CN106368368A - Stone material aluminum honeycomb composite slab suspended ceiling construction method based on T-shaped and Z-shaped hanging parts - Google Patents

Stone material aluminum honeycomb composite slab suspended ceiling construction method based on T-shaped and Z-shaped hanging parts Download PDF

Info

Publication number
CN106368368A
CN106368368A CN201611001516.3A CN201611001516A CN106368368A CN 106368368 A CN106368368 A CN 106368368A CN 201611001516 A CN201611001516 A CN 201611001516A CN 106368368 A CN106368368 A CN 106368368A
Authority
CN
China
Prior art keywords
stone material
suspension member
composite plate
honeycomb composite
aluminium honeycomb
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611001516.3A
Other languages
Chinese (zh)
Other versions
CN106368368B (en
Inventor
何党辉
刘党兵
郭振兴
孟峰希
刘卫斌
陈彦
汪晨
张凡
张一凡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Dingsheng Decoration Engineering Co Ltd
Original Assignee
Shaanxi Dingsheng Decoration Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Dingsheng Decoration Engineering Co Ltd filed Critical Shaanxi Dingsheng Decoration Engineering Co Ltd
Priority to CN201611001516.3A priority Critical patent/CN106368368B/en
Publication of CN106368368A publication Critical patent/CN106368368A/en
Application granted granted Critical
Publication of CN106368368B publication Critical patent/CN106368368B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/04Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation comprising slabs, panels, sheets or the like
    • E04B9/0442Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation comprising slabs, panels, sheets or the like having a honeycomb core
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/06Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/22Connection of slabs, panels, sheets or the like to the supporting construction
    • E04B9/24Connection of slabs, panels, sheets or the like to the supporting construction with the slabs, panels, sheets or the like positioned on the upperside of, or held against the underside of the horizontal flanges of the supporting construction or accessory means connected thereto
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/22Connection of slabs, panels, sheets or the like to the supporting construction
    • E04B9/24Connection of slabs, panels, sheets or the like to the supporting construction with the slabs, panels, sheets or the like positioned on the upperside of, or held against the underside of the horizontal flanges of the supporting construction or accessory means connected thereto
    • E04B9/245Connection of slabs, panels, sheets or the like to the supporting construction with the slabs, panels, sheets or the like positioned on the upperside of, or held against the underside of the horizontal flanges of the supporting construction or accessory means connected thereto by means of screws, bolts or clamping strips held against the underside of the supporting construction

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Panels For Use In Building Construction (AREA)

Abstract

The invention discloses a stone material aluminum honeycomb composite slab suspended ceiling construction method based on T-shaped and Z-shaped hanging parts. A construction stone material aluminum honeycomb composite slab suspended ceiling comprises multiple columns of stone material aluminum honeycomb composite slabs, a column of T-shaped hanging parts is arranged between every two adjacent columns of stone material aluminum honeycomb composite slabs, each T-shaped hanging part is clamped between left and right Z-shaped hanging parts, a column of outer side hanging parts is arranged on the outer side of each column of outer side compound slabs, and a column of pre-embedded bolts for fixing outer side hanging parts or Z-shaped hanging parts is arranged on the left and right sides of each stone material aluminum honeycomb composite slab respectively. The stone material aluminum honeycomb composite slab suspended ceiling construction method comprises the steps of 1 suspended ceiling keel installation, 2 T-shaped part installation, 3, stone material aluminum honeycomb composite slab installation and 4 joint filling treatment. The stone material aluminum honeycomb composite slab suspended ceiling construction method includes simple steps, is reasonable in design, simple and convenient to construct, high in working efficiency and good in construction effect, the stone material aluminum honeycomb composite slab suspended ceiling construction process can be simply, conveniently and rapidly completed, the input cost is low, and the construction quality is easy to ensure.

Description

Stone material aluminium honeycomb composite plate ceiling construction method based on t type and Z-shaped suspension member
Technical field
The invention belongs to ceiling construction technical field, especially relate to a kind of stone material aluminum honeycomb based on t type and Z-shaped suspension member Composite plate ceiling construction method.
Background technology
With scientific and technological continuous development, architectural image tends to diversification, and traditional dry-hang stone furred ceiling technology has met Not large space, the technical requirements of large span stone ceiling construction.Stone material aluminium honeycomb composite plate ceiling material with impact resistance strong, The characteristic such as light weight, efficiency of construction are high, facing is attractive in appearance, is widely used in various large spaces surface-veneer engineered.Stone material aluminum honeycomb is multiple Plywood is that one kind utilizes aviation complex technique, very thin marble thin slice and honeycomb texture product laminating production is gone out a kind of new Dalle, also referred to as aluminum honeycomb-stone composite plate.At present, stone material cellular compound plate ceiling construction mostly uses back bolt type and does Extension method is constructed.Back bolt type dry-hanging method is to be drilled to after dovetail hole bolt swollen with convex is combined in back face of stone to be connected with Os Draconis again, and by Anyhow the Os Draconis of metal rack composition are fastened on major structure of construction by built-in fitting.But existing above-mentioned traditional back of the body bolt When formula dry-hanging method carries out stone material aluminium honeycomb composite plate ceiling construction, there is work progress complexity, input cost height, low construction efficiency The problems such as.And nowadays, stone material aluminium honeycomb composite plate ceiling construction neither one is unified, specification and specific construction method can Follow, thus be inevitably present during practice of construction that constructing operation is more random, lack of standardization, input cost is higher, construction effect The problems such as rate is relatively low, institute's construction molding stone material aluminium honeycomb composite plate furred ceiling is second-rate.
Content of the invention
The technical problem to be solved is for above-mentioned deficiency of the prior art, provides one kind to be based on t type With the stone material aluminium honeycomb composite plate ceiling construction method of Z-shaped suspension member, its method and step is simple, reasonable in design and constructing operation is simple Just, work efficiency height, construction effect are good, and energy is easy, be rapidly completed stone material aluminium honeycomb composite plate ceiling construction process, and input cost Relatively low, construction quality is easy to ensure.
For solving above-mentioned technical problem, the technical solution used in the present invention is: a kind of stone material based on t type and Z-shaped suspension member Aluminium honeycomb composite plate ceiling construction method it is characterised in that: constructed stone material aluminium honeycomb composite plate furred ceiling include multiple row be in parallel Lay and be respectively positioned on the stone material aluminium honeycomb composite plate in same level, described in multiple row, stone material aluminium honeycomb composite plate is along described building The transverse width direction on roof is laid from left to right, and stone material aluminium honeycomb composite plate described in each column all includes polylith and builds along described Build the stone material aluminium honeycomb composite plate that the longitudinal length on roof is laid from front to back, described stone material aluminium honeycomb composite plate is square Shape;It is located at the stone material aluminium honeycomb composite plate described in string of the leftmost side in stone material aluminium honeycomb composite plate described in multiple row and be located at the rightmost side Stone material aluminium honeycomb composite plate described in string be outside composite plate, side except as noted in stone material aluminium honeycomb composite plate described in multiple row All stone material aluminium honeycomb composite plates outside composite plate are intermediate composite sheet;Adjacent two arrange described stone material aluminium honeycomb composite plates it Between be provided with the t type suspension member that string is mounted to stone material aluminium honeycomb composite plate, described in each column, t type suspension member all includes multiple edges The longitudinal length of described building roof lays t type suspension member on the same line from front to back;Each described t type suspension member is equal It is installed between the two Z-shaped suspension members in left and right, each described t type suspension member is all formed with two Z-shaped suspension members being located at both sides around One assembled suspension member;Described in each column, the outside of outside composite plate is provided with suspension member outside string, outside suspension member described in each column All include multiple longitudinal length along described building roof and lay outside suspension member on the same line from front to back;Each column The quantity of the t type suspension member in described t type suspension member, stone material aluminium honeycomb composite plate described in same being mounted is m, wherein m For positive integer and m >=2;The outside suspension member quantity in outside suspension member described in each column, outside composite plate described in same being mounted It is m;The left and right sides of every piece of described stone material aluminium honeycomb composite plate is provided with string for fixing outside suspension member or Z-shaped extension The pre-embedded bolt of part, pre-embedded bolt described in each column all includes the m pre-embedded bolt laid from front to back on the same line;
For t font and it includes horizonal base plate and the vertical installation being fixed on top in the middle part of horizonal base plate to described t type suspension member Plate;Described Z-shaped suspension member be z font and it include top board, the lower supporting plate being located at the outer side-lower of top board and be connected to pressure , all in horizontal layout, described lower supporting plate leads to for middle part connecting plate between plate and lower supporting plate, described top board and lower supporting plate Cross pre-embedded bolt to be fixed on stone material aluminium honeycomb composite plate;The upper pressure of two described Z-shaped suspension members in each described assembled suspension member Plate is press respectively against above the horizonal base plate left and right sides of t type suspension member;
When constructed stone material aluminium honeycomb composite plate furred ceiling is constructed, comprise the following steps:
Step one, ceiling joist are installed: needing to install ceiling joist below the building roof of furred ceiling, described ceiling joist is in To laying and it passes through multiple suspension rods and hangs on described building roof level;
Described ceiling joist is spliced with the lateral keel that multiple tracks is in parallel laying by longitudinal Os Draconis that multiple tracks is in parallel laying Form, described longitudinal Os Draconis are laid along the longitudinal length of described building roof, described longitudinal Os Draconis and lateral keel Perpendicular laying;Longitudinal Os Draconis described in multiple tracks are all laid in same level and the longitudinal keel shoe of its composition, horizontal described in multiple tracks All it is laid in same level to Os Draconis and it forms lateral keel frame, described in per pass, longitudinal Os Draconis are all horizontal with described in multiple tracks Os Draconis are fastenedly connected, and described longitudinal keel shoe is located at the lower section of described lateral keel frame;
Step 2, t type suspension member are installed: install multiple row t type suspension member, t described in multiple row on ceiling joist described in step one Type suspension member is all laid in same level;
Vertical installing plate in described t type suspension member is fixedly mounted on longitudinal Os Draconis by connecting bolt, t type described in each column Multiple described t type suspension member in suspension member be each attached to along with described longitudinal Os Draconis;
Step 3, stone material aluminium honeycomb composite plate are installed: to described in each piece in constructed stone material aluminium honeycomb composite plate furred ceiling Stone material aluminium honeycomb composite plate is installed respectively, obtains the stone material aluminium honeycomb composite plate furred ceiling of construction molding;
The outside of every piece of described outside composite plate is all mounted on fixing structures by m described outside suspension member, described Fixing structures are described building roof, set outside the side wall outside described ceiling joist, described building roof or described side wall The framed side wallboard put;The inner side of every piece of described outside composite plate is all mounted on by m described Z-shaped suspension member and is installed on longitudinal Os Draconis M described t type suspension member on;Every piece of described intermediate composite sheet is all mounted on by 2m described Z-shaped suspension member and is installed on longitudinal dragon On 2m described t type suspension member on bone;
Step 4, joint filling are processed: the described stone material aluminium honeycomb composite plate being completed to constructing in step 3 using gap-filling glue is hung In top, the splicing seams between adjacent two pieces of described stone material aluminium honeycomb composite plates carry out joint filling process respectively.
The above-mentioned stone material aluminium honeycomb composite plate ceiling construction method based on t type and Z-shaped suspension member, is characterized in that: in step 3 When carrying out the installation of stone material aluminium honeycomb composite plate, enter respectively from left to right or from right to left to stone material aluminium honeycomb composite plate described in multiple row Row is installed;To when described in each column, stone material aluminium honeycomb composite plate is installed, all from front to back or from rear to front to multiple described stones Material aluminium honeycomb composite plate carries out block-by-block installation respectively.
The above-mentioned stone material aluminium honeycomb composite plate ceiling construction method based on t type and Z-shaped suspension member, is characterized in that: described t type is hung Part and Z-shaped suspension member are aluminium alloy suspension member;Described in step one, longitudinal Os Draconis and lateral keel are shaped steel, described ceiling joist Longitudinal Os Draconis described in middle per pass and being all fixedly connected with welding manner between lateral keel described in multiple tracks.
The above-mentioned stone material aluminium honeycomb composite plate ceiling construction method based on t type and Z-shaped suspension member, is characterized in that: in step one Described longitudinal Os Draconis and lateral keel are Zinc-coated angle steel.
The above-mentioned stone material aluminium honeycomb composite plate ceiling construction method based on t type and Z-shaped suspension member, is characterized in that: in step one Described suspension rod is metal suspension rod, is fixedly connected with welding manner, described building between described metal suspension rod and lateral keel The built-in fitting fixing for described metal suspension rod upper weld is provided with roof.
The above-mentioned stone material aluminium honeycomb composite plate ceiling construction method based on t type and Z-shaped suspension member, is characterized in that: described connection In horizontal layout and it is fixedly mounted on longitudinal Os Draconis bolt, described vertical installing plate has one and supplies connecting bolt to install And the vertical bolt adjustment hole that can move up and down for connecting bolt, described vertical bolt adjustment hole is elongate holes;
It is pre- that pre-embedded bolt on each piece of stone material aluminium honeycomb composite plate in described stone material aluminium honeycomb composite plate furred ceiling is furred ceiling Bury bolt, described furred ceiling pre-embedded bolt is in vertically to laying, described lower supporting plate has the described furred ceiling pre-embedded bolt of confession The cross bolts adjustment hole installed and can be moved left and right for described furred ceiling pre-embedded bolt, described cross bolts adjustment hole is length Bar hole and itself and the perpendicular laying of described vertical bolt adjustment hole;
To the 2m institute that when intermediate composite sheet is installed every piece described, first will install on this intermediate composite sheet in step 3 State Z-shaped suspension member to be press respectively against on the horizonal base plate in 2m described t type suspension member, then by 2m described t type suspension member of adjustment up and down Setting height(from bottom) the vertical height of this intermediate composite sheet is adjusted, and the horizontal level of this intermediate composite sheet is carried out left and right Adjustment, until this intermediate composite sheet is adjusted to the installation site being pre-designed;Treat that this intermediate composite sheet adjusts to being pre-designed Installation site after, to for fixing the connecting bolt of 2m described t type suspension member and the institute for fixing 2m described t type suspension member State furred ceiling pre-embedded bolt to be locked respectively.
The above-mentioned stone material aluminium honeycomb composite plate ceiling construction method based on t type and Z-shaped suspension member, is characterized in that: described vertical Bolt adjustment hole is located at the middle part of vertical installing plate, and described cross bolts adjustment hole is located at the middle part of lower supporting plate;To for solid Determine the connecting bolt of 2m described t type suspension member and enter respectively for fixing the described furred ceiling pre-embedded bolt of 2m described t type suspension member After row is locked, also need to be respectively mounted skidproof buckle on each connecting bolt and each furred ceiling pre-embedded bolt.
The above-mentioned stone material aluminium honeycomb composite plate ceiling construction method based on t type and Z-shaped suspension member, is characterized in that: described m= 2~4, the longitudinal length l=600mm~1500mm of described stone material aluminium honeycomb composite plate;
As l≤600mm, m=2;As 600mm < l≤1000mm, m=3;As 1000mm < l≤1500mm, m= 4.
The above-mentioned stone material aluminium honeycomb composite plate ceiling construction method based on t type and Z-shaped suspension member, is characterized in that: in step 4 When carrying out joint filling process, first using glue rifle, described gap-filling glue is uniformly injected in described splicing seams, then is struck off with scraper plate immediately;Institute The thickness stating described gap-filling glue in splicing seams is 4mm~6mm;A width of 4mm~the 6mm of seam of described splicing seams.
The above-mentioned stone material aluminium honeycomb composite plate ceiling construction method based on t type and Z-shaped suspension member, is characterized in that: in step 3 Described fixing structures are framed side wallboard, and described framed side wallboard is located at left side or the right side of described stone material aluminium honeycomb composite plate furred ceiling, and Framed side wallboard is located at outside the composite plate of described outside;Described framed side wallboard is in vertically to laying and its stone material aluminum honeycomb described in polylith is multiple Plywood is spliced along the stone material aluminium honeycomb composite plate laid from front to back of longitudinal length of institute's construction building furred ceiling, described Stone material aluminium honeycomb composite plate in framed side wallboard is wallboard composite plate;The bottom of every piece of described wallboard composite plate is provided with m use In the pre-embedded bolt of fixing outside suspension member, the pre-embedded bolt in described wallboard composite plate is wallboard pre-embedded bolt, m described wallboard Pre-embedded bolt is all laid in same level;Described outside suspension member is corner suspension member, and it is fixing that described corner suspension member includes outside Plate, be located at the inner side fixed plate inside the fixed plate of described outside and be connected to described outside fixed plate and described inner side fixed plate it Between oblique connecting plate, described outside fixed plate is in vertically to laying and it is fixed on described wall by described wallboard pre-embedded bolt In plate composite plate, in horizontal layout and it is fixed on described outside by described furred ceiling pre-embedded bolt and is combined described inner side fixed plate On plate;Described oblique connecting plate tilts from outside to inside gradually downward.
The present invention compared with prior art has the advantage that
1st, construction method step is simple, reasonable in design and easy construction, puts into construction cost relatively low.
2nd, the t type suspension member the being adopted and structure of Z-shaped suspension member is simple and processing and fabricating is easy, can carry out batch production batch plus Work, crudy is easy to ensure.
3rd, the t type suspension member being adopted and the reasonable in design of Z-shaped suspension member, each t type suspension member is all installed in two z in left and right Between type suspension member, each t type suspension member all forms an assembled suspension member with two Z-shaped suspension members being located at both sides around, thus It is attached using clamp mode between t type suspension member and two Z-shaped suspension members in assembled suspension member, not only simple installation, and energy Easy, quick in vertical and horizontal direction, the position of mounted stone material aluminium honeycomb composite plate and plate face flatness are adjusted Whole it is ensured that the installation site accuracy of mounted stone material aluminium honeycomb composite plate and flatness, increase substantially installation effectiveness, saving of labor Save time.
4th, the assembled suspension member simple installation being adopted, quick and stone material aluminium honeycomb composite plate installation quality are easy to protect Card, in assembled suspension member, t type suspension member is fixed on longitudinal Os Draconis in advance, and Z-shaped suspension member is fixed on stone material aluminium honeycomb composite plate On pre-embedded bolt, fixed, and simple installation.
5th, rotation angle position (i.e. coupling part between furred ceiling and framed side wallboard) is attached using corner suspension member, is adopted Corner hanger structure is simple, reasonable in design and simple installation is easy, using effect is good, and corner suspension member is directly anchored to stone material On pre-embedded bolt on aluminium honeycomb composite plate, simple installation, fixed.
6th, simple to operate, efficiency of construction is high, and the construction period is short, can effectively save engineering cost.
7th, stone material aluminium honeycomb composite plate is connected with ceiling joist with Z-shaped suspension member using t type suspension member, Z-shaped suspension member and stone material aluminum Connected by pre-embedded bolt between honeycomb composite plate, and be attached by connecting bolt between t type suspension member and ceiling joist, And adjustment hole regulating bolt position is set, and after bolt fastening, landing is prevented using skidproof buckle, form stable space-load body System.
8th, using effect is good and practical value is high, and the stone material aluminium honeycomb composite plate furred ceiling with construction molding is lightweight, damage Consumption less, environmental protection the features such as, matched with Z-shaped suspension member by t type suspension member, make stone material aluminium honeycomb composite plate furred ceiling and furred ceiling imperial The stress system of one entirety of bone formation, efficiently solves large span, the construction problem of large space stone ceiling facing hardly possible.With biography The back bolt type dry-hanging method of system is compared, and has that simple to operate, efficiency of construction is high, plate adjusts that leeway is big, lightweight, after installation Many advantages, such as plate face whole structure is attractive in appearance.And, when carrying out ceiling construction using the present invention, construction quality is easily controlled, and does Arrived environmental protection, green construction, and can effective reduction of erection time, reduce engineering cost.
9th, economic benefit and social benefit are notable, compared with using traditional ceiling construction process, save cost effectiveness (CE) substantially, As 7200m is about to construction area2Building ceiling when being constructed, the cost of traditional suspension member is 5.7 yuan/, and the present invention The cost of adopted suspension member (i.e. assembled suspension member) construction building furred ceiling is 1.9 yuan/, the cost of furred ceiling of being constructed with traditional suspension member For 45.6 yuan/m2, it is 16.2 yuan/m with the cost of the adopted suspension member of the present invention (i.e. assembled suspension member) construction building furred ceiling2;Separately Outward, the labour cost of traditional construction technique is 176 yuan/m2, and the labour cost of the present invention is 135 yuan/m2.Not only may be used using the present invention To show the lines glamour of lithotome completely, save mounting cost, effectively shorten the construction period, can effectively be applied to silver The ceiling construction project of the public places such as row, commercial center, amusement, social benefit is notable.
10th, prospect of promoting the use of extensive and widely applicable it is adaptable in tier building and skyscraper stone material aluminum honeycomb multiple The ceiling decoration engineering of plywood.
In sum, the inventive method step is simple, reasonable in design and constructing operation is easy, work efficiency is high, construction effect good, Energy is easy, be rapidly completed stone material aluminium honeycomb composite plate ceiling construction process, and input cost is relatively low, and construction quality is easy to protect Card.
Below by drawings and Examples, technical scheme is described in further detail.
Brief description
Fig. 1 is method of the present invention FB(flow block).
Fig. 2 is the Construction State schematic diagram of the present invention.
Fig. 3 is the use state of assembled suspension member of the present invention with reference to figure.
Description of reference numerals:
1 suspension rod;2-1 longitudinal direction Os Draconis;2-2 lateral keel;
3 t type suspension members;3-1 horizonal base plate;The vertical installing plate of 3-2;
4 stone material aluminium honeycomb composite plates;5 outside suspension members;6 Z-shaped suspension members;
6-1 top board;6-2 lower supporting plate;6-3 middle part connecting plate;
7 framed side wallboards;8 connecting bolts;9 pre-embedded bolts;
10 horizontal keel;11 l shape suspension members;12 glue-lines.
Specific embodiment
A kind of stone material aluminium honeycomb composite plate ceiling construction method based on t type and Z-shaped suspension member as shown in Figure 1, is constructed It is in the parallel stone material aluminium honeycomb composite plate laid and be respectively positioned in same level that stone material aluminium honeycomb composite plate furred ceiling includes multiple row 4, stone material aluminium honeycomb composite plate 4 described in multiple row is laid from left to right along the transverse width direction of described building roof, each column Described stone material aluminium honeycomb composite plate 4 all includes polylith along the stone material laid from front to back of longitudinal length of described building roof Aluminium honeycomb composite plate 4, described stone material aluminium honeycomb composite plate 4 is rectangle, refers to Fig. 2;In stone material aluminium honeycomb composite plate 4 described in multiple row Positioned at stone material aluminium honeycomb composite plate 4 described in the string of the leftmost side and the stone material aluminium honeycomb composite plate 4 described in string positioned at the rightmost side It is outside composite plate, all stone material aluminum honeybees outside the composite plate of side except as noted in stone material aluminium honeycomb composite plate 4 described in multiple row Honeycomb composite plate 4 is intermediate composite sheet;It is provided with string to stone material aluminum between the adjacent two described stone material aluminium honeycomb composite plates 4 of row The t type suspension member 3 that honeycomb composite plate 4 is mounted, described in each column, t type suspension member 3 all includes multiple longitudinal directions along described building roof Length direction lays t type suspension member 3 on the same line from front to back;As shown in figure 3, each described t type suspension member 3 is all installed in Between the two Z-shaped suspension members 6 in left and right, each described t type suspension member 3 all forms one with two Z-shaped suspension members 6 being located at both sides around Assembled suspension member;Described in each column, the outside of outside composite plate is provided with suspension member 5 outside string, and described in each column, outside suspension member 5 is equal Lay outside suspension member 5 on the same line including multiple longitudinal length along described building roof from front to back;Each column The quantity of the t type suspension member 3 in described t type suspension member 3, stone material aluminium honeycomb composite plate 4 described in same being mounted is m, its Middle m is positive integer and m >=2;The outside suspension member in outside suspension member 5 described in each column, outside composite plate described in same being mounted 5 quantity are m;The left and right sides of every piece of described stone material aluminium honeycomb composite plate 4 is provided with string for suspension member 5 outside fixing Or the pre-embedded bolt 9 of Z-shaped suspension member 6, it is pre- that pre-embedded bolt 9 described in each column all includes that m lays on the same line from front to back Bury bolt 9;
Described t type suspension member 3 be t font and it include horizonal base plate 3-1 and be fixed in the middle part of horizonal base plate 3-1 the perpendicular of top To installing plate 3-2;Described Z-shaped suspension member 6 be z font and it include top board 6-1, be located at lower of the outer side-lower of top board 6-1 Fagging 6-2 and middle part connecting plate 6-3 being connected between top board 6-1 and lower supporting plate 6-2, described top board 6-1 and lower All in horizontal layout, described lower supporting plate 6-2 is fixed on stone material aluminium honeycomb composite plate 4 fagging 6-2 by pre-embedded bolt 9;Often In individual described assembled suspension member, the top board 6-1 of two described Z-shaped suspension members 6 is press respectively against a horizonal base plate 3-1 left side for t type suspension member 3 Above right both sides;
When constructed stone material aluminium honeycomb composite plate furred ceiling is constructed, comprise the following steps:
Step one, ceiling joist are installed: needing to install ceiling joist below the building roof of furred ceiling, described ceiling joist is in To laying and it is hung on described building roof level by multiple suspension rods 1;
Described ceiling joist is by lateral keel 2- that longitudinal Os Draconis 2-1 and the multiple tracks that multiple tracks is in parallel laying is in parallel laying 2 are spliced, and described longitudinal Os Draconis 2-1 is laid along the longitudinal length of described building roof, described longitudinal Os Draconis 2-1 The perpendicular laying with lateral keel 2-2;Longitudinal Os Draconis 2-1 described in multiple tracks is all laid in same level and its composition longitudinally dragon Skeleton, lateral keel 2-2 described in multiple tracks is all laid in same level and it forms lateral keel frame, longitudinally imperial described in per pass Bone 2-1 is all fastenedly connected with lateral keel 2-2 described in multiple tracks, and described longitudinal keel shoe is located at the lower section of described lateral keel frame;
Step 2, t type suspension member are installed: install multiple row t type suspension member 3, t described in multiple row on ceiling joist described in step one Type suspension member 3 is all laid in same level;
Vertical installing plate 3-2 in described t type suspension member 3 is fixedly mounted on longitudinal Os Draconis 2-1 by connecting bolt 8, often Arrange the multiple described t type suspension member 3 in described t type suspension member 3 be each attached to along with described longitudinal Os Draconis 2-1;
Step 3, stone material aluminium honeycomb composite plate are installed: to described in each piece in constructed stone material aluminium honeycomb composite plate furred ceiling Stone material aluminium honeycomb composite plate 4 is installed respectively, obtains the stone material aluminium honeycomb composite plate furred ceiling of construction molding;
The outside of every piece of described outside composite plate is all mounted on fixing structures by m described outside suspension member 5, described Fixing structures are described building roof, set outside the side wall outside described ceiling joist, described building roof or described side wall The framed side wallboard 7 put;The inner side of every piece of described outside composite plate is all mounted on by m described Z-shaped suspension member 6 and is installed on longitudinal Os Draconis On m described t type suspension member 3 on 2-1;Every piece of described intermediate composite sheet is all mounted on by 2m described Z-shaped suspension member 6 and is installed on On 2m described t type suspension member 3 on longitudinal Os Draconis 2-1;
Step 4, joint filling are processed: the described stone material aluminium honeycomb composite plate being completed to constructing in step 3 using gap-filling glue is hung In top, the splicing seams between adjacent two pieces of described stone material aluminium honeycomb composite plates 4 carry out joint filling process respectively.
In the present embodiment, the structure of all stone material aluminium honeycomb composite plates 4 and chi in described stone material aluminium honeycomb composite plate furred ceiling Very little all same.
During practice of construction, described stone material aluminium honeycomb composite plate 4 typically have 800mm × 800mm, 600mm × 1200mm, Multiple specification such as 600mm × 1000mm, 600mm × 1500mm, the plate construction of stone material aluminium honeycomb composite plate 4 has to comply with table 1 Requirement:
Table 1 stone material aluminium honeycomb composite plate plate construction requires table
Quantity m of installed pre-embedded bolt 9 on every piece of described stone material aluminium honeycomb composite plate 4, is combined according to stone material aluminum honeycomb The longitudinal length l of plate 4 is determined.
Described m=2~4, the longitudinal length l≤1500mm of described stone material aluminium honeycomb composite plate 4;
As l≤600mm, m=2;As 600mm < l≤1000mm, m=3;As 1000mm < l≤1500mm, m= 4.
In the present embodiment, l≤600mm, m=2.
During practice of construction, according to the longitudinal length l of stone material aluminium honeycomb composite plate 4, the value size of m accordingly can be adjusted Whole.
Before practice of construction, it is possible to use BIM bim according to drawing, specification, atlas and relevant regulations, Deepen Design is carried out to the drawing of constructed stone material aluminium honeycomb composite plate furred ceiling, and constructed stone material aluminum honeycomb will be considered The installation site of the equipment such as the light fixture on composite plate furred ceiling, Smoke Sensor, sprinkling equipment, air port double-edged fine-toothed comb, to constructed stone material In aluminium honeycomb composite plate furred ceiling, each piece of stone material aluminium honeycomb composite plate 4 carries out typesetting respectively, and obtains typesetting figure, reaches structure design Rationally and good looking appearance purpose, further according to typesetting figure, blanking processing is carried out to each piece of stone material aluminium honeycomb composite plate 4.
When reality is processed to each piece of described stone material aluminium honeycomb composite plate 4, need to be in the backboard of stone material aluminium honeycomb composite plate 4 The pre-buried 2m described pre-embedded bolt 9 in face.
Before carrying out ceiling joist installation in step one, first carry out surveying setting-out, release ceiling joist using level gauge Horizontal control lines and arch camber control line.
In the present embodiment, described in step one, longitudinal Os Draconis 2-1 and lateral keel 2-2 are shaped steel, described ceiling joist Longitudinal Os Draconis 2-1 described in middle per pass and being all fixedly connected with welding manner between lateral keel 2-2 described in multiple tracks.
And, longitudinal Os Draconis 2-1 and lateral keel 2-2 are Zinc-coated angle steel described in step one.
During practice of construction, described longitudinal Os Draconis 2-1 and lateral keel 2-2 are Zinc-coated angle steel (the i.e. angle steel of l50 × 4 Both sides width is 50mm and its thickness is 4mm).
In the present embodiment, the horizontal stroke of the laying spacing of longitudinal Os Draconis 2-1 and stone material aluminium honeycomb composite plate 4 in described ceiling joist Consistent to width.
For the position that access hole is arranged on constructed stone material aluminium honeycomb composite plate furred ceiling, also need additional Os Draconis are installed.
In the present embodiment, suspension rod 1 described in step one is metal suspension rod, between described metal suspension rod and lateral keel 2-2 It is fixedly connected with welding manner, described building roof is provided with pre-buried for the fixation of described metal suspension rod upper weld Part.
For reducing the impact to ceiling decoration smooth degree of layer of the sinking amount of deflection of described ceiling joist, described furred ceiling dragon as far as possible The mid portion springing height of bone should be not less than the 1/200 of room short span (i.e. the transverse width of described building roof).Step Before carrying out stone material aluminium honeycomb composite plate installation in rapid three, the line equipment in constructed stone material aluminium honeycomb composite plate furred ceiling is installed Must complete.
In the present embodiment, in step one, multiple described 1 point of multiple rows of multiple row of suspension rod are laid, and described in each column, suspension rod 1 all wraps Include the suspension rod 1 that multiple longitudinal length along described building roof are laid.
Before and after in suspension rod 1 described in each column, the spacing between two neighboring described suspension rod 1 is 900mm~1200mm, described hangs Distance outside all described ceiling joist of bar 1 is not to be exceeded 300mm, otherwise should increase suspension rod 1, when suspension rod 1 and constructed stone material When line equipment in aluminium honeycomb composite plate furred ceiling is met, adjustment suspension centre (i.e. the installation position of suspension rod 1) is to ensure furred ceiling quality.
In the present embodiment, between described suspension rod 1 and lateral keel 2-2 and between lateral keel 2-2 and longitudinal Os Draconis 2-1 All using welding manner, and weld formed angle welding foot welding height be 4mm~6mm, do preservative treatment after full weld.
After described ceiling joist installs, described ceiling joist lower edge is drawn logical ray examination to check and accept, and completes hidden work Journey is checked and accepted.
When carrying out the installation of stone material aluminium honeycomb composite plate in step 3, for making simple installation, first at the scene to each block of stone material aluminum Honeycomb composite plate 4 carries out walkthrough, and each piece of stone material aluminium honeycomb composite plate 4 is numbered respectively, subsequently again to stone material aluminum honeycomb Composite plate 4 carries out checking the number installing one by one.
In the present embodiment, when carrying out the installation of stone material aluminium honeycomb composite plate in step 3, from left to right or from right to left to many Arrange described stone material aluminium honeycomb composite plate 4 to be installed respectively;To when described in each column, stone material aluminium honeycomb composite plate 4 is installed, all From front to back or from rear to front block-by-block installation is carried out respectively to multiple described stone material aluminium honeycomb composite plates 4.
Thus, actual when carrying out stone material aluminium honeycomb composite plate and installing, branch's point row carry out hanging wire installation.
In the present embodiment, described t type suspension member 3 and Z-shaped suspension member 6 are aluminium alloy suspension member.
In the present embodiment, described middle part connecting plate 6-3 is in vertically to laying.
And, the vertical height of described middle part connecting plate 6-3 is identical with the thickness of slab of horizonal base plate 3-1.
In the present embodiment, in horizontal layout and it is fixedly mounted on longitudinal Os Draconis 2-1 described connecting bolt 8, described perpendicular Have one to install for connecting bolt 8 and can adjust for the vertical bolt that connecting bolt 8 moves up and down on installing plate 3-2 Hole, described vertical bolt adjustment hole is elongate holes.
Pre-embedded bolt 9 on each piece of stone material aluminium honeycomb composite plate 4 in described stone material aluminium honeycomb composite plate furred ceiling is furred ceiling Pre-embedded bolt, described furred ceiling pre-embedded bolt is in vertically to laying, described lower supporting plate 6-2 has the described furred ceiling of confession pre-buried The cross bolts adjustment hole that bolt is installed and can be moved left and right for described furred ceiling pre-embedded bolt, described cross bolts adjustment hole For elongate holes and itself and the perpendicular laying of described vertical bolt adjustment hole.
In the present embodiment, to when every piece described, intermediate composite sheet is installed in step 3, first by this intermediate composite sheet The 2m described Z-shaped suspension member 6 installed is press respectively against on the horizonal base plate 3-1 in 2m described t type suspension member 3, then by upper downward The setting height(from bottom) of whole 2m described t type suspension member 3 is adjusted to the vertical height of this intermediate composite sheet, and to this intermediate composite sheet Horizontal level carry out left and right adjustment, until this intermediate composite sheet is adjusted to the installation site being pre-designed;Treat that this centre is multiple Plywood adjusts to the installation site being pre-designed, to for fixing the connecting bolt 8 of 2m described t type suspension member 3 and being used for solid The pre-embedded bolt 9 (i.e. described furred ceiling pre-embedded bolt) determining 2m described t type suspension member 3 is locked respectively.
And, to for fixing the connecting bolt 8 of 2m described t type suspension member 3 and being used for fixing 2m described t type suspension member 3 Described furred ceiling pre-embedded bolt be locked respectively after, also need to distinguish on each connecting bolt 8 and each furred ceiling pre-embedded bolt Skidproof buckle is installed.
In the present embodiment, described vertical bolt adjustment hole is located at the middle part of vertical installing plate 3-2, and described cross bolts are adjusted Hole position is in the middle part of lower supporting plate 6-2.
In the present embodiment, described pre-embedded bolt 9 is a diameter of φ 8mm and length is the bolt of 40mm.
It is fastenedly connected using pre-embedded bolt 9 between described stone material aluminium honeycomb composite plate 4 and Z-shaped suspension member 6, Z-shaped suspension member 6 passes through T type suspension member 3 is fixedly connected with longitudinal Os Draconis 2-1, by described vertical bolt adjustment hole and described cross bolts adjustment hole, Simplicity, quick regulation can be carried out to the plate face flatness of each piece of stone material aluminium honeycomb composite plate 4 installed.
In the present embodiment, when carrying out the installation of stone material aluminium honeycomb composite plate in step 3, open from one layer of described building roof Begin, first stone material aluminium honeycomb composite plate 4 described in string is installed, then on the basis of this row stone material aluminium honeycomb composite plate 4, according to typesetting figure Each piece of stone material aluminium honeycomb composite plate 4 successively block-by-block retrusive is installed.
During practice of construction, a width of 4mm of seam of the described splicing seams between adjacent two pieces of described stone material aluminium honeycomb composite plates 4~ 6mm.
In the present embodiment, a width of 5mm of seam of described splicing seams, uses 5mm special seam control in described splicing seams (i.e. plate stitch) System seam is wide.When stone material aluminium honeycomb composite plate 4 is installed, to check with datum line, including horizontal direction and direction in length and breadth Absolute altitude is it is ensured that after the installation site of stone material aluminium honeycomb composite plate 4 is errorless, then connecting bolt 8 and pre-embedded bolt 9 are tightened with fixation Stone material aluminium honeycomb composite plate 4, installs skidproof buckle afterwards it is ensured that the flatness of each piece of stone material aluminium honeycomb composite plate 4 installed, and Ensure that the seam width of described splicing seams is consistent, seam no visual difference of height.
In the present embodiment, on every piece of described stone material aluminium honeycomb composite plate 4, set pre-embedded bolt 9 is symmetrically laid.
Thus, described in each column, the laying spacing of outside suspension member 5 China and foreign countries' pendant part 5 and t type in t type suspension member 3 described in each column are hung The laying spacing of part 3 is consistent.On every piece of described stone material aluminium honeycomb composite plate 4 installation position of pre-embedded bolt 9 with to this stone material aluminum The t type suspension member 3 that honeycomb composite plate 4 is mounted and/or the installation position of outside suspension member 5 are consistent.
As shown in Fig. 2 fixing structures described in step 3 is framed side wallboard 7, described framed side wallboard 7 is located at described stone material aluminum honeybee The left side of honeycomb composite plate furred ceiling or right side, and framed side wallboard 7 is outside the composite plate of described outside;Described framed side wallboard 7 be in vertically to Lay and its stone material aluminium honeycomb composite plate 4 described in polylith is laid from front to back along the longitudinal length of institute's construction building furred ceiling Stone material aluminium honeycomb composite plate 4 be spliced, the stone material aluminium honeycomb composite plate 4 in described framed side wallboard 7 be wallboard composite plate;Every piece The bottom of described wallboard composite plate is provided with the m pre-embedded bolt 9 for fixing outside suspension member 5, in described wallboard composite plate Pre-embedded bolt 9 be wallboard pre-embedded bolt, m described wallboard pre-embedded bolt is all laid in same level;Described outer pendant Part 5 be corner suspension member, described corner suspension member include outside fixed plate, be located at described outside fixed plate inside inner side fixed plate and It is connected to the oblique connecting plate between described outside fixed plate and described inner side fixed plate, described outside fixed plate is in vertically to cloth And if it is fixed in described wallboard composite plate by described wallboard pre-embedded bolt, described inner side fixed plate be in horizontal layout and its It is fixed in the composite plate of described outside by described furred ceiling pre-embedded bolt;Described oblique connecting plate inclines from outside to inside gradually downward Tiltedly.
In the present embodiment, in suspension rod 1 described in multiple row, it is located at the suspension rod 1 described in string of the leftmost side and the string being located at rear side Described suspension rod 1 is outside suspension rod, and the outside of outside suspension rod described in each column is respectively and fixedly provided with the level dragon supplying framed side wallboard 7 fixing one Bone 10, described horizontal keel 10 is in parallel laying with longitudinal Os Draconis 2-1.
The top of every piece of described wallboard composite plate is provided with m for the pre-embedded bolt 9 of fixing outside suspension member 5, every piece The pre-embedded bolt 9 being equipped with set by described wallboard composite plate top is wallboard fixing bolt, on each described wallboard fixing bolt It is respectively and fixedly provided with an inner side suspension member, be provided with one inside each described inner side suspension member and level dragon is fixed on by fastening bolt L shape suspension member 11 on bone 10, described inner side suspension member is that to the Z-shaped suspension member 6 laid, described l shape suspension member 11 is installed on institute in vertically State in the suspension member of inner side.
It is fastenedly connected by gap-filling glue between described wallboard composite plate bottom and described outside composite plate.Thus, when When described wallboard composite plate is identical with the material of described outside composite plate, between described wallboard composite plate and described outside composite plate Junction adopt gluing process.
During practice of construction, when described wallboard composite plate is different from the material of described outside composite plate, described wallboard is combined Closed up using end cap or negative and positive angle closing in line in junction between plate and described outside composite plate.
In the present embodiment, described outside suspension member 5 is aluminium alloy suspension member.
And, the angle between described inclination connecting plate and horizontal plane is 45 °.
In the present embodiment, when carrying out joint filling process in step 4, first using glue rifle, described gap-filling glue is uniformly injected into described In splicing seams, then struck off with scraper plate immediately;In described splicing seams, the thickness of described gap-filling glue is 4mm~6mm.
In the present embodiment, described gap-filling glue is sealing neutral silicone resin.
Before carrying out joint filling process in step 4, first clear up in described splicing seams and periphery debris, and in described splicing The both sides of seam paste protection adhesive tape respectively, prevent from polluting the surface stone material of described splicing seams the week side of boss, glue rifle to be employed is filled out described After seam glue is uniformly injected in described splicing seams and is struck off with scraper plate immediately, described protection adhesive tape of dismantling immediately, the glue ultimately forming Stitch 12 surfaces to smooth, centre is slightly recessed and no Zou's pleat.
After the completion of construction, also need according to the described stone material aluminum honeycomb to construction molding for the building engineering construction quality acceptance standard Composite plate furred ceiling carries out an acceptance inspection, and " Code for construction quality acceptance of building decoration " requires the flatness of described ceiling joist, rises Arch compliant requires, and the flatness error of described ceiling joist is not more than 2mm, and described ceiling joist is along short span 1/200 Arch camber, the surrounding levelness of described ceiling joist is not more than 5mm, and the panel flatness of described stone material aluminium honeycomb composite plate furred ceiling is not More than 2mm, the discrepancy in elevation of adjacent two pieces of described stone material aluminium honeycomb composite plates 4 is not more than 0.5mm, adjacent two pieces of described stone material aluminum honeycombs The linearity of the described splicing seams between composite plate 4 is not more than 2mm.
The above, be only presently preferred embodiments of the present invention, not the present invention imposed any restrictions, every according to the present invention Any simple modification, change and equivalent structure change that technical spirit is made to above example, all still fall within skill of the present invention In the protection domain of art scheme.

Claims (10)

1. a kind of stone material aluminium honeycomb composite plate ceiling construction method based on t type and Z-shaped suspension member it is characterised in that: constructed stone It is in the parallel stone material aluminium honeycomb composite plate laid and be respectively positioned in same level that material aluminium honeycomb composite plate furred ceiling includes multiple row (4), described in multiple row, stone material aluminium honeycomb composite plate (4) is laid from left to right along the transverse width direction of described building roof, Stone material aluminium honeycomb composite plate (4) described in each column all includes polylith and lays from front to back along the longitudinal length of described building roof Stone material aluminium honeycomb composite plate (4), described stone material aluminium honeycomb composite plate (4) be rectangle;Stone material aluminium honeycomb composite plate described in multiple row (4) it is located at the stone material aluminium honeycomb composite plate described in string (4) of the leftmost side and the stone material aluminum honeycomb described in string being located at the rightmost side in Composite plate (4) is outside composite plate, the institute outside the composite plate of side except as noted in stone material aluminium honeycomb composite plate (4) described in multiple row Stone material aluminium honeycomb composite plate (4) is had to be intermediate composite sheet;It is respectively provided between the adjacent two described stone material aluminium honeycomb composite plates (4) of row There is t type suspension member (3) that string is mounted to stone material aluminium honeycomb composite plate (4), t type suspension member (3) described in each column all includes multiple Longitudinal length along described building roof lays t type suspension member (3) on the same line from front to back;Each described t type Suspension member (3) is all installed between the two Z-shaped suspension members (6) in left and right, each described t type suspension member (3) all with positioned at both sides around Two Z-shaped suspension members (6) form an assembled suspension member;Described in each column, the outside of outside composite plate is provided with suspension member outside string (5), described in each column outside suspension member (5) all include multiple longitudinal length along described building roof be laid in from front to back with Outside suspension member (5) on one straight line;In t type suspension member (3) described in each column, stone material aluminium honeycomb composite plate (4) described in same is carried out The quantity of t type suspension member (3) mounting is m, and wherein m is positive integer and m >=2;To same in outside suspension member (5) described in each column Outside suspension member (5) quantity that outside composite plate described in block is mounted is m;Every piece of described stone material aluminium honeycomb composite plate (4) The left and right sides be provided with string for the pre-embedded bolt (9) of fixing outside suspension member (5) or Z-shaped suspension member (6), described in each column in advance Bury bolt (9) and all include the m pre-embedded bolt (9) laid from front to back on the same line;
Described t type suspension member (3) be t font and it include horizonal base plate (3-1) and be fixed in the middle part of horizonal base plate (3-1) above Vertical installing plate (3-2);Described Z-shaped suspension member (6) be z font and it include top board (6-1), be located at top board (6-1) outside The lower supporting plate (6-2) of lower section and the middle part connecting plate (6-3) being connected between top board (6-1) and lower supporting plate (6-2), institute State top board (6-1) and lower supporting plate (6-2) all in horizontal layout, it is fixing that described lower supporting plate (6-2) passes through pre-embedded bolt (9) On stone material aluminium honeycomb composite plate (4);The top board (6-1) of two described Z-shaped suspension members (6) point in each described assembled suspension member It is not pressed in above horizonal base plate (3-1) left and right sides of t type suspension member (3);
When constructed stone material aluminium honeycomb composite plate furred ceiling is constructed, comprise the following steps:
Step one, ceiling joist are installed: needing to install ceiling joist below the building roof of furred ceiling, described ceiling joist is in level To lay and its pass through multiple suspension rods (1) hang on described building roof;
Described ceiling joist is in longitudinal Os Draconis (2-1) of the parallel laying and multiple tracks lateral keel (2- in parallel laying by multiple tracks 2) it is spliced, described longitudinal Os Draconis (2-1) are laid along the longitudinal length of described building roof, described longitudinal Os Draconis (2-1) with the perpendicular laying of lateral keel (2-2);Described in multiple tracks, longitudinal Os Draconis (2-1) are all laid in same level and it The longitudinal keel shoe of composition, lateral keel (2-2) described in multiple tracks is all laid in same level and it forms lateral keel frame, often Described in road, longitudinal Os Draconis (2-1) are all fastenedly connected with lateral keel described in multiple tracks (2-2), and described longitudinal keel shoe is located at described horizontal stroke Lower section to keel shoe;
Step 2, t type suspension member are installed: install multiple row t type suspension member (3), t type described in multiple row on ceiling joist described in step one Suspension member (3) is all laid in same level;
Vertical installing plate (3-2) in described t type suspension member (3) is fixedly mounted on longitudinal Os Draconis (2-1) by connecting bolt (8) On, multiple described t type suspension member (3) in t type suspension member (3) described in each column be each attached to along with described longitudinal Os Draconis (2-1);
Step 3, stone material aluminium honeycomb composite plate are installed: to each block of described stone material in constructed stone material aluminium honeycomb composite plate furred ceiling Aluminium honeycomb composite plate (4) is installed respectively, obtains the stone material aluminium honeycomb composite plate furred ceiling of construction molding;
The outside of every piece of described outside composite plate is all mounted on fixing structures by m described outside suspension member (5), described solid Determine structures to be described building roof, arrange outside the side wall outside described ceiling joist, described building roof or described side wall Framed side wallboard (7);The inner side of every piece of described outside composite plate is all mounted on by m described Z-shaped suspension member (6) and is installed on longitudinal dragon On m described t type suspension member (3) on bone (2-1);Every piece of described intermediate composite sheet is all mounted by 2m described Z-shaped suspension member (6) On 2m described t type suspension member (3) on being installed on longitudinal Os Draconis (2-1);
Step 4, joint filling are processed: in the described stone material aluminium honeycomb composite plate furred ceiling being completed to constructing in step 3 using gap-filling glue Splicing seams between adjacent two pieces of described stone material aluminium honeycomb composite plates (4) carry out joint filling process respectively.
2., according to the stone material aluminium honeycomb composite plate ceiling construction method based on t type and Z-shaped suspension member described in claim 1, it is special Levy and be: when carrying out the installation of stone material aluminium honeycomb composite plate in step 3, from left to right or from right to left to stone material aluminum described in multiple row Honeycomb composite plate (4) is installed respectively;To when described in each column, stone material aluminium honeycomb composite plate (4) is installed, all from front to back Or from rear to front, block-by-block installation is carried out respectively to multiple described stone material aluminium honeycomb composite plates (4).
3. according to the stone material aluminium honeycomb composite plate ceiling construction method based on t type and Z-shaped suspension member described in claim 1 or 2, its It is characterised by: described t type suspension member (3) and Z-shaped suspension member (6) are aluminium alloy suspension member;Longitudinal Os Draconis (2-1) described in step one and Lateral keel (2-2) is shaped steel, longitudinal Os Draconis (2-1) and lateral keel described in multiple tracks described in per pass in described ceiling joist (2-2) all it is fixedly connected with welding manner between.
4., according to the stone material aluminium honeycomb composite plate ceiling construction method based on t type and Z-shaped suspension member described in claim 3, it is special Levy and be: described in step one, longitudinal Os Draconis (2-1) and lateral keel (2-2) are Zinc-coated angle steel.
5. according to the stone material aluminium honeycomb composite plate ceiling construction method based on t type and Z-shaped suspension member described in claim 1 or 2, its It is characterised by: suspension rod described in step one (1) is metal suspension rod, to weld between described metal suspension rod and lateral keel (2-2) Mode is fixedly connected, and described building roof is provided with the built-in fitting fixing for described metal suspension rod upper weld.
6. according to the stone material aluminium honeycomb composite plate ceiling construction method based on t type and Z-shaped suspension member described in claim 1 or 2, its It is characterised by: in horizontal layout and it is fixedly mounted on longitudinal Os Draconis (2-1) described connecting bolt (8), described vertical installation Have one on plate (3-2) to supply connecting bolt (8) to install and can adjust for the vertical bolt that connecting bolt (8) moves up and down Hole, described vertical bolt adjustment hole is elongate holes;
Pre-embedded bolt (9) on each piece of stone material aluminium honeycomb composite plate (4) in described stone material aluminium honeycomb composite plate furred ceiling is furred ceiling Pre-embedded bolt, described furred ceiling pre-embedded bolt is in vertically to laying, described lower supporting plate (6-2) has the described furred ceiling of confession pre- Bury the cross bolts adjustment hole that bolt is installed and can be moved left and right for described furred ceiling pre-embedded bolt, described cross bolts are adjusted Hole is elongate holes and itself and the perpendicular laying of described vertical bolt adjustment hole;
To when every piece described, intermediate composite sheet is installed in step 3, first by 2m installed on this intermediate composite sheet described z Type suspension member (6) is press respectively against on the horizonal base plate (3-1) in 2m described t type suspension member (3), more described by adjustment 2m up and down The setting height(from bottom) of t type suspension member (3) is adjusted to the vertical height of this intermediate composite sheet, and the horizontal position to this intermediate composite sheet Put and carry out left and right adjustment, until this intermediate composite sheet is adjusted to the installation site being pre-designed;Treat that this intermediate composite sheet adjusts To the installation site being pre-designed, to the connecting bolt (8) being used for fixing 2m described t type suspension member (3) be used for fixing 2m The described furred ceiling pre-embedded bolt of individual described t type suspension member (3) is locked respectively.
7., according to the stone material aluminium honeycomb composite plate ceiling construction method based on t type and Z-shaped suspension member described in claim 6, it is special Levy and be: described vertical bolt adjustment hole is located at the middle part of vertical installing plate (3-2), described cross bolts adjustment hole is located at lower The middle part of fagging (6-2);To the connecting bolt (8) being used for fixing 2m described t type suspension member (3) be used for fixing 2m described t After the described furred ceiling pre-embedded bolt that type suspension member (3) is fixed is locked respectively, also need to be in each connecting bolt (8) and each It is respectively mounted skidproof buckle on furred ceiling pre-embedded bolt.
8. according to the stone material aluminium honeycomb composite plate ceiling construction method based on t type and Z-shaped suspension member described in claim 1 or 2, its It is characterised by: described m=2~4, the longitudinal length l≤1500mm of described stone material aluminium honeycomb composite plate (4);
As l≤600mm, m=2;As 600mm < l≤1000mm, m=3;As 1000mm < l≤1500mm, m=4.
9. according to the stone material aluminium honeycomb composite plate ceiling construction method based on t type and Z-shaped suspension member described in claim 1 or 2, its It is characterised by: when carrying out joint filling process in step 4, first using glue rifle, described gap-filling glue is uniformly injected in described splicing seams, then Struck off with scraper plate immediately;In described splicing seams, the thickness of described gap-filling glue is 4mm~6mm;The a width of 4mm of seam of described splicing seams~ 6mm.
10. according to the stone material aluminium honeycomb composite plate ceiling construction method based on t type and Z-shaped suspension member described in claim 1 or 2, It is characterized in that: fixing structures described in step 3 is framed side wallboard (7), and described framed side wallboard (7) is located at described stone material aluminum honeycomb The left side of composite plate furred ceiling or right side, and framed side wallboard (7) is outside the composite plate of described outside;Described framed side wallboard (7) is in vertically To lay and its described in polylith stone material aluminium honeycomb composite plate (4) along institute's construction building furred ceiling longitudinal length from front to back The stone material aluminium honeycomb composite plate (4) laid is spliced, and the stone material aluminium honeycomb composite plate (4) in described framed side wallboard (7) is wallboard Composite plate;The bottom of every piece of described wallboard composite plate is provided with the m pre-embedded bolt (9) for fixing outside suspension member (5), institute Stating the pre-embedded bolt (9) in wallboard composite plate is wallboard pre-embedded bolt, and m described wallboard pre-embedded bolt is all laid in same level On face;Described outside suspension member (5) is corner suspension member, and described corner suspension member includes outside fixed plate, is located at described outside fixed plate The inner side fixed plate of inner side and the oblique connecting plate being connected between described outside fixed plate and described inner side fixed plate, described outer Side fixed plate is in that described inner side is consolidated vertically to laying and it is fixed in described wallboard composite plate by described wallboard pre-embedded bolt In horizontal layout and it is fixed in the composite plate of described outside fixed board by described furred ceiling pre-embedded bolt;Described oblique connecting plate by Tilt gradually downward to interior outward.
CN201611001516.3A 2016-11-14 2016-11-14 Based on T-shaped and Z-type pendant stone material aluminium honeycomb composite plate ceiling construction method Active CN106368368B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611001516.3A CN106368368B (en) 2016-11-14 2016-11-14 Based on T-shaped and Z-type pendant stone material aluminium honeycomb composite plate ceiling construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611001516.3A CN106368368B (en) 2016-11-14 2016-11-14 Based on T-shaped and Z-type pendant stone material aluminium honeycomb composite plate ceiling construction method

Publications (2)

Publication Number Publication Date
CN106368368A true CN106368368A (en) 2017-02-01
CN106368368B CN106368368B (en) 2018-07-03

Family

ID=57894103

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611001516.3A Active CN106368368B (en) 2016-11-14 2016-11-14 Based on T-shaped and Z-type pendant stone material aluminium honeycomb composite plate ceiling construction method

Country Status (1)

Country Link
CN (1) CN106368368B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107323649A (en) * 2017-05-18 2017-11-07 上海空间推进研究所 Airborne vehicle cabin door sealing structure
CN110056115A (en) * 2019-05-29 2019-07-26 深圳市中装建设集团股份有限公司 A kind of smallpox assembling-type metal keel structure designing system
CN110485671A (en) * 2019-09-09 2019-11-22 苏州美瑞德建筑装饰有限公司 A kind of stone material aluminum honeycomb combined wall board mounting structure and method
CN113073780A (en) * 2021-03-26 2021-07-06 浙江亚厦装饰股份有限公司 Concatenation formula aluminum honeycomb panel

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008025109A (en) * 2006-07-18 2008-02-07 Toyo Tire & Rubber Co Ltd Construction method of ceiling with joint cover
CN203373892U (en) * 2013-07-09 2014-01-01 深圳市美芝装饰设计工程股份有限公司 Glass suspended ceiling and suspended ceiling module thereof
CN203603337U (en) * 2013-11-18 2014-05-21 深圳市好耐福建材有限公司 Closely-spliced suspended ceiling system of anti-shock ceiling
CN104929297A (en) * 2015-07-22 2015-09-23 百益百利(福州)幕墙工程有限公司 Combined type ceiling hanging part and wood veneer ceiling installing process
CN105714969A (en) * 2016-03-04 2016-06-29 山东天元装饰工程有限公司 Variable-angle suspended ceiling switching mechanism

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008025109A (en) * 2006-07-18 2008-02-07 Toyo Tire & Rubber Co Ltd Construction method of ceiling with joint cover
CN203373892U (en) * 2013-07-09 2014-01-01 深圳市美芝装饰设计工程股份有限公司 Glass suspended ceiling and suspended ceiling module thereof
CN203603337U (en) * 2013-11-18 2014-05-21 深圳市好耐福建材有限公司 Closely-spliced suspended ceiling system of anti-shock ceiling
CN104929297A (en) * 2015-07-22 2015-09-23 百益百利(福州)幕墙工程有限公司 Combined type ceiling hanging part and wood veneer ceiling installing process
CN105714969A (en) * 2016-03-04 2016-06-29 山东天元装饰工程有限公司 Variable-angle suspended ceiling switching mechanism

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107323649A (en) * 2017-05-18 2017-11-07 上海空间推进研究所 Airborne vehicle cabin door sealing structure
CN110056115A (en) * 2019-05-29 2019-07-26 深圳市中装建设集团股份有限公司 A kind of smallpox assembling-type metal keel structure designing system
CN110056115B (en) * 2019-05-29 2024-03-29 深圳市中装建设集团股份有限公司 Using method of ceiling assembled metal keel structure
CN110485671A (en) * 2019-09-09 2019-11-22 苏州美瑞德建筑装饰有限公司 A kind of stone material aluminum honeycomb combined wall board mounting structure and method
CN110485671B (en) * 2019-09-09 2024-03-15 苏州美瑞德建筑装饰有限公司 Stone aluminum honeycomb composite wallboard mounting structure and method
CN113073780A (en) * 2021-03-26 2021-07-06 浙江亚厦装饰股份有限公司 Concatenation formula aluminum honeycomb panel

Also Published As

Publication number Publication date
CN106368368B (en) 2018-07-03

Similar Documents

Publication Publication Date Title
CN106368368A (en) Stone material aluminum honeycomb composite slab suspended ceiling construction method based on T-shaped and Z-shaped hanging parts
CN206308878U (en) Based on T-shaped and Z-type suspension member stone material aluminium honeycomb composite plate ceiling construction structure
CN107419870A (en) A kind of construction method for decorating panel cladding system and decoration panel cladding system
CN102947519A (en) Variable fastener for fixing curtain wall
CN104264920B (en) Construction method of ultrahigh large-curvature circular spiral as-cast-finish stair
CN104929297B (en) A kind of decoration panel installation of ceiling technique
CN105804305B (en) Corrugated metal plate ceiling system and its installation method
CN108729572B (en) Production line of wall body
CN108894488A (en) A kind of construction method of Novel section steel keel steel and wood composite template
CN206128603U (en) Curtain mounting structure that leads a wandering life cornices
CN106044486A (en) Car wall full-frame type elevator car
CN103469943B (en) Multi-angle glass curtain wall unit plate and consisting of glass curtain wall system
CN105155846A (en) Construction method for arc-shaped reinforced concrete stand
CN104196165B (en) Huge post of a kind of ultra-large type Multi-cavity steel structure and preparation method thereof
CN104294975B (en) A kind of aluminum facade attachment means
CN205875486U (en) Give a new lease of life to light -duty board curtain wall construction structure of stone architectural concrete
CN1122129C (en) Construction method of indoor decoration with light wall board
CN115306137A (en) Operation platform structure for mounting suspended ceiling at bottom of overhead corridor and construction method thereof
CN103410334B (en) A kind of clay plate curtain wall construction method of installation
CN105239703B (en) A kind of Wooden decoration board curtain wall construction method of installation
CN106567454A (en) Installation method of inclined steel reinforced concrete composite structure
CN203499072U (en) Multi-angle glass-curtain-wall unit plate and glass-curtain-wall system composed of same
CN208310158U (en) Construction protection crosshead
CN207919819U (en) A kind of steel framework concrete partition
CN206769290U (en) A kind of wallboard installing structure in house

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant