CN106958240A - Air-cushion type batch vacuum pipe well and apply its soft foundation Yield rainfall relation method - Google Patents
Air-cushion type batch vacuum pipe well and apply its soft foundation Yield rainfall relation method Download PDFInfo
- Publication number
- CN106958240A CN106958240A CN201710243934.1A CN201710243934A CN106958240A CN 106958240 A CN106958240 A CN 106958240A CN 201710243934 A CN201710243934 A CN 201710243934A CN 106958240 A CN106958240 A CN 106958240A
- Authority
- CN
- China
- Prior art keywords
- vacuum
- air
- well
- pipe well
- pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/02—Improving by compacting
- E02D3/10—Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/10—Geothermal energy
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Structural Engineering (AREA)
- Agronomy & Crop Science (AREA)
- Environmental & Geological Engineering (AREA)
- Soil Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
A kind of air-cushion type batch vacuum pipe well of the present invention, it includes pipe well, air-cushion type vacuum tube well layering dewatering device is provided with the middle part of the pipe well, air-cushion type vacuum tube well layering dewatering device includes the airfilled ring of inner ring cover plate and quality of rubber materials, four slideways of right-angled intersection arrangement are provided with the inner ring cover plate, one slide-plate is provided with each slideway, vavuum pump adapter hole connects up vacuum generator tube, vacuum meter adapter hole connects up vacuum meter pipe, cable and suspending pump cord hole connect up cable and suspending pump rope pipe, drain tube holes connect downwards drainage connecting pipe, drain tube holes connect up drainpipe, there is tapping pipe interior ring cover plate both sides are down-set, the airfilled ring is arranged at below inner ring cover plate.Air-cushion type batch vacuum pipe well of the present invention and application its soft foundation Yield rainfall relation method can carry out different dewatering constructions to different soil properties, and can reach a bite pipe well can carry out tube well dewatering, and vacuum-dewatering this double action can be met again.
Description
Technical field
The present invention relates to a kind of air-cushion type batch vacuum pipe well and using its soft foundation Yield rainfall relation method.For weak soil
The quick lowering of watertable of ground, construction cost can be reduced by this method, reduce labor intensity, improve efficiency of construction.Possession
Base processing technology field.
Background technology
At present, construction industry large-area soft ground consolidation process and excavation of foundation pit, all refer to lowering of watertable, with
Meet the requirement of reduction water content of soil.The method for reducing soil body level of ground water typically uses well-points dewatering, the side of tube well dewatering
Method is realized, in both techniques, and its tube well dewatering can reach below 20m due to insertion soil body depth, and be released by waterpower
The principle of weight, precipitation depth can reach below 10m, be that soft soil foundation deep layer precipitation creates condition, therefore tube well dewatering is
It is widely used in reinforced soft soil ground processing.
But in work progress is implemented, infiltration coefficient requires higher to tube well dewatering, that is to say that tube well dewatering is typically suitable
It is 20 ~ 200m/d soil layers in infiltration coefficient, to the less muck soil of infiltration coefficient, can not be just applicable.According to this difficult point, it is
The strong point and advantage of tube well dewatering are given full play to, vacuum tube well precipitation is generated, i.e., by being closed to pipe well mouthful, and accessed
Vavuum pump, carries out vacuum-dewatering.But, needing in the range of reinforcement depth, its soil property is not quite similar, soil layer infiltration coefficient is also not to the utmost
It is identical.When vacuum tube well is under conditions of vacuum-dewatering, most of negative pressure of vacuum is melt into the preferable soil layer of soil property, in actual measurement
During the vacuum pressure of vacuum tube well, it can not measure substantially.Its main cause is exactly that most or whole vacuum pressures disappear
Lose in the preferable soil layer of infiltration coefficient, and need in the mud of negative pressure of vacuum, then because muck soil can not obtain vacuum
Negative pressure.It is basic without negative pressure of vacuum in other words.Therefore, vacuum tube well precipitation is unsatisfactory to the effect of mud.
The content of the invention
It is an object of the invention to overcome above-mentioned not enough to carry out different precipitation there is provided a kind of to different soil properties and apply
Work, can reach a bite pipe well can carry out tube well dewatering, and the air-cushion type batch vacuum of this double action of vacuum-dewatering can be met again
Pipe well and apply its soft foundation Yield rainfall relation method.
The object of the present invention is achieved like this:
A kind of air-cushion type batch vacuum pipe well, it includes being provided with the layering of air-cushion type vacuum tube well in the middle part of pipe well, the pipe well
Dewatering device, air-cushion type vacuum tube well layering dewatering device includes the airfilled ring of inner ring cover plate and quality of rubber materials, the interior ring cover
It is provided with four slideways of right-angled intersection arrangement, each slideway to be provided with one slide-plate, inner ring cover plate on plate and sets true
Empty pump adapter hole, vacuum meter adapter hole, cable and suspending pump cord hole and drain tube holes, its intermediate pump adapter hole is connected up
Vacuum generator tube, vacuum meter adapter hole connects up vacuum meter pipe, and cable and suspending pump cord hole connect up cable and suspending pump
Rope pipe, drain tube holes connect downwards drainage connecting pipe, and drain tube holes connect up drainpipe, down-set in interior ring cover plate both sides
There is tapping pipe, the airfilled ring is arranged at below inner ring cover plate, and the airfilled ring external diameter is slightly larger than the internal diameter of pipe well.
It is as follows using the soft foundation Yield rainfall relation method and step of air-cushion type batch vacuum pipe well:
Step 1: assembling air-cushion type batch vacuum pipe well
Step 2: injection pipe well:
3.1st, injection pipe well is constructed according to conventional job specfication;
3.2nd, according to immersible pump is put into after the completion of code requirement injection pipe well, trial operation under conditions of pipe well normal operation, enters
Enter next step;
Step 3: batch vacuum precipitation
It is determined that layering position:Data or the construction experience according to well-digging process are surveyed in base area, determine the poor soil layer of infiltration coefficient
Position, puts into airfilled ring, after airfilled ring reaches defined location in pipe well, airfilled ring is inflated, airfilled ring is stuck in
Required position;
Put into inner ring cover plate:After all pipelines are connected firmly on inspection, inner ring cover plate is put into airfilled ring and covered in airfilled ring
On, after inner ring cover plate is covered on airfilled ring, open gear outside the sliding block on inner ring cover plate, sliding block and open and be stuck on pipe well wall,
Complete after the installation of inner ring cover plate, connect vavuum pump, vacuumized.
Group wells is constructed:When large-area precipitation is constructed, it is necessary to many mouthfuls of tube well dewatering formation group wells constructions, at this moment, according to
Design requirement under conditions of many mouthfuls of tube well dewaterings are completed, to residing for different pipe wells in the range of precipitation different thickness soil property bar
Part, carries out layering using air-cushion type batch vacuum pipe well and vacuumizes, on this condition, determined according to the power of vavuum pump using true
The number of units of empty pump, every vavuum pump connects each air-cushion type batch vacuum pipe well by being responsible for.
For air-cushion type batch vacuum pipe well multilayer precipitation:During practice of construction, Multi-layered osmotic coefficient is such as run into small
In 20m/d soil layer, then determined to set multilayer cushion seals to carry out vacuum-dewatering according to infiltration coefficient, its method is set from lower to upper
Put, step 3.1 and the 3.2 corresponding pipelines of connection are pressed in the position being layered in required air cushion, and are vacuumized after cushion seals,
The soil layer small to the infiltration coefficient of different depth carries out vacuum-dewatering.
Compared with prior art, the beneficial effects of the invention are as follows:
1st, implement simple, it is applied widely
Using traditional precipitation pipe well, the soil layer poor to infiltration coefficient is layered by setting air-cushion type in pipe well, forms one
The dual-purpose function of pipe, had not only been drawn water using gravity precipitation but also using vacuum, and had made to need precipitation region by different dewatering modes, reach
Soil moisture content is uniform, meets weak soil Yield rainfall relation needs.And air cushion layering can arbitrarily set its vacuum according to the different layers of soil property
Negative pressure occurrence scope, expands the scope of application of tube well dewatering, it is ensured that the dewatering effect of the different soil properties of different thickness.
2nd, the engineering time is short, and speed is fast, low cost
Of the invention to expand applicability of the tube well dewatering to soil property compared with existing traditional pipe well, traditional tube well dewatering is applied to
Soil layer infiltration coefficient is 20 ~ 200m/d, and 20m/d soil property is less than to infiltration coefficient, and particularly muck soil is absolutely void, mainly
Reason is that tube well dewatering is to release water by gravity.Pipe well is layered using air-cushion type, due to being less than 20m/d soil property to infiltration coefficient
By vacuum-dewatering, and by layering, negative pressure of vacuum concentrates on the soil property that infiltration coefficient is less than 20m/d, therefore its tube well dewatering
Effect substantially, force of gravity releases water precipitation speed faster.
The present invention is compared with vacuum tube well, because vacuum tube well precipitation is generally used for the soil property that infiltration coefficient is less than 20m/d,
In the range of required drawdown, soil property is not quite similar, and when local infiltration coefficient is larger, then thus substantial amounts of negative pressure of vacuum can let out
Leakage, causes vacuum tube well without vacuum situation, makes existing vacuum tube well and to no effect.And the present invention is divided by being set in pipe well
Layer, the soil property that 20m/d is more than to infiltration coefficient releases water using gravity(That is tube well dewatering), 20m/d soil is less than to infiltration coefficient
Matter is isolated using layering, carries out negative pressure of vacuum precipitation.So as to ensure that vacuum tube well precipitation is only used for the small soil layer of infiltration coefficient,
So as to reduce precipitation time, Rain quality is improved.
3rd, it is environment friendly and pollution-free, construction site civilization
Air-cushion type is layered tube well dewatering, and designed layering dewatering device is reusable device, is inflated when using, not the used time
It is i.e. recyclable after deflation, it is that civilized construction creates conditions.
4th, deep layer precipitation, efficiency high
The air-cushion type vacuum tube well layering dewatering device of the present invention, can arbitrarily be adjusted according to pipe well embedded depth, unrestricted, special
Be not large-area precipitation construction in, can be different because of well to different soil residing for group wells, the scope different depth that buried to each well enters
The different setting of row, the particularly consolidation process to interlayer soil, its dewatering effect are more obvious.Its negative pressure of vacuum can pass through layering
The vacuum meter set on cover plate is shown, is easy to the supervision and management of work progress.Therefore, this method cannot be only used for civil engineering work
Journey, it may also be used for the consolidation process of road, place, underground piping etc..
Air-cushion type batch vacuum pipe well of the present invention and its construction method step are simple, by taking difference to different soil layers
Precipitation method, reached that a well is dual-purpose, can both meet the dewatering effect of different soil, again can to bad ground carry out multilayer it is true
Airborne water.Therefore different soil property Yield rainfall relation constructions are suitable for, solving existing tube well dewatering, vacuum tube well precipitation can not go beyond
Obstacle, which is lowering of watertable, reduce water content of soil lays a good foundation.
Brief description of the drawings
Fig. 1 is the structural representation of air-cushion type batch vacuum pipe well of the present invention.
Fig. 2 is the schematic diagram of inner ring cover plate.
Fig. 3 is the schematic diagram of airfilled ring.
Wherein:
Vacuum generator tube 1, vacuum meter pipe 2, cable and suspending pump rope pipe 3, drainpipe 4, pipe well 5, inner ring cover plate 6, vavuum pump connect
Pore 6.1, cable and suspending pump cord hole 6.2, drain tube holes 6.3, slideway 6.4, slide plate 6.5, airfilled ring 7, Inflation door 7.1, let out
Water pipe 8, drainage connecting pipe 9, immersible pump 10.
Embodiment
Referring to Fig. 1-Fig. 3, a kind of air-cushion type batch vacuum pipe well of the present invention, it includes pipe well 5, the pipe well 5
Middle part be provided with air-cushion type vacuum tube well layering dewatering device, air-cushion type vacuum tube well layering dewatering device include inner ring cover plate
6 and the airfilled ring 7 of quality of rubber materials, four slideways 6.4 of right-angled intersection arrangement, each slideway are provided with the inner ring cover plate 6
One slide-plate 6.5 is provided with 6.4, only needs manually to open slide plate by slideway when using, withstands pipe well inner ring, its
Main effect is support inner ring cover plate, particularly under conditions of vacuumizing, when negative pressure of vacuum reaches 60KPa, the skid plates support pipe
The borehole wall, can prevent that huge suction from inhaling de- by inner ring cover plate, destruction is vacuumized, without using when can by slide plate by manually operate by
Slide plate is shunk in inner ring by slideway.
Vavuum pump is set to take over hole 6.1, vacuum meter adapter hole on inner ring cover plate 6(Unlabelled in figure), cable and suspending pump
Cord hole 6.2 and drain tube holes 6.3, its intermediate pump adapter hole 6.1 connect up vacuum generator tube 1, vacuum meter take over hole to
Upper connection vacuum meter pipe 2, cable and suspending pump cord hole 6.2 connect up cable and suspending pump rope pipe 3, and drain tube holes 6.3 are downward
Connect drainage connecting pipe 9;Immersible pump 10 is located at the bottom of pipe well 5, and drain tube holes 6.3 connect up drainpipe 4, in interior ring cover plate
6 both sides are down-set tapping pipe 8, and its main function is when air-cushion type vacuum tube well layering dewatering device is arranged on middle part
When, the underground water in the soil body of top in convergence pipe well is then flowed into the pipe well of bottom by the pipeline, its length of tapping pipe 8 according to
Immersible pump position is determined, it is submerged in water, is not influenceed by vacuumizing(Take the mode of water-stop).
Vacuum generator tube 1, vacuum meter pipe 2, cable and suspending pump rope pipe 3 and the drainpipe 4 connected on inner ring cover plate 6;
The tubing that identical caliber can be used uniformly makes, so as to need not assert during construction, it is mutually general.
The airfilled ring 7 is made using rubber.Water wing of the shape as used by daily, the airfilled ring 7 is arranged at inner ring
The lower section of cover plate 6, the external diameter of airfilled ring 7 is slightly larger than the internal diameter of pipe well 5, when pipe well is vacuumized, inner ring cover plate 6 and airfilled ring 7
Combine closely, to prevent gas leakage.Also it is stuck in simultaneously using airfilled ring 7 on the borehole wall of pipe well 5.The internal diameter of airfilled ring 7 can be according to interior
Ring cover plate 6 is determined, can typically be set to 150mm.Inflation door 7.1 is set on airfilled ring, and the effect one of airfilled ring is that pipe well is carried out
Layering use, therefore Inflation door 7.1 length according to air cushion ensphere pipe well depth determine, two be using its inflation after with interior ring cover
Plate shape is into sealant.
It is as follows using the soft foundation Yield rainfall relation method and step of air-cushion type batch vacuum pipe well:
Step 1: assembling air-cushion type batch vacuum pipe well
Step 2: injection pipe well:
2.1st, injection pipe well is constructed according to conventional job specfication;
2.2nd, according to immersible pump is put into after the completion of code requirement injection pipe well, trial operation under conditions of pipe well normal operation, enters
Enter next step;
Step 3: batch vacuum precipitation
3.1st, layering position is determined:Data or the construction experience according to well-digging process are surveyed in base area, determine that infiltration coefficient is poor
Soil layer position, puts into airfilled ring, after airfilled ring reaches defined location in pipe well, you can airfilled ring is inflated, makes gas
Packing ring is stuck in required position;Then the immersible pump of pipe well bottom and submersible pump cable line are passed through into airfilled ring, and connects inner ring
Vacuum generator tube 1, the pipeline being connected with inner ring cover plate are connected on cover plate on corresponding cable, suspending pump rope pipe 3, inner ring cover plate
It must be tightened with iron wire, be come off to prevent pipeline and cause to do over again.
3.2nd, inner ring cover plate is put into:After all pipelines are connected firmly on inspection, inner ring cover plate is put into airfilled ring and covered
On airfilled ring, because airfilled ring is provided with inside and outside circle, after inner ring cover plate is covered on airfilled ring, open on inner ring cover plate
Sliding block, outer gear opens and is stuck on pipe well wall, completes after the installation of inner ring cover plate, you can connection vavuum pump, is vacuumized.
3.3rd, group wells is constructed:When large-area precipitation is constructed, it is necessary to many mouthfuls of tube well dewatering formation group wells constructions, at this moment,
Can according to design requirement under conditions of many mouthfuls of tube well dewaterings are completed, to residing for different pipe wells in the range of precipitation different thickness soil
Matter condition, carries out layering using air-cushion type batch vacuum pipe well and vacuumizes, and on this condition, is determined to make according to the power of vavuum pump
With the number of units of vavuum pump, every vavuum pump connects each air-cushion type batch vacuum pipe well by being responsible for., should during vacuumizing
Note the reading of each well vacuum meter, it is ensured that negative pressure of vacuum meets Yield rainfall relation requirement.
3.4th, air-cushion type batch vacuum pipe well multilayer precipitation:During practice of construction, Multi-layered osmotic coefficient is such as run into small
In 20m/d soil layer, then can be determined to set multilayer cushion seals to carry out vacuum-dewatering according to infiltration coefficient, its method can from it is lower toward
Upper to set, the position being layered in required air cushion presses this step 3.1 and 3.2 and connects corresponding pipeline, and is carried out after cushion seals
Vacuumize, the soil layer small to the infiltration coefficient of different depth carries out vacuum-dewatering.
Claims (5)
1. a kind of air-cushion type batch vacuum pipe well, it includes pipe well(5), it is characterised in that the pipe well(5)Middle part be provided with
Air-cushion type vacuum tube well is layered dewatering device, and air-cushion type vacuum tube well layering dewatering device includes inner ring cover plate(6)With rubber material
The airfilled ring of matter(7), inner ring cover plate(6)Upper setting vavuum pump takes over hole(6.1), vacuum meter adapter hole, cable and suspending pump rope
Hole(6.2)And drain tube holes(6.3), its intermediate pump adapter hole(6.1)Connect up vacuum generator tube(1), vacuum meter connects
Pore connects up vacuum meter pipe(2), cable and suspending pump cord hole(6.2)Connect up cable and suspending pump rope pipe(3), draining
Pore(6.3)Drainage connecting pipe is connected downwards(9), drain tube holes(6.3)Connect up drainpipe(4), in interior ring cover plate(6)Two
Laterally it is arranged with tapping pipe(8), the airfilled ring(7)It is arranged at inner ring cover plate(6)Lower section, the airfilled ring(7)External diameter is slightly
More than pipe well(5)Internal diameter.
2. a kind of air-cushion type batch vacuum pipe well according to claim 1, it is characterised in that the inner ring cover plate(6)On set
It is equipped with four slideways of right-angled intersection arrangement(6.4), each slideway(6.4)On be provided with one slide-plate(6.5).
3. a kind of air-cushion type batch vacuum pipe well according to claim 2, it is characterised in that apply air-cushion type batch vacuum
The soft foundation Yield rainfall relation method and step of pipe well is as follows:
Step 1: assembling air-cushion type batch vacuum pipe well
Step 2: injection pipe well:
2.1st, injection pipe well is constructed according to conventional job specfication;
2.2nd, according to immersible pump is put into after the completion of code requirement injection pipe well, trial operation under conditions of pipe well normal operation, enters
Enter next step;
Step 3: batch vacuum precipitation
3.1st, layering position is determined:Data or the construction experience according to well-digging process are surveyed in base area, determine that infiltration coefficient is poor
Soil layer position, puts into airfilled ring, after airfilled ring reaches defined location in pipe well, airfilled ring is inflated, makes airfilled ring
It is stuck in required position;
3.2nd, inner ring cover plate is put into:After all pipelines are connected firmly on inspection, inner ring cover plate is put into airfilled ring and Gai Qi
On packing ring, after inner ring cover plate is covered on airfilled ring, open gear outside the sliding block on inner ring cover plate, sliding block and open and be stuck in pipe well wall
On, complete after the installation of inner ring cover plate, connect vavuum pump, vacuumized.
4. a kind of air-cushion type batch vacuum pipe well according to claim 3, it is characterised in that apply air-cushion type batch vacuum
The soft foundation Yield rainfall relation method of pipe well is further comprising the steps of:
Group wells is constructed:When large-area precipitation is constructed, it is necessary to many mouthfuls of tube well dewatering formation group wells constructions, at this moment, according to design
It is required that under conditions of many mouthfuls of tube well dewaterings are completed, to residing for different pipe wells in the range of precipitation different thickness soil condition, adopt
Layering is carried out with air-cushion type batch vacuum pipe well to vacuumize, and on this condition, is determined to use vavuum pump according to the power of vavuum pump
Number of units, every vavuum pump, which passes through, is responsible for each air-cushion type batch vacuum pipe well of connection.
5. a kind of air-cushion type batch vacuum pipe well according to claim 3, it is characterised in that apply air-cushion type batch vacuum
The soft foundation Yield rainfall relation method of pipe well is further comprising the steps of:For air-cushion type batch vacuum pipe well multilayer precipitation:In reality
In work progress, the soil layer that Multi-layered osmotic coefficient is less than 20m/d is such as run into, then is determined to set multilayer air cushion close according to infiltration coefficient
Envelope carries out vacuum-dewatering, and its method is set from lower to upper, and the position being layered in required air cushion is corresponding by step 3.1 and 3.2 connections
Pipeline, and vacuumized after cushion seals, the soil layer small to the infiltration coefficient of different depth carries out vacuum-dewatering.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710243934.1A CN106958240B (en) | 2017-04-14 | 2017-04-14 | Air cushion type layered vacuum pipe well and soft foundation drainage method using same |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710243934.1A CN106958240B (en) | 2017-04-14 | 2017-04-14 | Air cushion type layered vacuum pipe well and soft foundation drainage method using same |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106958240A true CN106958240A (en) | 2017-07-18 |
CN106958240B CN106958240B (en) | 2023-06-06 |
Family
ID=59483415
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710243934.1A Active CN106958240B (en) | 2017-04-14 | 2017-04-14 | Air cushion type layered vacuum pipe well and soft foundation drainage method using same |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106958240B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108222042A (en) * | 2018-01-09 | 2018-06-29 | 北京地矿工程建设有限责任公司 | A kind of novel evacuated well sealing device and its installation method |
CN109428309A (en) * | 2017-09-05 | 2019-03-05 | 中国二十冶集团有限公司 | Foundation pit temporary electricity system and its construction method |
CN113550292A (en) * | 2020-04-23 | 2021-10-26 | 江苏中田地基工程有限公司 | Foundation drainage method and system |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003147758A (en) * | 2001-08-27 | 2003-05-21 | Kazuhiko Sakamoto | Underground water level lowering device |
CN101070704A (en) * | 2007-06-04 | 2007-11-14 | 上海地矿工程勘察有限公司 | Controllable one-well lamina precipitation construction method |
CN101092818A (en) * | 2007-06-07 | 2007-12-26 | 上海交通大学 | Method for lowering water by combining phreatic water in footing groove with artesian aquifer - well stratifications |
CN201785761U (en) * | 2010-09-10 | 2011-04-06 | 叶吉 | Water-gas separation integrated tube well |
CN104452734A (en) * | 2014-11-12 | 2015-03-25 | 叶吉 | Rapid soft foundation separation preloading method |
CN105064383A (en) * | 2015-08-27 | 2015-11-18 | 冯克俊 | Pipe-inserting negative pressure air jet deep-well dewatering device |
CN205636766U (en) * | 2016-05-04 | 2016-10-12 | 上海岩土工程勘察设计研究院有限公司 | Nested pumping device of pneumatic type |
CN205636765U (en) * | 2016-05-04 | 2016-10-12 | 上海岩土工程勘察设计研究院有限公司 | Inflatable is from inhaling precipitation well |
CN207003415U (en) * | 2017-04-14 | 2018-02-13 | 沈艳忱 | Air-cushion type batch vacuum pipe well |
-
2017
- 2017-04-14 CN CN201710243934.1A patent/CN106958240B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003147758A (en) * | 2001-08-27 | 2003-05-21 | Kazuhiko Sakamoto | Underground water level lowering device |
CN101070704A (en) * | 2007-06-04 | 2007-11-14 | 上海地矿工程勘察有限公司 | Controllable one-well lamina precipitation construction method |
CN101092818A (en) * | 2007-06-07 | 2007-12-26 | 上海交通大学 | Method for lowering water by combining phreatic water in footing groove with artesian aquifer - well stratifications |
CN201785761U (en) * | 2010-09-10 | 2011-04-06 | 叶吉 | Water-gas separation integrated tube well |
CN104452734A (en) * | 2014-11-12 | 2015-03-25 | 叶吉 | Rapid soft foundation separation preloading method |
CN105064383A (en) * | 2015-08-27 | 2015-11-18 | 冯克俊 | Pipe-inserting negative pressure air jet deep-well dewatering device |
CN205636766U (en) * | 2016-05-04 | 2016-10-12 | 上海岩土工程勘察设计研究院有限公司 | Nested pumping device of pneumatic type |
CN205636765U (en) * | 2016-05-04 | 2016-10-12 | 上海岩土工程勘察设计研究院有限公司 | Inflatable is from inhaling precipitation well |
CN207003415U (en) * | 2017-04-14 | 2018-02-13 | 沈艳忱 | Air-cushion type batch vacuum pipe well |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109428309A (en) * | 2017-09-05 | 2019-03-05 | 中国二十冶集团有限公司 | Foundation pit temporary electricity system and its construction method |
CN109428309B (en) * | 2017-09-05 | 2021-08-13 | 中国二十冶集团有限公司 | Temporary power utilization system for foundation pit and construction method thereof |
CN108222042A (en) * | 2018-01-09 | 2018-06-29 | 北京地矿工程建设有限责任公司 | A kind of novel evacuated well sealing device and its installation method |
CN113550292A (en) * | 2020-04-23 | 2021-10-26 | 江苏中田地基工程有限公司 | Foundation drainage method and system |
Also Published As
Publication number | Publication date |
---|---|
CN106958240B (en) | 2023-06-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100480475C (en) | Controllable one-well lamina precipitation construction method | |
CN206386134U (en) | A kind of Underground Subway Station guarded drainage construction | |
CN102434716B (en) | Flexible pipe assisted type pipeline returning method | |
CN103031850B (en) | Low-permeability sludge claypan ultra-vacuum dual-pipe unwatering well and construction technology | |
CN104847010B (en) | A kind of miniature groundwater reservoir in city and construction method | |
CN205369282U (en) | Well point dewatering of sluice construction usefulness | |
CN113279421B (en) | Vacuum dewatering process for deep foundation pit | |
CN106958240A (en) | Air-cushion type batch vacuum pipe well and apply its soft foundation Yield rainfall relation method | |
CN104878771B (en) | The construction method of vacuum tube well precipitation system | |
CN207003415U (en) | Air-cushion type batch vacuum pipe well | |
CN206438526U (en) | Deep basal pit tube well dewatering equipment | |
CN103382850A (en) | Top plate crack water guiding device and method | |
CN106522217A (en) | Steel conduit device and broken pile treatment construction method for cast-in-situ bored pile | |
CN211228566U (en) | Recoverable vacuum light well point dewatering system | |
CN204919528U (en) | A go out membrane structure for detecting vacuum pre -compaction in -process reinforcement effect | |
CN109750684B (en) | Multipurpose dewatering well structure and manufacturing method thereof | |
CN107268364A (en) | The construction method that mud bag builds road is filled on reclaimed ground | |
CN203007963U (en) | Ultra-high vacuum double-pipe drained well at low-permeability silt clay course | |
CN105970909B (en) | Well point plastic strip vacuum preloading seepage consolidation joint precipitating, pre-pressing dynamic consolidation method | |
CN205917685U (en) | Integral type well dotted arranges vacuum system | |
CN111910665B (en) | Precipitation treatment method for steeply inclined strip-shaped interbedded composite stratum foundation pit | |
CN109944263B (en) | Double-vacuum dewatering system and method | |
CN208009457U (en) | A kind of novel evacuated well sealing device | |
CN205917682U (en) | Soft soil foundation integral type well dotted arranges vacuum system | |
CN105862716A (en) | Integral well-point plastic drain pipe |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |