09-08 用于装配式建筑施工的塔吊转换方法 Pending CN106495028A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510563470.3A CN106495028A (zh) 2015-09-08 2015-09-08 用于装配式建筑施工的塔吊转换方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510563470.3A CN106495028A (zh) 2015-09-08 2015-09-08 用于装配式建筑施工的塔吊转换方法

Publications (1)

Publication Number Publication Date
CN106495028A true CN106495028A (zh) 2017-03-15

Family

ID=58287476

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510563470.3A Pending CN106495028A (zh) 2015-09-08 2015-09-08 用于装配式建筑施工的塔吊转换方法

Country Status (1)

Country Link
CN (1) CN106495028A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108868161A (zh) * 2018-09-17 2018-11-23 陕西建工第三建设集团有限公司 一种超高层建筑结构外附着落地式塔吊交错施工方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101240550A (zh) * 2007-12-26 2008-08-13 浙江省长城建设集团股份有限公司 格构式钢柱塔吊基础座的施工方法
JP2011207596A (ja) * 2010-03-30 2011-10-20 Tadano Ltd カウンタウエイト及びその製造方法
CN103410101A (zh) * 2013-08-23 2013-11-27 中南大学 抛物线形超高型桥墩施工中的塔吊转换方法
CN103508332A (zh) * 2013-10-12 2014-01-15 中建三局建设工程股份有限公司 塔机及其转换基座
CN203640375U (zh) * 2013-08-04 2014-06-11 中国建筑第四工程局有限公司 一种不同塔吊基座的转换结构
CN104818729A (zh) * 2015-05-27 2015-08-05 浙江省一建建设集团有限公司 可供大小塔吊转换的共用基础

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101240550A (zh) * 2007-12-26 2008-08-13 浙江省长城建设集团股份有限公司 格构式钢柱塔吊基础座的施工方法
JP2011207596A (ja) * 2010-03-30 2011-10-20 Tadano Ltd カウンタウエイト及びその製造方法
CN203640375U (zh) * 2013-08-04 2014-06-11 中国建筑第四工程局有限公司 一种不同塔吊基座的转换结构
CN103410101A (zh) * 2013-08-23 2013-11-27 中南大学 抛物线形超高型桥墩施工中的塔吊转换方法
CN103508332A (zh) * 2013-10-12 2014-01-15 中建三局建设工程股份有限公司 塔机及其转换基座
CN104818729A (zh) * 2015-05-27 2015-08-05 浙江省一建建设集团有限公司 可供大小塔吊转换的共用基础

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108868161A (zh) * 2018-09-17 2018-11-23 陕西建工第三建设集团有限公司 一种超高层建筑结构外附着落地式塔吊交错施工方法
CN108868161B (zh) * 2018-09-17 2020-08-07 陕西建工第三建设集团有限公司 一种超高层建筑结构外附着落地式塔吊交错施工方法

Similar Documents

Publication Publication Date Title
CN103243926B (zh) 高层建筑工程管井立管吊装的施工方法
AU2009244469B2 (en) Erection method for solar receiver and support tower
CN105649325B (zh) 装配式混凝土剪力墙结构可调节式三角架支撑体系及方法
CN102979313B (zh) 转换层超重钢桁架高空吊装施工方法
CN103982045B (zh) 一种屋面网壳结构无支架悬挑安装施工方法
AU2011253650A1 (en) Installing method for anchor cage and installing method for industrial equipment
WO2014117480A1 (zh) 超大跨度筒壳网格结构施工方法
CN105569242A (zh) 一种叠合楼板的装配方法
CN102691420A (zh) 多层大跨度钢桁架安装施工方法
CN105970819A (zh) 一种钢锚梁的安装施工方法
CN105040591A (zh) 一种波形钢腹板的定位装置及其定位方法
CN109132843B (zh) 一种竖井内超大截面金属风管的安装方法
CN201610978U (zh) 一种便于安装检修多层管道的管架
CN106495028A (zh) 用于装配式建筑施工的塔吊转换方法
CN202302300U (zh) 组合式管道安装作业平台
CN105350698A (zh) 一种大跨度穹顶安装施工方法
CN104627849B (zh) 一种用于内天井管道吊装的吊装设备及吊装方法
CN102815631A (zh) 外挂式塔吊支撑架
CN105625732A (zh) 超高悬挑钢结构桁架无支撑施工方法
CN102633198A (zh) 适用于大风地区的储罐吊装施工方法
CN102465601B (zh) 苯加氢工程主体框架钢结构安装方法
CN205777531U (zh) 楼板施工用张弦梁模板支撑设备
CN102400558B (zh) 苯加氢钢结构安装工程中工艺钢平台钢柱安装方法
CN102733612B (zh) 电动葫芦轨道安装方法
CN104818675A (zh) 钢筋节段的组拼方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170315