CN106351612B CN201610792882.9A CN201610792882A CN106351612B CN 106351612 B CN106351612 B CN 106351612B CN 201610792882 A CN201610792882 A CN 201610792882A CN 106351612 B CN106351612 B CN 106351612B
Authority
CN
China
Prior art keywords
horizontal well
well
yield
daily
branch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610792882.9A
Other languages
Chinese (zh)
Other versions
CN106351612A (en
Inventor
李忠厚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yanan University
Original Assignee
Yanan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yanan University filed Critical Yanan University
Priority to CN201610792882.9A priority Critical patent/CN106351612B/en
Publication of CN106351612A publication Critical patent/CN106351612A/en
Application granted granted Critical
Publication of CN106351612B publication Critical patent/CN106351612B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/12Methods or apparatus for controlling the flow of the obtained fluid to or in wells
    • E21B43/121Lifting well fluids
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/12Methods or apparatus for controlling the flow of the obtained fluid to or in wells

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Processing Of Solid Wastes (AREA)

Abstract

The branch horizontal well recovery method based on fractal dimension that the invention discloses a kind of, is specifically implemented according to the following steps:The theoretical value of the shale gas yield of branch horizontal well is calculated first, secondly it carries out the operation of branch horizontal well day actual production according to theoretical value and draws branch horizontal well day actual production and the curve graph of time, it is adjusted until curve graph trip point does not occur when trip point occurs in curve graph, when accumulative water yield and equal critical water yield, branch horizontal well is scrapped.A kind of branch horizontal well recovery method based on fractal dimension, it is adjusted after the generation of transition point, be conducive to shale gas and carry output water in horizontal wellbore in time, reduce the harm that air-water mixture returns shaft bottom, reduce aggregation of the output water in shaft bottom, it is efficient to reduce maintenance cost, save maintenance cost.

Description

Branch horizontal well mining method based on fractal dimension
Technical Field
The invention belongs to the technical field of shale gas exploitation operation, and relates to a fractal dimension-based method for exploiting a branch horizontal well.
Background
In shale gas development, the branch well is drilled on the basis of the horizontal well, so that the length of a target layer can be increased, the oil drainage area can be increased, and the oil gas yield can be improved. At present, the branched horizontal well technology is an effective means for exploiting a shale gas reservoir. In shale gas well production, in order to obtain the maximum cumulative production, generally, one method is to control the pressure at the bottom of a horizontal well of a gas well to be constant, and the other method is to control the flow rate at the top of the gas well to be constant.
However, the existing shale gas branch horizontal well mining method generally has the following defects: the bottom hole pressure is kept unchanged, the yield of the gas well is gradually reduced along with the time, and the economic benefit of gas well exploitation is reduced; if the flow of the wellhead is kept unchanged and the time goes on, the formation pressure difference causes formation water to be produced at the bottom of the horizontal well, the formation water blocks an airflow channel of shale gas, and the development life of the gas well is shortened. Neither of these two methods of exploitation takes into account the number of branches of a shale gas well in the reservoir, i.e., the fractal dimension of the shale gas well. Therefore, a method for exploiting a branch horizontal well considering the fractal dimension of shale gas so as to improve the shale gas recovery efficiency is needed in the prior art.
Disclosure of Invention
The invention aims to provide a fractal dimension-based method for exploiting a branch horizontal well, which solves the problems that in the existing exploitation of a shale gas branch horizontal well, along with the extension of exploitation time, stratum water at the bottom of the horizontal well blocks an airflow channel of shale gas, and the development life of a gas well is shortened.
The technical scheme adopted by the invention is that a fractal dimension-based method for exploiting a branch horizontal well is implemented according to the following steps:
step 1: determining core absolute permeability k of target reservoir0And viscosity of shale gas mug
Step 2: establishing a gas-water two-phase seepage formula under the influence of fractal dimension:
wherein,
in the formula, krwRepresents the relative permeability of the aqueous phase; mu.swRepresents the viscosity of the aqueous phase;representing a pressure gradient of the reservoir; q. q.swRepresenting the theoretical daily water yield of the branch horizontal well; q. q.sgRepresenting the daily gas production of the branch horizontal well; k is a radical ofrgRepresenting the relative permeability of shale gas; p represents the pressure at any location in the reservoir; dnRepresenting a fractal dimension; l represents the horizontal well segment length of the branched horizontal well; l isnRepresenting the length of the branch segment; n represents the total number of branches;
and step 3: computation branchTheoretical value q of horizontal well shale gas yield0
And 4, step 4: according to q in step 30Actual daily yield q of branch horizontal wellsIs put into production, i.e. qs=q0Simultaneously recording production time, drawing a curve graph A of daily actual yield and time of the branched horizontal well, and drawing a curve graph B of daily actual water yield and time of the branched horizontal well;
and 5: when the curve A of the step 4 has a jump point, adjusting the daily actual yield q of the branched horizontal wellsIs denoted by q1
Step 6: according to q in step 51Actual daily yield q of branch horizontal wellsIs put into production, i.e. qs=q1Simultaneously recording production time, drawing a curve graph A of daily actual yield and time of the branched horizontal well, and drawing a curve graph B of daily actual water yield and time of the branched horizontal well;
and 7: when the curve A of the step 6 has a jump point, adjusting the daily actual yield q of the branched horizontal wellsIs denoted by q2
And 8: repeating the step 6 and the step 7 until the curve graph A of the daily actual yield and the time of the branched horizontal well does not have a jump point, and at the moment, the daily actual yield of the branched horizontal well is not adjusted;
and step 9: summing daily water yield on a curve chart B of daily actual water yield and time of the branched horizontal well to obtain the accumulated water yield QWater assemblyAnd when the accumulated water yield is equal to the critical water yield, the branch horizontal well is discarded.
The invention is also characterized in that:
calculating a theoretical value q of shale gas yield of the branch horizontal well in step 30The specific method comprises the following steps:
according to the stable seepage theory, integrating the formula (1) by using a quasi-function method to obtain a shale gas yield formula as follows:
in the formula I0Represents the horizontal length of the gas layer; zscRepresenting the gas compression factor in a standard state; t isscRepresents the temperature in the standard state; rhogscRepresents the gas density in the standard state; p is a radical ofscIndicating a standard state down force; t represents the formation temperature; z represents a gas compression factor; p is a radical ofeRepresenting the original formation pressure; p is a radical ofwnRepresenting the bottom pressure of the horizontal well branch, and R (t) representing the dynamic boundary under the influence of the horizontal well branch; r iswnRepresenting the lateral wellbore radius.
Adjusting daily actual yield q of the branched horizontal well in step 5sThe specific method comprises the following steps:
step 5.1: determining the total branch number n and the interval l of the perforation positions of each adjacent branch well according to the drilling and perforation data of the branch horizontal well, and establishing an adjusting function based on the fractal dimension as follows:
wherein,
wherein β represents the shale formation pressure propagation coefficient, v represents the formation pressure drop propagation velocity, f (t) represents an adjustment function, t represents the production time, INT () represents a rounding function, p represents the formation pressure;
step 5.2: branching the daily actual yield q of the horizontal well according to the adjusting function of the step 5.1sThe adjustment is carried out, and the adjustment is carried out,
in the formula, q1Indicating the daily production of gas well wellhead adjustments.
Cumulative water yield Q in step 9Water assemblyThe calculation method comprises the following steps:
in the formula, qDaily waterRepresenting the daily actual water yield of the shale gas well
The critical water production in step 9 is determined by exploratory well and well testing data of the target reservoir.
Absolute permeability k of core in step 10Measured by an automatic core permeability tester.
Viscosity mu of shale gas in step 1gObtained by curve fitting.
The invention has the beneficial effects that:
1. a fractal dimension-based multilateral horizontal well exploitation method is characterized in that according to the characteristics of multilateral horizontal well shale gas exploitation, a gas-water two-phase seepage formula considering the fractal dimension of shale gas is established, and the shale gas in a reservoir layer can be fully exploited, so that the recovery ratio of the shale gas is improved;
2. an adjustment function based on the fractal dimension is established, so that the yield of the gas well can be reasonably adjusted, blind adjustment is avoided, and damage to the gas layer is reduced;
3. a formula for adjusting the wellhead flow of the gas well in a grading manner according to an adjusting function based on the fractal dimension is established, and the stratum production pressure difference can be reduced by selecting the reasonable wellhead flow for adjusting shale gas in a grading manner, so that the stratum water channeling is slowed down, and the exploitation life of a branch horizontal well is prolonged;
4. when a jump point appears on a production curve chart according to a mining method based on fractal dimension, a proper adjusting time is selected, the pressure drop speed of a region where a pressure drop funnel reaches can be delayed, the desorption gas precipitation time and the desorption amount are prolonged, and therefore the accumulated yield is integrally increased; the adjustment is carried out after the jump point is generated, so that shale gas can carry produced water in a horizontal shaft in time, the harm of returning a gas-water mixture to the shaft bottom is reduced, and the accumulation of the produced water at the shaft bottom is reduced, thereby reducing the maintenance cost, having high efficiency and saving the maintenance cost.
Drawings
FIG. 1 is a schematic diagram of curve A;
fig. 2 is a schematic diagram of curve B.
Detailed Description
The invention relates to a fractal dimension-based method for exploiting a branch horizontal well, which specifically comprises the following steps:
step 1: determining core absolute permeability k of target reservoir0And viscosity of shale gas mugWherein the absolute permeability k of the core0Viscosity mu of shale gas measured by automatic core permeability testergObtained by a curve fitting method;
step 2: establishing a gas-water two-phase seepage formula under the influence of fractal dimension:
wherein,
in the formula, krwRepresents the relative permeability of the aqueous phase; mu.swRepresents the viscosity of the aqueous phase;representing a pressure gradient of the reservoir; q. q.swRepresenting the theoretical daily water yield of the branch horizontal well; q. q.sgRepresenting the daily gas production of the branch horizontal well; k is a radical ofrgRepresenting the relative permeability of shale gas; p represents the pressure at any location in the reservoir; dnRepresenting a fractal dimension; l represents the horizontal well segment length of the branched horizontal well; l isnRepresenting the length of the branch segment; n represents the total number of branches;
and step 3: calculating theoretical value q of shale gas yield of branch horizontal well0The specific method comprises the following steps:
according to the stable seepage theory, integrating the formula (1) by using a quasi-function method to obtain a shale gas yield formula as follows:
in the formula I0Represents the horizontal length of the gas layer; zscRepresenting the gas compression factor in a standard state; t isscRepresents the temperature in the standard state; rhogscRepresents the gas density in the standard state; p is a radical ofscIndicating a standard state down force; t represents the formation temperature; z represents a gas compression factor; p is a radical ofeRepresenting the original formation pressure; p is a radical ofwnRepresenting the bottom hole pressure of a horizontal well branch; r (t) represents the dynamic boundary under the influence of horizontal well branches; r iswnRepresenting a lateral wellbore radius;
and 4, step 4: according to q in step 30Actual daily yield q of branch horizontal wellsIs put into production, i.e. qs=q0Recording production time, drawing a curve graph A of daily actual yield and time of the branched horizontal well and drawing a curve graph B of daily actual water yield and time of the branched horizontal well;
and 5: when the curve A of the step 4 has a jump point, adjusting the daily actual yield q of the branched horizontal wellsIs denoted by q1
Adjusting daily actual yield q of branch horizontal wellsThe specific method comprises the following steps:
step 5.1: determining the total branch number n and the interval l of the perforation positions of each adjacent branch well according to the drilling and perforation data of the branch horizontal well, and establishing an adjusting function based on the fractal dimension as follows:
wherein,
wherein β represents the shale formation pressure propagation coefficient, v represents the formation pressure drop propagation velocity, f (t) represents an adjustment function, t represents the production time, INT () represents a rounding function, p represents the formation pressure;
step 5.2: branching the daily actual yield q of the horizontal well according to the adjusting function of the step 5.1sThe adjustment is carried out, and the adjustment is carried out,
in the formula, q1Indicating the daily adjustment yield of the wellhead of the gas well;
step 6: according to q in step 51Actual daily yield q of branch horizontal wellsIs put into production, i.e. qs=q1Recording production time, drawing a curve graph A of daily actual yield and time of the branched horizontal well and drawing a curve graph B of daily actual water yield and time of the branched horizontal well;
and 7: when the curve A of the step 6 has a jump point, adjusting the daily actual yield q of the branched horizontal wellsIs denoted by q2
And 8: repeating the step 6 and the step 7 until the curve graph A of the daily actual yield and the time of the branched horizontal well does not have a jump point, and at the moment, the daily actual yield of the branched horizontal well is not adjusted;
and step 9: summing daily water yield on a curve chart B of daily actual water yield and time of the branched horizontal well to obtain the accumulated water yield QWater assemblySaid cumulative water production QWater assemblyThe calculation method comprises the following steps:
in the formula, qDaily waterRepresenting the daily actual water yield of the shale gas well
And when the accumulated water yield is equal to the critical water yield, the branch horizontal well is discarded.
It is to be understood that the embodiments described are only a few embodiments of the present application and not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present application. Because the total gas production of the shale gas well comprises two parts of the production caused by gas layer pressure reduction and the production caused by shale gas desorption gas, the purposes of delaying formation water production and prolonging the service life of the gas well so as to increase the desorption gas production can be achieved by adjusting the wellhead production of the shale gas, and finally the purpose of increasing the total production of the shale gas well is achieved.
A fractal dimension-based multilateral horizontal well exploitation method is characterized in that according to the characteristics of multilateral horizontal well shale gas exploitation, a gas-water two-phase seepage formula considering the fractal dimension of shale gas is established, and the shale gas in a reservoir layer can be fully exploited, so that the recovery ratio of the shale gas is improved; an adjustment function based on the fractal dimension is established, so that the yield of the gas well can be reasonably adjusted, blind adjustment is avoided, and damage to the gas layer is reduced; a formula for adjusting the wellhead flow of the gas well in a grading manner according to an adjusting function based on the fractal dimension is established, and the stratum production pressure difference can be reduced by selecting the reasonable wellhead flow for adjusting shale gas in a grading manner, so that the stratum water channeling is slowed down, and the exploitation life of a branch horizontal well is prolonged; when a jump point appears on a production curve chart according to a mining method based on fractal dimension, a proper adjusting time is selected, the pressure drop speed of a region where a pressure drop funnel reaches can be delayed, the desorption gas precipitation time and the desorption amount are prolonged, and therefore the accumulated yield is integrally increased; the adjustment is carried out after the jump point is generated, so that shale gas can carry produced water in a horizontal shaft in time, the harm of returning a gas-water mixture to the shaft bottom is reduced, and the accumulation of the produced water at the shaft bottom is reduced, thereby reducing the maintenance cost, having high efficiency and saving the maintenance cost.

Claims (7)

1. A method for exploiting a branch horizontal well based on a fractal dimension is characterized by comprising the following steps:
step 1: determining core absolute permeability k of target reservoir0And viscosity of shale gas mug
Step 2: establishing a gas-water two-phase seepage formula under the influence of fractal dimension:
wherein,
in the formula, krwRepresents the relative permeability of the aqueous phase; mu.swRepresents the viscosity of the aqueous phase;representing a pressure gradient of the reservoir; q. q.swRepresenting the theoretical daily water yield of the branch horizontal well; q. q.sgRepresenting the daily gas production of the branch horizontal well; k is a radical ofrgRepresenting the relative permeability of shale gas; p represents the pressure at any location in the reservoir; dnRepresenting a fractal dimension; l represents the horizontal well segment length of the branched horizontal well; l isnRepresenting the length of the branch segment; n represents the total number of branches;
and step 3: calculating theoretical value q of shale gas yield of branch horizontal well0
And 4, step 4: according to q in step 30Actual daily yield q of branch horizontal wellsIs put into production, i.e. qs=q0Simultaneously recording production time, drawing a curve graph A of daily actual yield and time of the branched horizontal well, and drawing a curve graph B of daily actual water yield and time of the branched horizontal well;
and 5: when the curve A of the step 4 has a jump point, adjusting the daily actual yield q of the branched horizontal wellsIs denoted by q1
Step 6: according to q in step 51Actual daily yield q of branch horizontal wellsIs put into production, i.e. qs=q1Simultaneously recording production time, drawing a curve graph A of daily actual yield and time of the branched horizontal well, and drawing a curve graph B of daily actual water yield and time of the branched horizontal well;
and 7: when the curve A of the step 6 has a jump point, adjusting the daily actual yield q of the branched horizontal wellsIs denoted by q2
And 8: repeating the step 6 and the step 7 until the curve graph A of the daily actual yield and the time of the branched horizontal well does not have a jump point, and at the moment, the daily actual yield of the branched horizontal well is not adjusted;
and step 9: summing daily water yield on a curve chart B of daily actual water yield and time of the branched horizontal well to obtain the accumulated water yield QWater assemblyAnd when the accumulated water yield is equal to the critical water yield, the branch horizontal well is discarded.
2. The method for exploiting the horizontal multilateral well based on the fractal dimension as claimed in claim 1, wherein the absolute permeability k of the core in the step 1 is0Measured by an automatic core permeability tester.
3. The method for exploiting the horizontal multilateral well based on the fractal dimension as claimed in claim 1, wherein the viscosity mu of the shale gas in the step 1gObtained by curve fitting.
4. The method for exploiting the horizontal multilateral well based on the fractal dimension as claimed in claim 1, wherein the theoretical value q of shale gas yield of the horizontal multilateral well is calculated in the step 30The specific method comprises the following steps:
according to the stable seepage theory, integrating the formula (1) by using a quasi-function method to obtain a shale gas yield formula as follows:
in the formula I0Represents the horizontal length of the gas layer; zscRepresenting the gas compression factor in a standard state; t isscRepresents the temperature in the standard state; rhogscRepresents the gas density in the standard state; p is a radical ofscIndicating a standard state down force; t represents the formation temperature; z represents a gas compression factor; p is a radical ofeRepresenting the original formation pressure; p is a radical ofwnRepresenting the bottom hole pressure of a horizontal well branch; r (t) represents the dynamic boundary under the influence of horizontal well branches; r iswnRepresenting the lateral wellbore radius.
5. The method for exploiting the horizontal multilateral well based on the fractal dimension as claimed in claim 4, wherein the daily actual yield q of the horizontal multilateral well is adjusted in the step 5sThe specific method comprises the following steps:
step 5.1: determining the total branch number n and the interval l of the perforation positions of each adjacent branch well according to the drilling and perforation data of the branch horizontal well, and establishing an adjusting function based on the fractal dimension as follows:
wherein,wherein β represents the shale formation pressure propagation coefficient, v represents the formation pressure drop propagation velocity, f (t) represents an adjusting function, t represents the exploitation time, INT () represents a rounding function, and 5.2, the daily actual production q of the branch horizontal well is adjusted according to the adjusting function of the step 5.1sThe adjustment is carried out, and the adjustment is carried out,
in the formula, q1Indicating the daily production of gas well wellhead adjustments.
6. The method for exploiting the horizontal multilateral well based on the fractal dimension as claimed in claim 1, wherein the cumulative water yield Q in the step 9Water assemblyThe calculation method comprises the following steps:
in the formula, qDaily waterRepresenting the daily actual water yield of the shale gas well; t represents the production time.
7. A fractal dimension based horizontal offset well mining method as claimed in claim 1, wherein the critical water production in step 9 is determined by exploratory well and well test data of the target reservoir.
CN201610792882.9A 2016-10-31 2016-10-31 A kind of branch horizontal well recovery method based on fractal dimension Expired - Fee Related CN106351612B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610792882.9A CN106351612B (en) 2016-10-31 2016-10-31 A kind of branch horizontal well recovery method based on fractal dimension

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610792882.9A CN106351612B (en) 2016-10-31 2016-10-31 A kind of branch horizontal well recovery method based on fractal dimension

Publications (2)

Publication Number Publication Date
CN106351612A CN106351612A (en) 2017-01-25
CN106351612B true CN106351612B (en) 2018-08-21

Family

ID=57856962

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610792882.9A Expired - Fee Related CN106351612B (en) 2016-10-31 2016-10-31 A kind of branch horizontal well recovery method based on fractal dimension

Country Status (1)

Country Link
CN (1) CN106351612B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104389594A (en) * 2014-10-13 2015-03-04 成都创源油气技术开发有限公司 Shale gas well productivity evaluation and prediction method
CN104834807A (en) * 2015-03-18 2015-08-12 成都北方石油勘探开发技术有限公司 Stress sensitive reservoir stratum relative permeability calculation method based on fractal theory
CN104948163A (en) * 2014-03-24 2015-09-30 中国石油化工股份有限公司 Method for measuring shale gas well capacity
CN105625990A (en) * 2014-10-30 2016-06-01 中国石油化工股份有限公司 Method for mining shale oil by virtue of horizontal well through performing volume fracturing on reservoirs
CN105840187A (en) * 2016-06-03 2016-08-10 陕西延长石油(集团)有限责任公司研究院 Method for calculating staged fracturing productivity of compact reservoir horizontal well

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2811760B1 (en) * 2000-07-17 2002-09-13 Inst Francais Du Petrole METHOD FOR MODELING FLUID DISPLACEMENTS IN A POROUS MEDIUM TAKING ACCOUNT OF HYSTERESIS EFFECTS
CA2856132C (en) * 2011-11-22 2016-06-07 Saudi Arabian Oil Comapny Coupled pipe network - reservoir modeling for multi-branch oil wells

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104948163A (en) * 2014-03-24 2015-09-30 中国石油化工股份有限公司 Method for measuring shale gas well capacity
CN104389594A (en) * 2014-10-13 2015-03-04 成都创源油气技术开发有限公司 Shale gas well productivity evaluation and prediction method
CN105625990A (en) * 2014-10-30 2016-06-01 中国石油化工股份有限公司 Method for mining shale oil by virtue of horizontal well through performing volume fracturing on reservoirs
CN104834807A (en) * 2015-03-18 2015-08-12 成都北方石油勘探开发技术有限公司 Stress sensitive reservoir stratum relative permeability calculation method based on fractal theory
CN105840187A (en) * 2016-06-03 2016-08-10 陕西延长石油(集团)有限责任公司研究院 Method for calculating staged fracturing productivity of compact reservoir horizontal well

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
《基于分形理论的油页岩有效扩散系数研究》;范新欣 等;《化学工程》;20101031;第38卷(第10期);第238-242页 *
《确定气水同产水平井流入动态关系的新方法》;谭晓华 等;《石油钻采工程》;20140531;第36卷(第3期);第59-64页 *
《页岩气不稳定渗流压力传播规律和数学模型》;朱维耀 等;《石油勘探与开发》;20160430;第43卷(第2期);第261-267页 *

Also Published As

Publication number Publication date
CN106351612A (en) 2017-01-25

Similar Documents

Publication Publication Date Title
CN106437629B (en) A kind of branch horizontal well recovery method based on starting pressure gradient
CN105587298B (en) The water dependent well moisture content inversion method of manifold tube pattern
CN106484933A (en) A kind of method and system for determining shale gas well well control dynamic holdup
CN107630686B (en) compact oil energy supplementing method for staggered displacement and imbibition displacement between horizontal well sections
CN107832540A (en) A kind of compact oil reservoir technical limit well space determines method
CN106640027A (en) Spatial structure well pattern construction method for underground river type carbonate karst reservoir of fractured-vuggy reservoir
CN105626036A (en) Oil reservoir engineering calculation method for determining reasonable oil reservoir liquid yield
CN104234677A (en) Method for improving condensate recovery ratio of condensate gas reservoir through gas injection vertical displacement
CN104100237B (en) Drainage and mining method for coal-bed gas well
CN111535792A (en) Shale gas well flowback rate prediction method
CN110259421A (en) Fractured compact oil reservoir water injection energy supplementing method
CN104727790A (en) Method for predicting period of re-enriching remaining oil of water flooding reservoir into new reservoir
CN106285568B (en) A kind of branch horizontal well recovery method based on Green's function
CN106351612B (en) A kind of branch horizontal well recovery method based on fractal dimension
CN106354957B (en) A kind of branch horizontal well recovery method based on Bessel function
CN106437630B (en) A kind of branch horizontal well recovery method based on diffusion coefficient
RU2434124C1 (en) Procedure for development of oil deposit in carbonate collectors complicated with erosion cut
CN106285569B (en) A kind of branch horizontal well recovery method based on slippage coefficient
CN105863581A (en) Oil extraction method for controlling water and increasing oil of high-water-content oil well of buried hill oil reservoir
CN110630230B (en) Development method for controlling water content of water flooding after ultra-high water content period
CN102778260B (en) Calculation method for water drainage and water drainage time in dynamic precipitation process of submersible fully penetrating well or well group
CN104297797A (en) Refraction micro-metering well investigation method for ultra-thick loess highland
CN105625992A (en) Reasonable liquid extracting method specific to roof ridge fault block oil reservoir
CN105673004A (en) Method for developing high pour-point oil reservoir
CN109538167B (en) Method for sectional step-by-step drainage and production of coal bed gas U-shaped well

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180821

Termination date: 20191031

CF01 Termination of patent right due to non-payment of annual fee