CN106460209A - System for carrying out operations linked to use of cells of facility for producing aluminium by means of electrolysis - Google Patents

System for carrying out operations linked to use of cells of facility for producing aluminium by means of electrolysis Download PDF

Info

Publication number
CN106460209A
CN106460209A CN201580011921.0A CN201580011921A CN106460209A CN 106460209 A CN106460209 A CN 106460209A CN 201580011921 A CN201580011921 A CN 201580011921A CN 106460209 A CN106460209 A CN 106460209A
Authority
CN
China
Prior art keywords
cover
arm
groove
storage device
support member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201580011921.0A
Other languages
Chinese (zh)
Other versions
CN106460209B (en
Inventor
J·古尔林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fives ECL SAS
Original Assignee
ECL SAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=50829032&utm_source=***_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=CN106460209(A) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by ECL SAS filed Critical ECL SAS
Publication of CN106460209A publication Critical patent/CN106460209A/en
Application granted granted Critical
Publication of CN106460209B publication Critical patent/CN106460209B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C25ELECTROLYTIC OR ELECTROPHORETIC PROCESSES; APPARATUS THEREFOR
    • C25CPROCESSES FOR THE ELECTROLYTIC PRODUCTION, RECOVERY OR REFINING OF METALS; APPARATUS THEREFOR
    • C25C3/00Electrolytic production, recovery or refining of metals by electrolysis of melts
    • C25C3/06Electrolytic production, recovery or refining of metals by electrolysis of melts of aluminium
    • C25C3/22Collecting emitted gases
    • CCHEMISTRY; METALLURGY
    • C25ELECTROLYTIC OR ELECTROPHORETIC PROCESSES; APPARATUS THEREFOR
    • C25CPROCESSES FOR THE ELECTROLYTIC PRODUCTION, RECOVERY OR REFINING OF METALS; APPARATUS THEREFOR
    • C25C3/00Electrolytic production, recovery or refining of metals by electrolysis of melts
    • C25C3/06Electrolytic production, recovery or refining of metals by electrolysis of melts of aluminium
    • C25C3/08Cell construction, e.g. bottoms, walls, cathodes

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Electrolytic Production Of Metals (AREA)
  • Agricultural Chemicals And Associated Chemicals (AREA)

Abstract

The system (50) is intended to be mounted on a mobile unit of the facility in order to be able to be moved over the cells. It comprises: a support (51) intended to be mounted on the unit; a hinged arm (52) mounted on the support; a gripping device (60) for gripping at least one cover (33) designed to be able to be coupled to a first end (53) of the arm; and a temporary storage device (55) for storing at least one cover, said storage device, mounted on the support, being capable of receiving at least one cover delivered by the arm provided with the gripping device and of allowing said arm provided with the gripping device to retrieve at least one cover previously placed in the storage device.

Description

It is associated with the use for the groove by the device of electrolytic production of aluminum for enforcement The system of operation
The present invention relates to a kind of be used for implementing and for becoming electrolysis (igneous electrolysis) production aluminum by fire Device in groove (cell) the system using associated operation.
The invention still further relates to a kind of unit for the groove using such device, this unit includes a system that, with And a kind of for by fire become electrolytic production of aluminum device.
The invention still further relates to a kind of method of the groove for intervening such device.
Industrial electric by fire one-tenth in a cell according to well-known Hall-He Lute (Hall-H é roult) method Solution produces aluminum.French patent application FR 2806742 (corresponding to United States Patent (USP) US 6409894) describes the electricity for producing aluminum The device of Xie Chang (plant).
Cell reaction, secondary reaction and High Operating Temperature lead to produce the gas mainly containing carbon dioxide and fluorinated product State waste gas.The release in air for these waste gas is tightly controlled and control, and the environment not only concerning potroom (hall) is big Gas, near the working condition of the personnel of groove operation the reason, and concern atmospheric pollution.Some national Environmental capacity bars Example is conditional to the amount of the waste gas discharged into the atmosphere.
There is currently the solution allowing reliably and successfully to extract, reclaim and process these waste gas.Universal solution Certainly scheme is to make electrolysis bath equipped with gas sampling equipment.This equipment covers electrolyzer and includes storing apparatus, this receiving Device especially includes a closure assembly (hood means), and suction and chemical exhaust processing meanss.
This closure assembly includes removable cover, and described cover provides to the access within groove, particularly when being replaced with new anode When changing the anode exhausting.Access within groove is intervened at other and (the removing of such as liquid metals, covers bath or multiple safeguard behaviour Make) during may be also necessary.
Method according to known to the first, by the operator on ground one by one manually from groove remove cover and Described cover is put back to.Operator be then exposed to close to electrolysis bath with there is the related danger of commanding apparatus.Especially, pick up Operator is needed to tilt to groove with the position unloaded required for lower cover.When cover is placed on narrow surface, it is incorrectly positioned Cover can lead to it to be poorly placed on groove, so that operator is unstable and leads to him to have the danger falling in pond.The opposing party Face, removes cover and reduces the efficiency of collecting device and make operator be exposed to waste gas from groove, this requires wearing protecting mask.
In method known to second, for example, it is recorded in French Patent (FRP) 2879582 (corresponding to United States Patent (USP) No.8273223), by a kind of system as follows, cover is removed from groove and they are put back to, this system includes:
- one support member (support), this support member is installed on a moveable unit of device, therefore may be used So that it moves above groove;
- and the first articulated jib, this first articulated jib is installed on this support member and is equipped with one and is used for grabbing Hold the equipment of at least one cover.
It is necessary to clean the surface of the groove of supporting cover before a cover is placed on groove.While replacing anode The fragment of the bath of some hardening may fall on this surface, and the presence of these fragments will prevent the appropriate positioning of cover.For Implement this clean operation, the system of file FR 2879582 includes the second articulated jib, and this second articulated jib is installed in support On part and be equipped with burnisher (such as brush).Therefore, removed at one by the first arm equipped with prehension device Cover in place on groove, then while this cover remains connected to this first arm, the second arm execution equipped with burnisher is clear Clean operation, and then this first arm puts back to this cover on this groove.
Such system is substantially gratifying.However, there are many shortcomings in it.Especially, it have relative complex And the structure of heaviness, it may be implemented for this and maintenance adversely affects.In addition, this system is relatively-stationary, because it It is difficult to adapt to different types of cover and groove, and be difficult to extend it so that it can execute other operations on groove.
It is contemplated that overcoming shortcoming referred to above.
For this reason, and according in a first aspect, the present invention relates to a kind of for implement with for by fiery become electrolytic production of aluminum The system of the operation that the operation of the groove of device is associated, including groove cover manipulation operations, this system is intended to be installed in this device On one moveable unit, enable to make this system move above described groove, this system includes:
- one support member, this support member is intended to be mounted on the unit;
- one articulated jib, this articulated jib is installed on this support member;
- one prehension device being used at least one cover, this prehension device is designed to be coupled to the first end of this arm;
- and, in addition, one is used for the temporary memory device that at least one covers, described storage device is installed in this In support member, at least one that can receive by this arm equipped with this prehension device transports is covered and is adapted to allow for equipped with this The described arm of prehension device fetches at least one cover being previously placed in this storage device.
The operation (particularly one of cover due to being arranged on the presence of the storage device on this support member, is needed to remove in execution The replacement of individual or multiple anode) and cover is put back into operation before the appropriate position cleaning of some regions of groove (particularly) While it is not necessary to this articulated jib for good and all keeps cover.Therefore, this articulated jib having broken away from cover can be used to execute other behaviour Make, and and then fetch the cover being placed in this storage device to put back to them on groove.
Therefore, to this arm can execute multiple operations degree so that this system can more compact and manufacture and safeguard more Cheaply.
Especially, according to a possible embodiment it may be considered that arriving, this system includes independent one and is arranged on this Articulated jib in support member.Therefore even the gain of compactness is made to increase further.
This arm can be dedicated to cover manipulation operations and place the cleaning in the region of the groove of cover thereon.Therefore, it is permissible It is designed to execute other operations, so that the versatility of this system is increased, and keep compactness generally not change.
Alternatively, may further specify that this system includes one for manipulating from above-mentioned cover and cleaning the additional of different operations Arm, if especially these other operation needs specific function or the structure of the arm executing them.
According to a possible embodiment, this system also includes an instrument storage device, sets including at least this grasping A standby and burnisher, this storage device is installed on this support member, and being arranged to receive is provided by this arm At least one instrument and for one of instrument of allowing described arm to take to be placed in this storage device.
By this arrangement, this arm can only be equipped with the instrument required for the ongoing operation of execution, at this moment simultaneously Between during other instruments be placed in this storage device.Especially, can be clear by not carrying the arm execution of this prehension device Clean, make its more practical and effective percentage during clean operation.
In addition, this storage device be present to ensure that system versatility under very good operating condition.In fact, work Tool keeps on this system and is not placed on the floor of device, for example, thus saving floor space, it is to avoid the not phase of instrument The movement hoped and this instrument is positioned to this arm can fetch its difficulty.
This support member can include a pedestal, and the following is fixedly mounted on this pedestal:This arm, at least The temporary memory device of one cover, and this instrument storage device when there is this instrument storage device.This arm and two storages set Standby interior therefore in identical reference frame (r é f é rentiel), therefore it is not required to provide such a testing equipment, for just Really take or fetch one or more covers of storage or the instrument of a storage.
It can be stated that the first end of this arm is equipped with the first coupling device and this prehension device or may be coupled to this arm Any other instrument of this first end is coupled equipped be designed to removedly be cooperated with this first coupling device second and fills Put.Especially, this second coupling device can be identical on all instruments, to obtain " general " coupled system.This coupling from This instrument is maintained on this arm mechanical angle, and realizes energy and actuation commands from electrically and/or pneumatically or hydraulically angle Transmission.
Preferably, this second coupling device is addressable when instrument is positioned in storage device, so that its energy Enough first ends by this arm are close and cooperate with this first coupling device.
Can be designed to receive cloth generally in identical perpendicular for the temporary memory device that at least one covers The multiple covers put, wherein their lateral edges are less horizontal, and described cover in the vertical direction is with substantially continuous side Formula is overlapping.This allows to eliminate in any space being likely to be present in cover before groove removes between described cover by gravity (play).Therefore, the space that the overall dimension of whole group cover must be placed back less than this group, this is easy to for cover to be put back into appropriate position Put.
In a possible embodiment, include one in open position for the temporary memory device that at least one covers Moveable component and closed position between, this open position allows to be incorporated in described storage device/incite somebody to action at least one cover At least one cover removes out from described storage device, covers and be maintained in described storage device described in this closed position.
This system can also include a testing equipment, and this testing equipment can determine before grasping a cover by arm This covers on the accurate location on groove, and can detect an element, this element be close to this groove, must by cover again by arm The position navigating to, enables to suitably reorientate described cover.This two functions can be set by identical detection Two single components execution that are standby or passing through this testing equipment.For example, can to include at least one interim for this testing equipment Telemetry system, such as laser range finder (laser range finder).
This support member can include in operation substantially vertically moveable at least one portion, and this arm is mounted In described at least one portion.This is movably partly relative to the unit installing this support member thereon typically It can be pedestal.This arm is for example fixed on the lower portion of this support member by its second end.
Therefore, this support member described movably partly can elevated so that this system and particularly this arm might as well The part hindering other operations that must implement on this groove and/or not touching this groove when this unit must be made mobile (just carries Rise device (positive raiser), superstructure etc.) other operations.
According to second aspect, the present invention relates to a kind of groove for carrying out the device for becoming electrolytic production of aluminum by fire The unit of operation, this unit includes:
- one mobilecrane, this mobilecrane includes two crossbeams extending transversely with and this movable type Crane is designed to move in a longitudinal direction above described groove;
- one balladeur train (carriage), this balladeur train is arranged on the institute of this mobilecrane in the way of transverse movable State on two crossbeams;
A-and system as described above, the support member of this system is installed on this balladeur train.
According to the third aspect, the present invention relates to a kind of device for becoming electrolytic production of aluminum by fire, including:
- one building, multiple grooves are located in this building, and each groove extends in a lateral direction, and described groove is in longitudinal direction It is juxtaposed to each other on direction;
- one unit as described above, this mobilecrane is installed in be arranged at this building two Longitudinally movable on longitudinal rail near transverse end wall.
According to fourth aspect, the present invention relates to a kind of be used for for intervention becoming the groove of the device of electrolytic production of aluminum by fire Method, including with this order, following steps:
A) use an articulated jib, at least one cover being present on a groove of taking, described arm is installed in one In support member and equipped with a prehension device being used at least one cover;
B) use described arm, by described cover be placed on one be arranged on be used on this support member at least one cover deposit temporarily In storage equipment, then separate described prehension device and described cover to discharge described arm;
C) by means of described arm, fetch at least one cover being previously placed in this storage device;
D) by means of described arm, described cover is put back on this groove.
Therefore, after step b), the release of this arm is described to cover and can execute other operations.
The method can also in step b) and c) between include, and with this order, following steps:
- use described arm, that is, execution cover manipulation operations a) arrives arm d), this prehension device is placed on one and is arranged on this In instrument storage device on support member;
- the instrument different from this prehension device that will be present in this storage device is coupled to described arm;
- execute an operation with described instrument;
- put back to described instrument in this storage device;
- this prehension device is re-coupled on described arm.
Typically, the described instrument different from this prehension device can be a burnisher (such as brush), and passes through The operation of described instrument execution is the clean operation at least one region to this groove.
With reference now to the Description of Drawings present invention a possible embodiment as a non-limiting example.
Fig. 1 is the diagrammatic cross-sectional view of the aluminum electrolysis device including the system according to the present invention;
Fig. 2 is the diagrammatic cross-sectional view of an electrolysis bath of this device;
Fig. 3 represents the perspective view of a part for the groove of Fig. 2;
Fig. 4 is the perspective view of the system according to one embodiment of the invention;
The perspective view of the temporary storage cell namely for the groove cover of the system belonging to Fig. 4 for Fig. 5 and Fig. 6 and top view, This storage device is empty;
Fig. 7 and Fig. 8 is analogous to the view of Fig. 5, and this storage device receives a cover and three covers respectively;
The continuous step of the method exemplified with one groove of system intervention described in Fig. 4 used according to the invention for Fig. 9 to the Figure 16 Suddenly.
Fig. 1 represents aluminum electrolysis device 1, and more particularly represents the potroom of such device 1.
This device 1 includes a building 2, and multiple electrolysis baths 3 are located in this building.Each groove 3 is in transverse direction Y Extend, and groove 3 is juxtaposed to each other on longitudinal direction X.
As illustrated in Fig. 2 and Fig. 3, each groove 3 includes 20, one, the pond supporting construction being referred to as " superstructure " 30 and multiple anode 40,40 '.
Pond 20 includes 21, interior lining 22 of a box hat and a cathode assembly, and this interior lining generally passes through Formed by the block that refractory material is made, this cathode assembly includes the block (being referred to as " cathode block 23 ") being made up of carbonaceous material and gold Belong to pitman 24, the electric conductor 45,46,47 for transporting Faradaic current is attached to described metal pitman.
Each anode 40 is equipped with a metallic rod 41, and this metallic rod is typically via polypody part (multipode) 42 It is attached to anode 40.Anode 40 is removably secured to moveable metal framework 25 by means of removable adapter 26, It is referred to as " anode superstructure ".Anode superstructure 25 is supported by superstructure 30 and is secured to the conductance for transporting Faradaic current Body 47, is referred to as " positive lifter ".
In general, more than 100 grooves 3 in a row or with embarking on journey are juxtaposed to each other in the X direction.Using connection conductor 45th, 46,47 the groove 3 in a row is electrically connected in series.Groove 3 is disposed along device 1 and reserves a circulation corridor 48 and in groove 3 Between reserve an entrance 49.
Each groove 3 is equipped with a cover system, and this system includes a series of removable covers 33, described cover typically by Metal is made, and is more typically made up of aluminium alloy.Waste gas is limited in the inside 29 of groove 3 and is connected to use by this cover system In discharging waste gas and guide them to arrive the device (not shown) of processing center.
Cover 33 is typically inserted in a guide groove 35 arranged along groove 3 (in the Y direction) and is brought to It is bearing on the flange 31 of superstructure 30.Cover 33 is placed side by side on a groove 3 in the Y direction.May be neighbouring at two Exist with the space of approximate 2mm to 5mm magnitude between the lateral edges 36 of cover 33.On the other hand, described cover can be positioned so that and encloses There is the angle defect in several years around X-axis and Y-axis.For example, the size of cover 33 can be as follows:The width (along Y) of 685mm and The height of 1535mm.Cover 33 can be generally plane or cambered surface.Cover 33 is held in place under its own weight, without Want locking device.For example, the weight of a cover 33 can be the magnitude of 12kg.Cover 33 is normally equipped with one for by operating The handle 34 that person manipulates.
The bar 41 of anode 40 manifests from this cover system typically across opening 32, and opening 32 is disposed in this for this purpose In cover system.
According to modal technology, anode 40 is made up of preliminary drying carbonaceous material.Anode during the electroreduction reaction of aluminum 40 needs that gradually use up execute interference on groove 3, and it especially includes, the anode 40 ' being exhausted with new anode 40 replacement.
This device 1 includes one for the unit 4 to the operation that groove 3 is carried out, so-called " assembly is looked after in pond ", i.e. to groove 3 The operation all anodes in this way replacement carrying out or the bath of crushing of groove 3 and AlF3Feeding hopper.It is many that unit 4 can be utilized to manipulation Plant load, such as pond element, the casting ladle of fusing metal or anode.
As illustrated in Fig. 1, unit 4 includes a mobilecrane 5, and this mobilecrane includes horizontal expansion Two crossbeams 6 and this mobilecrane is suitable to move on longitudinal direction X above groove 3.More specifically, portable Heavy-duty machine 5 is installed into can be longitudinal on the longitudinal rail being arranged near two transverse end walls 8 of building 2 or track 7 Mobile.
Unit 4 also includes a balladeur train 9, and this balladeur train is mounted so that on two crossbeams 6 of mobilecrane 5 horizontal To removable.Balladeur train 9 is the part that machine 10 is looked after in pond, and this pond is looked after machine and also included one equipped with multiple manipulation kimonos Module 11 is looked after in the pond of business equipment 12.Pond is looked after machine 10 and can also be included a control room.
Look after machine 10 in the pond for anode replacement operation, these manipulate and service equipment 12 includes instrument, i.e. allusion quotation Type ground curst fracturer (crust breaker), scraper bowl shovel (bucket shovel), anode prehension device (are referred to as " sun Pole fixture ") and the hopper equipped with a scalable conduit.This curst fracturer is used for making the bath of aluminium oxide and solidification Curst ruptures, and described curst generally covers all or part of the anode 40 of groove 3;This scraper bowl shovel is used to withdrawing from use After the anode crossed, the solid matter (fragment of such as curst and aluminium oxide) by removing positioned at there to clear up anode 40 Position;This anode clamp is used to grasp by anode rod 41 and manipulate anode 40, particularly removes from a groove 3 and exhausts Anode and new anode 40 is placed in this groove 3;This scalable conduit is used to introduce the bath of aluminium oxide and/or crushing To in groove 3, to form coat after the anode new by is placed in position.Curst fracturer, scraper bowl shovel and anode Fixture is typically installed to the lower end of a guide member (such as post or telescopic arm).
In addition, unit 4 includes the system 50 of an operation for carrying out being associated with the operation of the groove 3 of device 1, especially It is the operation of cover 33 for pilot slot 3 and the operation for cleaning at least one region of groove 3.
As illustrated in Fig. 4, system 50 includes a support member 51, and this support member is installed on unit 4, and more accurate For be arranged on balladeur train 9, so that it can be made to move above groove 3.System 50 also includes one and is arranged on support member 51 On articulated jib 52.For example, arm 52 includes the first free end 53 and lower the second end 54 partly gone up being attached at support member 51.It Can be six axle anthropomorphic robots.Arm 52 can be mounted in the unique articulated jib on support member 51.
Arm 52 can be made to make it generally while being in operation in general, support member 51 is designed such that Vertically move.This must be allowed when operating on groove 3 to take arm 52 near this groove 3 to, and in remaining time dimension Gripping arm 52 is in raised position so that it does not disturb other service operations, or can with the part of groove 3 (such as just by arm 52 Lifter 47 or supporting construction 30) contact the fact so that any movement of the unit 4 of without prejudice to bearing system 50.For this Purpose, it can be stated that support member 51 includes a telescopic mast in substantially vertical direction Z.
System 50 also includes the temporary memory device 55 at least one cover 33, and this temporary memory device is installed in and props up In support member 51, and in the illustrated embodiment, instrument storage device 56 is also mounted on support member 51.
In the embodiment that figure 4 illustrates, support member 51 includes a pedestal 57, and the following is fixedly mounted in On this pedestal:Arm 52, the temporary memory device 55 at least one cover and instrument storage device 56.More specifically, base Seat 57 can be installed in the lower of support member 51 and partly go up and may move with respect to the upper straightened portion of support member 51, and this is vertical Movement is to be activated by jack (jack) 58.In addition, pedestal 57 can include the wing of a mounting storage device 55 thereon The wing 66 of shape thing (wing) 65 and one installation tool storage device 56 thereon.
The multiple types of tools that can manipulate can be found by arm 52 in instrument storage device 56, and specifically:
- at least one cover 33 prehension device 60, for example include one be provided with supporting for example pass through pneumatic system The main body of the branch of prehension device 59 (such as suction cup (suction cup)) of activation;
- and, burnisher 63, such as brush, scraper or air-blast device.
Instrument storage device 56 be arranged such that to receive at least one instrument 60,63 being provided by arm 52 and To allow described arm 52 to take one of instrument 60,63 being placed in storage device 56.Except prehension device 60 with clearly Outside clean instrument 63, storage device 56 can also receive such as gage probe, survey tool, the other parts (sun for groove Pole framework, anode stub) scrubbing tool, bath removing tool etc..
For this reason, the first end 53 of arm 52 can be equipped with the first coupling device 61, it is possible to be coupled to arm 52 simultaneously Each instrument (particularly prehension device 60 and burnisher 63) of first end 53 the second coupling device 62 can be equipped with, Described second coupling device 62 is designed to removedly cooperate with described first coupling device 61.One in the present invention favourable Version in, the second coupling device 62 is all identical for all described instruments, thus creating a general coupled system.
Coupling device 61,62 is designed in the first end 53 of arm 52 and described instrument (particularly prehension device 60 and clear Clean instrument 63) between releasable connection is provided, and provide the pneumatic power supply between arm 52 and instrument and electric driving force That supplies is dynamically connected certainly.In the case of general coupled system, Coupling device 61,62 preferably should have enough to by each instrument It is connected to the connector of arm 52.In addition, coupling device 61,62 is preferably designed to ensures the instrument quilt when there is power failure It is held in place.
The function of instrument storage device 56 is to allow to be stored in the instrument being not used by preset time.These are not used by Instrument is preferably latched in storage device 56, such as by means of jack.Storage device 56 can include and be connected to base The integral multiple element 64 of wing 66 of seat 57, each of these elements 64 are used as a pedestal, one not by The instrument using can be placed or lock on the base.
It is designed to receive the arm 52 by equipped with prehension device 60 for the temporary memory device 55 that at least one covers At least one cover 33 carrying, and allow to fetch equipped with the described arm 52 of prehension device 60 and be previously placed in storage device 55 At least one interior cover 33.
Referring now to Fig. 5 to Fig. 8 storage device more particularly described below 55.
In the illustrated embodiment, storage device 55 includes a less horizontal pedestal 70, first and laterally props up Post 71 and the second lateral stay 73, this first lateral stay and this second lateral stay are generallyperpendicular with respect to pedestal 70 And it is fixing with respect to pedestal 70.First lateral stay 71 and the second lateral stay 73 can be by connecting the wing of storage device 55 Thing 65 and be connected to the pedestal 57 of support member 51.
Additionally, generally vertical shield (shutter) 72 is arranged near the second lateral stay 73.Shield 72 is being beaten May move with respect to the second lateral stay 73 between open position and closed position, this open position allows to put at least one cover 33 Put in described storage device 55/at least one cover 33 is removed from described storage device 55, in this closed position, cover 33 quilts It is maintained in described storage device 55, be in storage location.It is stipulated that one movably hides in a variant not illustrated Plate is near the first lateral stay 71.
Storage device 55 preferably lacks a front panel, with allow by arm 52 from be previously incorporated one or more cover 33 And remove them.Additionally, storage device 55 can lack an entablature:In other words, it is opened at top.Separately Outward, storage device 55 can lack an entity rear board, and wing 65 forms storage device 55 sole component below.
Shield 72 may be located remotely from the second lateral stay 73 and places or be brought near the second lateral stay 73, so that one Or multiple cover 33 can be trapped between the second lateral stay 73 and shield 72 free end of shield 72 (more specifically).Therefore, In this storage location, by means of shield 72, cover 33 is maintained between two pillars 71,73.
Therefore, when shield 72 is in the position away from the second pillar 73, i.e. when it is in open position (Fig. 5 to Fig. 8), At least one cover 33 is placed in storage device 55/to remove at least one cover 33 from storage device 55 be possible.On the contrary, when When shield 72 is brought to the position of close second pillar 73, i.e. when it is in closed position (Fig. 4), cover 33 is maintained at storage In equipment 55.
In the illustrated embodiment, storage device 55 includes an actuation member, and this actuation member is designed to Moveable component is enough made to be that shield 72 moves between its open position and closed position.As illustrated in figure 6 , such as this actuation member is the form of at least one jack 75.Jack 75 may be connected to a lug 76, and this is convex Ear is integral with shield 72 and is hinged and fixing with respect to the second pillar 73 around a generally vertical axis 77.Cause This, movement between its open position and closed position for the shield 72 is related to shield 72 around the rotation of axis 77.Can also be One stroke end detector is arranged on jack 75.
In addition, the first pillar 71 and possibly the second pillar 73 and/or shield 72 can have a direction Second pillar 73 or more generally relative to the generally vertical groove 74 opened of pillar, and at least one cover 33 One edge is intended to mate thereto.Typically, a top edge of one or more groove 74 receiving hoods 33 and/or following Edge, term "up" and "down" refers to the position being occupied on groove 3 by a cover 33.In fact, this pillar 71 can have V-arrangement Cross section, as shown in Figure 6.This arrangement improves positioning in storage device 55 for the cover 33 and retains quality.
When only one cover 33 is in storage location in storage device 55, it is placed on pedestal 70 and by means of screening Plate 72 is maintained between two pillars 71,73, and as illustrated in fig. 7, its lateral edges 36 are less horizontal.
Cover 33 (for up to three in the embodiment illustrating in fig. 8) when several in storage device 55 in storage location When middle, lower cover 33 is placed on pedestal 70.Additionally, cover 33 is arranged substantially in identical perpendicular and along vertical Direction Z is essentially continuously overlapping.In addition, when being placed on a groove 3, cover 33 has and is substantially located at plane (X, Z) Interior lateral edges 36, as shown in Figure 3.On the contrary, in storage location, as shown in Fig. 7 and Fig. 8, cover 33 has big The lateral edges 36 of level on body, i.e. make them rotate 90 ° with respect to the position that they occupy when being placed on a groove 3.
Additionally, system 50 can include detecting the device of at least one cover 33 presence in storage device 55.Particularly As seen in Figure 5, the one or more fingers on pedestal 70 that these detection means can include be arranged in storage device 55 Shape thing 78, these finger pieces 78 project upwards and can be in the weight being placed on one or more of storage device 55 cover 33 Under be pressed.
Temporary memory device 55 at least one cover 33 is preferably fixed, and is occurring even if being designed to ensure that During power failure, cover 33 is still held in place, and prevents them from surprisingly falling.
Arm 52 can be equipped with a cable support chain 80 (referring particularly to Fig. 9), all required for operating system 50 Cable and flexible pipe will be installed in this cable support chain.In addition, system 50 includes one or more casees 79, one or many Individual case accommodates multiple computers and/or atmospheric control, is particularly useful for controlling the locking of the cover 33 in storage device 55 (to pass through Shield 72 is moved to its closed position and maintains it in this position) and instrument storage device 56 in instrument 60,63 Locking.The programmed logic controller that the system being contained in case 79 can also allow for looking after machine 10 with pond communicates for life Order obtains and information relaying.
Reference Fig. 9 to Figure 16, the consecutive steps of the method exemplified with the groove 3 for tampering devic 1 for Fig. 9 to the Figure 16, described Method needs removing and then reinstalling of the cover 33 of groove 3.Especially, when replacing, with new anode 40, the anode 40 ' consuming, It is located at the cover 33 before the anode 40 ' that exhausts must be removed, and and then fixed on new anode 40 and just again pacified Dress.
As shown in Figure 9, by means of mobilecrane 5 and balladeur train 9, the support member 51 carrying by unit 4 is made to move The dynamic close groove 3 that must be intervened.In the illustrated embodiment, followed by the jack 58 of telescopic support 51 Arm 52 is made to move down, until the first end 53 of arm 52 is located near cover 33 to be removed.Prehension device 60 is coupled to this First end 53.Instrument storage device 56 comprises the burnisher 63 at least in queue.
Arm 52 equipped with prehension device 60 is taken at least one cover 33 being present on a groove 3, such as shows in Fig. 10 Go out.More specifically, prehension device 60 can be designed to take three simultaneously cover or two cover and half cover (half cover can To be arranged for example at the transverse end of groove 3).In general, each cover 33 can arrange three or four gripping members 59.
For this reason, this system can include one can determine this cover 33 before by the cover 33 in arm 52 grip groove 3 The sensor device of accurate location.In fact, as indicated above, cover 33 can be positioned so that there is one between them can Become space and/or have several years angular defect around X-axis and Y-axis.The physical location of detection cover 33 guarantees gripping member 59 on cover 33 Fabulous positioning and thereby, it is ensured that safety grasp, without the risk falling.
For example, by the handle 34 by means of testing equipment detection cover 33 it may be determined that covering 33 accurate location.
Then all these covers 33 are placed in storage device 55 via the arm 52 that prehension device 60 carries cover 33, such as scheme Illustrate in 11.For this purpose, make cover 33 in this total of three, this be only an embodiment with respect to they Position on one groove 3 rotates 90 °, and lateral edges 36 are therefore less horizontal, and passes through storage device 55 by arm 52 The forward part opened be placed in this storage device.
Cover 33 is placed between two pillars 71,73 in storage device 55, shield 72 in the open position so that Being capable of introduced cover 33 (Figure 11).
Then shield 72 is made to move to its closed position so that cover 33 is maintained between pillar 71,73 and shield 72 (Figure 12).Then prehension device 60 and cover 33 disconnection, the risk falling without them can be made.
Once removing cover 33 from groove 3, pond is looked after machine 10 and just can be intervened groove 3 to execute multiple operations, especially Ground but not exclusively be replace anode.During these interventions, cover 33 is maintained in retracted position, and therefore without prejudice to this A little interventions.In more general terms, arm 52 and whole system 50 are oriented to these interventions of without prejudice to.Specifically, can be with lift system 50 (by means of telescopic support 51 in described embodiments), and after a while when will need again using this system execute It will be made to reduce during other operations.
Arm 52 necessarily maintains cover 33 can be used to execute other operations, mostly by way of other works Tool.Therefore, first, arm 52 is made to get loose from prehension device 60 in storage device 56 by being placed on prehension device 60, typical case Ground is on corresponding component 64.
Then the first coupling device 61 by being arranged at the first end 53 of arm 52 is present in storage device with being arranged on One of 56 instruments are different from the cooperation between the second coupling device 62 in prehension device 60, and arm 52 is connected to This instrument.Then arm 52 can be associated with the operation of groove 3 but unlike that manipulating the operation of cover 33 using the execution of this instrument.
In the embodiment that figure 13 illustrates, this instrument is burnisher 63, and this burnisher is used to clean groove 3 At least one region, as shown in Figure 14.
Specifically, after having substituted for an anode, and appropriate location cover 33 being put back on groove 3 it Front it is necessary to cleaning guide groove 35, along whole length unlapped when cover 33 is removed, thus remove being possible in sun The fragment falling during the replacement operation of the pole 40 i.e. hard bath chip bathed and crush.In order to clean guide groove 35, cleaner Tool 63 typically these fragments can be placed on inside pond 20.Arm 52 preferably should be designed that lifter positive in right part Positive lifter 47 cleans below without turning back with left part.
Once completing clean operation it is possible to be put back into burnisher 63 in storage device 56, it is in corresponding element On 64, and and then arm 52 can be made to disconnect with burnisher 63.
Then arm 52 can be connected to another instrument being present in storage device 56 to execute another operation.
As illustrated in Figure 15, by being arranged on the first coupling device 61 at the first end 53 of arm 52 and setting previously Cooperate between the second coupling device 62 that arm 52 has been placed in the prehension device 60 in temporary memory device 56, arm 52 is permissible Fetch this prehension device 60.
Then arm 52 equipped with prehension device 60 can fetch being previously placed in storage device 55 in this way Individual or multiple covers 33.This operation does not need the equipment of an accurate location that can detect cover 33, because since they are placed In storage device 55 after they be always held at arm 52 identical reference position in.Which save the time and enhance Reliability.
Once gripping member 59 is suitably associated with cover 33, the shield 72 of storage device 55 can be made to move to it and to open Position is to allow to remove cover 33 from storage device 55.
Then, as illustrated in Figure 16, arm 52 is moved to it is put back to the cover 33 that it keeps on groove 3. To enable rightly reorientating cover 33, system 50 can include a testing equipment, and this testing equipment can detect One with groove 3, element that the position that must be repositioned onto cover 33 by arm 52 is adjacent.This adjacent element can be such as It is a neighbouring cover 33 in place on groove 3 or a transverse end being in groove 3 in cover to be relocated On cover in the case of be groove 3 an end wall.
Cover 33 is inserted in previously cleaned guide groove 35 arm 52, and places them in superstructure 30 Edge 31 on.
To the degree storing cover 33 on Z in an overlapping manner, wherein their lateral edges 36 are less horizontal , in cover 33 before groove 3 removes, it is understood that there may be any space between two neighbouring covers 33 is corrected by gravity. Therefore, the overall dimension of all covers 33 in return-enclosure 3 to be placed removes from groove 3 along Y less than here group cover 33 Up till now group cover 33 general size.In other words, can be used on groove 3 places the position of cover 33 more than along this group cover 33 The yardstick of Y.Greatly facilitate the placement of the cover 33 on groove.
Just described process can automatically be implemented, have been sent from being positioned at the pond above groove 3 and looking after machine 10 System 50 independent operation after a cycle enabled instruction.
Alternatively, especially for being adjusted, manually operate and can be considered, acted on by operator and be present in pond The indoor control member that controls looking after machine 10 executes operation.
Therefore, the system according to the present invention makes it possible in very crowded cell environment and with required standard Exactness manipulates cover and executes other operations (cleaning etc.).
Due to its modularity, this system can also make be substantially reduced cycle time, e.g., less than 100 seconds (the taking, cover of cover Cleaning and put back to).
Because this system is compact, it can execute specific operation such as background task, does not cause and pond to them Look after the degree of the risk of an element collision of machine.Outstanding for the tool changing situation between prehension device and burnisher It so looks after machine 10 interference tank 3 so that the curst of bath ruptures, removes the anode exhausting or replace new anode in pond Described tool changing can be completed simultaneously.
In addition to financial influence, reduce cycle time be favourable in terms of safety and environment because decreasing from groove Remove the time of cover.
Certainly, the invention is not restricted to foregoing example embodiment, but include all technically equivalent ones of foregoing approach With modification with and combinations thereof.

Claims (20)

1. a kind of operation for enforcement and for becoming the operation of the groove (3) of the device (1) of electrolytic production of aluminum to be associated by fire System, cover (33) manipulation operations including groove (3), this system (50) is intended to be installed in one of this device (1) movably On unit (4), so that this system can move above described groove (3), this system (50) includes:
- one support member (51), this support member is intended to be installed on this unit (4);
- one articulated jib (52), this articulated jib is installed on this support member (51);
- one prehension device (60) being used at least one cover (33), this prehension device is designed to be coupled to this arm (52) First end (53);
It is characterized in that, this system (50) also includes a temporary memory device (55) at least one cover (33), described Storage device (55) is installed on this support member (51), can receive by this arm (52) equipped with this prehension device (60) At least one cover (33) of transporting and be adapted to allow for fetching equipped with the described arm (52) of this prehension device (60) previously placed At least one in this storage device (55) covers (33).
2. system according to claim 1 is arranged on this support member (51) it is characterised in that this system includes independent one On articulated jib (52).
3. system according to claim 1 and 2 is it is characterised in that this system also includes a work for storage tool Tool storage device (56), described instrument includes at least this prehension device (60) and a burnisher (63), this storage device (56) it is installed on this support member (51), and be arranged to and can receive at least one instrument providing by this arm (52) simultaneously And allow described arm (52) to take one of instrument being placed in this storage device (56).
4. the system according to any one of Claim 1-3 is it is characterised in that this support member (51) includes a base Seat (57), the following is fixedly mounted on this pedestal:This arm (52), the interim storage at least one cover (33) set Standby (55) and when there are instrument storage device (56) this instrument storage device (56).
5. the system according to any one of claim 1 to 4 is it is characterised in that the first end (53) of this arm (52) is joined Have the first coupling device (61) and this prehension device (60) or can be coupled to this arm (52) this first end (53) any Other instruments are equipped with being designed to the second coupling device (62) of removedly cooperating with this first coupling device (61).
6. the system according to any one of claim 1 to 5 is it is characterised in that cover facing of (33) at least one When storage device (55) be designed to receive multiple covers (33) of arrangement generally in identical perpendicular, wherein their side Edge (36) is less horizontal, and described cover (33) is overlapping in substantially continuous mode on vertical direction (Z).
7. the system according to any one of claim 1 to 6 is it is characterised in that cover facing of (33) at least one When storage device (55) include a moveable component (72) between open and closed positions, this open position allows By at least one cover (33) be incorporated in described storage device (55)/at least one covered (33) move from described storage device (55) Except out, described in this closed position, cover (33) is maintained in described storage device (55).
8. system according to claim 7 it is characterised in that this storage device (55) include an actuation member (75), This actuation member is designed to make this moveable component (72) move between its open position and closed position.
9. the system according to any one of claim 1 to 8 is it is characterised in that this storage device (55) includes one Less horizontal pedestal (70), the first and second lateral stays (71,73) and a generally vertical shield (72), institute Stating the first and second lateral stays is generally vertical and fixes with respect to this pedestal, and this shield is at described two lateral Near at least one of post pillar (73), this shield is between open and closed positions with respect to described lateral stay (73) may move, this open position allow by least one cover (33) be incorporated in described storage device (55)/by least one Cover (33) is withdrawn from from described storage device (55), and described in this closed position, cover (33) is maintained at described storage device (55) Interior, it is in storage location.
10. system according to claim 9 is it is characterised in that at least one of described pillar pillar (71) has one Individual groove (74), described groove is generally vertical and opens towards another pillar (73), at least one cover (33) One edge is intended to cooperation in this groove.
11. systems according to any one of claim 1 to 10 are it is characterised in that this system includes detection at least The device (78) of presence in this storage device (55) for the individual cover (33).
12. systems according to any one of claim 1 to 11 are it is characterised in that this system includes a detection sets Standby, this testing equipment can determine accurate location on groove (3) for this cover (33) before grasping cover (33) by arm (52), and Such a element can be detected, this element be close to this groove (3), the position that (33) are repositioned onto will be covered by arm (52) Put, so as to suitably reorientating described cover (33).
13. systems according to any one of claim 1 to 12 are it is characterised in that this support member (51) is included in behaviour Substantially vertically moveable at least one portion (57) in work, and this arm (52) is installed in described at least one portion (57) on;This arm (52) is for example fixed on the lower portion of this support member (51) by its second end (54).
14. systems according to any one of claim 1 to 13 are it is characterised in that this support member (51) includes one Telescopic mast in substantially vertical direction (Z).
15. systems according to any one of claim 1 to 14 are it is characterised in that this articulated jib (52) is one six Axle anthropomorphic robot.
A kind of 16. units of the operation of the groove (3) for carrying out the device (1) for becoming electrolytic production of aluminum by fire, this unit (4) include:
- one mobilecrane (5), this mobilecrane includes two crossbeams (6) extending transversely with and this movement Formula crane is designed to above described groove (3) in the upper movement of longitudinal direction (X);
- one balladeur train (9), this balladeur train is arranged on described two horizontal strokes of this mobilecrane (5) in the way of transverse movable On beam (6);
It is characterized in that, this unit also includes a system (50) according to any one of claim 1 to 15, and this is The support member (51) of system (50) is installed on this balladeur train (9).
A kind of 17. devices for becoming electrolytic production of aluminum by fire, including:
- one building (2), multiple grooves (3) are located in this building, and each groove (3) above extends in horizontal direction (Y), described Groove (3) is juxtaposed to each other on longitudinal direction (X);
- one unit (4) according to claim 16, this mobilecrane (5) is installed into and is being arranged at this building Two transverse end walls (8) of thing (2) longitudinal rail (7) nearby is upper longitudinally movable.
A kind of 18. methods of the groove (3) for intervening the device (1) for becoming electrolytic production of aluminum by fire, including suitable with this Sequence, following steps:
A) use an articulated jib (52), at least one being present on a groove (3) of taking covers (33), and described arm (52) is pacified It is contained in a support member (51) above and equipped with a prehension device (60) being used at least one cover (33);
B) by means of described arm (52), by described cover (33) be placed on one be arranged on this support member (51) at least one In the temporary memory device (55) of individual cover (33), then separate described prehension device (60) and described cover (33) so that release is described Arm (52);
C) use described arm (52), fetch at least one being previously placed in this storage device (55) and cover (33);
D) by means of described arm (52), described cover (33) is put back on this groove (3).
19. methods according to claim 18 it is characterised in that it in step b) and c) between also include, and suitable with this Sequence, following steps:
- use described arm (52), this prehension device (60) is placed on an instrument storage being arranged on this support member (51) In equipment (56);
- the instrument (63) different from this prehension device (60) that will be present in this storage device (56) is coupled to described arm (52);
- execute an operation with described instrument (63);
- put back to described instrument (63) in this storage device (56);
- this prehension device (60) is re-coupled on described arm (52).
20. methods according to claim 19 are it is characterised in that the described instrument different from this prehension device (60) is one Individual burnisher (63), and be the cleaning at least one region (35) to this groove (3) with the operation that described instrument (63) is implemented Operation.
CN201580011921.0A 2014-03-05 2015-02-16 For implementing and the system using associated operation of the slot for the device by electrolytic production of aluminum Active CN106460209B (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
FR1400540A FR3018283B1 (en) 2014-03-05 2014-03-05 SYSTEM FOR CARRYING OUT OPERATIONS RELATING TO THE OPERATION OF CELLS OF AN ALUMINUM PRODUCTION FACILITY BY ELECTROLYSIS
FR1400540 2014-03-05
PCT/FR2015/000034 WO2015132479A2 (en) 2014-03-05 2015-02-16 System for carrying out operations linked to the use of cells of a facility for producing aluminium by means of electrolysis

Publications (2)

Publication Number Publication Date
CN106460209A true CN106460209A (en) 2017-02-22
CN106460209B CN106460209B (en) 2018-11-13

Family

ID=50829032

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201580011921.0A Active CN106460209B (en) 2014-03-05 2015-02-16 For implementing and the system using associated operation of the slot for the device by electrolytic production of aluminum

Country Status (8)

Country Link
EP (1) EP3114257B1 (en)
CN (1) CN106460209B (en)
AR (1) AR099617A1 (en)
AU (1) AU2015226002B2 (en)
CA (1) CA2938716C (en)
FR (1) FR3018283B1 (en)
RU (1) RU2699600C2 (en)
WO (1) WO2015132479A2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2606991A (en) 2021-03-31 2022-11-30 Alumatlq As Electrolytic cell lid handling system and method of use
EP4174216A1 (en) 2021-10-27 2023-05-03 Dubai Aluminium PJSC Protection device for anodes of an electrolytic cell, comprising movable panels, and its implementation method
EP4293141A1 (en) 2022-06-13 2023-12-20 Dubai Aluminium PJSC Anode servicing assembly for an aluminium electrolysis plant, and methods for operating the same

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3935090A (en) * 1974-03-15 1976-01-27 Dmitry Pavlovich Petrusenko Covering of an aluminum-producing electrolysis cell
US4136003A (en) * 1975-03-10 1979-01-23 Swiss Aluminum Ltd. Cell for fused-salt electrolysis with gas collecting means
IT1221994B (en) * 1987-07-09 1990-08-31 Techmo Car Spa EQUIPMENT FOR THE MECHANIZED CHANGE OF THE ANODES IN THE ELECTROLYTIC CELLS FOR THE PRODUCTION OF ALUMINUM
IT1263968B (en) * 1993-02-25 1996-09-05 Gianfranco Zannini AUTOMATED EQUIPMENT FOR THE CHANGE OF THE ELECTROLYTIC CELL ANODES FOR THE PRODUCTION OF ALUMINUM
SI1028084T1 (en) * 1999-02-12 2003-10-31 Reel S.A. Hoisting device for the replacement of the anodes in the electrolytic cells for aluminium production
FR2801295B1 (en) * 1999-11-19 2001-12-21 Reel Sa LOAD LIFTING AND HANDLING UNIT WITHIN AN IGNATED ELECTROLYSIS ALUMINUM PRODUCTION INSTALLATION AND INSTALLATION USING SUCH A UNIT
FR2806742B1 (en) 2000-03-24 2002-05-03 Pechiney Aluminium INSTALLATION OF FACILITIES OF AN ELECTROLYSIS PLANT FOR THE PRODUCTION OF ALUMINUM
FR2879582B1 (en) * 2004-12-21 2007-01-19 Ecl Soc Par Actions Simplifiee DEVICE FOR HANDLING THE HOODS OF A CELL FOR THE PRODUCTION OF ALUMINUM BY ELECTROLYSIS
NO328467B1 (en) * 2005-12-09 2010-02-22 Norsk Hydro As Method and apparatus for encapsulating an electrolysis cell
US9050726B2 (en) * 2012-05-16 2015-06-09 Gi 2 Technologies, Llc Activation control device for robotic auxiliary devices

Also Published As

Publication number Publication date
FR3018283B1 (en) 2017-12-22
CN106460209B (en) 2018-11-13
EP3114257B1 (en) 2018-08-22
RU2016135644A3 (en) 2018-10-25
CA2938716C (en) 2021-11-09
EP3114257A2 (en) 2017-01-11
FR3018283A1 (en) 2015-09-11
AU2015226002A1 (en) 2016-09-01
CA2938716A1 (en) 2015-09-11
AR099617A1 (en) 2016-08-03
WO2015132479A3 (en) 2016-03-24
RU2699600C2 (en) 2019-09-06
AU2015226002B2 (en) 2019-04-04
WO2015132479A2 (en) 2015-09-11
RU2016135644A (en) 2018-04-25

Similar Documents

Publication Publication Date Title
RU2382834C2 (en) Device for manipulation of covers of electrolytic cell for manufacturing of alluminium by electrolysis
RU2370574C2 (en) Compact service module implemented at production of aluminium by electrolysis
US7422675B2 (en) Process for changing anodes in an electrolytic aluminum production cell including adjustment of the position of the anode and device for implementing the process
US20080251392A1 (en) Process For Changing an Anode In an Electrolytic Aluminium Production Cell Including Adjustment of the Position of the Anode and Pot Tending Machine For Implementing It
ITMI930365A1 (en) AUTOMATED EQUIPMENT FOR THE CHANGE OF ELECTROLYTIC CELL ANODES FOR THE PRODUCTION OF ALUMINUM
US8066856B2 (en) Service module with at least one anode clamp and means for applying a force or a shock on the anode rod
CN106460209B (en) For implementing and the system using associated operation of the slot for the device by electrolytic production of aluminum
US7857954B2 (en) Compact pot tending module for use in plants for the production of aluminum by electrolysis
AU2005284068B2 (en) Method of changing an anode of a cell for the production of aluminium by means of electrolysis, including an adjustment of the position of the anode, and device for performing same
CN102666933B (en) For being collected in the device of the solid fragment in the electrolysis bath producing aluminum
US20140231268A1 (en) Compact service module and use thereof in a plant for producing aluminum by electrolysis
JP6572017B2 (en) Transportation rail installation device and installation method
US20060060469A1 (en) Serving machine for electrolysis cells for producing aluminium
EP4293141A1 (en) Anode servicing assembly for an aluminium electrolysis plant, and methods for operating the same

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant