CN106440984A - Blasthole explosive pressing pipes for city shallow buried rock stratum tunnel static blasting construction and construction method - Google Patents

Blasthole explosive pressing pipes for city shallow buried rock stratum tunnel static blasting construction and construction method Download PDF

Info

Publication number
CN106440984A
CN106440984A CN201611184983.4A CN201611184983A CN106440984A CN 106440984 A CN106440984 A CN 106440984A CN 201611184983 A CN201611184983 A CN 201611184983A CN 106440984 A CN106440984 A CN 106440984A
Authority
CN
China
Prior art keywords
pressure pipe
blasthole
medicament
detritus
outer shroud
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611184983.4A
Other languages
Chinese (zh)
Other versions
CN106440984B (en
Inventor
李金奎
李霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian University
Original Assignee
Dalian University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian University filed Critical Dalian University
Priority to CN201611184983.4A priority Critical patent/CN106440984B/en
Publication of CN106440984A publication Critical patent/CN106440984A/en
Application granted granted Critical
Publication of CN106440984B publication Critical patent/CN106440984B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D3/00Particular applications of blasting techniques
    • F42D3/04Particular applications of blasting techniques for rock blasting
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D1/00Blasting methods or apparatus, e.g. loading or tamping

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention discloses blasthole explosive pressing pipes for city shallow buried rock stratum tunnel static blasting construction and a construction method and belongs to the technical field of city tunnel subsurface excavation construction. The blasthole explosive pressing pipes comprise peripheral blasthole explosive pressing pipes and middle blasthole explosive pressing pipes. Each peripheral blasthole explosive pressing pipe comprises an outer annular pressing pipe a and an inner annular pressing pipe a. Two detritus cutting picks a are symmetrically distributed on the outer pressing portions of each outer annular pressing pipe a and the corresponding inner annular pressing pipe a separately, and flexible brackets are symmetrically distributed on the two sides of each detritus cutting pick a correspondingly. Each middle blasthole explosive pressing pipe comprises an outer annular pressing pipe b and an inner annular pressing pipe b which is in slip connection with the outer annular pressing pipe b. Four symmetrical detritus cutting picks b are in rigid connection with the outer pressing portions of each outer annular pressing pipe b and the corresponding inner annular pressing pipe b. The blasthole explosive pressing pipes for city shallow buried rock stratum tunnel static blast working and the construction method have the advantages of simple connecting structure, easy operation, realization of directional rock breaking, high efficiency of tunneling rock breaking, short construction period, low cost, security, and high efficiency.

Description

City shallow embedding rock stratum tunnel static blasting construction blasthole medicament pressure pipe and construction method
Technical field
The present invention relates to a kind of city shallow embedding rock stratum tunnel static blasting construction auxiliary pressure pipe and construction method, belong to city Tunnel excavation construction technique field.
Background technology
With the fast development of China's urban construction, increasing Urban underground Tunnel engineering.City tunnel engineering is buried Deep shallower, often pass through the road engineering closed on, pipe engineering and earth's surface during constructing tunnel and build (structure) and build, existing brill Quick-fried method construction unavoidably impacts to existing structures safety and surrounding enviroment.Existing static blasting construction method is applied Work generally existing tunnel perimeter is contoured to be difficult to control to, and detritus ability is weak, and rock breaking efficiency is poor.
Content of the invention
For solving the defect that prior art exists, it is an object of the invention to provide a kind of detritus ability is strong, blasting efficiency is high, There is no detonation wave, simple to operate, easy construction, the city shallow embedding rock stratum tunnel static blasting construction blasthole medicament of energy directional blasting Pressure pipe and construction method.
The technical scheme is that:City shallow embedding rock stratum tunnel static blasting construction blasthole medicament pressure pipe, including periphery Blasthole medicament pressure pipe and intermediate hole medicament pressure pipe;
Described periphery blasthole medicament pressure pipe includes, outer shroud pressure pipe a and internal ring pressure pipe a being slidably connected therewith, outer shroud pressure pipe a Constitute the concentric circumferences of closing with internal ring pressure pipe a, described internal ring pressure pipe a is slidably connected with outer shroud pressure pipe a by slide rail a, described Slide rail a is provided with some ball base a, and ball base a installs ball a, and outer shroud pressure pipe a is provided with for coordinating ball a to roll Spill guide-track groove a, two detritus pick a are respectively symmetrically on the outer splenium being distributed in outer shroud pressure pipe a and internal ring pressure pipe a, described Two detritus pick a both sides are respectively symmetrically and flexible rest are distributed with;
Described intermediate hole medicament pressure pipe includes, outer shroud pressure pipe b and internal ring pressure pipe b being slidably connected therewith, outer shroud pressure pipe b Constitute the concentric circumferences of closing with internal ring pressure pipe b, described internal ring pressure pipe b passes through two slide rail b and outer shroud pressure pipe b of symmetric design It is slidably connected, each described slide rail b is provided with some ball base b, ball base b installs ball b, outer shroud pressure pipe b is provided with For the spill guide-track groove b coordinating ball b to roll, the outer splenium of described outer shroud pressure pipe b and internal ring pressure pipe b is rigidly connected symmetrical Four detritus pick b.
Described slide rail a end is provided with slide rail closure a, and described slide rail b end is provided with slide rail closure b.
Described spill guide-track groove a end is provided with groove closure a, and described spill guide-track groove b end is provided with groove closure b.
The length of described detritus pick a and detritus pick b is 10-12mm.
Described spill guide-track groove a section is U-shaped, depth 3-5mm, and described depth is less than the 1/3 of outer shroud pressure pipe a wall thickness, institute State spill guide-track groove b section U-shaped, depth 3-5mm, described depth is less than the 1/3 of outer shroud pressure pipe b wall thickness.
Described slide rail a stroke is the 1/3-1/2 of blasthole a diameter, and described slide rail b stroke is the 1/3-1/2 of blasthole b diameter.
The length 2-4mm shorter than detritus pick a length of described flexibility rest.
Described ball base a, ball a quantity are four, and described ball base b, ball b quantity are four.
City shallow embedding rock stratum tunnel static blasting construction method, comprises the steps:
S1) arrange drilling boring according to the geological conditions and hardness of country rock;
S2) the boring that each drilling is terminated, carries out clearing up landwaste and the rubble of in the hole;
S3) according to a static blasting construction area, periphery blasthole and intermediate hole are determined;
S4) determine cracking agent consumption, prepare cracking agent slurry;
S5) assemble, tie up outer shroud pressure pipe a and internal ring pressure pipe a of fixing periphery blasthole medicament pressure pipe, and intermediate hole medicine Outer shroud pressure pipe b of agent pressure pipe and internal ring pressure pipe b;
S6) irrigate cracking agent slurry into periphery blasthole medicament pressure pipe and intermediate hole medicament pressure pipe respectively, and cover;
S7) the periphery blasthole medicament pressure pipe of capping and the distribution of intermediate hole medicament pressure pipe are inserted periphery blasthole and middle big gun In the hole, the outer contour of the detritus pick a of periphery blasthole medicament pressure pipe is overlapped with tunnel excavation contour line;Intermediate hole medicament pressure One direction of the detritus pick b of pipe is parallel with the free face of explosion, other direction is vertical with free face.
Described cracking agent is static breaking agent, and composition includes quick lime, described cracking agent slurry composition include quick lime and Water.
The invention has the beneficial effects as follows:Slip combined static medicine pressure pipe pick is rigidly connected with inner and outer ring pressure pipe, cuts Tooth concentrates detritus, flexible rest stationary positioned, and slidably, attachment structure is simple, processing ease for inner and outer rings pressure pipe ball, real Now orientation detritus, tunnel contour forming, driving detritus efficiency high, short time limit, low cost, safe and efficient.
Brief description
The present invention has accompanying drawing 7 width.
Fig. 1 is periphery blasthole medicament pressure pipe structure chart;
Fig. 2 is outer shroud pressure pipe a structure chart;
Fig. 3 is internal ring pressure pipe a structure chart;
Fig. 4 is intermediate hole medicament pressure pipe structure chart;
Fig. 5 is outer shroud pressure pipe b structure chart;
Fig. 6 is internal ring pressure pipe b structure chart;
Fig. 7 is periphery blasthole medicament pressure pipe and intermediate hole medicament pressure pipe scattergram during static blasting.
In figure reference is as follows:1.1st, blasthole a, 1.2, blasthole b, 2.1, slide rail a, 2.2, slide rail b, 3.1, outer shroud pressure pipe A, 3.2, outer shroud pressure pipe b, 4.1, internal ring pressure pipe a, 4.2, internal ring pressure pipe b, 5.1, spill guide-track groove a, 5.2, spill guide-track groove b, 6.1st, groove closure a, 6.2, groove closure b, 7.1, detritus pick a, 7.2, detritus pick b, 8, flexible rest, 9.1, ball bottom Seat a, 9.2, ball base b, 10.1, slide rail closure a, 10.2, slide rail closure b, 11.1, ball a, 11.2, ball b.
Specific embodiment
The present invention will be further described for 1-7 below in conjunction with the accompanying drawings:
City shallow embedding rock stratum tunnel static blasting construction blasthole medicament pressure pipe, including periphery blasthole medicament pressure pipe and middle big gun Hole medicament pressure pipe;
Described periphery blasthole medicament pressure pipe includes, outer shroud pressure pipe a3.1 and internal ring pressure pipe a4.1 being slidably connected therewith, outward Ring pressure pipe a3.1 constitutes the concentric circumferences of closing with internal ring pressure pipe a4.1, and described internal ring pressure pipe a4.1 passes through slide rail a2.1 and outer shroud Pressure pipe a3.1 is slidably connected, and described slide rail a2.1 is provided with some ball base a9.1, and ball base a9.1 installs ball A11.1, outer shroud pressure pipe a3.1 is provided with the spill guide-track groove a5.1 for coordinating ball a11.1 to roll, two detritus picks A7.1 is respectively symmetrically on the outer splenium being distributed in outer shroud pressure pipe a3.1 and internal ring pressure pipe a4.1, described two detritus pick a7.1 two Side is respectively symmetrically and flexible rest 8 is distributed with;
Described intermediate hole medicament pressure pipe includes, outer shroud pressure pipe b3.2 and internal ring pressure pipe b4.2 being slidably connected therewith, outward Ring pressure pipe b3.2 constitutes the concentric circumferences of closing with internal ring pressure pipe b4.2, and described internal ring pressure pipe b4.2 passes through two of symmetric design Slide rail b2.2 is slidably connected with outer shroud pressure pipe b3.2, and each described slide rail b2.2 is provided with some ball base b9.2, ball base Ball b11.2 is installed on b9.2, outer shroud pressure pipe b3.2 is provided with the spill guide-track groove b5.2 for coordinating ball b11.2 to roll, Be rigidly connected on the outer splenium of described outer shroud pressure pipe b3.2 and internal ring pressure pipe b4.2 symmetrical four detritus pick b7.2.
Described slide rail a2.1 end is provided with slide rail closure a10.1, and described slide rail b2.2 end is provided with slide rail closure b10.2.
Described spill guide-track groove a5.1 end is provided with groove closure a6.1, and described spill guide-track groove b5.2 end is provided with groove Closure b6.2.
The length of described detritus pick a7.1 and detritus pick b7.2 is 10-12mm.
Described spill guide-track groove a5.1 section is U-shaped, depth 3-5mm, and described depth is less than outer shroud pressure pipe a3.1 wall thickness 1/3, described spill guide-track groove b5.2 section is U-shaped, depth 3-5mm, and described depth is less than the 1/3 of outer shroud pressure pipe b3.2 wall thickness.
Described slide rail a2.1 stroke is the 1/3-1/2 of blasthole a1.1 diameter, and described slide rail b2.2 stroke is that blasthole b1.2 is straight The 1/3-1/2 in footpath.
The length 2-4mm shorter than detritus pick a7.1 length of described flexibility rest 8.
Described ball base a9.1, ball a11.1 quantity are four, and described ball base b9.2, ball b11.2 quantity are Four.
City shallow embedding rock stratum tunnel static blasting construction method, comprises the steps:
S1) arrange drilling boring according to the geological conditions and hardness of country rock;
S2) the boring that each drilling is terminated, carries out clearing up landwaste and the rubble of in the hole;
S3) according to a static blasting construction area, periphery blasthole and intermediate hole are determined;
S4) determine cracking agent consumption, prepare cracking agent slurry;According to static blasting construction area drilling hole amount, a depth Degree calculates the consumption of cracking agent, water and additive, according to ratio and consumption by cracking agent, water and additive mixing and stirring, Form even slurry;
S5) assemble, tie up outer shroud pressure pipe a3.1 and internal ring pressure pipe a4.1 of fixing periphery blasthole medicament pressure pipe, and middle Outer shroud pressure pipe b3.2 of blasthole medicament pressure pipe and internal ring pressure pipe b4.2;Fixation is tied up by low-intensity iron wire, bottom adopts plastics Latch is connected with steel base, and preventing and treating cracking agent slurry is excessive;
S6) irrigate cracking agent slurry into periphery blasthole medicament pressure pipe and intermediate hole medicament pressure pipe respectively, and cover;With Irrigate in pressure pipe in one region, continuous pouring slurry in same pressure pipe simultaneously, full irrigation pressure pipe, after the completion of perfusion, the mouth of pipe adopts Plastic plug is connected with steel lid envelope, and preventing and treating cracking agent slurry is blurted out;
S7) the periphery blasthole medicament pressure pipe of capping and the distribution of intermediate hole medicament pressure pipe are inserted periphery blasthole and middle big gun In the hole, the outer contour of the detritus pick a7.1 of periphery blasthole medicament pressure pipe is overlapped with tunnel excavation contour line;Intermediate hole medicine One direction of the detritus pick b7.2 of agent pressure pipe is parallel with the free face of explosion, other direction is vertical with free face.Confirm Behind direction, using loess stemming, blasthole is blocked, closure length is not less than 30cm;
Described cracking agent is static breaking agent, and composition includes quick lime, described cracking agent slurry composition include quick lime and Water.Add cracking agent and water in described periphery blasthole medicament pressure pipe, cracking agent occurs chemical reaction, volumetric expansion with water, makes Obtain internal ring pressure pipe to extend out along slide rail, detritus pick enters into blasthole wall rock interior, flexible support and blasthole contact internal walls, right Static tube plays fixing and effect of contraction, located the rubble direction of detritus pick, realizes orientation detritus, according to default tunnel Profile, arranges this periphery blasthole medicament pressure pipe at contour edge, and adjusts the rubble direction of detritus pick, so, detritus Pick will carry out rubble operation along the rubble direction setting, and forms tunnel contour it is ensured that the accuracy of tunnel excavation profile. Up to 40-60MPa, engineering rock mass intensity is about 10-30Mpa, detritus pick 7 to this periphery blasthole medicament pressure pipe in the hole maximum intensity Presence considerably increase detritus stress concentration it will be apparent that enhancing static blasting detritus efficiency, improve tunnel boring efficiency, Greatly shorten the driving duration, reduce tunnel piercing cost, there is safely and efficiently feature simultaneously.
The above is only the preferred embodiment of the present invention it is noted that ordinary skill people for the art For member, on the premise of without departing from the technology of the present invention principle, some improvement and modification can also be made, these improve and modification Also should be regarded as protection scope of the present invention.

Claims (10)

1. a kind of static blasting construction blasthole medicament pressure pipe in city shallow embedding rock stratum tunnel is it is characterised in that include periphery blasthole medicine Agent pressure pipe and intermediate hole medicament pressure pipe;
Described periphery blasthole medicament pressure pipe includes, outer shroud pressure pipe a (3.1) and internal ring pressure pipe a (4.1) being slidably connected therewith, outward Ring pressure pipe a (3.1) constitutes the concentric circumferences of closing with internal ring pressure pipe a (4.1), and described internal ring pressure pipe a (4.1) passes through slide rail a (2.1) it is slidably connected with outer shroud pressure pipe a (3.1), described slide rail a (2.1) is provided with some balls base a (9.1), ball base a (9.1) upper installation ball a (11.1), outer shroud pressure pipe a (3.1) is provided with the spill guide rail for coordinating ball a (11.1) to roll Groove a (5.1), two detritus pick a (7.1) are respectively symmetrically the external pressure being distributed in outer shroud pressure pipe a (3.1) and internal ring pressure pipe a (4.1) In portion, described two detritus pick a (7.1) both sides are respectively symmetrically and flexible rest (8) are distributed with;
Described intermediate hole medicament pressure pipe includes, outer shroud pressure pipe b (3.2) and internal ring pressure pipe b (4.2) being slidably connected therewith, outward Ring pressure pipe b (3.2) constitutes the concentric circumferences of closing with internal ring pressure pipe b (4.2), and described internal ring pressure pipe b (4.2) passes through symmetric design Two slide rail b (2.2) be slidably connected with outer shroud pressure pipe b (3.2), each described slide rail b (2.2) is provided with some ball base b (9.2), ball base b (9.2) is upper installs ball b (11.2), and outer shroud pressure pipe b (3.2) is provided with for coordinating ball b (11.2) Spill guide-track groove b (5.2) rolling, it is right that the outer splenium of described outer shroud pressure pipe b (3.2) and internal ring pressure pipe b (4.2) is rigidly connected Four detritus pick b (7.2) claiming.
2. the static blasting of city according to claim 1 shallow embedding rock stratum tunnel construction blasthole medicament pressure pipe it is characterised in that Described slide rail a (2.1) end is provided with slide rail closure a (10.1), and described slide rail b (2.2) end is provided with slide rail closure b (10.2).
3. the static blasting of city according to claim 1 shallow embedding rock stratum tunnel construction blasthole medicament pressure pipe it is characterised in that Described spill guide-track groove a (5.1) end is provided with groove closure a (6.1), and described spill guide-track groove b (5.2) end is provided with groove envelope Stifled b (6.2).
4. the static blasting of city according to claim 1 shallow embedding rock stratum tunnel construction blasthole medicament pressure pipe it is characterised in that The length of described detritus pick a (7.1) and detritus pick b (7.2) is 10-12mm.
5. the static blasting of city according to claim 1 shallow embedding rock stratum tunnel construction blasthole medicament pressure pipe it is characterised in that Described spill guide-track groove a (5.1) section is U-shaped, depth 3-5mm, and described depth is less than the 1/3 of outer shroud pressure pipe a (3.1) wall thickness, Described spill guide-track groove b (5.2) section is U-shaped, depth 3-5mm, and described depth is less than the 1/3 of outer shroud pressure pipe b (3.2) wall thickness.
6. the static blasting of city according to claim 1 shallow embedding rock stratum tunnel construction blasthole medicament pressure pipe it is characterised in that Described slide rail a (2.1) stroke is the 1/3-1/2 of blasthole a (1.1) diameter, and described slide rail b (2.2) stroke is that blasthole b (1.2) is straight The 1/3-1/2 in footpath.
7. the static blasting of city according to claim 1 shallow embedding rock stratum tunnel construction blasthole medicament pressure pipe it is characterised in that The length 2-4mm shorter than detritus pick a (7.1) length of described flexibility rest (8).
8. the static blasting of city according to claim 1 shallow embedding rock stratum tunnel construction blasthole medicament pressure pipe it is characterised in that Described ball base a (9.1), ball a (11.1) quantity are four, and described ball base b (9.2), ball b (11.2) quantity are Four.
9. the city shallow embedding rock stratum tunnel static blasting construction method based on blasthole medicament pressure pipe is it is characterised in that include as follows Step:
S1) arrange drilling boring according to the geological conditions and hardness of country rock;
S2) the boring that each drilling is terminated, carries out clearing up landwaste and the rubble of in the hole;
S3) according to a static blasting construction area, periphery blasthole and intermediate hole are determined;
S4) determine cracking agent consumption, prepare cracking agent slurry;
S5) assemble, tie up outer shroud pressure pipe a (3.1) and internal ring pressure pipe a (4.1) of fixing periphery blasthole medicament pressure pipe, and middle Outer shroud pressure pipe b (3.2) of blasthole medicament pressure pipe and internal ring pressure pipe b (4.2);
S6) irrigate cracking agent slurry into periphery blasthole medicament pressure pipe and intermediate hole medicament pressure pipe respectively, and cover;
S7) the periphery blasthole medicament pressure pipe of capping and the distribution of intermediate hole medicament pressure pipe are inserted periphery blasthole and intermediate hole Interior, the outer contour of detritus pick a (7.1) of periphery blasthole medicament pressure pipe is overlapped with tunnel excavation contour line;Intermediate hole medicine One direction of detritus pick b (7.2) of agent pressure pipe is parallel with the free face of explosion, other direction is vertical with free face.
10. the city shallow embedding rock stratum tunnel static blasting construction method based on blasthole medicament pressure pipe according to claim 9, It is characterized in that, described cracking agent is static breaking agent, and composition includes quick lime, and described cracking agent slurry composition includes quick lime And water.
CN201611184983.4A 2016-12-20 2016-12-20 City shallow embedding rock stratum tunnel static blasting construction blasthole medicament pressure pipe and construction method Active CN106440984B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611184983.4A CN106440984B (en) 2016-12-20 2016-12-20 City shallow embedding rock stratum tunnel static blasting construction blasthole medicament pressure pipe and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611184983.4A CN106440984B (en) 2016-12-20 2016-12-20 City shallow embedding rock stratum tunnel static blasting construction blasthole medicament pressure pipe and construction method

Publications (2)

Publication Number Publication Date
CN106440984A true CN106440984A (en) 2017-02-22
CN106440984B CN106440984B (en) 2018-03-16

Family

ID=58215100

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611184983.4A Active CN106440984B (en) 2016-12-20 2016-12-20 City shallow embedding rock stratum tunnel static blasting construction blasthole medicament pressure pipe and construction method

Country Status (1)

Country Link
CN (1) CN106440984B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107420104A (en) * 2017-06-09 2017-12-01 中铁建大桥工程局集团第五工程有限公司 The horizontal prebored hole static blasting excavation construction method of shallow tunnel super-large diameter
CN109296378A (en) * 2018-10-23 2019-02-01 中交二航局第二工程有限公司 Hidden hole drilling cooperates quartering hammer digging excavation construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04293893A (en) * 1991-03-22 1992-10-19 Fujita Corp Controlled blasting method of base rock tunnel
CN1176377A (en) * 1996-09-08 1998-03-18 黄凤扬 Calcination demolition method for marble and limestone and its blasthole plug and demolition liquid
CN101871752A (en) * 2010-06-28 2010-10-27 黄义干 Hydraulic static blasting expansion tube
CN103376032A (en) * 2012-04-12 2013-10-30 周思明 Hydraulic rock blaster

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04293893A (en) * 1991-03-22 1992-10-19 Fujita Corp Controlled blasting method of base rock tunnel
CN1176377A (en) * 1996-09-08 1998-03-18 黄凤扬 Calcination demolition method for marble and limestone and its blasthole plug and demolition liquid
CN101871752A (en) * 2010-06-28 2010-10-27 黄义干 Hydraulic static blasting expansion tube
CN103376032A (en) * 2012-04-12 2013-10-30 周思明 Hydraulic rock blaster

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107420104A (en) * 2017-06-09 2017-12-01 中铁建大桥工程局集团第五工程有限公司 The horizontal prebored hole static blasting excavation construction method of shallow tunnel super-large diameter
CN109296378A (en) * 2018-10-23 2019-02-01 中交二航局第二工程有限公司 Hidden hole drilling cooperates quartering hammer digging excavation construction method

Also Published As

Publication number Publication date
CN106440984B (en) 2018-03-16

Similar Documents

Publication Publication Date Title
CN103089275B (en) Control method of surrounding rocks in water-rich very-broken surrounding rock tunnel collapse sections
CN104806267B (en) The shield end reinforcement system and its construction method of land pebble stratum super-front large pipe shed
CN106703692A (en) Method using surface orientation bedding drilling grouting to reinforce laminar limestone
CN108060908A (en) Water-rich sand layer long range horizontal orientation drilling grouting and reinforcing technology under groups of building
CN104499479B (en) It is a kind of to pass through the dug pile construction method that sand gravel backfills layer
CN209444350U (en) Shield launching wears existing shield tunnel barrel vault advanced support structure under being
CN112593853B (en) Construction method for coal mine waste filling and water-reducing mining
CN102493822A (en) Method for performing curtain grouting construction on tunnel by water rich fault influence zone
CN102518470B (en) Method for preventing and controlling water by using freezing pipes in annular water intercepting tunnel
CN105863648B (en) A kind of tunneling is shallow to cover large-section tunnel construction method
CN202117686U (en) Surrounding rock advanced support structure for railway tunnel at deep-buried watery and weak stratums
CN102635388A (en) Interaction permeability-increasing method of pre-splitting blasting and hydraulic cracking of coal seam
CN103835729A (en) Ground pre-grouting strengthening technology for deep long-distance roadway surrounding rock
CN109322699A (en) Pollution isolation blocking technology under a kind of mine
CN103742154B (en) A kind of shield tunnel ventilation shaft construction method
CN103362117A (en) Full-section grouting method for grouting section
CN105041322A (en) Method and system for reinforcing hole for push bench to go in and out
CN106761814A (en) A kind of pipe curtain and bamboo reinforcement grouted anchor bar combined retaining structure and method
CN111075478A (en) Pre-grouting reinforcement process for ground construction of broken belt of excavation working face structure
CN102400694A (en) Reinforcement method for combined part of shield tunnel and mining-method tunnel
CN103835723A (en) Comprehensive pretreatment method for shaft penetration in mined-out area stratum
CN109026010A (en) A kind of mine seepage well slip casting type sinking shaft construction method
CN109281707A (en) A kind of advanced control method of face roof absciss layer water damage
CN109763821A (en) A kind of compound shield lane method of dynamic pressure exploiting field main entry
CN101793154A (en) Method for grouting for stopping up water by using geological parameters of tunnel surrounding rocks and setting relief holes

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant