CN106429742A - Locating device and implementing method for mounting elevator cage of construction elevator - Google Patents
Locating device and implementing method for mounting elevator cage of construction elevator Download PDFInfo
- Publication number
- CN106429742A CN106429742A CN201610966792.7A CN201610966792A CN106429742A CN 106429742 A CN106429742 A CN 106429742A CN 201610966792 A CN201610966792 A CN 201610966792A CN 106429742 A CN106429742 A CN 106429742A
- Authority
- CN
- China
- Prior art keywords
- clamping block
- block
- ladder cage
- mounting
- building hoist
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B11/00—Main component parts of lifts in, or associated with, buildings or other structures
Landscapes
- Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Mechanical Engineering (AREA)
- Structural Engineering (AREA)
- Ladders (AREA)
Abstract
The invention provides a locating device for mounting an elevator cage of a construction elevator. The locating device comprises a support frame and a locking block, wherein the locking block is fixed to a target position of a guide rail frame, and the support frame is in detachable connection with the locking block. The invention further provides an implementing method for mounting the elevator cage of the construction elevator. The implementing method comprises the following steps: initially locating the locking block in the target position of the guide rail frame; lifting the support frame through a crane or an electric hoist or by a worker; aligning the support frame with the locking block which is well located and fixing the support frame; mounting the elevator cage, to be specific, directly mounting the elevator cage on the support frame; and mounting the driving system and the electric system of the construction elevator, and carrying out electric adjustment. By mounting the device on the guide rail frame, the elevator cage can be located at any height on the guide rail frame, and the elevator cage does not need to be placed on a main underframe or a sleeper.
Description
Technical field
The present invention relates to building hoist field is and in particular to a kind of building hoist ladder cage mounting and positioning device and enforcement
Method.
Background technology
In installation process, when mounted, ladder cage and driving means are lifted ladder cage current building hoist, put respectively
Enter in guide rail bracket, and because now electrical system is not yet installed and debugged, ladder cage does not have stopping means on guide rail bracket, ladder cage is only
Can be placed on main underframe or on chock, make ladder cage is provided with larger limitation, if in addition, ladder cage is sent out in certain altitude
Raw fault and when being not easy to drop to floor pen, maintenance activity under certain altitude for the ladder cage also makes certain hidden of security presence
Suffer from.
In addition, for the construction elevator of many ladder cages, the installation of ladder cage cannot place one's entire reliance upon be placed on main underframe or
On person's chock, therefore design and construction elevator ladder cage mounting and positioning device is necessary.
Content of the invention
The technical problem to be solved in the present invention is:A kind of building hoist ladder cage mounting and positioning device and embodiment party are provided
Method, so that ladder cage can be positioned on guide rail bracket, without being placed on main underframe or on chock.
The present invention by solving the technical scheme taken of above-mentioned technical problem is:A kind of building hoist ladder cage installs positioning
Device it is characterised in that:It includes bracing frame and clamping block, and clamping block is fixed on the target location of guide rail bracket, and described props up
Support is detachably connected with clamping block.
By such scheme, described bracing frame includes support beam, lower support block and bracing piece therebetween;Described
Upper support beam and bracing piece between, between bracing piece and lower support block, be and be fixedly connected;
Described clamping block includes clamping block and lower clamping block, and upper clamping block is connected with described upper support beam, lower locking
Block is connected with described lower support block.
By such scheme, described bracing piece is at least 2 bracing diagonals.
By such scheme, the incline direction of described bracing diagonal is from top to bottom from laterally toward intermediate, inclined.
By such scheme, described bracing frame is connected with clamping block by screw.
By such scheme, described clamping block includes 2 pieces of fixture blocks for clamp rail frame, and 2 fixture blocks pass through connector
Connect.
A kind of building hoist ladder cage installation embodiment party being realized using above-mentioned building hoist ladder cage mounting and positioning device
Method it is characterised in that:It comprises the following steps:
S1, by clamping block initial alignment in the target location of guide rail bracket;
S2, sling by loop wheel machine or electric block or manually lift bracing frame;
S3, bracing frame is with the locking block alignment having good positioning and fixing;
S4, installation ladder cage, ladder cage is rest directly upon on bracing frame;
S5, installation lift drive system and electrical system, and carry out electric adjustment.
As stated above, described bracing frame includes support beam, lower support block and bracing piece therebetween;Described
Upper support beam and bracing piece between, between bracing piece and lower support block, be and be fixedly connected;Described clamping block includes
Clamping block and lower clamping block;
Upper support beam first by upper support beam and upper locking block alignment, is fixed on upper clamping block by screw by described S3
On;Again by lower support block and lower locking block alignment, by screw, lower support block is fixed on lower clamping block.
Beneficial effects of the present invention are:
1st, pass through this device is installed on guide rail bracket, can on guide rail bracket any altitude location ladder cage, put without by ladder cage
Put on main underframe or on chock;When ladder cage breaks down, this device can be installed below ladder cage it is ensured that the peace of ladder cage
Quan Xing;This device is easy for installation, simple economy, improves benefit it is ensured that job safety.
2nd, for the building hoist of many ladder cages, ensure that more ladder cages are convenient on guide rail bracket and install.
3rd, by refinement further to bracing frame, on the premise of ensureing quality, bracing frame can further be reduced
Complex degree of structure.
4th, arrange the bracing diagonal of eight shapes, can further improve the strength and stiffness of whole device.
Brief description
Fig. 1 is one embodiment of the invention application schematic diagram in single ladder cage.
Fig. 2 is one embodiment of the invention application schematic diagram in many ladder cages.
Fig. 3 is the Structure explosion diagram of one embodiment of the invention.
Fig. 4 is the Structure explosion diagram of clamping block in one embodiment of the invention.
In figure:1- guide rail bracket, 2- drive system, 3- ladder cage, 4- ladder cage mounting and positioning device, 5- attached wall, the upper clamping block of 6-,
Support block, 12- screw under clamping block under 7- circular cone pin, the upper support beam of 8-, 9- bracing diagonal, 10-, 11-, 13- fixture block.
Specific embodiment
With reference to instantiation and accompanying drawing, the present invention will be further described.
As illustrated in figs. 1 and 2, guide rail bracket 1 is connected with attached wall 5, first ladder cage mounting and positioning device 4 is arranged on guide rail bracket
On 1, then ladder cage 3 is installed so that ladder cage mounting and positioning device supports ladder cage 3, then drive system 2 is installed again.
The present invention provides a kind of building hoist ladder cage mounting and positioning device, and it includes bracing frame and clamping block, clamping block
It is fixed on the target location of guide rail bracket 1, described bracing frame is detachably connected with clamping block.
As shown in Figure 3 it is preferred that described bracing frame include support beam 8, lower support block 11 and therebetween plus
Strong bar;Between described upper support beam 8 and bracing piece, between bracing piece and lower support block 11, it is and is fixedly connected;Described
Clamping block includes clamping block 6 and lower clamping block 10, and upper clamping block 6 is connected with described upper support beam 8, lower clamping block 10 with
Described lower support block 11 connects.Upper support beam 8 is used for directly supporting the polycrystalline substance of ladder cage 3, and lower support block 11 can carry
The latching force of this device high.
It is further preferred that described bracing piece is at least 2 bracing diagonals 9.In the present embodiment, described bracing diagonal
9 incline direction is from top to bottom from laterally toward intermediate, inclined.When bracing diagonal 9 is 2, as herringbone, this knot
Structure can improve the strength and stiffness of whole device.
Refine further, described bracing frame is connected with clamping block by screw 12.
Further refine, as shown in figure 4, described clamping block includes 2 pieces of fixture blocks 13,2 for clamp rail frame
Individual fixture block 13 is connected by connector, and in the present embodiment, connector is circular cone pin 7.
A kind of building hoist ladder cage installation embodiment party being realized using above-mentioned building hoist ladder cage mounting and positioning device
Method, comprises the following steps:S1, by clamping block initial alignment in the target location of guide rail bracket 1(With two pieces of fixture blocks 13 in the present embodiment
Clamp guide rail bracket, then with circular cone pin 7, two pieces of fixture blocks 13 are fixed);S2, sling by loop wheel machine or electric block or manually
Lift bracing frame;S3, bracing frame is with the locking block alignment having good positioning and fixing;S4, installation ladder cage 3, ladder cage 3 is directly laid
On bracing frame;S5, installation lift drive system and electrical system, and carry out electric adjustment.
Preferably, described bracing frame includes support beam 8, lower support block 11 and bracing piece therebetween;Described
Upper support beam 8 and bracing piece between, between bracing piece and lower support block 11, be and be fixedly connected;Described clamping block bag
Include clamping block 6 and lower clamping block 10;Upper support beam 8 is first aligned by described S3 with upper clamping block 6, will by screw 12
Upper support beam 8 is fixed on clamping block 6;Again lower support block 11 is aligned with lower clamping block 10, by screw 12 by lower
Bracer 11 is fixed on lower clamping block 10.
Above example is merely to illustrate design philosophy and the feature of the present invention, its object is to make technology in the art
Personnel will appreciate that present disclosure and implement according to this, protection scope of the present invention is not limited to above-described embodiment.So, all according to
The equivalent variations made according to disclosed principle, mentality of designing or modification, all within protection scope of the present invention.
Claims (8)
1. a kind of building hoist ladder cage mounting and positioning device it is characterised in that:It includes bracing frame and clamping block, and clamping block is solid
It is scheduled on the target location of guide rail bracket, described bracing frame is detachably connected with clamping block.
2. building hoist ladder cage mounting and positioning device according to claim 1 it is characterised in that:Described bracing frame bag
Include support beam, lower support block and bracing piece therebetween;Between described upper support beam and bracing piece, bracing piece with
Between lower support block, it is and is fixedly connected;
Described clamping block includes clamping block and lower clamping block, and upper clamping block is connected with described upper support beam, lower locking
Block is connected with described lower support block.
3. building hoist ladder cage mounting and positioning device according to claim 2 it is characterised in that:Described bracing piece is
At least 2 bracing diagonals.
4. building hoist ladder cage mounting and positioning device according to claim 3 it is characterised in that:Described bracing diagonal
Incline direction be from top to bottom from laterally toward intermediate, inclined.
5. building hoist ladder cage mounting and positioning device as claimed in any of claims 1 to 4 it is characterised in that:
Described bracing frame is connected with clamping block by screw.
6. building hoist ladder cage mounting and positioning device as claimed in any of claims 1 to 4 it is characterised in that:
Described clamping block includes 2 pieces of fixture blocks for clamp rail frame, and 2 fixture blocks are connected by connector.
7. the building hoist ladder cage peace that the building hoist ladder cage mounting and positioning device described in a kind of utilization claim 1 is realized
Dress implementation it is characterised in that:It comprises the following steps:
S1, by clamping block initial alignment in the target location of guide rail bracket;
S2, sling by loop wheel machine or electric block or manually lift bracing frame;
S3, bracing frame is with the locking block alignment having good positioning and fixing;
S4, installation ladder cage, ladder cage is rest directly upon on bracing frame;
S5, installation lift drive system and electrical system, and carry out electric adjustment.
8. building hoist ladder cage according to claim 7 implementation is installed it is characterised in that:Described bracing frame bag
Include support beam, lower support block and bracing piece therebetween;Between described upper support beam and bracing piece, bracing piece with
Between lower support block, it is and is fixedly connected;Described clamping block includes clamping block and lower clamping block;
Upper support beam first by upper support beam and upper locking block alignment, is fixed on upper clamping block by screw by described S3
On;Again by lower support block and lower locking block alignment, by screw, lower support block is fixed on lower clamping block.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610966792.7A CN106429742B (en) | 2016-10-28 | 2016-10-28 | Building hoist ladder cage mounting and positioning device and implementation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610966792.7A CN106429742B (en) | 2016-10-28 | 2016-10-28 | Building hoist ladder cage mounting and positioning device and implementation method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106429742A true CN106429742A (en) | 2017-02-22 |
CN106429742B CN106429742B (en) | 2019-04-16 |
Family
ID=58179426
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610966792.7A Active CN106429742B (en) | 2016-10-28 | 2016-10-28 | Building hoist ladder cage mounting and positioning device and implementation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106429742B (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000086113A (en) * | 1998-09-10 | 2000-03-28 | Toshiba Elevator Co Ltd | Elevator, and installation method thereof |
CN2467492Y (en) * | 2001-02-27 | 2001-12-26 | 中国菱电股份有限公司 | Construction platform for elevator mounting machine |
CN201923740U (en) * | 2011-01-25 | 2011-08-10 | 李贤明 | Construction operation hanging basket for installing elevators |
CN203795819U (en) * | 2014-01-23 | 2014-08-27 | 唐继忠 | Attached type lifting scaffold anti-inclination locking device |
CN104163391A (en) * | 2014-08-08 | 2014-11-26 | 三峡大学 | Safe locking method and safe locking device for heavy-load construction of special construction lifting platform |
CN204310644U (en) * | 2014-12-11 | 2015-05-06 | 无锡市小天鹅建筑机械有限公司 | A kind of single suspension centre cage guide installation and maintenance hanging basket |
CN105986663A (en) * | 2015-02-04 | 2016-10-05 | 雄宇集团无锡电梯安装技术有限公司 | Elevator tooling lifting platform |
-
2016
- 2016-10-28 CN CN201610966792.7A patent/CN106429742B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000086113A (en) * | 1998-09-10 | 2000-03-28 | Toshiba Elevator Co Ltd | Elevator, and installation method thereof |
CN2467492Y (en) * | 2001-02-27 | 2001-12-26 | 中国菱电股份有限公司 | Construction platform for elevator mounting machine |
CN201923740U (en) * | 2011-01-25 | 2011-08-10 | 李贤明 | Construction operation hanging basket for installing elevators |
CN203795819U (en) * | 2014-01-23 | 2014-08-27 | 唐继忠 | Attached type lifting scaffold anti-inclination locking device |
CN104163391A (en) * | 2014-08-08 | 2014-11-26 | 三峡大学 | Safe locking method and safe locking device for heavy-load construction of special construction lifting platform |
CN204310644U (en) * | 2014-12-11 | 2015-05-06 | 无锡市小天鹅建筑机械有限公司 | A kind of single suspension centre cage guide installation and maintenance hanging basket |
CN105986663A (en) * | 2015-02-04 | 2016-10-05 | 雄宇集团无锡电梯安装技术有限公司 | Elevator tooling lifting platform |
Also Published As
Publication number | Publication date |
---|---|
CN106429742B (en) | 2019-04-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201821226U (en) | Lifting device of large synchronous motor | |
CN108915272A (en) | A kind of inclined-plane cell cube hanging method | |
CN102659043B (en) | Improved dismounting device for buttress rod of tower crane | |
US11279593B2 (en) | Compensation line storing apparatus, jump lift and the usage method thereof | |
CN103420281B (en) | The attaching/detaching apparatus of hoisting crane and accessory structure thereof, method for dismounting and installation method | |
CN104153586A (en) | Construction method for installing purline through suspension cable cranes | |
AU2219901A (en) | Method for installing elevators | |
JP2011132012A (en) | Method of installing hoisting machine of elevator | |
CN106429742A (en) | Locating device and implementing method for mounting elevator cage of construction elevator | |
CN106121259A (en) | The hanging apparatus of embedded integrated outer wall plate and hanging method thereof | |
CN103979442B (en) | The method of 6400 tons of Hydraulic double-type crane lifting cost tropsch reactors | |
CN107458965B (en) | A kind of large scale equipment hanging method | |
CN203959697U (en) | The equalizing bar of hoisting platform truss | |
CN104030176B (en) | The equalizer bar of hoisting platform truss and hanging method thereof | |
CN105253793B (en) | Construction method for traction transporting and hoisting of zinc pot in zinc plating workshop | |
CN210485177U (en) | Water pipe and bridge shared anti-seismic support | |
AU2016300492A1 (en) | Assembly method for DC converter valve | |
CN203715136U (en) | Tool for hoisting lifting hole cover plate in nuclear power plant | |
CN106365049B (en) | Swing arm tower crane attachment support steel beam transporting device | |
CN201972391U (en) | Self-stabilizing operation platform of elevator shaft | |
CN102121307B (en) | Self-stabilizing operating platform for elevator shaft | |
CN105442828B (en) | One kind is conveniently detached security protection screen | |
CN203834907U (en) | Installation rack for non-scaffold elevator installation | |
CN217128915U (en) | Hanging flower basket equipment rack | |
CN103225390A (en) | Hollow facade pulley guide attached-type lifting scaffold |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |