CN106321585A - Color steel adhesive recovery device and recovery method - Google Patents

Color steel adhesive recovery device and recovery method Download PDF

Info

Publication number
CN106321585A
CN106321585A CN201611027365.9A CN201611027365A CN106321585A CN 106321585 A CN106321585 A CN 106321585A CN 201611027365 A CN201611027365 A CN 201611027365A CN 106321585 A CN106321585 A CN 106321585A
Authority
CN
China
Prior art keywords
glue
black
white
black glue
storage box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611027365.9A
Other languages
Chinese (zh)
Other versions
CN106321585B (en
Inventor
倪兆刚
倪旭正
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201611027365.9A priority Critical patent/CN106321585B/en
Publication of CN106321585A publication Critical patent/CN106321585A/en
Application granted granted Critical
Publication of CN106321585B publication Critical patent/CN106321585B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B11/00Connecting constructional elements or machine parts by sticking or pressing them together, e.g. cold pressure welding
    • F16B11/006Connecting constructional elements or machine parts by sticking or pressing them together, e.g. cold pressure welding by gluing

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Details Or Accessories Of Spraying Plant Or Apparatus (AREA)

Abstract

The invention belongs to the technical field of color steel adhesive spraying and discloses a color steel adhesive recovery device and a recovery method. The color steel adhesive recovery device is mainly technically characterized by comprising a white adhesive collection tank and a black adhesive collection tank below a white adhesive pipe and a black adhesive pipe respectively; a temporary white adhesive storage chamber and a temporary black adhesive storage chamber are arranged below the white adhesive collection tank and the black adhesive collection tank respectively; a black adhesive guide pipe communicated with the temporary black adhesive storage chamber is arranged below the black adhesive collection tank, the lower end of the black adhesive guide pipe is inserted to the bottom of the temporary black adhesive storage chamber, and a seal plug is arranged above the black adhesive guide pipe; a black adhesive flow guide pipe is arranged below the temporary black adhesive storage chamber, an 'N'-shaped guide pipe is arranged in the temporary black adhesive storage chamber and communicated with a black adhesive storage chamber through the black adhesive guide pipe, and the temporary white adhesive storage chamber is directly communicated with a white adhesive storage chamber. In a collection process, black adhesive is constantly kept in a closed space, air drying and solidification of the black adhesive are avoided, and the collected black adhesive can be recycled, so that production cost is greatly reduced, and air or soil pollution caused by combustion or discard of a solidified black adhesive and white adhesive mixture is avoided.

Description

Color steel bonded adhesives retracting device and the method for recovery
Technical field
The invention belongs to color steel adhesive technology field, particularly relate to a kind of color steel bonded adhesives retracting device and recovery method.
Background technology
In order to be incubated, sound insulation, the purpose such as anticorrosion, need on color steel the materials such as adhering glass silk, foam, bonded adhesives bag Including black glue and white glue mixing, this bonded adhesives has the most hardening indehiscent advantage of cured glue layer.In production process, by black glue Black glue and white glue are dropped on color steel by pipe and white rubber tube, then smear uniformly by smearing mechanism, in the color steel end or Quit work etc. when need not smear, in order to avoid black glue and white glue fall on operating board, operating board of making dirty, scrap rubber groove is placed on Below white rubber tube and black sebific duct, white glue and black glue are dropped in scrap rubber groove.There is following defect in said method: one, is producing During, need scrap rubber groove of repeatedly taking, not only operate inconvenience, but also easily cause scrap rubber groove and the problem such as topple over and occur, make Scrap rubber falls in mill floor or frame, cleans difficulty;Its two, white glue and black glue mixing fall in scrap rubber groove, cause material Waste, increases production cost;Its three, mixed black glue and white glue solidify in scrap rubber groove, and the scrap rubber after solidification is dropped Or burn, cause the pollution of air and soil.
Summary of the invention
First technical problem that the invention solves the problems that just is to provide a kind of black glue and white glue can be collected recycling, have Effect reduces production cost, pollution-free, easy to operate color steel bonded adhesives retracting device.
For solving the problems referred to above, the technical scheme that coloured silk steel bonded adhesives retracting device of the present invention uses is: include being positioned at two ends Bracing frame and connect bracing frame connecting rod, be provided above white rubber tube bracing frame and black sebific duct bracing frame at support frame as described above, It is provided above white rubber tube and black sebific duct, at described white rubber tube and black sebific duct at described white rubber tube bracing frame and black sebific duct bracing frame Between be provided with striker plate, below described white rubber tube bracing frame and black sebific duct bracing frame, be provided with transverse slipway, described in vain It is provided with white glue temporary storage box below sebific duct, below described black sebific duct, is provided with black glue temporary storage box, described white glue temporary storage box and institute State black glue temporary storage box two ends to be positioned on described transverse slipway, be provided above white glue collecting tank at described white glue temporary storage box, It is provided with the white glue skirt connected with white glue temporary storage box below described white glue collecting tank, is provided with below described white glue temporary storage box White glue mozzle, is provided with white glue magazine below described white glue mozzle, is provided with and deposits with white glue below described white glue magazine The white glue conduit of storage tank top connection, is provided with white glue outlet in described white glue storage box side;In described white glue storage box Side is provided with white glue air vent, is provided above black glue collecting tank at described black glue temporary storage box, below described black glue collecting tank Being provided with the black glue skirt connected with black glue temporary storage box, this black glue skirt lower end is inserted bottom black glue temporary storage box, at described black glue Skirt is provided above closure, is provided above draw bar in described closure, and described draw bar is connected with described fork;Described Be provided with black glue mozzle below black glue temporary storage box, in described black glue temporary storage box, be provided with " N " type passage, this passage with Described black glue mozzle connection, is provided with black glue material receiving tube below described black glue mozzle, at described black glue mozzle and black Sealing sleeve pipe it is provided with outside glue material receiving tube;It is provided with black with what black glue storage box top connected below described black glue material receiving tube Glue conduit, is provided with black gel outlet in described black glue storage box side;It is provided above black glue aerofluxus in described black glue storage box Mouthful, described black glue air vent is provided with exhaustor, described exhaustor is provided with flow control valve;Temporary at described white glue It is provided with transverse shifting controlling organization between storage tank and described black glue temporary storage box.
Its additional technical feature is:
Described transverse shifting controlling organization includes push-pull bar, and on described push-pull bar, activity fixes two connecting rods, described in two The other end side of connecting rod is not fixed on described white glue temporary storage box and black glue temporary storage box;
Described flow control valve is fixed on described bracing frame, at support frame as described above, lateral outer side is provided with bar shaped card Groove, the control bar of described flow control valve is positioned at draw-in groove, and described swing link end part is positioned at above described draw-in groove, at described draw-in groove one Side is provided with sheet metal, and this sheet metal electrically connects with the diode with power supply;
The cross section of described white glue collecting tank and black glue collecting tank is " V " font;
Described black glue conduit is transparent plastic tube;
Described connecting rod is the metal tube of closed at both ends, is respectively arranged with valve at described connecting rod two ends, and described connecting rod is serially connected in institute In the middle part of the exhaustor stated.
Second technical problem that the invention solves the problems that just is to provide the above-mentioned color steel bonded adhesives retracting device of a kind of use and enters The method that the color steel bonded adhesives of row reclaims.
For solving the problems referred to above, the technical scheme that coloured silk steel bonded adhesives recovery method of the present invention uses is:
The method comprises the following steps:
The first step, fixing color steel bonded adhesives retracting device
Coloured silk steel bonded adhesives retracting device is fixed on above color steel spraying track
Second step, filler
Rotational swing rod, makes closure remove black glue skirt upper end, is poured in black glue collecting tank by black collagen material, and black glue is drawn by black glue Pipe enters in black glue temporary storage box, and when glue liquid surface height black in black glue temporary storage box is higher than passage upper port, black glue can be along guide Pipe upper port flows into passage, flow to black glue mozzle from passage, now, stops pouring black glue in black glue collecting tank, logical Cross fork and draw bar controls closure and inserts in black glue skirt, simultaneously close off the flow control valve on black glue exhaustor;
3rd step, removes white glue temporary storage box and black glue temporary storage box
By transverse shifting controlling organization, white glue temporary storage box and black glue temporary storage box are moved to transverse slipway both sides so that black glue is received Collection groove and white glue collecting tank are respectively from black sebific duct and white rubber tube moved out from beneath;
4th step, glue spraying
By black sebific duct and white rubber tube to color steel surface glue spraying;
5th step, unnecessary black glue and the collection of white glue
When color steel arrives end or other need not spray black glue and white glue, by transverse shifting controlling organization, will be white Glue temporary storage box and black glue temporary storage box are simultaneously moved to transverse slipway centre position so that black glue collecting tank and white glue collecting tank position respectively Below black sebific duct and white rubber tube, black glue and white glue respectively fall in black glue collecting tank and white glue collecting tank,
White glue falls in white glue collecting tank, enters in white glue temporary storage box from white glue skirt, then flows into white glue material through white glue mozzle Box, from white glue magazine in white glue conduit flows into white glue storage box;
Black glue falls in black glue collecting tank, controls closure by fork and draw bar and pulls out from black glue skirt, and black glue is from black glue Skirt enters in black glue temporary storage box, and the passage in black glue temporary storage box, black glue mozzle and black glue material receiving tube enter black glue and lead Pipe, opens the flow control valve on black glue exhaustor simultaneously, makes black glue storage box internal gas pressure reduce, and makes black glue flow into the storage of black glue In case, after the black glue stream in black glue collecting tank is clean, controls closure by fork and draw bar and insert in black glue skirt, close simultaneously Close the flow control valve on black glue exhaustor;
6th step, continues glue spraying
When installing new color steel or other need to spray black glue and white glue, start to repeat from the 3rd step.
Its additional technical feature is: in described second step, filler step, and black glue is flowing to black glue mozzle from passage After, continue to pour black glue into in black glue collecting tank, until black glue is not flowing downward, now, open on black glue exhaustor Flow control valve, after black glue stream is clean in black glue collecting tank, cuts out rapidly flow control valve.
Color steel bonded adhesives retracting device provided by the present invention and recovery method compared with prior art, have following excellent Point: one, owing to including the bracing frame being positioned at two ends and the connecting rod connecting bracing frame, is provided above white glue at support frame as described above Pipe bracing frame and black sebific duct bracing frame, be provided above white rubber tube and black glue at described white rubber tube bracing frame and black sebific duct bracing frame Pipe, is provided with striker plate, between described white rubber tube and black sebific duct below described white rubber tube bracing frame and black sebific duct bracing frame It is provided with transverse slipway, below described white rubber tube, is provided with white glue temporary storage box, below described black sebific duct, be provided with black glue temporary Storage tank, described white glue temporary storage box and described black glue temporary storage box two ends are positioned on described transverse slipway, at described white glue temporary storage box It is provided above white glue collecting tank, below described white glue collecting tank, is provided with the white glue skirt connected with white glue temporary storage box, Be provided with white glue mozzle below described white glue temporary storage box, below described white glue mozzle, be provided with white glue magazine, described in vain It is provided with the white glue conduit connected with white glue storage box top below sizing material box, described white glue storage box side is provided with white glue Outlet;It is provided above white glue air vent in described white glue storage box, is provided above black glue at described black glue temporary storage box and collects Groove, is provided with the black glue skirt connected with black glue temporary storage box below described black glue collecting tank, and this black glue skirt lower end is inserted black Bottom glue temporary storage box, it is provided above closure at described black glue skirt, is provided above draw bar, described traction in described closure Bar is connected with described fork;Below described black glue temporary storage box, it is provided with black glue mozzle, arranges in described black glue temporary storage box There are " N " type passage, this passage to connect with described black glue mozzle, are provided with below described black glue mozzle and expect black splicing Pipe, is provided with sealing sleeve pipe outside described black glue mozzle and black glue material receiving tube;It is provided with below described black glue material receiving tube The black glue conduit connected with black glue storage box top, is provided with black gel outlet in described black glue storage box side;At described black glue Storage box is provided above black glue air vent, is provided with exhaustor on described black glue air vent, arranges on described exhaustor There is flow control valve;Between described white glue temporary storage box and described black glue temporary storage box, it is provided with transverse shifting controlling organization, is entering Before the operation of row glue spraying, first rotational swing rod, make closure remove black glue skirt upper end, black collagen material is poured in black glue collecting tank, Black glue enters in black glue temporary storage box by black glue skirt, when glue liquid surface height black in black glue temporary storage box is higher than passage upper port Time, black glue can flow into passage along passage upper port, flow to black glue mozzle from passage, now, stops collecting to black glue Pour black glue in groove into, control closure by fork and draw bar and insert in black glue skirt, simultaneously close off the stream on black glue exhaustor Control valve, at this moment, the liquid level in black glue temporary storage box alreadys more than the upper end of passage, and black glue temporary storage box upper end is by envelope Block, until in black glue storage box, the atmosphere draught-free in all spaces, black glue is at black glue temporary storage box below black glue temporary storage box In will not air-dry solidification, then begin through transverse shifting controlling organization, white glue temporary storage box and black glue temporary storage box moved to laterally Slideway both sides so that black glue collecting tank and white glue collecting tank are respectively from black sebific duct and white rubber tube moved out from beneath;By black sebific duct and White rubber tube is to color steel surface glue spraying;When color steel arrives end or other need not spray black glue and white glue, by horizontal stroke To moving control mechanism, white glue temporary storage box and black glue temporary storage box are simultaneously moved to transverse slipway centre position so that black glue is collected Groove and white glue collecting tank lay respectively at below black sebific duct and white rubber tube, and black glue and white glue respectively fall in black glue collecting tank and white glue is received In collection groove, white glue falls in white glue collecting tank, enters in white glue temporary storage box from white glue skirt, then flows into white glue through white glue mozzle Magazine, from white glue magazine in white glue conduit flows into white glue storage box;Black glue falls in black glue collecting tank, by fork and traction Bar controls closure and pulls out from black glue skirt, and black glue enters in black glue temporary storage box from black glue skirt, leading in black glue temporary storage box Material pipe, black glue mozzle and black glue material receiving tube enter black glue conduit, open the flow control valve on black glue exhaustor simultaneously, make black Glue storage box internal gas pressure reduces, and black glue flows in black glue storage box from black glue conduit, treats that the black glue stream in black glue collecting tank is clean After, control closure by fork and draw bar and insert in black glue skirt, simultaneously close off the flow control valve on black glue exhaustor, Install new color steel or other are when needing to spray black glue and white glue, restart spraying, due to white glue under field conditions (factors) Solidification will not be air-dried, directly enter white glue storage box by white glue collecting tank, white glue temporary storage box, white glue collecting tank, white glue skirt In, its path need not close;And black glue is owing to acting on the steam in air etc., easily air-dry solidification, therefore, Before needing to collect, first passing through black glue collecting tank and pour black glue in black glue temporary storage box into, the lower end of black glue skirt is positioned at black glue liquid surface Hereinafter, air can not enter black glue temporary storage box from black glue skirt, adds the effect of closure, and air hardly enters black glue and stores up temporarily Inside case, when collecting black glue, black glue instills in black glue collecting tank, opens closure, and black glue enters black glue from black glue skirt and stores up temporarily In case, owing to closing in black glue storage box, after black glue enters, the pressure in black glue storage box increases so that black glue can not enter Black glue storage box, now, by opening the outside aerofluxus of flow control valve on exhaustor, reduces the pressure in black glue storage box After, black glue continues to flow into black glue storage box, until the black glue stream in black glue collecting tank is clean, controls closure by fork and draw bar Inserting in black glue skirt, simultaneously close off the flow control valve on black glue exhaustor, so, during collecting, black glue is located all the time In enclosed environment, it is to avoid black glue air-dries solidification, and the black glue after collection can continue with;Therefore greatly reduce and produce into This, it is to avoid the pollution that air or soil caused because of the black glue and white glue mixture lighting or abandoning solidification;Its two, due to institute Stating transverse shifting controlling organization and include push-pull bar, on described push-pull bar, two connecting rods, two described connecting rods are fixed in activity Other end side be not fixed on described white glue temporary storage box and black glue temporary storage box, mobile white glue temporary storage box and black glue temporary storage box are more Convenient;Its three, owing to described flow control valve is fixed on described bracing frame, support frame as described above near lateral outer side arrange Having strip-shaped clamp groove, the control bar of described flow control valve is positioned at draw-in groove, and described swing link end part is positioned at above described draw-in groove, in institute Stating draw-in groove side and be provided with sheet metal, this sheet metal electrically connects with the diode with power supply, temporary at white glue temporary storage box and black glue After storage tank is outwards removed, now flow control valve can cut out by fork automatically, operates easier, when flow control valve is in During opening, diode current flow is luminous, reminds operator to close flow control valve, it is to avoid because flow control valve is chronically at out Open state;Its four, owing to the cross section of described white glue collecting tank and black glue collecting tank is that " V " font, white glue and black glue are not easy Collecting tank remains;Its five, owing to described black glue conduit is transparent plastic tube, during filler, it is easy to see black glue It flow to black glue mozzle from passage, use convenient;Its six, owing to described connecting rod is the metal tube of closed at both ends, Described connecting rod two ends are respectively arranged with valve, and described connecting rod is serially connected in the middle part of described exhaustor, can be by the stream on exhaustor Control valve is arranged on opposite side, uses convenient.
Accompanying drawing explanation
Fig. 1 is the structural representation of coloured silk steel bonded adhesives retracting device of the present invention;
Fig. 2 is the longitudinal sectional drawing at black Jiao Yinguanchu;
Fig. 3 is the structural representation that white glue temporary storage box and black glue temporary storage box move to transverse slipway centre position;
Fig. 4 is the profile of black Jiao Zanchuxiangchu;
Fig. 5 is the structural representation of transverse shifting controlling organization;
Fig. 6 is flow control valve and controls the structural representation at bar;
Fig. 7 is the profile of connecting rod.
Detailed description of the invention
Below in conjunction with the accompanying drawings with detailed description of the invention to coloured silk steel bonded adhesives retracting device of the present invention and the structure of recovery method It is described in further details with use principle.
As shown in Figure 1, Figure 2, shown in Fig. 3, Fig. 4 and Fig. 5, the structural representation of coloured silk steel bonded adhesives retracting device of the present invention, this Bright color steel bonded adhesives retracting device includes the bracing frame 1 being positioned at two ends and connects the connecting rod 2 of bracing frame 1, above bracing frame 1 It is provided with white rubber tube bracing frame 3 and black sebific duct bracing frame 4, is provided above white at white rubber tube bracing frame 3 and black sebific duct bracing frame 4 Sebific duct 5 and black sebific duct 6, be provided with striker plate 7 between white rubber tube 5 and black sebific duct 6, props up at white rubber tube bracing frame 3 and black sebific duct It is provided with transverse slipway 8 below support 4, below white rubber tube 5, is provided with white glue temporary storage box 9, be provided with black below black sebific duct 6 Glue temporary storage box 10, white glue temporary storage box 9 and black glue temporary storage box 10 two ends are positioned on transverse slipway 8, are provided above at white glue temporary storage box 9 There is white glue collecting tank 11, below white glue collecting tank 11, be provided with the white glue skirt 12 connected with white glue temporary storage box 9, temporary at white glue It is provided with white glue mozzle 13 below storage tank 9, below white glue mozzle 13, is provided with white glue magazine 14, below white glue magazine 14 It is provided with the white glue conduit 16 connected with white glue storage box 15 top.White glue outlet 17 it is provided with in white glue storage box 15 side. It is provided above white glue air vent 18 in white glue storage box 15.It is provided above black glue collecting tank 19 at black glue temporary storage box 10, Be provided with the black glue skirt 20 connected with black glue temporary storage box 10 in the lower section of black glue collecting tank 19, this black glue skirt 20 lower end is inserted Bottom black glue temporary storage box 10.Black glue skirt 20 be provided above block 21,21 be provided above draw bar 22 in closure, lead Draw bar 22 to be connected with fork 23;Below black glue temporary storage box 10, it is provided with black glue mozzle 24, arranges in black glue temporary storage box 10 Having " N " type passage 25, this passage 25 connects with black glue mozzle 24, is provided with black glue material receiving tube below black glue mozzle 24 26, outside black glue mozzle 24 and black glue material receiving tube 26, it is provided with sealing sleeve pipe 27.It is provided with below black glue material receiving tube 26 The black glue conduit 29 connected with black glue storage box 28 top.Black glue storage box 28 side is provided with black gel outlet 30.At black glue Storage box 28 is provided above black glue air vent 31, is provided with exhaustor 32, sets on exhaustor 32 on black glue air vent 31 It is equipped with flow control valve 33.It is provided with transverse shifting controlling organization 34 between white glue temporary storage box 9 and black glue temporary storage box 10.
Before carrying out glue spraying operation, first rotational swing rod 23, make closure 21 remove black glue skirt 20 upper end, by black collagen material Pouring in black glue collecting tank 19, black glue enters in black glue temporary storage box 10, when black glue in black glue temporary storage box 10 by black glue skirt 20 When liquid level is higher than passage 25 upper port, black glue can flow into passage 25 along the upper port of passage 25, from passage 25 It flow to black glue mozzle 24, now, stop pouring black glue in black glue collecting tank 19, control envelope by fork 23 and draw bar 22 In the stifled 21 black glue skirts 20 of insertion, simultaneously close off the flow control valve 33 on black glue exhaustor 32, at this moment, in black glue temporary storage box 10 Liquid level already more than the upper end of passage 25, black glue temporary storage box upper end is sealed by closure 21, black glue temporary storage box 10 times In Fang Zhizhi black glue storage box 28, the atmosphere draught-free in all spaces, black glue will not air-dry solidification, so in black glue temporary storage box Afterwards by transverse shifting controlling organization 34, white glue temporary storage box 9 and black glue temporary storage box 10 are moved to transverse slipway both sides so that black glue Collecting tank 19 and white glue collecting tank 11 are respectively from black sebific duct 6 and white rubber tube 5 moved out from beneath;By black sebific duct 6 and white rubber tube 5 to coloured silk Surface of steel plate glue spraying;When color steel arrives end or other need not spray black glue and white glue, by transverse shifting control Mechanism 34, is simultaneously moved to transverse slipway 8 centre position by white glue temporary storage box 9 and black glue temporary storage box 10 so that black glue collecting tank 19 Laying respectively at below black sebific duct 6 and white rubber tube 5 with white glue collecting tank 11, black glue and white glue respectively fall in black glue collecting tank 19 with white In glue collecting tank 11.After white glue falls into white glue collecting tank, enter in white glue temporary storage box 9 from white glue skirt 12, then through white glue water conservancy diversion Pipe 13 flows into white glue magazine 14, from white glue magazine 14 in white glue conduit 16 flows into white glue storage box 15.
After black glue falls into black glue collecting tank 19, control closure 21 by fork 23 and draw bar 22 and draw from black glue skirt 20 Going out, black glue enters in black glue temporary storage box 10 from black glue skirt 20, the passage 25 in black glue temporary storage box 10, black glue mozzle 24 Enter black glue conduit 29 with black glue material receiving tube 26, open the flow control valve 33 on black glue exhaustor 32 simultaneously, make black glue store Case 28 internal gas pressure reduces, and black glue flows in black glue storage box 28 from black glue conduit 29, treats the black glue stream in black glue collecting tank 19 After Jing, control, in the closure 21 black glue skirt 20 of insertion, to simultaneously close off on black glue exhaustor 32 by fork 23 and draw bar 22 Flow control valve 33.When installing new color steel or other need to spray black glue and white glue, restart spraying.
Solidification will not be air-dried under field conditions (factors), directly by white glue collecting tank 11, white glue temporary storage box 9, white due to white glue Sizing material box 14, white glue skirt 16 enter in white glue storage box 15, and its path need not close.And black glue due to in air The effect such as steam, easily air-dry solidification, therefore, before needs collection, first pass through black glue collecting tank 19 to black glue temporary storage box Pouring black glue in 10 into, the lower end of black glue skirt 20 is positioned at below black glue liquid surface, and it is temporary that air can not enter black glue from black glue skirt 20 In storage tank 10, adding the effect of closure 21, it is internal that air hardly enters black glue temporary storage box 10, and when collecting black glue, black glue drips Entering in black glue collecting tank, open closure 21, black glue enters in black glue temporary storage box 10 from black glue skirt 20, due to black glue storage box 10 Closing, after black glue enters, the pressure in black glue storage box 28 increases so that black glue can not enter black glue storage box 28, now, By opening the outside aerofluxus of flow control valve 33 on exhaustor 32, after reducing the pressure in black glue storage box 28, black glue continues Flow into black glue storage box 28, until the black glue stream in black glue collecting tank 19 is clean, control closure 21 by fork 23 and draw bar 22 Insert in black glue skirt 20, simultaneously close off the flow control valve 33 on black glue exhaustor 32, so, during collecting, black glue All the time it is in enclosed environment, it is to avoid black glue air-dries solidification, and the black glue after collection can continue with;Therefore greatly reduce Production cost, it is to avoid the pollution that air or soil caused because of the black glue and white glue mixture lighting or abandoning solidification.
As it is shown in figure 5, transverse shifting controlling organization 34 includes push-pull bar 35, on push-pull bar 35, two connections are fixed in activity Bar 36, the other end side of two connecting rods 36 is not fixed on white glue temporary storage box 9 and black glue temporary storage box 10, mobile white glue temporary storage box 9 and black glue temporary storage box 10 convenient.
As shown in Figure 6, flow control valve 33 is fixed on bracing frame 1, at bracing frame 1, lateral outer side is provided with bar shaped Draw-in groove 37, the control bar 38 of flow control valve 33 is positioned at draw-in groove 37, and the end of fork 23 is positioned at above draw-in groove 37, at draw-in groove 37 Side is provided with sheet metal 39, and this sheet metal 39 electrically connects with the diode 40 with power supply.Temporary at white glue temporary storage box 9 and black glue After storage tank 10 is outwards removed, now flow control valve 33 can cut out by fork 23 automatically, operates easier, works as flow-control When valve 33 is in opening, diode 40 turns on luminescence, reminds operator to close flow control valve 33, it is to avoid because of flow-control Valve is chronically at opening.
The cross section of white glue collecting tank 11 and black glue collecting tank 19 is that " V " font, white glue and black glue are not easy in collecting tank Residual.
Black glue conduit 29 is transparent plastic tube, during filler, it is easy to see that black glue flow to black glue from passage In mozzle, use convenient.
As shown in Figure 1 and Figure 7, connecting rod 2 is the metal tube of closed at both ends, is respectively arranged with valve 41 at connecting rod 2 two ends, even Bar 2 is serially connected in the middle part of exhaustor 32, the flow control valve 33 on exhaustor 32 can be arranged on opposite side, use more square Just.
The technical scheme that color steel bonded adhesives recovery method uses is:
The method comprises the following steps:
The first step, fixing color steel bonded adhesives retracting device
Coloured silk steel bonded adhesives retracting device is fixed on above color steel spraying track
Second step, filler
Rotational swing rod 23, makes closure 21 remove black glue skirt 20 upper end, is poured into by black collagen material in black glue collecting tank 19, and black glue leads to Cross black glue skirt 20 and enter in black glue temporary storage box 10, when glue liquid surface height black in black glue temporary storage box 10 is higher than passage 25 upper port Time, black glue can flow into passage 25 along passage 25 upper port, flow to black glue mozzle 24 from passage 25, now, stop to Pour black glue in black glue collecting tank 19, control, in the closure 21 black glue skirt 20 of insertion, to close by fork 23 and draw bar 22 simultaneously Close the flow control valve 33 on black glue exhaustor;
3rd step, removes white glue temporary storage box and black glue temporary storage box
By transverse shifting controlling organization 34, white glue temporary storage box 9 and black glue temporary storage box 10 are moved to transverse slipway both sides so that black Glue collecting tank 19 and white glue collecting tank 11 are respectively from black sebific duct 6 and white rubber tube 5 moved out from beneath;
4th step, glue spraying
By black sebific duct 6 and white rubber tube 5 to color steel surface glue spraying;
5th step, unnecessary black glue and the collection of white glue
When color steel arrives end or other need not spray black glue and white glue, by transverse shifting controlling organization 34, will White glue temporary storage box 9 and black glue temporary storage box 10 are simultaneously moved to transverse slipway 8 centre position so that black glue collecting tank 19 and white glue are collected Groove 11 lays respectively at below black sebific duct 6 and white rubber tube 5, and black glue and white glue respectively fall in black glue collecting tank 19 and white glue collecting tank 11 In,
After white glue falls into white glue collecting tank, enter in white glue temporary storage box 9 from white glue skirt 12, then flow into white through white glue mozzle 13 Sizing material box 14, from white glue magazine 14 in white glue conduit 16 flows into white glue storage box 15.
After black glue falls into black glue collecting tank 19, control closure 21 by fork 23 and draw bar 22 and draw from black glue skirt 20 Going out, black glue enters in black glue temporary storage box 10 from black glue skirt 20, the passage 25 in black glue temporary storage box 10, black glue mozzle 24 Enter black glue conduit 29 with black glue material receiving tube 26, open the flow control valve 33 on black glue exhaustor 32 simultaneously, make black glue store Case 28 internal gas pressure reduces, and black glue flows in black glue storage box 28 from black glue conduit 29, treats the black glue stream in black glue collecting tank 19 After Jing, control, in the closure 21 black glue skirt 20 of insertion, to simultaneously close off on black glue exhaustor 32 by fork 23 and draw bar 22 Flow control valve 33.
6th step, continues glue spraying
When installing new color steel or other need to spray black glue and white glue, start to repeat from the 3rd step.
In order to avoid making liquid level in black glue temporary storage box 10 sufficiently high, in described second step, filler step, black glue is from leading After material pipe flow extremely black glue mozzle 24, continue to pour black glue into in black glue collecting tank 19, until black glue is not flowing downward, this Time, open the flow control valve 33 on black glue exhaustor 32, after black glue stream is clean in black glue collecting tank 19, close rapidly flow control Valve 33 processed.
Certainly, the present invention is used not only for the recovery of color steel bonded adhesives, and protection scope of the present invention is not limited solely to State embodiment, as long as structure is same or similar with coloured silk steel bonded adhesives retracting device of the present invention and recovery method structure, just fall at this The scope of invention protection.

Claims (8)

1. color steel bonded adhesives retracting device, it is characterised in that: include the bracing frame being positioned at two ends and the connecting rod connecting bracing frame, Bracing frame is provided above white rubber tube bracing frame and black sebific duct bracing frame, on described white rubber tube bracing frame and black sebific duct bracing frame Side is provided with white rubber tube and black sebific duct, is provided with striker plate, supports at described white rubber tube between described white rubber tube and black sebific duct It is provided with transverse slipway below frame and black sebific duct bracing frame, below described white rubber tube, is provided with white glue temporary storage box, described black It is provided with black glue temporary storage box, described white glue temporary storage box and described black glue temporary storage box two ends below sebific duct and is positioned at described transverse slipway On,
It is provided above white glue collecting tank at described white glue temporary storage box, is provided with below described white glue collecting tank and stores up temporarily with white glue The white glue skirt of case connection, is provided with white glue mozzle below described white glue temporary storage box, arranges below described white glue mozzle There is white glue magazine, below described white glue magazine, be provided with the white glue conduit connected with white glue storage box top, at described white glue Storage box side is provided with white glue outlet;It is provided above white glue air vent in described white glue storage box,
It is provided above black glue collecting tank at described black glue temporary storage box, is provided with below described black glue collecting tank and stores up temporarily with black glue The black glue skirt of case connection, this black glue skirt lower end is inserted bottom black glue temporary storage box, is provided above envelope at described black glue skirt Stifled, it is provided above draw bar in described closure, described draw bar is connected with described fork;
Below described black glue temporary storage box, it is provided with black glue mozzle, in described black glue temporary storage box, is provided with " N " type passage, This passage connects with described black glue mozzle, is provided with black glue material receiving tube, at described black glue below described black glue mozzle It is provided with sealing sleeve pipe outside mozzle and black glue material receiving tube;It is provided with and black Jiao Cunchuxiangding below described black glue material receiving tube The black glue conduit of portion's connection, is provided with black gel outlet in described black glue storage box side;It is provided above in described black glue storage box There is black glue air vent, described black glue air vent is provided with exhaustor, described exhaustor is provided with flow control valve;
It is provided with transverse shifting controlling organization between described white glue temporary storage box and described black glue temporary storage box.
Color steel bonded adhesives retracting device the most according to claim 1, it is characterised in that: described transverse shifting controlling organization bag Including push-pull bar, on described push-pull bar, two connecting rods are fixed in activity, and the other end side of two described connecting rods is not fixed on institute State on white glue temporary storage box and black glue temporary storage box.
Color steel bonded adhesives retracting device the most according to claim 1, it is characterised in that: described flow control valve is fixed on institute On the bracing frame stated, at support frame as described above, lateral outer side is provided with strip-shaped clamp groove, the control bar position of described flow control valve In draw-in groove, described swing link end part is positioned at above described draw-in groove, described draw-in groove side is provided with sheet metal, this sheet metal and band The diode having power supply electrically connects.
Color steel bonded adhesives retracting device the most according to claim 1, it is characterised in that: described white glue collecting tank and black glue are received The cross section of collection groove is " V " font.
Color steel bonded adhesives retracting device the most according to claim 1, it is characterised in that: described black glue conduit is transparent moulding Material pipe.
Color steel bonded adhesives retracting device the most according to claim 1, it is characterised in that: described connecting rod is the gold of closed at both ends Belonging to pipe, be respectively arranged with valve at described connecting rod two ends, described connecting rod is serially connected in the middle part of described exhaustor.
7. use the color steel bonded adhesives retracting device described in claim 1,2,3,4,5 or 6 to carry out the side that color steel bonded adhesives reclaims Method, it is characterised in that: the method comprises the following steps:
The first step, fixing color steel bonded adhesives retracting device
Coloured silk steel bonded adhesives retracting device is fixed on above color steel spraying track
Second step, filler
Rotational swing rod, makes closure remove black glue skirt upper end, is poured in black glue collecting tank by black collagen material, and black glue is drawn by black glue Pipe enters in black glue temporary storage box, and when glue liquid surface height black in black glue temporary storage box is higher than passage upper port, black glue can be along guide Pipe upper port flows into passage, flow to black glue mozzle from passage, now, stops pouring black glue in black glue collecting tank, logical Cross fork and draw bar controls closure and inserts in black glue skirt, simultaneously close off the flow control valve on black glue exhaustor;
3rd step, removes white glue temporary storage box and black glue temporary storage box
By transverse shifting controlling organization, white glue temporary storage box and black glue temporary storage box are moved to transverse slipway both sides so that black glue is received Collection groove and white glue collecting tank are respectively from black sebific duct and white rubber tube moved out from beneath;
4th step, glue spraying
By black sebific duct and white rubber tube to color steel surface glue spraying;
5th step, unnecessary black glue and the collection of white glue
When color steel arrives end or other need not spray black glue and white glue, by transverse shifting controlling organization, will be white Glue temporary storage box and black glue temporary storage box are simultaneously moved to transverse slipway centre position so that black glue collecting tank and white glue collecting tank position respectively Below black sebific duct and white rubber tube, black glue and white glue respectively fall in black glue collecting tank and white glue collecting tank, and white glue falls into white glue In collecting tank, enter in white glue temporary storage box from white glue skirt, then flow into white glue magazine through white glue mozzle, from white glue magazine through white Glue conduit flows in white glue storage box;
Black glue falls in black glue collecting tank, controls closure by fork and draw bar and pulls out from black glue skirt, and black glue is from black glue Skirt enters in black glue temporary storage box, and the passage in black glue temporary storage box, black glue mozzle and black glue material receiving tube enter black glue and lead Pipe, opens the flow control valve on black glue exhaustor simultaneously, makes black glue storage box internal gas pressure reduce, and makes black glue flow into the storage of black glue In case, after the black glue stream in black glue collecting tank is clean, controls closure by fork and draw bar and insert in black glue skirt, close simultaneously Close the flow control valve on black glue exhaustor;
6th step, continues glue spraying
When installing new color steel or other need to spray black glue and white glue, start to repeat from the 3rd step.
The method that color steel bonded adhesives the most according to claim 7 reclaims, it is characterised in that: at described second step, filler walks In Zhou, black glue, after flowing to black glue mozzle from passage, continues to pour black glue into in black glue collecting tank, until black glue does not exists Flow downward, now, open the flow control valve on black glue exhaustor, after black glue stream is clean in black glue collecting tank, close rapidly Flow control valve.
CN201611027365.9A 2016-11-22 2016-11-22 Color steel bonded adhesives retracting device and the method for recovery Expired - Fee Related CN106321585B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611027365.9A CN106321585B (en) 2016-11-22 2016-11-22 Color steel bonded adhesives retracting device and the method for recovery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611027365.9A CN106321585B (en) 2016-11-22 2016-11-22 Color steel bonded adhesives retracting device and the method for recovery

Publications (2)

Publication Number Publication Date
CN106321585A true CN106321585A (en) 2017-01-11
CN106321585B CN106321585B (en) 2018-01-30

Family

ID=57817145

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611027365.9A Expired - Fee Related CN106321585B (en) 2016-11-22 2016-11-22 Color steel bonded adhesives retracting device and the method for recovery

Country Status (1)

Country Link
CN (1) CN106321585B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114551623A (en) * 2022-02-28 2022-05-27 晟高发新能源发展(江苏)有限公司 Rapid packaging equipment and method for double-glass solar cell module

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5523828A (en) * 1994-09-14 1996-06-04 De Kesel; Jan Seal for a toner cartridge assembly
CN2866503Y (en) * 2005-09-22 2007-02-07 华南再生资源(中山)有限公司 Recovery system for treating waste plastic and rubber
CN102707585A (en) * 2011-11-25 2012-10-03 京东方科技集团股份有限公司 Photoresist recovery system
CN203091218U (en) * 2013-03-07 2013-07-31 京东方科技集团股份有限公司 Photoresist recovery device and coating machine
CN103910493A (en) * 2014-03-21 2014-07-09 京东方科技集团股份有限公司 Photoresist recovery device, coating system and coating method
CN204079858U (en) * 2014-09-15 2015-01-07 枣阳市华威硅氟材料有限公司 A kind of discarded silicon rubber recovery and processing system
CN104307316A (en) * 2014-09-24 2015-01-28 重庆市聚益橡胶制品有限公司 Odorless regenerated rubber tail gas recycling and purification system
CN206159202U (en) * 2016-11-22 2017-05-10 倪兆刚 Various steel bonded adhesives recovery unit

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5523828A (en) * 1994-09-14 1996-06-04 De Kesel; Jan Seal for a toner cartridge assembly
CN2866503Y (en) * 2005-09-22 2007-02-07 华南再生资源(中山)有限公司 Recovery system for treating waste plastic and rubber
CN102707585A (en) * 2011-11-25 2012-10-03 京东方科技集团股份有限公司 Photoresist recovery system
CN203091218U (en) * 2013-03-07 2013-07-31 京东方科技集团股份有限公司 Photoresist recovery device and coating machine
CN103910493A (en) * 2014-03-21 2014-07-09 京东方科技集团股份有限公司 Photoresist recovery device, coating system and coating method
CN204079858U (en) * 2014-09-15 2015-01-07 枣阳市华威硅氟材料有限公司 A kind of discarded silicon rubber recovery and processing system
CN104307316A (en) * 2014-09-24 2015-01-28 重庆市聚益橡胶制品有限公司 Odorless regenerated rubber tail gas recycling and purification system
CN206159202U (en) * 2016-11-22 2017-05-10 倪兆刚 Various steel bonded adhesives recovery unit

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114551623A (en) * 2022-02-28 2022-05-27 晟高发新能源发展(江苏)有限公司 Rapid packaging equipment and method for double-glass solar cell module

Also Published As

Publication number Publication date
CN106321585B (en) 2018-01-30

Similar Documents

Publication Publication Date Title
CN106321585A (en) Color steel adhesive recovery device and recovery method
CN109826664B (en) Integrated device and method for coal bed gas extraction and automatic drainage of accumulated water in drilling holes
CN214093556U (en) Automatic exhaust device for lithium battery solution pipeline
CN205209261U (en) Automatic cleaning device of cold quick -witted basin bulk cargo of ring of environmental protection and cold machine of ring thereof
CN206159202U (en) Various steel bonded adhesives recovery unit
CN202467897U (en) High-negative-pressure automatic water discharging device for gas drainage pipeline
CN209555662U (en) A kind of novel ecological plant fiber tableware molding machine with drip-proof structure
CN208805395U (en) Unmanned plane water sample acquisition device
CN208309405U (en) A kind of Bridge Crack patcher
CN103114838B (en) High-pressure automatic sand discharge device
CN106424731A (en) Selective laser melting-forming equipment and powder supply method thereof
CN213378313U (en) Anti-blocking device for asphalt conveying pipeline
CN206325795U (en) The glue spreading apparatus of bottle cap processing
CN205956491U (en) Combined air valve
CN210610469U (en) Big-arch shelter two rete water suction means
CN202255785U (en) Automatic circulation liquid supply leakage test device
CN110747721B (en) Road crack pouring machine
CN204825764U (en) Ice and snow hot melt storehouse
CN209307932U (en) A kind of road mark line removing vehicle
CN204899977U (en) A automatic sand removal device of pipeline that is used for tailings to fill thick liquid system that makes
CN207106068U (en) A kind of tire bead arbor press spreading mechanism
CN209306941U (en) A kind of collection of pitch oil filling riser raffinate and blow device
CN103980918B (en) A kind of high-efficiency environment friendly coke oven dust leads cigarette equipment
CN113843712A (en) Floater cutting device on water
CN106067541B (en) Powder filling back cover immersion liquid full-automatic production method and production line

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180130