Content of the invention
Based on this, the invention reside in overcoming the defect of prior art, providing and a kind of setting for drawing water of drill-hole pumping test
Standby, disclosure satisfy that the drill-hole pumping test demand under the conditions of different buried depth.
A kind of pumping equipment for drill-hole pumping test, including suction pump, line pump, water storage device and outlet pipeline,
The input of described suction pump is used for extracting the water in boring, and the output end of described suction pump connected with water storage device, described in
Between the input of pump connect with water storage device, the output end of described line pump is connected with outlet pipeline.
The above-mentioned pumping equipment for drill-hole pumping test, extracts the water in boring using suction pump and is temporarily stored in water storage device
Interior, when in water storage device water reach line pump input when, water can be evacuated to outlet pipeline by line pump, thus reach by
Water in boring extracts the purpose outside boring out.This is used for the pumping equipment of drill-hole pumping test, even faces larger buried depth
When it is also possible to will boring in water extract out it is ensured that drill-hole pumping test can smoothly carry out.
Wherein in an embodiment, the described pumping equipment for drill-hole pumping test also includes the first connecting line,
The described entrance of the first connecting line is connected with the output end of suction pump, and the outlet of described first connecting line is with water storage device even
Logical, and the rational height of the outlet of described first connecting line is higher than the rational height of the input of described line pump, in order to avoid storage
Aqueous reflux pumpback water pump in water installations.
Wherein in an embodiment, described line pump is at least two, and described water storage device is at least two, described takes out
Water pump, at least two line pumps set gradually, and water storage device described in line pump described at least two and at least two corresponds,
The output end of described suction pump water storage device corresponding with the line pump positioned at foremost connect, two adjacent line pumps it
Between, the input positioned at line pump above is connected with corresponding water storage device, positioned at output end and the position of line pump above
Line pump corresponding water storage device connection later, the output end positioned at rearmost line pump is connected with outlet pipeline.Make
Used time can configure the number of line pump according to the flexible in size of buried depth, to realize higher lift, meets drill-hole pumping test
Demand.
Wherein in an embodiment, the described pumping equipment for drill-hole pumping test also includes at least two second even
Adapter road, line pump described in the second connecting line and at least two described at least two corresponds, in two adjacent centres
Between pump, the entrance of described second connecting line is connected with the output end of the line pump being located above, described second connecting line
Outlet connect with being located at the corresponding water storage device of line pump below, and the rational height of the outlet of described second connecting line
Higher than the rational height of the described input positioned at line pump below, in order to avoid the aqueous reflux in water storage device returns line pump.
Wherein in an embodiment, the described pumping equipment for drill-hole pumping test also includes fixed support and hangs
Rope, described fixed support, suction pump, water storage device are fixedly connected with lifting rope respectively.Suction pump, water storage device are fixed in advance and hang
On rope, before carrying out drill-hole pumping test, fixed support is fixed on the ground, then can be by suction pump and storage by lifting rope
Water installations are lifted in boring, and convenient test is carried out.
Wherein in an embodiment, the described pumping equipment for drill-hole pumping test also includes controller, described takes out
Water pump, line pump are electrically connected with controller respectively, to realize the working state control of suction pump and line pump.
Wherein in an embodiment, the described pumping equipment for drill-hole pumping test is also included in detection boring
Air pressure barometer, described suction pump, line pump be immersible pump, and described line pump is arranged in water storage device, described takes out
Water pump is provided with the first hydraulic gage above the input port of suction pump, and described line pump is provided with the input positioned at line pump
The second hydraulic gage above mouthful, described barometer, the first hydraulic gage, the second hydraulic gage are electrically connected with controller respectively, to connect
Receive hydraulic pressure value and air pressure Value Data.
Wherein in an embodiment, described first connecting line is provided with water flow switch, and described water storage device is provided with
Electric draining valve, described water flow switch, electric draining valve are electrically connected with controller respectively.In drill-hole pumping off-test
Afterwards, controller can indicate that water flow switch is opened with electric draining valve, reaches the purpose of draining.
The present invention also provides a kind of control method based on the above-mentioned pumping equipment for drill-hole pumping test, including following
Step:
First hydraulic gage detection hydraulic pressure value Pw1, barometer detection boring in atmospheric pressure value PA1;
Controller obtains hydraulic pressure value Pw1And atmospheric pressure value PA1, according to atmospheric pressure value PA1Given threshold K1, and by hydraulic pressure value Pw1With threshold
Value K1It is compared, if hydraulic pressure value Pw1More than threshold k1, then controller instruction draws water pump operation;
Second hydraulic gage detection hydraulic pressure value Pw2;
Controller obtains hydraulic pressure value Pw2And standard atmospheric pressure value Pa, according to standard atmospheric pressure value PaGiven threshold K2If, hydraulic pressure
Value Pw2More than threshold k2, then pump operation in the middle of controller instruction.
The above-mentioned control method based on the pumping equipment tested for drill-hole pumping, hydraulic pressure value Pw1More than threshold k1Hole
Interior water had not had the input of suction pump, and controller indicates the pump operation that draws water, hydraulic pressure value Pw2aMore than threshold k2aI.e. the first water storage
Water in device had not had the input of the first line pump, and controller indicates the first middle pump operation, hydraulic pressure value Pw2bMore than threshold value
K2bI.e. the water in the second water storage device had not had the input of the second line pump, and controller indicates the second middle pump operation, can
Ensure that the water in boring is smoothly extracted out.
Further, the described control method based on the pumping equipment tested for drill-hole pumping, further comprising the steps of:
If hydraulic pressure value Pw1Less than threshold k1, then controller instruction suction pump stopping, and indicate that water flow switch is closed;
If hydraulic pressure value Pw2Less than threshold k2, then controller instruction line pump stopping, and indicate electric draining closing gate.
The water that this step is directed in boring is exhausted dry situation.Hydraulic pressure value Pw1Less than threshold k1I.e. suction pump
Input cannot extract the water in boring, and controller instruction suction pump stops, and prevents suction pump from dallying.Hydraulic pressure value Pw2Less than threshold
Value K2I.e. the input of line pump cannot extract the water in water storage device, and controller instruction line pump stops, and prevents line pump
Idle running.
Specific embodiment
Below embodiments of the invention are described in detail:
As shown in figure 1, the pumping equipment for drill-hole pumping test described in the present embodiment, including in suction pump 1, first
Between pump 2, the second line pump 3, the first water storage device 4, the second water storage device 5 and outlet pipeline 6, the input of described suction pump 1
For extracting the water in boring, the output end of described suction pump 1 connected with the first water storage device 4, described first line pump 2 defeated
Enter end to connect with the first water storage device 4, the output end of described first line pump 2 is connected with the second water storage device 5, in described second
Between the input of pump 3 connect with the second water storage device 5, the output end of described second line pump 3 is connected with outlet pipeline 6.Need
Illustrate, the number of line pump during use, can also be configured according to the flexible in size of buried depth, with improve overall water lift height (
Claim total (pumping) head, the water lift height that is, multistage pumping equipment is constituted), meet the demand of drill-hole pumping test.
The above-mentioned pumping equipment for drill-hole pumping test, extracts the water in boring using suction pump 1 and is temporarily stored in the first storage
In water installations 4, when the water in the first water storage device 4 reaches the input of the first line pump 2, the first line pump 2 extracts first
Water in water storage device 4 is temporarily stored in the second water storage device 5, when the water in the second water storage device 5 reaches the defeated of the second line pump 3
When entering to hold, water can be evacuated to outlet pipeline 6 by the second line pump 3, thus reaching the purpose extracting the water in boring out outside boring.
This is used for the pumping equipment of drill-hole pumping test, even faces during larger buried depth it is also possible to extract the water in boring out, protects
Card drill-hole pumping test can smoothly be carried out.
Wherein, the described pumping equipment for drill-hole pumping test also includes the first connecting line 7, described first connecting tube
The entrance on road 7 is connected with the output end of suction pump 1, and the outlet of described first connecting line 7 is connected with the first water storage device 4, and
The rational height of the outlet of described first connecting line 7 is higher than the rational height of the input of described first line pump 2, reduces the
The possibility of the aqueous reflux pumpback water pump 1 in one water storage device 4.
The pumping equipment for drill-hole pumping test described in the present embodiment also includes the second connecting line a8, the second connection
Pipeline b9, described second connecting line a8 is corresponding with described first line pump 2, in described second connecting line b9 and described second
Between pump 3 corresponding, the entrance of described second connecting line a8 is connected with the output end of the first line pump 2, described second connecting line
The outlet of a8 is connected with the second water storage device 5, and the rational height of the outlet of described second connecting line a8 is higher than described second
The rational height of the input of line pump 3, reduces the possibility that the aqueous reflux in the second water storage device 5 returns the first line pump 2.
In the present embodiment, the described pumping equipment for drill-hole pumping test also includes fixed support 10 and lifting rope 11,
Described fixed support 10, suction pump 1, the first water storage device 4, the second water storage device 5 are fixedly connected with lifting rope 11 respectively.Suction pump
1st, the first water storage device 4, the second water storage device 5 are fixed on lifting rope 11 in advance, before carrying out drill-hole pumping test, by fixing
Frame 10 fixes on the ground, then can be lifted suction pump 1, the first water storage device 4 and the second water storage device 5 by lifting rope 11
In boring, convenient test is carried out.
The pumping equipment for drill-hole pumping test described in the present embodiment also includes controller 12, described suction pump 1, the
One line pump 2, the second line pump 3 are electrically connected with controller 12 respectively, to realize suction pump 1, in the first line pump 2 and second
Between pump 3 working state control.
In the present embodiment, the described pumping equipment for drill-hole pumping test is also included for the air pressure in detection boring
Barometer 13, described suction pump 1, the first line pump 2, the second line pump 3 be immersible pump, and described first line pump 2 is arranged
In the first water storage device 4, described second line pump 3 is arranged in the second water storage device 5, and described suction pump 1 is provided with and is located at
The first hydraulic gage 14 above the input port of suction pump 1, described first line pump 2 is provided with the input positioned at the first line pump 2
The second hydraulic gage a15 above mouthful, described second line pump 3 is provided with above the input port of the second line pump 3 second
Hydraulic gage b16, described barometer 13, the first hydraulic gage 14, the second hydraulic gage a15, the second hydraulic gage b16 respectively with controller 12
It is electrically connected with, to receive hydraulic pressure value and air pressure Value Data.
The first connecting line 7 described in the present embodiment is provided with water flow switch 17, and described first water storage device 4 is provided with electricity
Dynamic water discharging valve a18, described second water storage device 5 is provided with electric draining valve b19, described water flow switch 17, electric draining
Valve a18, electric draining valve b19 are electrically connected with controller 12 respectively.After drill-hole pumping off-test, controller 12 energy
Enough instruction water flow switch 17 and electric draining valve are opened, and reach the purpose of draining.
Described first water storage device 4 is provided with the first spout hole with atmosphere, and described second water storage device 5 is provided with
With the second spout hole of atmosphere, it is easy to the air in water storage device and water discharge.Described outlet pipeline 6 is provided with water meter,
Described water meter is electrically connected with controller 12, to receive rate of discharge data.
In the present embodiment, the described pumping equipment for drill-hole pumping test also includes the input dress for input data
Put and for showing the display device of result, described input unit, display device are electrically connected with controller 12 respectively.This enforcement
Using keyboard as described input unit, using display as described display device.
Controller 12 described in the present embodiment is computer, possesses the functions such as digital independent, computing and control.Certainly, institute
State controller 12 and can also be single-chip microcomputer, arm processor, embedded system etc., be not limited.
This controller 12 possesses with lower module, and the coupling between modules is low, can flexibly switch change:
1st, data obtaining module.This module is capable of determining based on tri- sets of global position systems of BDS, GPS and GLONASS
Position is it is also possible to networking or automatically obtaining the time by crystal oscillator clock.
2nd, data transmission module.This module has data transfer and warning function, internally passes through serial communication, externally passes through
Network communication, it includes RS232 and RS485 serial port module unit, RJ45 wire communication module unit, WIFI communication module list
Unit, can also configure mobile communication module unit (as GPRS, GSM, TDSCDMA or LTE etc.), BT Bluetooth communication mould as needed
Module unit, USB serial port module unit (as PC end USB or MICROUSB) etc..
3rd, data memory module.This module includes FLASH modular unit, EEPROM module unit, DDRAM module, also may be used
To configure MICROSD modular unit and TIF modular unit according to specific needs.
4th, parameter acquisition module.This module is used for obtaining rate of discharge value, the hydraulic pressure value of hydraulic gage offer of water meter offer
And the atmospheric pressure value of barometer 13 offer etc..
5th, result computing module.This module is used for being provided according to input unit, data obtaining module and parameter acquisition module
Data enter row operation, thus draw real-time traffic, real time water level, drawdown, infiltration coefficient, Seepage Prediction value etc. tie
Really.
The present embodiment also provides a kind of control method based on the above-mentioned pumping equipment for drill-hole pumping test, including with
Lower step:
First hydraulic gage 14 detects hydraulic pressure value Pw1, barometer 13 detection boring in atmospheric pressure value PA1;
Controller 12 obtains hydraulic pressure value Pw1And atmospheric pressure value PA1, according to atmospheric pressure value PA1Given threshold K1, and by hydraulic pressure value Pw1With
Threshold k1It is compared, if hydraulic pressure value Pw1More than threshold k1, then controller 12 instruction suction pump 1 run;
Second hydraulic gage a15 detection hydraulic pressure value Pw2a;
Controller 12 obtains hydraulic pressure value Pw2aAnd standard atmospheric pressure value Pa, according to standard atmospheric pressure value PaGiven threshold K2aIf,
Hydraulic pressure value Pw2aMore than threshold k2a, then controller 12 indicate the first line pump 2 run;
Second hydraulic gage b16 detection hydraulic pressure value Pw2b;
Controller 12 obtains hydraulic pressure value Pw2b, according to standard atmospheric pressure value PaGiven threshold K2bIf, hydraulic pressure value Pw2bMore than threshold
Value K2b, then controller 12 indicate the second line pump 3 run.
The above-mentioned control method based on the pumping equipment tested for drill-hole pumping, hydraulic pressure value Pw1More than threshold k1Hole
Interior water had not had the input of suction pump 1, and controller 12 instruction suction pump 1 runs, hydraulic pressure value Pw2aMore than threshold k2aI.e. first
Water in water storage device 4 had not had the input of the first line pump 2, and controller 12 indicates that the first line pump 2 runs, hydraulic pressure value
Pw2bMore than threshold k2bI.e. the water in the second water storage device 5 had not had the input of the second line pump 3, controller 12 instruction second
Line pump 3 runs, and ensure that the water in boring is smoothly extracted out.
In the present embodiment, threshold k1For atmospheric pressure value PA11.00-1.02 times, when water did not had the first hydraulic gage 14, take out
Water pump 1 runs at once, and sensitivity is high.Threshold k2aFor standard atmospheric pressure value Pa1.00-1.02 times, do not had the second hydraulic pressure in water
During meter a15, the first line pump 2 runs at once, and sensitivity is high.Threshold k2bFor standard atmospheric pressure value Pa1.00-1.02 times,
When water did not had the second hydraulic gage b16, the second line pump 3 runs at once, and sensitivity is high.
Further, the described control method based on the above-mentioned pumping equipment for drill-hole pumping test, also includes following
Step:
If hydraulic pressure value Pw1Less than threshold k1, then controller 12 instruction suction pump 1 stop, and indicate water flow switch 17 close;
If hydraulic pressure value Pw2aLess than threshold k2a, then controller 12 indicate the first line pump 2 stop, and indicate electric draining lock
Door a closes;
If hydraulic pressure value Pw2bLess than threshold k2b, then controller 12 indicate the second line pump 3 stop, and indicate electric draining lock
Door b closes.
The water that this step is directed in boring is exhausted dry situation.Hydraulic pressure value Pw1Less than threshold k1I.e. suction pump 1
Input cannot extract water in boring, controller 12 instruction suction pump 1 stops, and prevents suction pump 1 from dallying.Hydraulic pressure value
Pw2aLess than threshold k2aI.e. the input of the first line pump 2 cannot extract the water in the first water storage device 4, and controller 12 indicates
First line pump 2 stops, and prevents the first line pump 2 from dallying.Hydraulic pressure value Pw2bLess than threshold k2bThe i.e. input of the second line pump 3
The water in the second water storage device 5 cannot be extracted, controller 12 indicates that the second line pump 3 stops, having prevented the second line pump 3 empty
Turn.
Further, the described control method based on the above-mentioned pumping equipment for drill-hole pumping test, also includes following
Step:
If hydraulic pressure value Pw1More than threshold k1, and hydraulic pressure value Pw1With atmospheric pressure value PA1Difference in setting time T0Interior holding is not
Become, then controller 12 instruction suction pump 1 runs setting time T1After stop, and indicate water flow switch 17 close;
If hydraulic pressure value Pw2aLess than threshold k2a, then controller 12 indicate the first line pump 2 stop, and indicate electric draining lock
Door a closes;
If hydraulic pressure value Pw2bLess than threshold k2b, then controller 12 indicate the second line pump 3 stop, and indicate electric draining lock
Door b closes.
The water drawdown that this step is directed in boring is maintained at the situation of a certain height for a long time.Hydraulic pressure value Pw1With air pressure
Value PA1Difference can reflect that drawdown is constant, now controller 12 instruction suction pump 1 run setting time T1After stop,
Then the first line pump 2, the second line pump 3 stop in succession, terminate drill-hole pumping test.
Further, the described control method based on the above-mentioned pumping equipment for drill-hole pumping test, also includes following
Step:
If hydraulic pressure value Pw2aLess than threshold k2a, and hydraulic pressure value Pw2bMore than threshold k2b, then controller 12 instruction the second line pump
3 stop up to hydraulic pressure value Pw2aMore than threshold k2aAfterwards, run the second line pump 3 again.
This step is directed to and is more than draw water speed or second water storage of the first line pump 2 because of the speed of drawing water of the second line pump 3
The failure condition that the reasons such as device 5 leak produce.Hydraulic pressure value Pw2aLess than threshold k2a, and hydraulic pressure value Pw2bMore than threshold k2bCan
Reflect that the input of the second line pump 3 cannot extract the water in the second water storage device 5, and the input of the first line pump 2 is still
Water in extraction the first water storage device 4, now controller 12 instruction the second line pump 3 stops defeated up to the second line pump 3
Enter end and can extract the water in the second water storage device 5, it is to avoid the second line pump 3 dallies.
Further, the described control method based on the above-mentioned pumping equipment for drill-hole pumping test, also includes following
Step:
If hydraulic pressure value Pw2aMore than standard atmospheric pressure value Pa+ ρ gH, then the stopping of controller 12 instruction the first line pump 2 is up to water
Pressure value Pw2aLess than threshold k2aAfterwards, run the first line pump 2 again.
Wherein, ρ is the density of water, and g is acceleration of gravity, and H is the height of the second hydraulic gage a15 to first spout hole.
This step is directed to and is less than draw water speed or first water storage of the first line pump 2 because of the speed of drawing water of the second line pump 3
Device 4 leak or the first line pump 2 cannot the failure conditions that produce of the reason such as normal work.Hydraulic pressure value Pw2aMore than normal atmosphere
Pressure value Pa+ ρ gH can reflect that the water in the first water storage device 4 has overflowed, and now controller 12 indicates that the first line pump 2 stops
Until the water level decreasing in the first water storage device 4 is to the second hydraulic gage a15, it is to avoid the first line pump 2 flogs a dead horse.
Each technical characteristic of embodiment described above can arbitrarily be combined, for making description succinct, not to above-mentioned reality
The all possible combination of each technical characteristic applied in example is all described, as long as however, the combination of these technical characteristics is not deposited
In contradiction, all it is considered to be the scope of this specification record.
Embodiment described above only have expressed the several embodiments of the present invention, and its description is more concrete and detailed, but simultaneously
Can not therefore be construed as limiting the scope of the patent.It should be pointed out that coming for those of ordinary skill in the art
Say, without departing from the inventive concept of the premise, some deformation can also be made and improve, these broadly fall into the protection of the present invention
Scope.Therefore, the protection domain of patent of the present invention should be defined by claims.