CN209353734U - For installing the double-track device of curtain wall - Google Patents
For installing the double-track device of curtain wall Download PDFInfo
- Publication number
- CN209353734U CN209353734U CN201821667093.3U CN201821667093U CN209353734U CN 209353734 U CN209353734 U CN 209353734U CN 201821667093 U CN201821667093 U CN 201821667093U CN 209353734 U CN209353734 U CN 209353734U
- Authority
- CN
- China
- Prior art keywords
- sliding rail
- ring sliding
- curtain wall
- building structure
- inner ring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Load-Bearing And Curtain Walls (AREA)
Abstract
The utility model relates to a kind of, and the double-track device for installing curtain wall includes: the inner ring sliding rail for being fastened transversely to building structure;It is fixed on building structure, and is set to the outer ring sliding rail in the outside of inner ring sliding rail, inner ring sliding rail and outer ring sliding rail are respectively positioned on the outside of building structure and stay between building structure and set distance;Set on outer ring sliding rail and provide the hanging basket of operating platform;And it is fixed on building structure and the promotion hoist engine close to outer ring sliding rail, curtain wall to be installed is promoted to floor corresponding to installation site by promoting hoist engine, and then enables curtain wall to be installed be hung on inner ring sliding rail and curtain wall to be installed is moved to by installation site by inner ring sliding rail.Solve the problems, such as that the construction efficiency of the installation and removal using limit sliding rail in the prior art is low.
Description
Technical field
It is espespecially a kind of for installing the double-track device of curtain wall the utility model relates to the realm of building construction.
Background technique
Currently, curtain wall has become decoration of exterior wall decoration technology the most universal in building decoration and fitment field.For position
Set higher curtain wall, during practice of construction, after curtain wall to be lifted into the height of position to be installed, curtain wall is difficult to carry out
Transverse shifting, there are certain horizontal distance between curtain wall and position to be installed, construction is inconvenient.Usually in curtain wall wait pacify
Vertically arranged a pair of of the limit sliding rail of holding position opposite sides, but installed in building structure in the work progress of muti-piece curtain wall,
Corresponding to the installation site of different curtain walls, require to reinstall limit sliding rail or disassembly limit sliding rail, construction efficiency every time
Lowly.
Utility model content
The purpose of the utility model is to overcome the defects of the prior art, provide a kind of two-orbit dress for installing curtain wall
It sets, the working procedure for solving the installation and removal using limit sliding rail in the prior art is more, the low problem of construction efficiency.
Realizing the technical solution of above-mentioned purpose is:
The utility model provides a kind of for installing the double-track device of curtain wall, comprising:
It is fastened transversely to the inner ring sliding rail of building structure;
Be fixed on the building structure, and be set to the outer ring sliding rail in the outside of the inner ring sliding rail, the inner ring sliding rail and
The outer ring sliding rail, which is respectively positioned on the outside of the building structure and stays between the building structure, sets distance;
Set on the outer ring sliding rail and provide the hanging basket of operating platform;And
It is fixed on the building structure and the promotion hoist engine close to the outer ring sliding rail, passes through the promotion hoist engine
Curtain wall to be installed is promoted to floor corresponding to installation site, and then the curtain wall to be installed is enabled to be hung on the inner ring
The curtain wall to be installed is simultaneously moved to installation site by the inner ring sliding rail by sliding rail.
The utility model be used for install curtain wall double-track device the utility model has the advantages that
The utility model is used to install the double-track device of curtain wall by setting outer ring sliding rail and promotes hoist engine, for leading to
It crosses and promotes hoist engine at the height of curtain wall vertical lifting to position to be installed, by the way that inner ring sliding rail is arranged, be used for curtain wall
It is transversely and horizontally moved, thus by after at the height for the position to be installed for being lifted into curtain wall, since the position of curtain wall is inclined
It moves and is horizontally moved curtain wall, until being moved to curtain wall at position to be installed, solve in the prior art using limit
Sliding rail solves the problems, such as that curtain wall deviates in hoisting process and need the working procedure of the installation and removal of the scheme of transverse shifting
It is more, the low problem of construction efficiency.Inner ring sliding rail and outer ring sliding rail have independence, create to cross construction extremely beneficial
Condition securely and reliably saves human and material resources, substantially increases lifting speed and lifting quality, saves the duration.
The utility model be used to install the double-track device of curtain wall further improvement lies in that, the curtain wall peace to be installed
When top loaded on the building structure, the inner ring sliding rail and the outer ring sliding rail are both secured to the top of the building structure
Layer.
The utility model be used for install curtain wall double-track device further improvement lies in that, further includes:
Vertically it is fixed on the support rod of the top layer of the building structure;
It is fastened transversely to the first spandrel girder of the support rod, the end of first spandrel girder protrudes out the building knot
It is configured to described first and protrudes out end, the inner ring sliding rail and the outer ring sliding rail are fixed on protruding out for multiple first spandrel girders
End;And
The oblique hound being fixed between the support rod and first spandrel girder.
The utility model be used to install the double-track device of curtain wall further improvement lies in that, the curtain wall peace to be installed
When lower part loaded on the building structure, the inner ring sliding rail and the outer ring sliding rail are both secured to the middle part of the building structure
Floor.
The utility model be used for install curtain wall double-track device further improvement lies in that, further includes:
Multiple second spandrel girders of the intermediate floor of the building structure are fixed on, the end of second spandrel girder protrudes out
The building structure forms second and protrudes out end out, and the inner ring sliding rail and the outer ring sliding rail are fixed on multiple second load-bearing
The second of beam protrudes out end;And
The oblique part being located above the spandrel girder for being fixed on second spandrel girder and the building structure it is oblique
Draw piece.
The utility model be used to install the double-track device of curtain wall further improvement lies in that, the inner ring sliding rail is removable
Be equipped with electric block.
Detailed description of the invention
Fig. 1 is the main view of the top layer for being installed on building structure for the double-track device that the utility model is used to install curtain wall
Figure.
Fig. 2 is the side view of the top layer for being installed on building structure for the double-track device that the utility model is used to install curtain wall
Figure.
Fig. 3 is the building positioned at middle part for being installed on building structure for the double-track device that the utility model is used to install curtain wall
The side view of layer.
Specific embodiment
The utility model is described in further detail in the following with reference to the drawings and specific embodiments.
Refering to fig. 1, it is shown that the utility model is used to install the top for being installed on building structure of the double-track device of curtain wall
The main view of layer.As shown in Figure 1, the double-track device that the utility model is used to install curtain wall includes: to be fastened transversely to building knot
Structure, and it is located at the inner ring sliding rail 30 of the top of the installation site of curtain wall 10 to be installed;It is fixed on building structure, and is set to inner ring
The outer ring sliding rail 40 in the outside of sliding rail 30, inner ring sliding rail 30 and outer ring sliding rail 40 are respectively positioned on the outside of building structure and and building knot
It is stayed between structure and sets distance;Set on outer ring sliding rail 40 and provide the hanging basket 41 of operating platform;And it is fixed on building structure and close
Curtain wall 10 to be installed is promoted to corresponding to installation site by the promotion hoist engine 60 of outer ring sliding rail 40 by promoting hoist engine 60
Floor, and then curtain wall 10 to be installed is enabled to be hung on inner ring sliding rail 30 and move curtain wall 10 to be installed by inner ring sliding rail 30
It moves to installation site.
It is used to install a better embodiment of the double-track device of curtain wall as the utility model, referring to Fig.2, showing
The utility model is used to install the side view of the top layer for being installed on building structure of the double-track device of curtain wall.In conjunction with Fig. 1 and Fig. 2
Shown, when curtain wall 10 to be installed is installed on the top of building structure, inner ring sliding rail 30 and outer ring sliding rail 40 are both secured to build
The top layer 20 of structure.The present apparatus further include: be vertically fixed on the support rod 11 of the top layer 20 of building structure;It is fastened transversely to support
First spandrel girder 12 of bar 11, the end of the first spandrel girder 12 protrude out building structure formation first and protrude out end, inner ring sliding rail 30
End is protruded out with what outer ring sliding rail 40 was fixed on multiple first spandrel girders 12;And oblique it is fixed on support rod 11 and the first spandrel girder
Hound 13 between 12.The top layer 20 of building structure is vertically fixed on by using support rod 11, to avoid directly
One spandrel girder 12 is fastened transversely to the top layer 20 of building structure, to avoid protecting the destruction of the top layer 20 of building structure
The waterproof performance of the top layer 20 of building structure.Hound 13 enhances the stability of whole connection.Not shadow in the construction process
Ring the construction operation of the relevant specialities such as civil engineering in each floor, hard-cover, electromechanical installation.
It is used to install a better embodiment of the double-track device of curtain wall as the utility model, refering to Fig. 3, it is shown that
The utility model is used to install the side view of the floor positioned at middle part for being installed on building structure of the double-track device of curtain wall.Such as
Shown in Fig. 3, when curtain wall 10 to be installed is installed on the lower part of building structure, inner ring sliding rail 30 and outer ring sliding rail 40 are both secured to build
The intermediate floor 21 of building structure.The present apparatus further include: multiple second spandrel girders 14 of the intermediate floor 21 of building structure are fixed on,
The end of second spandrel girder 14, which protrudes out building structure and forms second, protrudes out end, and inner ring sliding rail and outer ring sliding rail are fixed on multiple the
The second of two spandrel girders 14 protrudes out end;And it is oblique be fixed on the second spandrel girder 14 and building structure be located at the second spandrel girder 14
The oblique pull part 15 of the part of top.
In the present embodiment, multiple second spandrel girders 14 are horizontally arranged at interval in building structure, are used for subsequent by inner ring
Sliding rail and outer ring sliding rail are fixed on multiple second spandrel girders 14, enhance whole stability, facilitate and subsequent lift to curtain wall.
By setting inner ring sliding rail and outer ring sliding rail, inner ring sliding rail is for curtain wall 10 to be installed to be horizontally moved.Promote elevator
Machine 60 is fixed on building structure and close to outer ring sliding rail 40, promotes hoist engine 60 for lifting curtain wall 10 to be installed.Outer ring is sliding
Hanging basket 41 is additionally provided on rail 40, for providing operating platform.Protruding out for the second spandrel girder 14 is fixed in one end of oblique pull part 15
End, the other end of oblique pull part 15 is fixed on the floor being located above positioned at the second spandrel girder 14 of building structure, to utilize
Oblique pull part 15 increases the fastness of the connection between the second spandrel girder 14 and building structure, to enhance whole stabilization
Property.
It is used to install a better embodiment of the double-track device of curtain wall as the utility model, inner ring sliding rail 30 is removable
Dynamic is equipped with electric block 31, by connecting electric block 31 and curtain wall 10 to be installed, by electric block 31 along inner ring
Sliding rail 30 is mobile, moves horizontally curtain wall 10 to be installed to realize.
Outer ring sliding rail 40 is movably equipped with hanging basket 41, and hanging basket 41 can be used for providing job platform to construction personnel, thus
Construction personnel can release the connection of curtain wall 10 and outer ring sliding rail 40 to be installed in hanging basket, and by 10 He of curtain wall to be installed
Electric block 31 on inner ring sliding rail 30 is attached, and the installation of horizontal transport and plate is carried out then in conjunction with inner ring sliding rail 30,
Independent construction is independent of each other, and is substantially shorter the duration by such method, saves project cost.In the present embodiment, it is arranged two
A electric hoist, an electric hoist are used for lifting curtain wall, another electric hoist plays a protective role, and securely and reliably, save manpower, object
Power substantially increases lifting speed and lifting quality, saves the duration.
The utility model is used to install having the beneficial effect that for the double-track device of curtain wall
The utility model is used to install the double-track device of curtain wall by setting outer ring sliding rail and promotes hoist engine, for leading to
It crosses and promotes hoist engine at the height of curtain wall vertical lifting to position to be installed, by the way that inner ring sliding rail is arranged, be used for curtain wall
It is transversely and horizontally moved, thus by after at the height for the position to be installed for being lifted into curtain wall, since the position of curtain wall is inclined
It moves and is horizontally moved curtain wall, until being moved to curtain wall at position to be installed, solve in the prior art using limit
Sliding rail solves the problems, such as that curtain wall deviates in hoisting process and need the working procedure of the installation and removal of the scheme of transverse shifting
It is more, the low problem of construction efficiency.Inner ring sliding rail and outer ring sliding rail have independence, create to cross construction extremely beneficial
Condition securely and reliably saves human and material resources, substantially increases lifting speed and lifting quality, saves the duration.
Combine figure embodiment that the utility model is described in detail above, those skilled in the art can root
Many variations example is made to the utility model according to above description.Thus, certain details in embodiment should not constitute practical to this
Novel restriction, the utility model will be using the ranges that the appended claims define as the protection scope of the utility model.
Claims (6)
1. a kind of for installing the double-track device of curtain wall characterized by comprising
It is fastened transversely to the inner ring sliding rail of building structure;
It is fixed on the building structure, and is set to the outer ring sliding rail in the outside of the inner ring sliding rail, the inner ring sliding rail and described
Outer ring sliding rail, which is respectively positioned on the outside of the building structure and stays between the building structure, sets distance;
Set on the outer ring sliding rail and provide the hanging basket of operating platform;And
It is fixed on the building structure and the promotion hoist engine close to the outer ring sliding rail, it will be to by the promotion hoist engine
The curtain wall of installation is promoted to floor corresponding to installation site, and then the curtain wall to be installed is enabled to be hung on the inner ring sliding rail
And the curtain wall to be installed is moved to by installation site by the inner ring sliding rail.
2. as described in claim 1 for installing the double-track device of curtain wall, which is characterized in that
When the curtain wall to be installed is installed on the top of the building structure, the inner ring sliding rail and the outer ring sliding rail are solid
Due to the top layer of the building structure.
3. as claimed in claim 2 for installing the double-track device of curtain wall, which is characterized in that further include:
Vertically it is fixed on the support rod of the top layer of the building structure;
It is fastened transversely to the first spandrel girder of the support rod, the end of first spandrel girder protrudes out the building structure shape
End is protruded out at first, and what the inner ring sliding rail and the outer ring sliding rail were fixed on multiple first spandrel girders first protrudes out end;
And
The oblique hound being fixed between the support rod and first spandrel girder.
4. as described in claim 1 for installing the double-track device of curtain wall, which is characterized in that
When the curtain wall to be installed is installed on the lower part of the building structure, the inner ring sliding rail and the outer ring sliding rail are solid
Due to the intermediate floor of the building structure.
5. as claimed in claim 4 for installing the double-track device of curtain wall, which is characterized in that further include:
Multiple second spandrel girders of the intermediate floor of the building structure are fixed on, the end of second spandrel girder protrudes out institute
It states building structure formation second and protrudes out end, the inner ring sliding rail and the outer ring sliding rail are fixed on multiple second spandrel girders
Second protrudes out end;And
The oblique part being located above second spandrel girder for being fixed on second spandrel girder and the building structure it is oblique
Draw piece.
6. as described in claim 1 for installing the double-track device of curtain wall, which is characterized in that
The inner ring sliding rail is movably equipped with electric block.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821667093.3U CN209353734U (en) | 2018-10-15 | 2018-10-15 | For installing the double-track device of curtain wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821667093.3U CN209353734U (en) | 2018-10-15 | 2018-10-15 | For installing the double-track device of curtain wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209353734U true CN209353734U (en) | 2019-09-06 |
Family
ID=67782041
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821667093.3U Active CN209353734U (en) | 2018-10-15 | 2018-10-15 | For installing the double-track device of curtain wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209353734U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112110330A (en) * | 2020-09-21 | 2020-12-22 | 中建二局第一建筑工程有限公司 | Curtain wall unit body rail hoisting system and method |
CN113734943A (en) * | 2021-08-27 | 2021-12-03 | 湖北富烨装饰工程有限公司 | Rail type hoisting tool for mounting building curtain wall |
-
2018
- 2018-10-15 CN CN201821667093.3U patent/CN209353734U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112110330A (en) * | 2020-09-21 | 2020-12-22 | 中建二局第一建筑工程有限公司 | Curtain wall unit body rail hoisting system and method |
CN112110330B (en) * | 2020-09-21 | 2023-03-14 | 中建二局第一建筑工程有限公司 | Curtain wall unit body rail hoisting system and method |
CN113734943A (en) * | 2021-08-27 | 2021-12-03 | 湖北富烨装饰工程有限公司 | Rail type hoisting tool for mounting building curtain wall |
CN113734943B (en) * | 2021-08-27 | 2023-10-20 | 湖北富烨装饰工程有限公司 | Rail mounted lifting device for building curtain installation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105256728B (en) | A kind of cantilever erection method of the Chinese human relations formula steel truss girder of cable-stayed bridge | |
CN209353734U (en) | For installing the double-track device of curtain wall | |
CN203392766U (en) | Lightweight lifting bracket arranged on roof | |
CN106245919A (en) | A kind of assembled architecture Automated assembly platform | |
CN103194977A (en) | Placing method for girder guiding machine before first hole box girder erection by integrated transportation and erection type bridge girder erection machine | |
JP2008248664A (en) | Hoisting method of curtain wall | |
CN203333143U (en) | Building construction basket | |
CN108675170A (en) | Roofing monorail crane and its construction method | |
CN206680101U (en) | A kind of simple and convenient guardrail model sheetinstallat chassis | |
CN105952129B (en) | Elevator shaft combined type integral lifting operation platform and construction method thereof | |
CN205442496U (en) | High -rise building roof curtain lifting device | |
CN202882376U (en) | Elevator shaft template support platform | |
CN202481972U (en) | Mineshaft material hoisting frame | |
CN204983692U (en) | Concrete panel's hoist device | |
CN208732486U (en) | Roofing monorail crane | |
CN203257106U (en) | Multifunctional power-driven walking type walking system | |
CN206174441U (en) | Elevator shaft operation platform | |
CN211257761U (en) | Lifting type elevator shaft operating platform | |
CN203320922U (en) | Supporting device for forming of elevator shaft template | |
CN209397505U (en) | One kind being used for loading test of half-through CFST arch bridge hoisting of deck beam mounting device | |
CN204126237U (en) | A kind of elevator hoistway construction platform | |
CN204224149U (en) | Steel structure secondary member hoisting device | |
CN107700854B (en) | Steel plate wall sliding installation device and installation method for super high-rise core tube | |
CN209367692U (en) | It is a kind of to rise gantry type two-way lifter device certainly | |
CN203229334U (en) | Lifting framework for lifting and translating single steel member |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |