CN106405628A - Earth crust shock collection system - Google Patents

Earth crust shock collection system Download PDF

Info

Publication number
CN106405628A
CN106405628A CN201610395064.5A CN201610395064A CN106405628A CN 106405628 A CN106405628 A CN 106405628A CN 201610395064 A CN201610395064 A CN 201610395064A CN 106405628 A CN106405628 A CN 106405628A
Authority
CN
China
Prior art keywords
data
station
collection station
data collection
router
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610395064.5A
Other languages
Chinese (zh)
Inventor
沙克伦
沙鲲鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baoding Full Petroleum Geophysical Prospecting Equipment Manufacturing Co Ltd
Original Assignee
Baoding Full Petroleum Geophysical Prospecting Equipment Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baoding Full Petroleum Geophysical Prospecting Equipment Manufacturing Co Ltd filed Critical Baoding Full Petroleum Geophysical Prospecting Equipment Manufacturing Co Ltd
Priority to CN201610395064.5A priority Critical patent/CN106405628A/en
Publication of CN106405628A publication Critical patent/CN106405628A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V1/00Seismology; Seismic or acoustic prospecting or detecting
    • G01V1/003Seismic data acquisition in general, e.g. survey design
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V1/00Seismology; Seismic or acoustic prospecting or detecting
    • G01V1/22Transmitting seismic signals to recording or processing apparatus

Landscapes

  • Engineering & Computer Science (AREA)
  • Remote Sensing (AREA)
  • Physics & Mathematics (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Acoustics & Sound (AREA)
  • Environmental & Geological Engineering (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Geophysics (AREA)
  • Geophysics And Detection Of Objects (AREA)

Abstract

The present invention discloses an earth crust shock collection system. The system comprises: at least one data collection station (FDU is called a data collection station for short), wherein the data collection station performs single-point and single-channel receiving, each point can output earth crust shock information in a digitization mode; a router which enter an intelligent router through passing through a 485 bus and then an Ethernet bus and connects with at least one data collection station to transmit the data collected by at least one data collection station; and an auxiliary data center connected to the intelligent router (a router for short) to receive the information outputted by the at least one data collection station through the router. The auxiliary data center also includes a power module configured to supply power to the at least one data collection station. The problem is solved that the quantity of work is large caused by the data in the wired transmission seismograph in the prior art, and the earth crust shock collection system is convenient for data transmission.

Description

Crustal shock acquisition system
Technical field
The present invention relates to communication field, in particular to crustal shock acquisition system.
Background technology
There are nearly 1,000 geophysical exploration teams in China, is engaged in physics geology investigation and prospecting all over the world.Equipment is modern Change can reduce seismic crew number and number of vehicles, reduces exploration cost, preferably protects local environment.
Cable in wired data transfer seismic instrument is up to as many as 250km in the construction in 5000 roads, and quality is more than 30t Even 50t, the copper cash connecting fault in thousands of cable connector also greatly have impact on the smooth process setting up arrangement, often Its folding and unfolding cable, needs more than 2000 to describe Chinese able-bodied labour, hundreds of almost car is carried, close-packed array.
The wired acquisition instrument of geophysical prospecting for oil and crustal shock acquisition system Construction traffic and personnel's contrast table
Content of the invention
The invention provides crustal shock acquisition system, to solve the data institute in wire transmission seismic detector in correlation technique The amount of labour leading to is than larger problem.
According to an aspect of the invention, it is provided a kind of crustal shock acquisition system, including:At least one data acquisition Stand, described data collection station receives for single-point single track, each point is all with the information of Digital output crustal shock;Router, even Connect at least one data collection station described, for transmitting described the collected data of at least one data collection station;Assistance data Center, connects to described router, for receiving, by described router, the letter that at least one data collection station described is exported Breath;Described assistance data center also includes power module, for being powered and/or institute at least one data collection station described State router to power.
Further, described power module includes:Solar power plant, for being generated electricity by solar energy;Electromotor, For being generated electricity by fuel;Least one set battery group, for storing described solar power plant and/or described electromotor The electric energy sending.Wherein, described solar power plant and described electromotor generate electricity simultaneously, or, described solar power plant and Described electromotor is mutually redundant.
Further, described assistance data center also includes:Server, for carrying out to the parameter at described gathered data station Configuration, and/or the parameter of described router is configured;Described server, be additionally operable to receive from described at least The information of one data collection station is analyzed.
Further, described system also includes:Remote data processing center, for at least one assistance data center even Connect, by the Internet high in the clouds store by the data at assistance data center, and/or, this assistance data center connect at least one The information of the collection of data collection station is stored;Described remote data processing center, is additionally operable to the data of storage is carried out point Analysis, and adopted according at least one data that analysis result connects to described assistance data center and/or described assistance data center Collection station is controlled.
Further, described assistance data center also includes:The module being communicated with base station, for by base station and institute State remote data processing center to carry out data transmission;Satellite communication module, for by satellite and described Remote data processing The heart carries out data transmission;Control module, for controlling using the described module being communicated with base station and described satellite communication mould At least one of block is carried out data transmission with described remote data processing center.
Further, described acquisition station adopts at least one of cymoscope:Analog detector, micro-electro-mechanical sensors, power Balanced type wideband shakes cymoscope.
Further, described force balance type wideband vibrations acceleration geophone parameter includes at least one of:Working band: 0.02-400Hz;Total harmonic distortion:<0.001% (<-100dB);Dynamic range:118dB;Full scale:0.5g;Noise:2uV (or≤100dB);Power consumption:20mW;Operating temperature:–40℃—+70℃.
Further, in described data collection station, A/D adopts integrated form low-noise programmable gain amplifier PGA) and double The A/D of passage input multiplexer.
Further, described router is additionally operable to provide to gps clock frequency multiplication at least one data collection station described, with Enter row clock synchronous.
By the present invention, using at least one data collection station, described data collection station receives for single-point single track, each point All with the information of Digital output crustal shock;Router, connects at least one data collection station described, for described in transmitting extremely The collected data of a few data collection station;Assistance data center, connects to described router, for by described router Receive the information that at least one data collection station described is exported;Described assistance data center also includes power module, for At least one data collection station described is powered and/or described router is powered.Have by present invention solution correlation technique The amount of labour that data in line transmission seismic detector is led to, than larger problem, is easy to the transmission of geological data.
Brief description
Accompanying drawing described herein is used for providing a further understanding of the present invention, constitutes the part of the application, this Bright schematic description and description is used for explaining the present invention, does not constitute inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is the schematic diagram that earth's crust microseism data according to embodiments of the present invention gathers base unit (3-12 road is optional);
Fig. 2 is single Zhi Dandao acquisition station car intelligent router draw bail block diagram according to embodiments of the present invention;
Fig. 3 is FDU-485/ Ethernet-intelligent router connection figure according to embodiments of the present invention;
Fig. 4 is the structural representation of GPS ADSL MODEM (base station) according to embodiments of the present invention;
Fig. 5 is the schematic diagram of field construction flow process according to embodiments of the present invention.
Specific embodiment
It should be noted that in the case of not conflicting, the embodiment in the application and the feature in embodiment can phases Mutually combine.To describe the present invention below with reference to the accompanying drawings and in conjunction with the embodiments in detail.
Present embodiments provide a kind of crustal shock acquisition system, including:At least one data collection station (FDU abbreviation number According to acquisition station), this data collection station receives for single-point single track, and each point is all with the information of Digital output crustal shock;Route Device, connects this at least one data collection station, for transmitting this collected data of at least one data collection station;Assistance data Center, connects to this router, for receiving, by this router, the information that this at least one data collection station is exported;This is auxiliary Data center is helped also to include power module, for being powered to this at least one data collection station and/or this router is powered.
As an optional embodiment, this power module includes:Solar power plant, for being carried out by solar energy Generate electricity;Electromotor, for being generated electricity by fuel;Least one set battery group, for store this solar power plant and/ Or the electric energy that this electromotor sends.Wherein, this solar power plant and this electromotor generate electricity simultaneously, or, this solar electrical energy generation Stand and this electromotor is mutually redundant.
As an optional embodiment, this assistance data center also includes:Server, for this gathered data station Parameter configured, and/or the parameter of this router is configured;This server, is additionally operable to receiving from this The information of at least one data collection station is analyzed.
As an optional embodiment, this system also includes:Remote data processing center, for auxiliary with least one Help data center to connect, stored the data at assistance data center by the Internet high in the clouds, and/or, this assistance data center is even The information of the collection of at least one data collection station connecing is stored;This remote data processing center, is additionally operable to storage Data is analyzed, and at least one this assistance data center and/or this assistance data center being connected according to analysis result Data collection station is controlled.
As an optional embodiment, this assistance data center also includes:The module being communicated with base station, is used for Carried out data transmission with this remote data processing center by base station;Satellite communication module, for by satellite and this long-range number Carry out data transmission according to processing center;Control module, for controlling the module being communicated with base station using this and this satellite to lead to At least one of letter module is carried out data transmission with this remote data processing center.
As an optional embodiment, this acquisition station adopts at least one of cymoscope:Analog detector, microcomputer Electric transducer, force balance type wideband vibrations cymoscope.
As an optional embodiment, this force balance type wideband vibrations acceleration geophone parameter includes at least one of: Working band:0.02-400Hz;Total harmonic distortion:<0.001% (<-100dB);Dynamic range:118dB;Full scale:0.5g; Noise:2uV (or≤100dB);Power consumption:20mW;Operating temperature:–40℃—+70℃.
As an optional embodiment, in this data collection station, A/D is put using integrated form low-noise programmable gain Big device PGA) and dual pathways input multiplexer A/D.
As an optional embodiment, this router is additionally operable to provide to GPS for this at least one data collection station Clock multiplier, synchronous to enter row clock.
Illustrate with reference to a preferred embodiment.
In the preferred embodiment, in field being explored in real time, locally stored and big data is realized in the collection of earth's crust microseism data Cloud storage.Locally stored for protect data safety, do not lose.Long-distance cloud is stored as making that data processing base is real-time to field to explore Journey is monitored.
In the present embodiment, by original 12 strings 2, simultaneously string is changed to single Zhi Dandao+AD+ control circuit+adM485 for list Stand single track, weight is the 1/50 of former string.Fully intermeshing data 485 transmission switchs to Ethernet transmission, is made up of independent intelligent router Ground observation acquisition system, gathered data is locally stored or carries out cloud storage.Multi-functional arrangement van, roof is equipped with 2KW Folding solar plate, in-car has 2.2KW electromotor, is powered to device within the domain with netting twine, and four gauzes are that number passes candied fruit, are also electricity Source line.In-car, equipped with server, processs and displays to gathered data, monitors construction quality, also can upload gathered data, Come to job site monitoring and managed by data processing base authoritative expert.
It is explained below.
Earth's crust microseism data acquisition system:By data collection station, turn Ethernet service station by duplexing 485 serial ports, communicate base Stand, solar-electricity source station, ancillary data management center forms.
Fig. 1 is the schematic diagram that earth's crust microseism data according to embodiments of the present invention gathers base unit (3-12 road is optional), Fig. 2 is single Zhi Dandao acquisition station car intelligent router draw bail block diagram according to embodiments of the present invention, such as Fig. 1, shown in 2, number Receive for Q-Land single-point single track according to acquisition station, every is all exported with digital quantity earthquake information, is propped up by 3-12 and forms earthquake-capturing Base unit, forms autonomous system with intelligent router, and it is locally stored to carry out data, or uploads.
Fig. 3 is FDU-485/ Ethernet-intelligent router connection figure according to embodiments of the present invention, by Ethernet cascade Networked, form thousand roads, ten thousand roads, 100,000 roads, Bai Wandao, data collecting system, then carried out by ancillary data management center existing Field management.
Fig. 4 is the structural representation of GPS ADSL MODEM (base station) according to embodiments of the present invention, as shown in figure 4, auxiliary Help control data corporation can using have cross-country function van be Construction traffic, roof equipped with 2kw solar power plant, It is equipped with 2.2kw gasoline engine electromotor, two groups of 48v battery groups, small communication base station.Work car built with small server, and Relevant device, has high accuracy gps interface, adsl interface, four line Ethernet interfaces.
When implementing, nearby can there is communication base station, Fig. 4 is GPS ADSL MODEM (base according to embodiments of the present invention Stand) structural representation.
Gathered data in this domain is sent to by remote data processing center by the Internet high in the clouds memory technology, by data Sampled result is carried out ground in remote data processing center by the reason center sampling of data inspection to this domain construction period in real time in real time Matter structure makees brief analysis, remotely commands site operation in real time, effectively carries out quality control, reach more preferable geological effect.
If there is no communication base station in surrounding 10KM.Just high in the clouds storage is carried out to big data by satellite communication.At data Reason base is passed through high in the clouds and job site data is extracted, and analysis result is noticed scene by analysis.
In the present embodiment, mobile solar power system is used field geology exploration industry, solve long-term dependence stupid Weight battery is brought up to and is moved down difficulty, and in traditional extensive geophysical exploration data collecting system, each set of cells is non- Often heavy, almost move back to guard station everyday and be charged, exhaust the people and drain the treasury very much.The present embodiment is by grid line, to data on the scene Collecting device and communication apparatus are powered, and grid line is data line, are also supply lines.Power supply storage battery is seated in van Interior, charged by solaode (or electromotor) in the wild.Can be by commercial power charged in guard station.
485 turns of ether interfaces of full duplex, acquisition station, grid line regular situation Xia Yi 12 road is one group, is inserted by 4 core netting twines Head connection, although single Zhi Dandao can establish one's own system, completes data storage and upload, occupies space in the wild too little, easily Lose, be unfavorable for reusing, so propping up data collection station composition field separate unit with 6-12, by 485 buses by this list In unit, each station couples together, then turns Ethernet interface by 485 buses and upload to intelligent router and carry out this domain storage or remotely Cloud storage.
Acquisition station is the minimum unit of system, but because acquisition station adopts ultralow Consumption, function incomplete it is impossible to de- From higher level station body running, in extendible extensive geophysical exploration data collecting system, acquisition station is propped up using single track list Cymoscope is encapsulated in together, becomes the minimum unit of new system.In this minimum unit, ethernet line is acquisition station, intelligence The necessary condition of data acquisition command and power supply institute can be provided by router, collection makes unit have good independence.Change and pass The string of system concept, weight reduces to the big line weight 1/40 of former combination, puts arrangement more freely.
Acquisition station (FDU) includes:Analog sensor, AD, FPGA, DC/DC, RS485, a housing is encapsulated as by concentration Interior, become single station single track data collection station, this technology shortens mimic transmission line, shields electromagnetic interference, effectively improve earthquake The resolution of data and signal to noise ratio, in exploration and development, are extremely advantageous to deep reservoir prediction and reservoir description.
This technology has two distinguishing features, and one is the square bin of little yardstick, and two is that reception channel number is many.When single track list props up reception Minimum track pitch can reach 5m, improves space sampling frequency, effectively eliminates collection footprint phenomenon.Receiving data is in data processing Base by Data Processor by analysis, determines different combining forms according to the noise developmental state of difference, or combination or Do not combine or little combination or big combination, to suppress the noise of this physical points, this compound mode is referred to as digital combination side Formula.
Analog detector can be adopted in acquisition station, MEMES micro-electro-mechanical sensors may also be employed.
The present embodiment uses force balance type wideband to shake cymoscope, and this cymoscope has bandwidth, and sensitivity is high, dynamic model The advantages of enclose big, suitable crustal bathyderm data acquisition.
Force balance type wideband shakes cymoscope technical specification:
Working band:0.02-400Hz;
Total harmonic distortion:<0.001% (<-100dB);
Dynamic range:118dB;
Full scale:0.5g;
Noise:2uV (or≤100dB);
Power consumption:20mW;
Operating temperature:–40℃—+70℃;
Movement size:(25.4x34mm diameter x is high).
Compared with conventional moving-coil type cymoscope, force balance type wideband cymoscope has lower harmonic distortion and lower system Cause this.
In data collection station, A/D adopts ADS1282-HT device, and ADS1282-HT device is the single of a very-high performance Piece analog-digital converter (ADC), has integrated form low-noise programmable gain amplifier (PGA) and dual pathways input multiplexing Device (MUX).ADS1282-HT device is applied to the severe rugged environment of the applications such as energy exploration and seismic monitoring.With existing acquisition station phase The method design has the advantages such as low noise, Larger Dynamic scope, low-power consumption and multichannel to ratio.Through laboratory and field test, it is System working stability, the quality of data collecting is high, and solves the deficiency of existing equipment continuous data collection.
In data collection station, A/D adopts ADS1282-HT device, and ADS1282-HT device is the single of a very-high performance Piece analog-digital converter (ADC), has integrated form low-noise programmable gain amplifier (PGA) and dual pathways input multiplexer (MUX).ADS1282-HT device is applied to the severe rugged environment of the applications such as energy exploration and seismic monitoring.With existing acquisition station phase The method design has the advantages such as low noise, Larger Dynamic scope, low-power consumption and multichannel to ratio.Through laboratory and field test, it is System working stability, the quality of data collecting is high, and solves the deficiency of existing equipment continuous data collection.By spi mouth with join Set iCEblink40-LP1K, connects.
ADS1282-HT
High-resolution:124dB signal to noise ratio (SNR) (1000SPS);
In high precision:Total harmonic distortion (THD):–102dB;Integral nonlinearity (INL):0.5ppm
Low-noise programmable gain amplifier (PGA);
Dual pathways input multiplexer (MUX);
The iCE40LP1K FPGA Programmable Logic Controller of super low-power consumption carries out W/ by SPI mouth to ADS1282-HT transducer R Synchronization Control, the ram host computer that data flow is passed through in iCE40LP1K passes through a class in full duplex 485 interface) interface is to ultralow The iCE40LP1K FPGA global function data transfer of power consumption.Full duplex 485 4 line is data line, is also router to number According to acquisition station (FDU) supply lines.
Acquisition station power supply is powered, and T+ therein and T- is that the local data of transmission cable slow channels sends differential signal Line, R+ and R- is that the local data of transmission cable low speed data channel receives differential signal line.Ethernet passes through transmission cable Low speed data transmission interface is powered to the acquisition station in domain, and supply voltage is 48V, i.e. the common-mode voltage of T+ and T mono- differential signal For+24V, and the common-mode voltage of data receiver interface R+ and R- is -24v.Using the centre cap of transformator, acquisition station can obtain Obtain the power supply that supply voltage is 48V.Specific way is, using the centre cap of transformator, changes transmission cable low speed data The common-mode voltage of the data transmit-receive differential signal of passage, make supply current simultaneously by two holding wires of differential pair station body it Between dealing.Transformator center by the transformer center tap of acquisition station upstream data receiving interface and downstream data transmission interface Tap is connected, the transformer center tap phase of the transformer center tap of upstream data transmission interface and downstream data receiving interface Even, the transmission to next stage for the acquisition station interior power can just be completed.
Because acquisition station is laid in the wild, affected by electrostatic and thunder and lightning, in order to protect the circuit safety of acquisition station, adopted When collection stands in using the power supply providing on network cable, firstly, it is necessary to take protection against excessive pressure it is ensured that the voltage of power supply In tolerance interval.Two transmission cable interfaces in view of acquisition station do not make differentiation on hardware, and power supply may It is to be provided it is also possible to be provided by the interface on the right by the interface on the left side, therefore, power supply "+" electricity between level and " one " pole Pressure reduction possibly+48V, it is also possible to a 48V, needs through bridge circuit, makes to be input to rear end rectification and voltage conversion circuit Power vd D be determine positive polarity.Rectification and the function of voltage conversion circuit, on the one hand, be will to provide on transmission cable Voltage required for local circuit work for the DC high voltage Power convert, on the other hand, on local circuit with transmission cable Carried out isolated from power between other acquisition stations.
It is transferred to the differential signal of acquisition station from Upstream Interface, after transformator, single-ended letter is transformed to by drive circuit Number, in the iCE40LP1K FPGA of input acquisition station and data clock recovery circuit, data clock recovery circuit is from data Receive clock signal at recovery, and be input in FPGA.When the receiver module of iCE40LP1K FPGA utilizes synchrodata to receive Clock, receiving data, it is decoded first and serioparallel exchange, the data conversion receiving is become the data flow in units of byte. Afterwards, receiver module according to data frame structure, will obtain the destination address of this Frame, and judge whether destination address is originally to adopt Collection station address, if be broadcast address, or other addresses.If destination address is this station address, iCE40LP1K FPGA will Can write the data in MCU_RD_FIFO, and produce " receiving data " this interruption, wait MCU to read this Frame;If Destination address is other station addresses, and FPGA will write the data in data forwarding FIFO, waits downstream transmission cable interface Forward;If destination address is broadcast address, iCE40LP1K FPGA will be simultaneously written forwarding FIFO and MCU RD data In FIFO, and produce " receiving data " this interruption, the Frame in the reading FIFO of MCU can wait MCU to read, and is turning Send out the forwarding that the Frame in FIFO then can wait downstream transmission cable interface.When MCU needs to send data, MCU first will Frame writes in the MCU WR_FIFO of FPGA, after the completion of Frame write, controls and post in MCU modification iCE40LP1K FPGA The value of storage, notifies the write of FPGA data frame to complete, waits to be sent.Because acquisition station downstream stations body is farther apart from supply station, by Downstream stations body is sent to this acquisition station needs the Frame being forwarded may pass through the forwarding of multistage acquisition station,
Intelligent router
Support qos feature:QoS supports that the bandwidth based on IP and COS limits, can according to need according to specified IP or The upload download bandwidth of port is managed to carry out a key closing minimum bandwidth guarantee work(for online data scanning software etc. Can, network usage, does not block and does not go offline;
Wireless signal is made to expand former IEEE802 to using MIMO technology.More than 3 times of 11g standard;Support PPPOE, dynamic The broadband access methods such as IP, static IP;Support the agreement such as TCP/IP, PPPOE, DHCP, ICMP, NAT;Support radio roaming (roaming) function;Built-in Dynamic Host Configuration Protocol server, carries out static address distribution simultaneously;Support virtual server, DMZ main frame;Built-in Fire wall, supports that IP address, MAC Address, domain name addresses filter, can flexibly control access authority and time;Support Upnp, static state Route;64/128 WEP encryption is provided, support WPA, 802.The superencipherments such as 1X and security mechanism support long-range web administration, entirely Chinese configuration interface;Support software upgrading;Support MAC Address modification and clone;Simple configuration and monitoring programme are provided.
Intelligent router provides complete working condition for acquisition channel in domain.While battery is managed, it is domain Interior each acquisition station body provides power supply;By to gps clock frequency multiplication it is achieved that the synchronous clock of full survey area, be synchronized sampling Guarantee.
Intelligent router realizes the encapsulation of order implementation procedure.The acquisition station configuration in this domain, management, the order such as control, net Network conversion server parses after receiving order, and is responsible for reliably being sent in one or more domains order by 485 buses Acquisition station body, and command response situation is counted, superior station body is reported by Ethernet
Ancillary data management center
Ancillary data management center by server, 2000W solar power plant, standby small-sized 2.2KW gasoline engine electromotor, Power conversion block, industry ethernet, GPS, big data storage device (or usb disk), 20 cun of display, high-power transceiver, group Become.
Its major function is as follows:
1. ancillary data management center provides complete working condition for acquisition channel in domain.What battery was managed is same When, provide power supply for acquisition station body each in domain;There are two battery interfaces, when using solaode for system power supply, by In load capacity and the sunlight intensity of solaode, the factor such as temperature is related, and output voltage is unstable, accordingly, it would be desirable to too Sun can battery be managed.In two interfaces of power station, insertion solaode and reserve battery respectively.Work as solar-electricity When the output voltage in pond declines, power input is seamlessly switched to reserve battery by power station.The power supply output of battery accesses rear end Supply voltage change-over circuit, the supply voltage change-over circuit of rear end is divided into two parts, and battery is exported by a partial circuit 24V DC source be converted to 3.3V, 2.5V and 1.8V, for this router station each several part circuit use, another part circuit The 24V DC source that battery is exported forms 48V DC source, and supplies acquisition station use by vertical cable low speed data channel.
2. the encapsulation of order implementation procedure is realized at ancillary data management center.The acquisition station of network interface server domain is configured, Management, the order such as control, bus data administrative center parses after receiving order, and responsible that order is reliable by 485 buses It is sent to acquisition station body in one or more domains, and command response situation is counted, superior station body is entered by Ethernet Row is reported
3. the high speed data transfer passage of data transmission cable adopts 100 m ethernet, due to 100 m ethernet data transfer away from From limited, intelligent router is therefore needed to carry out the relaying of 100 m ethernet data transfer in data transmission cable, to extend number biography The data transmission distance of cable high speed data transfer passage.
4. ancillary data management center is that in whole intelligent router management domain, the data between station body and higher level station body is led to Letter is imported and exported, and responsible transfer commutes the communication data in this intelligent router management domain between acquisition station and higher level station body.
5. ancillary data management center can be sent to data processing base using high altitude satellite to data in domain it is also possible to lead to Cross communication base station data in domain is uploaded.Receive the pulse per second (PPS) of GPS module output, or the pulse per second (PPS) obtaining from communication network is led to Cross frequency multiplication, provide system synchronization sampling clock for all stations body in intelligent router management domain.
6.Ancillary data management center can store 48 road acquisition station continuous acquisition in intelligent router management domain and be produced Sampled data.
When port number increases, the performance requirement raising for higher level station body is inconspicuous, on the other hand, makes ancillary data management Acquisition station in central station and notebook data administrative center station domain is departing from the feelings that higher level station body controls or higher level station body breaks down Under condition, remain able to normal work, improve stability and the motility of system work.
Earth's crust microseism data acquisition system characteristic:
1:Bandwidth 1-400HZ
2:Earthquake magnitude scope:-4.0 to 2.5
3:System channel number:More than expansible 2000 roads
4 sample rates:10-4K
5:A/D changes digit:32
6:Anti- water depth:100 meters
7:Dynamic range:120DB@4KHZ
150DB@10HZ
Fig. 5 is the schematic diagram of field construction flow process according to embodiments of the present invention, as shown in figure 5, first to acquisition station Hardware and connection are checked, if inspection is problematic, needs to fix a breakdown, then re-start inspection.? In the case that hardware detection and the connection with acquisition station all have no problem, can according to actual measurement need first this is adopted Collect station or other system carries out the setting of systematic parameter, after system parameter setting success, proceed by monitoring, record number According to file, after carrying out Data Management Analysis, it is aggregated into assistance data center, assistance data center can be according to the data obtaining Parameter setting is re-started to acquisition station or other system equipment, is then monitored again.Assistance data center can be by Data is activation is also sent to cloud storage to cloud storage, or after the direct collection of acquisition station.Data base can be to collection The data come carries out detailed big data analysis.Above-mentioned Data Management Analysis, can including but not limited to calculate the triggered time, Calculate dimensional orientation, carry out digital filtering, then carry out waveform analyses.Waveform analyses can by manually to complete it is also possible to by Machine to be completed using certain learning algorithm oneself.
In geophysical exploration data collecting system, in this preferred embodiment, introduce the concept of data field, entirely adopted Collecting system, using single single track breast line domain of standing, breast line domain is segmented multiple 485 host-host protocols and Ethernet protocol network domains further. It is achieved that the distributed management in domain, distributed storage and distributed synchronized sampling clock time service in domain at all levels, Had a style of one's own in each domain, the data collection task reliably completing domain that can be independent, weight of equipment is traditional wire number According to the 1/30 of collection, save manpower, reduced equipment again, labourer is freed from heavy physical work.
Kind earth's crust microseism data acquisition scheme in this preferred embodiment, storage and remote monitoring scheme, can apply to Oil, geology, mineral products, engineering exploration, oilfield exploitation Fracturing Monitoring, reservoir, city heavy construction, the field such as environmental conservation, Split the road of field data collection cloud storage.
These are only the preferred embodiments of the present invention, be not limited to the present invention, for those skilled in the art For member, the present invention can have various modifications and variations.All any modifications within the spirit and principles in the present invention, made, Equivalent, improvement etc., should be included within the scope of the present invention.

Claims (9)

1. a kind of crustal shock acquisition system is it is characterised in that include:
At least one data collection station, described data collection station receives for single-point single track, and each point is all with the Digital output earth's crust The information of vibrations;
Router, turns industry ethernet by 485 buses and connects at least one data collection station described, for described in transmitting at least The collected data of one data collection station;
Assistance data center, connects to described router, for receiving at least one data acquisition described by described router Stand exported information;Described assistance data center also includes power module, for entering at least one data collection station described Row power supply and/or described router are powered.
2. system according to claim 1 is it is characterised in that described power module includes:
Solar power plant, for being generated electricity by solar energy;
Electromotor, for being generated electricity by fuel;
Least one set battery group, for the electric energy storing described solar power plant and/or described electromotor sends.
Wherein, described solar power plant and described electromotor generate electricity simultaneously, or, described solar power plant and described generating Machine is mutually redundant.
3. system according to claim 1 is it is characterised in that described assistance data center also includes:
Server, for configuring to the parameter at described gathered data station, and/or joins to the parameter of described router Put;
Described server, is additionally operable to the information receiving from least one data collection station described is analyzed.
4. system according to claim 1 is it is characterised in that described system also includes:
Remote data processing center, for being connected with least one assistance data center, will be assisted by the storage of the Internet high in the clouds The data of data center, and/or, the information of the collection of at least one data collection station that this assistance data center connects is deposited Storage;
Described remote data processing center, is additionally operable to the data of storage is analyzed, and according to analysis result to described auxiliary At least one data collection station of data center and/or the connection of described assistance data center is controlled.
5. system according to claim 4 is it is characterised in that described assistance data center also includes:
The module being communicated with base station, for being carried out data transmission with described remote data processing center by base station;
Satellite communication module, for being carried out data transmission with described remote data processing center by satellite;
Control module, for control using in the described module being communicated with base station and described satellite communication module at least it One is carried out data transmission with described remote data processing center.
6. system according to any one of claim 1 to 4 it is characterised in that described acquisition station adopt following at least it One cymoscope:
Analog detector, micro-electro-mechanical sensors, force balance type wideband vibrations cymoscope.
7. system according to claim 6 it is characterised in that described force balance type wideband vibrations acceleration geophone parameter include with At least one lower:
Working band:0.02-400Hz;
Total harmonic distortion:<0.001% (<-100dB);
Dynamic range:118dB;
Full scale:0.5g;
Noise:2uV (or≤100dB);
Power consumption:20mW;
Operating temperature:–40℃—+70℃.
8. system according to any one of claim 1 to 4 is it is characterised in that A/D is using collection in described data collection station Accepted way of doing sth low-noise programmable gain amplifier PGA) and dual pathways input multiplexer A/D.
9. system according to any one of claim 1 to 4 it is characterised in that described router be additionally operable to for described extremely A few data collection station provides to gps clock frequency multiplication, synchronous to enter row clock.
CN201610395064.5A 2016-06-06 2016-06-06 Earth crust shock collection system Pending CN106405628A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610395064.5A CN106405628A (en) 2016-06-06 2016-06-06 Earth crust shock collection system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610395064.5A CN106405628A (en) 2016-06-06 2016-06-06 Earth crust shock collection system

Publications (1)

Publication Number Publication Date
CN106405628A true CN106405628A (en) 2017-02-15

Family

ID=58005501

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610395064.5A Pending CN106405628A (en) 2016-06-06 2016-06-06 Earth crust shock collection system

Country Status (1)

Country Link
CN (1) CN106405628A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108169793A (en) * 2017-12-27 2018-06-15 国家***第海洋研究所 A kind of earthquake data acquisition multi-protocols real-time transmission system
CN113589360A (en) * 2021-07-27 2021-11-02 中国科学院地质与地球物理研究所 Router based on field broadband seismograph observation station and data transmission method
CN113589359A (en) * 2021-07-27 2021-11-02 中国科学院地质与地球物理研究所 Router based on field broadband seismograph observation station and seismograph control method

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1234121A (en) * 1996-10-23 1999-11-03 振动技术有限公司 Seismic acquisition system using wireless telemeter
CN1987523A (en) * 2005-12-21 2007-06-27 侯树麒 Single point single track high density earth quack exploration data collecting method
CN102073061A (en) * 2009-11-19 2011-05-25 沙克伦 Ground microphone information high-density recording system using digital ground microphone
CN102565850A (en) * 2012-01-01 2012-07-11 成都理工大学 Wireless telemetry seismic signal acquisition system
CN203941297U (en) * 2014-06-14 2014-11-12 中国地震局地壳应力研究所 A kind of earthquake wireless sensor network central node equipment
CN104301411A (en) * 2014-10-15 2015-01-21 西安风标电子科技有限公司 Wireless network real-time exploration data collecting system
CN104793240A (en) * 2014-12-31 2015-07-22 安徽万泰地球物理技术有限公司 Real-time micro seismic data acquisition system based on wireless network technology
CN105403912A (en) * 2014-08-25 2016-03-16 中国石油化工股份有限公司 Device and system for collecting seismic data
CN105425279A (en) * 2015-11-02 2016-03-23 合肥国为电子有限公司 Real-time wireless step-by-step uploading type seismograph acquisition system

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1234121A (en) * 1996-10-23 1999-11-03 振动技术有限公司 Seismic acquisition system using wireless telemeter
CN1987523A (en) * 2005-12-21 2007-06-27 侯树麒 Single point single track high density earth quack exploration data collecting method
CN102073061A (en) * 2009-11-19 2011-05-25 沙克伦 Ground microphone information high-density recording system using digital ground microphone
CN102565850A (en) * 2012-01-01 2012-07-11 成都理工大学 Wireless telemetry seismic signal acquisition system
CN203941297U (en) * 2014-06-14 2014-11-12 中国地震局地壳应力研究所 A kind of earthquake wireless sensor network central node equipment
CN105403912A (en) * 2014-08-25 2016-03-16 中国石油化工股份有限公司 Device and system for collecting seismic data
CN104301411A (en) * 2014-10-15 2015-01-21 西安风标电子科技有限公司 Wireless network real-time exploration data collecting system
CN104793240A (en) * 2014-12-31 2015-07-22 安徽万泰地球物理技术有限公司 Real-time micro seismic data acquisition system based on wireless network technology
CN105425279A (en) * 2015-11-02 2016-03-23 合肥国为电子有限公司 Real-time wireless step-by-step uploading type seismograph acquisition system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108169793A (en) * 2017-12-27 2018-06-15 国家***第海洋研究所 A kind of earthquake data acquisition multi-protocols real-time transmission system
CN113589360A (en) * 2021-07-27 2021-11-02 中国科学院地质与地球物理研究所 Router based on field broadband seismograph observation station and data transmission method
CN113589359A (en) * 2021-07-27 2021-11-02 中国科学院地质与地球物理研究所 Router based on field broadband seismograph observation station and seismograph control method

Similar Documents

Publication Publication Date Title
CN206893080U (en) It is a kind of based on the seismic signal acquiring system being wirelessly transferred
CN104181579A (en) Full-digital three-component VSP (vertical seismic profile) system and measuring method thereof
CN101639539B (en) Storage type earthquake signal continuous collecting system
CN101776767A (en) Wireless seismic detector system
CN102565850A (en) Wireless telemetry seismic signal acquisition system
CN108063799A (en) A kind of serial distributed simulation amount airborne data acquisition system
CN106405628A (en) Earth crust shock collection system
CN108828671A (en) High-precision degree passes formula seismic prospecting data collecting system
CN108614290A (en) A kind of wireless distributed three-component seismic data acquisition system based on LoRa technologies
CN205788714U (en) A kind of 32 triple channel synchronous data collection devices with wireless self-networking function
CN105137477A (en) Multifunctional wireless data transmission seismic wave exploration instrument
CN111123353A (en) Real-time seismic data acquisition device, system and method
CN107462921A (en) A kind of docking system and data extraction method based on combined type sea bottom earthquake-capturing node
WO2013056511A1 (en) Wired, wireless and cableless all_in_one digital seismometer
CN206042059U (en) No cable seismic detector remote monitering system based on wireless network
CN102628958B (en) Digital seismic instrument with integration of wired, wireless and cable-less modes into one
Gao et al. Design of distributed three component seismic data acquisition system based on LoRa wireless communication technology
CN109581066A (en) Alternative resistivity visualizer
CN109540194A (en) Suspension sensor fault diagnostic instrument
CN207352181U (en) Shallow seismic exploration system based on wireless data transmission
CN103759807B (en) A kind of airport noise monitoring device based on Internet of Things framework
CN103513275B (en) There is the seismic signal acquisition node of the adjustable and self-checking function of sample rate
CN105759306A (en) Shallow earthquake exploration device
CN102955176B (en) Distributed electric potential gradient parallel observation electrode
CN202645539U (en) Borehole clinometer without cable based on synchronous technology

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170215

RJ01 Rejection of invention patent application after publication