CN106437128A - Attached arm lifting platform for high-rise building construction - Google Patents
Attached arm lifting platform for high-rise building construction Download PDFInfo
- Publication number
- CN106437128A CN106437128A CN201610751057.4A CN201610751057A CN106437128A CN 106437128 A CN106437128 A CN 106437128A CN 201610751057 A CN201610751057 A CN 201610751057A CN 106437128 A CN106437128 A CN 106437128A
- Authority
- CN
- China
- Prior art keywords
- guide rail
- platform
- jacking device
- hydraulic jacking
- hanging seat
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G2003/286—Mobile scaffolds; Scaffolds with mobile platforms mobile vertically
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Types And Forms Of Lifts (AREA)
Abstract
The invention discloses an attached arm lifting platform for high-rise building construction. The attached arm lifting platform is characterized by comprising a guide rail; the guide rail is installed on at least two hanging bases and can move up and down relative to the hanging bases; the hanging bases are embedded into a building body; the guide rail is provided with a first hydraulic jacking device so that the guide rail can be driven to move up and down in the hanging bases; a protection platform body is installed on the guide rail, can move up and down relative to the guide rail and is provided with a second hydraulic jacking device so that the protection platform body can be driven to move up and down; after the protection platform body is lifted in place, loads are directly removed onto the hanging bases, then the guide rail is lifted through the first hydraulic jacking device, after the guide rail is lifted in place, the loads are removed onto the hanging bases, and in this way a protection platform frame body and the guide rail can be lifted alternately. The lifting platform can quickly operate within a larger height distance range, and the safety is high.
Description
Technical field
The present invention relates to attached arm hoistable platform during a kind of high-building construction.
Background technology
When skyscraper side wall is constructed, traditional way is carried out by installing scaffold.But scaffold
Set up time consuming, and individual level is required for setting up, very labor intensive and material cost.
Content of the invention
In view of the deficiency of prior art, the technical problem to be solved is that offer one kind can be in certain altitude model
Attached arm hoistable platform during enclosing the interior high-building construction for realizing automatic lifting.
For this purpose, the technical scheme is that:Attached arm hoistable platform during high-building construction, including guide rail, guide rail is pacified
Loaded at least two hanging seats, guide rail can be moved up and down with respect to hanging seat, and it is internal that hanging seat is embedded in building, and the guide rail is configured with the
One hydraulic jacking device is provided with protective platform to drive guide rail to move up and down in hanging seat on the guide rail, protective platform can
Opposite rail is moved up and down, and the protective platform is configured with the second hydraulic jacking device to drive protective platform to move up and down, when
After protective platform lifting puts in place, in direct off-load to hanging seat, then by the first hydraulic jacking device come lift rail, treat that guide rail is carried
Rise and put in place, in off-load to hanging seat, be achieved in protective platform support body and guide rail replaces lifting.
In the present invention, after protective platform lifting puts in place, in direct off-load to hanging seat, then lifted by hydraulic system and lead
Rail, treats that guide rail lifting puts in place, and in off-load to hanging seat, be achieved in protective platform support body and guide rail replaces lifting.By this
Structure can make hoistable platform move up and down in larger altitude range, so as to reduce construction cost, can also accelerate to apply
Work speed, constructing operation is also more flexible.
Description of the drawings
The structural representation of attached arm hoistable platform during the high-building construction that Fig. 1 is provided for the present invention.
Specific embodiment
With reference to shown in Fig. 1, attached arm hoistable platform during the high-building construction that the present invention is provided, including guide rail 1, guide rail 1
It is installed at least two hanging seats 2, guide rail 1 can be moved up and down with respect to hanging seat 2, hanging seat 2 is embedded in building in vivo, the guide rail 1
The first hydraulic jacking device is configured with to drive guide rail 1 to move up and down in hanging seat 2, on the guide rail 1, protective platform is installed
3, protective platform 3 can opposite rail 1 move up and down, the protective platform 3 is configured with the second hydraulic jacking device to drive protection
Platform 3 is moved up and down, and after the lifting of protective platform 3 puts in place, in direct off-load to hanging seat 2, then passes through the first hydraulic jacking device
Carry out lift rail 1, treat that the lifting of guide rail 1 puts in place, in off-load to hanging seat 2, be achieved in replacing for 3 support body of protective platform and guide rail 1
Lifting.In order to lift construction material, 3 bottom of the protective platform is lifted with material platform 4.In the present embodiment, general drive
First hydraulic jacking device of guide rail 1 is in hanging seat 2, and the push rod of first hydraulic jacking device is withstood on guide rail 1, and is carried
Second hydraulic jacking device of dynamic protective platform 3 is on guide rail 1, and the push rod of second hydraulic jacking device withstands on protection and puts down
On platform 3, the first described hydraulic jacking device and the second hydraulic jacking device belong to prior art products, typically can be by buying
Obtain.
Claims (2)
1. attached arm hoistable platform during a kind of high-building construction, is characterized in that:Including guide rail, guide rails assembling is hung at least two
On seat, guide rail can be moved up and down with respect to hanging seat, and hanging seat is embedded in building in vivo, and the guide rail is configured with the first hydraulic jacking device
To drive guide rail to move up and down in hanging seat, protective platform is installed on the guide rail, protective platform can be moved down on opposite rail
Dynamic, the protective platform is configured with the second hydraulic jacking device to drive protective platform to move up and down, when protective platform rises to
Behind position, in direct off-load to hanging seat, then by the first hydraulic jacking device come lift rail, treat that guide rail lifting puts in place, off-load is arrived
On hanging seat, be achieved in protective platform support body and guide rail replaces lifting.
2. attached arm hoistable platform during high-building construction according to claim 1, is characterized in that:The protective platform bottom
Portion is lifted with material platform.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610751057.4A CN106437128A (en) | 2016-08-30 | 2016-08-30 | Attached arm lifting platform for high-rise building construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610751057.4A CN106437128A (en) | 2016-08-30 | 2016-08-30 | Attached arm lifting platform for high-rise building construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106437128A true CN106437128A (en) | 2017-02-22 |
Family
ID=58182800
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610751057.4A Pending CN106437128A (en) | 2016-08-30 | 2016-08-30 | Attached arm lifting platform for high-rise building construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106437128A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000282691A (en) * | 1999-03-30 | 2000-10-10 | Sumitomo Heavy Ind Ltd | Construction method for mounting member on inner wall of high-rise, tower structure, and scaffold device |
GB2435641A (en) * | 2003-09-16 | 2007-09-05 | Andrey Grigoryevich Tirskiy | High-rise fire fighting, rescue and construction equipment |
CN102828608A (en) * | 2012-09-21 | 2012-12-19 | 南京道广建筑模板有限公司 | Hydraulic climbing protection device for high-rise building construction |
CN202969890U (en) * | 2012-03-23 | 2013-06-05 | 北京韬盛科技发展有限公司 | Tool type liftable material platform |
CN205077845U (en) * | 2015-09-08 | 2016-03-09 | 中国建筑第二工程局有限公司 | Hydraulic intelligent climbing operation scaffold for core barrel well of building |
CN205976429U (en) * | 2016-08-30 | 2017-02-22 | 泰昌建设有限公司 | High -rise building construction period attaches arm lift platform |
-
2016
- 2016-08-30 CN CN201610751057.4A patent/CN106437128A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000282691A (en) * | 1999-03-30 | 2000-10-10 | Sumitomo Heavy Ind Ltd | Construction method for mounting member on inner wall of high-rise, tower structure, and scaffold device |
GB2435641A (en) * | 2003-09-16 | 2007-09-05 | Andrey Grigoryevich Tirskiy | High-rise fire fighting, rescue and construction equipment |
CN202969890U (en) * | 2012-03-23 | 2013-06-05 | 北京韬盛科技发展有限公司 | Tool type liftable material platform |
CN102828608A (en) * | 2012-09-21 | 2012-12-19 | 南京道广建筑模板有限公司 | Hydraulic climbing protection device for high-rise building construction |
CN205077845U (en) * | 2015-09-08 | 2016-03-09 | 中国建筑第二工程局有限公司 | Hydraulic intelligent climbing operation scaffold for core barrel well of building |
CN205976429U (en) * | 2016-08-30 | 2017-02-22 | 泰昌建设有限公司 | High -rise building construction period attaches arm lift platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205603141U (en) | Lifting platform | |
CN205990213U (en) | A kind of liftable fixed platform | |
CN204958134U (en) | Prefabricated floor plate special hoisting bar | |
FI20106401A0 (en) | METHOD AND LIFT SYSTEM | |
CN102704676A (en) | Jacking formwork mechanism | |
CN104929353A (en) | Detachable stepwise automatic climbing operating platform for elevator shafts | |
CN205637622U (en) | Perpendicular unit glass curtain wall hoist and mount system | |
CN105715028B (en) | Continuous lowering or hoisting gear and the elevating scaffold containing continuous lowering or hoisting gear | |
CN104612391B (en) | Construction of prevention work platform for skyscraper | |
CN203820331U (en) | Material hoist with built-in steel wire rope | |
CN106437128A (en) | Attached arm lifting platform for high-rise building construction | |
CN205976429U (en) | High -rise building construction period attaches arm lift platform | |
CN209353734U (en) | For installing the double-track device of curtain wall | |
CN204139567U (en) | Aerial work platform | |
CN104030176B (en) | The equalizer bar of hoisting platform truss and hanging method thereof | |
CN103010906B (en) | The towing machine arrangement structure of machine-roomless lift | |
CN202718385U (en) | Jack-raising formwork mechanism | |
CN205367403U (en) | Elevator hauler installation device | |
CN104328920B (en) | Construction material carrying method | |
CN208980193U (en) | The curtain wall hanging apparatus of anticollision | |
CN203917788U (en) | A kind of riveting work platform | |
CN103395725A (en) | Lifting device and construction method thereof | |
CN208152551U (en) | There is the dedicated rack device that climbs of skin concrete structure outer | |
KR102129286B1 (en) | Lifting device for construction of elevator passage | |
CN105502131A (en) | Elevator traction machine installing device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170222 |