CN106296456A - Intelligent substation secondary maintenance safety measure support system and construction method - Google Patents

Intelligent substation secondary maintenance safety measure support system and construction method Download PDF

Info

Publication number
CN106296456A
CN106296456A CN201610654677.6A CN201610654677A CN106296456A CN 106296456 A CN106296456 A CN 106296456A CN 201610654677 A CN201610654677 A CN 201610654677A CN 106296456 A CN106296456 A CN 106296456A
Authority
CN
China
Prior art keywords
secondary maintenance
maintenance safety
safety measure
standard data
measures standard
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610654677.6A
Other languages
Chinese (zh)
Other versions
CN106296456B (en
Inventor
朱维钧
刘海峰
陈宏�
徐宇新
潘伟
霍思敏
欧阳帆
李辉
敖非
许立强
梁文武
沈杨
臧欣
刘宇
徐浩
王优优
陈鑫
唐志翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG ROOF NEW INFORMATION TECHNOLOGY Co Ltd
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Hunan Electric Power Co Ltd
State Grid Hunan Electric Power Co Ltd
Original Assignee
SHANDONG ROOF NEW INFORMATION TECHNOLOGY Co Ltd
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Hunan Electric Power Co Ltd
State Grid Hunan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG ROOF NEW INFORMATION TECHNOLOGY Co Ltd, State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Hunan Electric Power Co Ltd, State Grid Hunan Electric Power Co Ltd filed Critical SHANDONG ROOF NEW INFORMATION TECHNOLOGY Co Ltd
Priority to CN201610654677.6A priority Critical patent/CN106296456B/en
Publication of CN106296456A publication Critical patent/CN106296456A/en
Application granted granted Critical
Publication of CN106296456B publication Critical patent/CN106296456B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to technical field of power systems, particularly relate to a kind of intelligent substation secondary maintenance safety measure support system and construction method.The invention provides the construction method of a kind of intelligent substation secondary maintenance safety measure, including: step 1, according to the secondary maintenance safety measure implementation principle obtained, generate secondary maintenance safety Measures Standard data base;Step 2, from standard database, searches the secondary maintenance safety Measures Standard that acquisition matches according to obtaining in secondary maintenance safety measure ticket the column information carried;Step 3, acquisition intelligent substation preset the key word that operational factor is corresponding, if judging to know that key word is present in secondary maintenance safety Measures Standard data, then obtain Artificial Control instruction;According to optimization secondary maintenance safety Measures Standard data, obtain secondary maintenance safety measure.By above-mentioned construction method, maintainer can location complete, intuitive and accurate isolated subject and determine quarantine measures, establishment efficiency is high, and workload is little.

Description

Intelligent substation secondary maintenance safety measure support system and construction method
Technical field
The present invention relates to technical field of power systems, particularly relate to a kind of intelligent substation secondary maintenance safety measure support System and construction method, be specifically related to a kind of to be effectively improved the establishment efficiency of intelligent substation secondary maintenance safety measure, carry High maintenance integrity degree, the support system that operator workload is simultaneously greatly decreased and construction method.
Background technology
Intelligent substation have employed modern communications and digital modeling technique, and on Form of Technique, relatively conventional station occurs The change of essence.For impact specific to secondary maintenance safety measure, it is mainly reflected in secondary maintenance safety measure Operation object and the observability of secondary safety measure implementation effect there occurs fundamental change.Wherein, the change of object is operated Change includes: 1, empty loop instead of the hardwire in normal station;2, soft pressing plate instead of original hard pressing plate;3, maintenance is introduced Pressing plate;The observability change of implementation effect then includes: 1, loop is the most directly perceived;2, pressing plate is the most directly perceived with associating of loop. Above-mentioned change there is problems in that during causing the establishment of secondary maintenance safety measure, execution
1) maintainer not only needs to be grasped station relevant knowledge, simultaneously need to be familiar with that IEC61850 is relevant to be known Knowing, even other Professional knowledges, such as communication speciality, Automation Specialty, this carries to the O&M maintainer being familiar with tradition transformer station Having carried out huge challenge, the most also the reliability to secondary safety measure proposes new challenge.
2) the secondary maintenance safety measure implementation principle in the maintenance regulation performed at present and operations specification or typical case two Secondary safety measure is all general rule, needs technical staff manually to convert thereof into a certain of some intelligent substation concrete Secondary safety measure.Conversion work not only needs deep to understand compilation principles or typical case's secondary safety measure, in addition it is also necessary to completely Understand intelligent substation secondary model even device software logic, technical staff is required higher and workload is huge.
3) the operable ability of device there are differences because of the difference of manufacturer or device version, overhauls regulation and runs There is unmatched situation in implementation principle or the operable ability of reality of typical case's secondary safety measure and device in specification, returns Road and soft pressing plate invisible causes these not mate phenomenon being not easy to be found.
Summary of the invention
(1) to solve the technical problem that
It is an object of the invention to: a kind of establishment effect that can be effectively improved intelligent substation secondary maintenance safety measure is provided Rate, raising maintenance integrity degree, the support system that operator workload is simultaneously greatly decreased and construction method, existing to solve Intelligent substation secondary maintenance to the requirement of maintainer compared with high, maintainer's workload big, establishment inefficient and maintenance complete Spend low problem.
(2) technical scheme
In order to solve above-mentioned technical problem, the invention provides the structure of a kind of intelligent substation secondary maintenance safety measure Method, it includes following operating procedure:
Step 1, the safety measure implementation principle of acquisition secondary maintenance, generate secondary according to described safety measure implementation principle Maintenance safety Measures Standard data base;
Step 2, acquisition secondary maintenance safety measure ticket, according to the column letter carried in described secondary maintenance safety measure ticket Breath searches the secondary maintenance peace obtained with described column information match from described secondary maintenance safety Measures Standard data base Full Measures Standard data;
Step 3, obtain described intelligent substation and preset the key word that operational factor is corresponding, if judging to know described key word Being present in described secondary maintenance safety Measures Standard data, then obtain Artificial Control instruction, the instruction of described Artificial Control is root Generate according to the real-time running data of described intelligent substation;According to secondary maintenance safety described in described Artificial Control optimization Measures Standard data, to obtain secondary maintenance safety measure.
Wherein, step 1 specifically includes:
Step 1.1, obtaining pre-established classification chart, described classification chart includes that multiple classification item and each classification item are corresponding Categorical data;
Step 1.2, according to described classification chart, multiple secondary maintenance safety measure tickets are classified, obtain the maintenance of each secondary The type of safety measure ticket;
Step 1.3, to extract in same type of secondary maintenance safety measure ticket loop corresponding with operation object classification item Keyword, according to default mapping ruler, loop is carried out formalization process with operation keyword corresponding to object classification item, Obtain secondary maintenance safety Measures Standard data base.
Wherein, described column information includes the type of Awaiting Overhaul equipment, the mode of connection of described intelligent substation, Yi Jiyu The operation conditions of the primary equipment of Awaiting Overhaul equipment association;
Correspondingly, described maintenance from described secondary according to the column information carried in described secondary maintenance safety measure ticket is pacified Full Measures Standard data base searches the step obtaining the secondary maintenance safety Measures Standard data with described column information match Suddenly specifically include:
Type according to described Awaiting Overhaul equipment, the mode of connection of described intelligent substation, and close with Awaiting Overhaul equipment Connection primary equipment operation conditions, in conjunction with described default mapping ruler, described predetermined keyword is carried out instantiation process, with from Described secondary maintenance safety Measures Standard data base obtains the secondary maintenance safety Measures Standard data matched.
Wherein, described key word includes: loop, soft pressing plate and empty loop;
Correspondingly, described judgement knows that described key word is present in described secondary maintenance safety Measures Standard data, then The step obtaining Artificial Control instruction specifically includes:
If judging to know that the loop in described secondary maintenance safety Measures Standard data and soft pressing plate exist in described intelligence Empty loop in the SCD file of transformer station and in described SCD file exists in described secondary maintenance safety Measures Standard data, Obtain the instruction of described Artificial Control.
Wherein, described according to secondary maintenance safety Measures Standard data described in described Artificial Control optimization, obtain two The step of secondary maintenance safety measure specifically includes:
Increase/deletion the control instruction carried in instructing according to described Artificial Control, increases/deletes described secondary maintenance peace Full Measures Standard data;
Or,
The sequential carried in instructing according to described Artificial Control adjusts instruction, adjusts described secondary maintenance safety Measures Standard The execution sequence of data correspondence step, obtains secondary maintenance safety measure.
Present invention also offers a kind of intelligent substation secondary maintenance safety measure support system, comprising:
First module, for obtaining the safety measure implementation principle of secondary maintenance, according to described safety measure implementation principle Generate secondary maintenance safety Measures Standard data base;
Second module, is used for obtaining secondary maintenance safety measure ticket, carries according in described secondary maintenance safety measure ticket Column information search from described secondary maintenance safety Measures Standard data base and obtain and the two of described column information match Secondary maintenance safety Measures Standard data;
Three module, presets, for obtaining described intelligent substation, the key word that operational factor is corresponding, if judging to know institute State key word to be present in described secondary maintenance safety Measures Standard data, then obtain Artificial Control instruction, described Artificial Control According to instruction, the real-time running data of described intelligent substation generates;According to secondary described in described Artificial Control optimization Maintenance safety Measures Standard data, to obtain secondary maintenance safety measure.
Wherein, described first module includes the first processing unit, the second processing unit and the 3rd processing unit:
Described first processing unit, for obtaining pre-established classification chart, described classification chart include multiple classification item and The categorical data that each classification item is corresponding;
Described second processing unit, for multiple secondary maintenance safety measure tickets being classified according to described classification chart, Obtain the type of each secondary maintenance safety measure ticket;
Described 3rd processing unit, extracts loop and operation object classification in same type of secondary maintenance safety measure ticket The keyword that project is corresponding, carries out form according to default mapping ruler to the keyword that loop is corresponding with operation object classification item Change processes, and obtains secondary maintenance safety Measures Standard data base.
Wherein, described column information includes the type of Awaiting Overhaul equipment, the mode of connection of described intelligent substation, Yi Jiyu The operation conditions of the primary equipment of Awaiting Overhaul equipment association;
Described second module includes fourth processing unit, and described fourth processing unit is for according to described Awaiting Overhaul equipment Type, the mode of connection of described intelligent substation, and the primary equipment operation conditions associated with Awaiting Overhaul equipment, in conjunction with described Preset mapping ruler, described predetermined keyword is carried out instantiation process, with from described secondary maintenance safety Measures Standard data Storehouse obtains the secondary maintenance safety Measures Standard data matched.
Wherein, described key word includes: loop, soft pressing plate and empty loop;
Described three module includes the 5th processing unit, if for judgement, described 5th processing unit knows that described secondary is examined Repair the loop in safety measure normal data and soft pressing plate exists in the SCD file of described intelligent substation and described SCD literary composition Empty loop in part exists in described secondary maintenance safety Measures Standard data, obtains the instruction of described Artificial Control.
Wherein, described three module also includes the 6th processing unit, described 6th processing unit for according to described manually The increase carried in control instruction/deletion control instruction, increases/deletes described secondary maintenance safety Measures Standard data;
Or,
The sequential carried in instructing according to described Artificial Control adjusts instruction, adjusts described secondary maintenance safety Measures Standard The execution sequence of data correspondence step, obtains secondary maintenance safety measure.
(3) beneficial effect
The technique scheme of the present invention has the advantage that and the invention provides a kind of intelligent substation secondary maintenance peace The construction method of full measure, including following operating procedure: step 1, the safety measure implementation principle of acquisition secondary maintenance, according to peace Full measure implementation principle generates secondary maintenance safety Measures Standard data base;Step 2, acquisition secondary maintenance safety measure ticket, root According to the column information carried in secondary maintenance safety measure ticket search from secondary maintenance safety Measures Standard data base acquisition with The secondary maintenance safety Measures Standard data of column information match;Step 3, acquisition intelligent substation preset operational factor correspondence Key word, if judge know key word exist in secondary maintenance safety Measures Standard data, then obtain Artificial Control instruction, Artificial Control instruction is that the real-time running data according to intelligent substation generates;Overhaul according to Artificial Control optimization secondary Safety measure normal data, to obtain secondary maintenance safety measure.The application is by the realization of above-mentioned construction method, maintainer Can be in the reorganization and expansion of intelligent substation, O&M and maintenance process, location complete, intuitive and accurate isolated subject and determining Quarantine measures, this establishment efficiency being possible not only to improve secondary safety measure, workload, at the scene work also can be greatly decreased simultaneously Work has the strongest universality and practicality.
Accompanying drawing explanation
Fig. 1 is the concrete operations flow process of the embodiment of the present invention a kind of intelligent substation secondary maintenance safety measure construction method Figure.
Detailed description of the invention
For making the purpose of the embodiment of the present invention, technical scheme and advantage clearer, below in conjunction with the embodiment of the present invention In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is A part of embodiment of the present invention rather than whole embodiments.Based on the embodiment in the present invention, ordinary skill people The every other embodiment that member is obtained on the premise of not making creative work, broadly falls into the scope of protection of the invention.
As it is shown in figure 1, embodiments provide the construction method of a kind of intelligent substation secondary maintenance safety measure, It includes following operating procedure:
Step 1, the safety measure implementation principle of acquisition secondary maintenance, generate secondary maintenance according to safety measure implementation principle Safety measure standard database;In the present embodiment, the safety measure implementation principle of secondary maintenance includes maintenance regulation or runs Secondary maintenance safety measure implementation principle in code;And by edit tool, safety measure implementation principle is compiled as computer The secondary maintenance safety Measures Standard data base that software is capable of identify that;
Step 2, obtain secondary maintenance safety measure ticket, according to the column information carried in secondary maintenance safety measure ticket from Secondary maintenance safety Measures Standard data base searches the secondary maintenance safety Measures Standard number obtained with column information match According to;Specifically, column information can include the mode of connection of transformer station belonging to equipment to be checked, the type of equipment to be checked, type of work, Primary equipment blackout condition, obtains the secondary maintenance safety Measures Standard data matched according to above-mentioned column information searching;
Step 3, acquisition intelligent substation preset the key word that operational factor is corresponding, if judging to know that key word exists two In secondary maintenance safety Measures Standard data, then obtaining Artificial Control instruction, Artificial Control instruction is the reality according to intelligent substation Time service data generate;According to Artificial Control optimization secondary maintenance safety Measures Standard data, to obtain secondary maintenance Safety measure.Wherein, optimize and refer to instruct according to Artificial Control, graphical increase or deletion secondary maintenance safety Measures Standard Data, the execution sequence of adjustment secondary maintenance safety Measures Standard data correspondence step, when secondary maintenance safety Measures Standard number During secondary safety measure newly-increased according to needs, by manually increasing, finally realize all dimension secondary maintenance safety measures complete Whole generation.
Specifically, the application by the realization of above-mentioned construction method, maintainer can the reorganization and expansion of intelligent substation, In O&M and maintenance process, location complete, intuitive and accurate isolated subject and determine quarantine measures, this is possible not only to improve two The establishment efficiency of secondary safety measure, also can be greatly decreased workload simultaneously, have the strongest universality and reality in working at the scene The property used.
In the present embodiment, step 1 specifically includes:
Step 1.1, obtaining pre-established classification chart, classification chart includes multiple classification item and class corresponding to each classification item Type data;Specifically, in the present embodiment, classification item includes device type, primary equipment power failure range and maintenance type etc.; Device type includes busbar protective device, line protective devices, main transformer protection, combining unit, intelligent terminal, prepared auto restart etc.;One Secondary device power failure range include entirely standing power failure, electric pressure has a power failure, interval has a power failure, do not has a power failure;Maintenance type includes first inspection, routine Test, defect elimination upgrading;
Step 1.2, according to classification chart, multiple secondary maintenance safety measure tickets are classified, obtain each secondary maintenance safety The type of measure ticket;Table 1 is that in the 220kV transformer station of double female modes of connection as a example by route protection, its classification chart is as follows:
Route protection classification chart in table 1 220kV transformer station
Step 1.3, to extract in same type of secondary maintenance safety measure ticket loop corresponding with operation object classification item Keyword, according to default mapping ruler, loop is carried out formalization process with operation keyword corresponding to object classification item, Obtain secondary maintenance safety Measures Standard data base.In the present embodiment, with circuit in the 220kV transformer station of double female modes of connection As a example by the protection first inspection work when line segregation has a power failure, extract the pass of secondary maintenance exemplary secure measure ticket PL-BAYPF-FM Key word (is only listed and is opened malfunctioning loop), the most as shown in table 2:
The keyword of 2 two maintenance exemplary secure measure ticket PL-BAYPF-FM of table
Wherein, circuit form turns to: [space from start type] [initial type of device] [purpose fills to [purpose interval type] Put type] for [loop-type].As a example by the 220kV transformer station of double female modes of connection, the startup of route protection to bus protection Malfunctioning circuit form turns to: [LINE] [PRO] to [BUS] [PRO] for [STARTFAILURE];Safety measure form turns to: [action type] [operating interval] [operation device] [operation object].
Preset mapping ruler: according to national standard " IEC61850 relay protection engineer applied model specification " to empty terminal and The semanteme of soft pressing plate, the empty loop of definition and the search rule of soft pressing plate;And for using general semantics (such as: logical node is GGIO, DO are SPCS) the empty loop that defines and soft pressing plate, use the fuzzy match mode of desc to define its search rule.This reality Executing example as a example by the 220kV transformer station of double female modes of connection, the start failure protection loop of route protection to bus protection can be set up such as Lower search rule, the most as shown in table 3:
Table 3 route protection is regular to the start failure protection loop map of bus protection
Specifically, in the present embodiment, column information includes the type of Awaiting Overhaul equipment, the wiring side of intelligent substation Formula, and the operation conditions of the primary equipment associated with Awaiting Overhaul equipment;Correspondingly, take according in secondary maintenance safety measure ticket The column information of band searches the secondary maintenance obtained with column information match from secondary maintenance safety Measures Standard data base The step of safety measure normal data specifically includes: according to type, the mode of connection of intelligent substation of Awaiting Overhaul equipment, and The primary equipment operation conditions associated with Awaiting Overhaul equipment, in conjunction with default mapping ruler, is carried out at instantiation predetermined keyword Reason, to obtain the secondary maintenance safety Measures Standard data matched from secondary maintenance safety Measures Standard data base.
Specifically, the key word that intelligent substation presets operational factor corresponding includes: loop, soft pressing plate and empty loop;Phase Ying Di, it is judged that know that key word exists in secondary maintenance safety Measures Standard data, then obtain the step of Artificial Control instruction Specifically include: if judging to know that the loop in secondary maintenance safety Measures Standard data and soft pressing plate exist at intelligent substation Empty loop in SCD file and in SCD file exists in secondary maintenance safety Measures Standard data, obtains Artificial Control and refers to Order, wherein, Artificial Control instruction is that the real-time running data according to intelligent substation generates.
Wherein, according to Artificial Control optimization secondary maintenance safety Measures Standard data, obtain secondary maintenance safety and arrange The step executed specifically includes: the increase/deletion control instruction carried in instructing according to Artificial Control, increases/delete secondary maintenance Safety measure normal data;Or, the sequential carried in instructing according to Artificial Control adjusts instruction, adjusts secondary maintenance safety measure The execution sequence of normal data correspondence step, obtains secondary maintenance safety measure.Specifically, in the present embodiment, secondary maintenance The optimization of safety measure normal data is broadly divided into two parts, i.e. integrity check and timing is checked.
Integrity check is in two kinds of situation: present in first and second safety measure ticket, loop or soft pressing plate are in SCD file In can not find.Two, present in SCD file, empty loop does not exists in secondary safety measure ticket.Divide for both of these case Do not provide prompting, check for scene.
Timing refers to violate the specification such as secondary equipment of intelligent converting station relay protective scheme, trouble free service regulation, requirement Operation order.When timing mistake occurs in secondary safety measure, provide alarm prompt and manually adjust.
In the present embodiment, first the SCD file from intelligent substation parses all of secondary device;Secondly choosing Select equipment to be checked, according to the mode of connection of transformer station belonging to equipment to be checked, the type of equipment to be checked, type of work, primary equipment Blackout condition, finds out corresponding and after formalization processes the secondary maintenance safety measure ticket of this maintenance;Furthermore according to through shape Formulaization process after secondary maintenance safety measure ticket in optical fiber, maintenance pressing plate, the secondary circuit key word such as in flakes, carry out example Change processes, and obtains: " extracting on XXXX line protective devices, the straight daylighting connecting XXXX circuit combining unit is fine " or " by XXXX The maintenance pressing plate of circuit is put point " pattern;Furthermore according to above-mentioned key word and empty loop, the lookup in SCD file of the soft pressing plate Mapping ruler, and then void loop and soft pressing plate are carried out instantiation process;Finally, prompting to uninstantiated successful empty loop and Soft pressing plate, carries out integrity according to real time data and timing adjusts and checks, and according to optical fiber corresponding to loop (typical case's ticket Described in), provide back-up safety measure;Wherein, for the describing mode of secondary safety measure cannot be changed, such as: use and " extract On XX line protective devices, the straight daylighting connecting XX circuit combining unit is fine " replacement " extracts on line protective devices port x X Optical fiber ", by control end automatically by this part secondary safety measure instantiation (only needing device instantiation), thus can ensure The integrity of secondary safety measure.
Present invention also offers a kind of intelligent substation secondary maintenance safety measure support system, comprising:
First module, for obtaining the safety measure implementation principle of secondary maintenance, generates according to safety measure implementation principle Secondary maintenance safety Measures Standard data base;Wherein, the safety measure implementation principle of secondary maintenance includes maintenance regulation or runs Secondary maintenance safety measure implementation principle in code;
Second module, is used for obtaining secondary maintenance safety measure ticket, according to the hurdle carried in secondary maintenance safety measure ticket Mesh information is searched the secondary maintenance safety obtained with column information match from secondary maintenance safety Measures Standard data base and is arranged Execute normal data;
Wherein, matching way includes two kinds of situations:
Excavate based on to the degree of depth of grammatical and semantic in the SCD file model in intelligent substation and describe based on isolated subject Method of Fuzzy Matching, take empty loop, soft pressing plate, physical port Auto-matching pattern, it is achieved non-thing in secondary safety measure Automatically identifying and isolation of reason isolated subject;
The secondary device information of non-standard model or disappearance supplements replacement scheme.According to state's net icd standard storehouse and general set Meter standard, supplements complete by model nonstandard in SCD file or missing information itself, and model and loop that part of standards is not directed to depend on According to soft pressing plate and the empty relation in loop, function pressing plate and the relation of defencive function, secondary safety measure instantiation degree is reduced To device aspect, realize all dimension secondary maintenance safety measures and completely generate.
Three module, presets, for obtaining intelligent substation, the key word that operational factor is corresponding, if judging to know key word Existing in secondary maintenance safety Measures Standard data, then obtain Artificial Control instruction, according to Artificial Control instruction, intelligence becomes The real-time running data in power station generates;According to Artificial Control optimization secondary maintenance safety Measures Standard data, to obtain Secondary maintenance safety measure.Wherein, optimize and refer to instruct according to Artificial Control, graphical increase or deletion secondary maintenance safety Measures Standard data, the execution sequence of adjustment secondary maintenance safety Measures Standard data correspondence step, when secondary maintenance safety is arranged Execute normal data when needing newly-increased secondary safety measure, by manually increasing, finally realize all dimension secondaries maintenance peace Full measure completely generates.
Specifically, in the present embodiment, the first module includes that the first processing unit, the second processing unit and the 3rd process list Unit:
First processing unit, for obtaining pre-established classification chart, classification chart includes multiple classification item and each sorting item The categorical data that mesh is corresponding;Wherein, classification item includes device type, primary equipment power failure range and maintenance type etc.;Equipment Type includes busbar protective device, line protective devices, main transformer protection, combining unit, intelligent terminal, prepared auto restart etc.;Once set Standby power failure range include entirely standing powers failure, electric pressure has a power failure, interval power failure, does not has a power failure;Maintenance type includes first inspection, customary examination Test, defect elimination is upgraded;
Second processing unit, for being classified by multiple secondary maintenance safety measure tickets according to classification chart, obtains each two The type of secondary maintenance safety measure ticket;
3rd processing unit, extracts loop and operation object classification item in same type of secondary maintenance safety measure ticket Corresponding keyword, is carried out at formalization the keyword that loop is corresponding with operation object classification item according to default mapping ruler Reason, obtains secondary maintenance safety Measures Standard data base.
Wherein, column information includes the mode of connection of the type of Awaiting Overhaul equipment, intelligent substation, and sets with Awaiting Overhaul The operation conditions of the primary equipment of standby association;
Specifically, the second module includes fourth processing unit, fourth processing unit for according to the type of Awaiting Overhaul equipment, The mode of connection of intelligent substation, and the primary equipment operation conditions associated with Awaiting Overhaul equipment, in conjunction with default mapping ruler, Predetermined keyword is carried out instantiation process, to obtain the secondary inspection matched from secondary maintenance safety Measures Standard data base Repair safety measure normal data.
Wherein, key word includes: loop, soft pressing plate and empty loop;
Three module includes the 5th processing unit, if the 5th processing unit knows secondary maintenance safety measure mark for judgement There is the empty loop in the SCD file of intelligent substation and in SCD file and exist two in loop and soft pressing plate in quasi-data In secondary maintenance safety Measures Standard data, obtain Artificial Control instruction.
Further, three module also includes the 6th processing unit, and the 6th processing unit is for instructing according to Artificial Control In increase/deletion control instruction of carrying, increase/delete secondary maintenance safety Measures Standard data;Or, refer to according to Artificial Control The sequential carried in order adjusts instruction, adjusts the execution sequence of secondary maintenance safety Measures Standard data correspondence step, obtains two Secondary maintenance safety measure.Wherein, or refer to increase/delete control instruction and sequential and adjust instruction and both can the most independently carry out, Also can carry out simultaneously, select to adjust accordingly instruction according to concrete implementation principle condition.
In sum, the invention provides the construction method of a kind of intelligent substation secondary maintenance safety measure, including such as Lower operating procedure: step 1, the safety measure implementation principle of acquisition secondary maintenance, generates secondary according to safety measure implementation principle Maintenance safety Measures Standard data base;Step 2, acquisition secondary maintenance safety measure ticket, according in secondary maintenance safety measure ticket The column information carried searches the secondary inspection obtained with column information match from secondary maintenance safety Measures Standard data base Repair safety measure normal data;Step 3, acquisition intelligent substation preset the key word that operational factor is corresponding, if judging to know pass Keyword exists in secondary maintenance safety Measures Standard data, then obtain Artificial Control instruction, and Artificial Control instruction is for according to intelligence The real-time running data of energy transformer station generates;According to Artificial Control optimization secondary maintenance safety Measures Standard data, with Obtain secondary maintenance safety measure.The application is by the realization of above-mentioned construction method, and maintainer can be at intelligent substation In reorganization and expansion, O&M and maintenance process, location complete, intuitive and accurate isolated subject and determine quarantine measures, this is possible not only to Improve the establishment efficiency of secondary safety measure, simultaneously workload also can be greatly decreased, have the strongest pervasive in working at the scene Property and practicality.
Last it is noted that above example is only in order to illustrate technical scheme, it is not intended to limit;Although With reference to previous embodiment, the present invention is described in detail, it will be understood by those within the art that: it still may be used So that the technical scheme described in foregoing embodiments to be modified, or wherein portion of techniques feature is carried out equivalent; And these amendment or replace, do not make appropriate technical solution essence depart from various embodiments of the present invention technical scheme spirit and Scope.

Claims (10)

1. the construction method of an intelligent substation secondary maintenance safety measure, it is characterised in that include following operating procedure:
Step 1, the safety measure implementation principle of acquisition secondary maintenance, generate secondary maintenance according to described safety measure implementation principle Safety measure standard database;
Step 2, obtain secondary maintenance safety measure ticket, according to the column information carried in described secondary maintenance safety measure ticket from Described secondary maintenance safety Measures Standard data base searches the secondary maintenance safety obtained with described column information match arrange Execute normal data;
Step 3, obtain described intelligent substation and preset the key word that operational factor is corresponding, if judging to know that described key word exists In described secondary maintenance safety Measures Standard data, then obtain Artificial Control instruction, institute according to the instruction of described Artificial Control State the real-time running data generation of intelligent substation;According to secondary maintenance safety measure described in described Artificial Control optimization Normal data, to obtain secondary maintenance safety measure.
Method the most according to claim 1, it is characterised in that step 1 specifically includes:
Step 1.1, obtaining pre-established classification chart, described classification chart includes multiple classification item and class corresponding to each classification item Type data;
Step 1.2, according to described classification chart, multiple secondary maintenance safety measure tickets are classified, obtain each secondary maintenance safety The type of measure ticket;
Step 1.3, extract the pass that loop in same type of secondary maintenance safety measure ticket is corresponding with operation object classification item Key word, carries out formalization process according to default mapping ruler to the keyword that loop is corresponding with operation object classification item, obtains Secondary maintenance safety Measures Standard data base.
Method the most according to claim 2, it is characterised in that described column information includes the type of Awaiting Overhaul equipment, described The mode of connection of intelligent substation, and the operation conditions of the primary equipment associated with Awaiting Overhaul equipment;
Correspondingly, described arrange from described secondary maintenance safety according to the column information carried in described secondary maintenance safety measure ticket Execute and standard database is searched the step tool obtaining the secondary maintenance safety Measures Standard data with described column information match Body includes:
Type according to described Awaiting Overhaul equipment, the mode of connection of described intelligent substation, and associate with Awaiting Overhaul equipment Primary equipment operation conditions, in conjunction with described default mapping ruler, carries out instantiation process to described predetermined keyword, with from described Secondary maintenance safety Measures Standard data base obtains the secondary maintenance safety Measures Standard data matched.
Method the most according to claim 1, it is characterised in that described key word includes: loop, soft pressing plate and empty loop;
Correspondingly, described judgement knows that described key word is present in described secondary maintenance safety Measures Standard data, then obtain The step of Artificial Control instruction specifically includes:
If judging to know that the loop in described secondary maintenance safety Measures Standard data and soft pressing plate exist in the power transformation of described intelligence Empty loop in the SCD file stood and in described SCD file exists in described secondary maintenance safety Measures Standard data, obtains Described Artificial Control instructs.
Method the most according to claim 1, it is characterised in that described examine according to secondary described in described Artificial Control optimization Repairing safety measure normal data, the step obtaining secondary maintenance safety measure specifically includes:
Increase/deletion the control instruction carried in instructing according to described Artificial Control, increases/deletes described secondary maintenance safety and arrange Execute normal data;
Or,
The sequential carried in instructing according to described Artificial Control adjusts instruction, adjusts described secondary maintenance safety Measures Standard data The execution sequence of corresponding step, obtains secondary maintenance safety measure.
6. an intelligent substation secondary maintenance safety measure support system, it is characterised in that including:
First module, for obtaining the safety measure implementation principle of secondary maintenance, generates according to described safety measure implementation principle Secondary maintenance safety Measures Standard data base;
Second module, is used for obtaining secondary maintenance safety measure ticket, according to the hurdle carried in described secondary maintenance safety measure ticket Mesh information searches the secondary inspection obtained with described column information match from described secondary maintenance safety Measures Standard data base Repair safety measure normal data;
Three module, presets, for obtaining described intelligent substation, the key word that operational factor is corresponding, if judging to know described pass Keyword is present in described secondary maintenance safety Measures Standard data, then obtain Artificial Control instruction, and described Artificial Control instructs According to described intelligent substation real-time running data generate;Overhaul according to secondary described in described Artificial Control optimization Safety measure normal data, to obtain secondary maintenance safety measure.
System the most according to claim 6, it is characterised in that described first module includes the first processing unit, the second process Unit and the 3rd processing unit:
Described first processing unit, for obtaining pre-established classification chart, described classification chart includes multiple classification item and each point The categorical data that intermediate item is corresponding;
Described second processing unit, for being classified by multiple secondary maintenance safety measure tickets according to described classification chart, obtains The type of each secondary maintenance safety measure ticket;
Described 3rd processing unit, extracts loop and operation object classification item in same type of secondary maintenance safety measure ticket Corresponding keyword, is carried out at formalization the keyword that loop is corresponding with operation object classification item according to default mapping ruler Reason, obtains secondary maintenance safety Measures Standard data base.
System the most according to claim 7, it is characterised in that described column information includes the type of Awaiting Overhaul equipment, described The mode of connection of intelligent substation, and the operation conditions of the primary equipment associated with Awaiting Overhaul equipment;
Described second module includes fourth processing unit, and described fourth processing unit is for the class according to described Awaiting Overhaul equipment Type, the mode of connection of described intelligent substation, and the primary equipment operation conditions associated with Awaiting Overhaul equipment, in conjunction with described pre- If mapping ruler, described predetermined keyword is carried out instantiation process, with from described secondary maintenance safety Measures Standard data base The secondary maintenance safety Measures Standard data that middle acquisition matches.
System the most according to claim 6, it is characterised in that described key word includes: loop, soft pressing plate and empty loop;
Described three module includes the 5th processing unit, if described 5th processing unit is for judging that knowing that described secondary overhauls pacifies Loop and soft pressing plate in full Measures Standard data exist in the SCD file of described intelligent substation and in described SCD file Empty loop exist in described secondary maintenance safety Measures Standard data, obtain described Artificial Control instruction.
System the most according to claim 6, it is characterised in that described three module also includes the 6th processing unit, described Increase/deletion control instruction that six processing units carry in instructing according to described Artificial Control, increases/deletes described secondary Maintenance safety Measures Standard data;
Or,
The sequential carried in instructing according to described Artificial Control adjusts instruction, adjusts described secondary maintenance safety Measures Standard data The execution sequence of corresponding step, obtains secondary maintenance safety measure.
CN201610654677.6A 2016-08-10 2016-08-10 Intelligent substation secondary maintenance safety measure support system and construction method Active CN106296456B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610654677.6A CN106296456B (en) 2016-08-10 2016-08-10 Intelligent substation secondary maintenance safety measure support system and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610654677.6A CN106296456B (en) 2016-08-10 2016-08-10 Intelligent substation secondary maintenance safety measure support system and construction method

Publications (2)

Publication Number Publication Date
CN106296456A true CN106296456A (en) 2017-01-04
CN106296456B CN106296456B (en) 2019-05-24

Family

ID=57669612

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610654677.6A Active CN106296456B (en) 2016-08-10 2016-08-10 Intelligent substation secondary maintenance safety measure support system and construction method

Country Status (1)

Country Link
CN (1) CN106296456B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107133883A (en) * 2017-04-28 2017-09-05 国网黑龙江省电力有限公司电力科学研究院 Based on the intelligent substation safety measure automatic generation method and device that safety measure is semantic
CN107153946A (en) * 2017-04-28 2017-09-12 国家电网公司 Intelligent station is secondary to pacify automatic generation method and the system of arranging
CN107563520A (en) * 2017-07-26 2018-01-09 国网安徽省电力公司 A kind of intelligent substation secondary safety measure method for visualizing
CN110930122A (en) * 2019-11-29 2020-03-27 国网宁夏电力有限公司检修公司 Method for executing and testing automatic safety measures of relay protection of intelligent station

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009053488A1 (en) * 2007-10-25 2009-04-30 Abb Research Operating a substation automation system
CN103729805A (en) * 2014-01-04 2014-04-16 国家电网公司 500kV intelligent substation security arrangement ticket expert system
CN105429027A (en) * 2015-11-12 2016-03-23 国网宁夏电力公司 Secondary safety measure support system in operation and maintenance of intelligent substation and construction method
CN105490387A (en) * 2015-12-29 2016-04-13 武汉凯默电气有限公司 Online verification apparatus and method for safety measures for intelligent substation relay protection equipment

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009053488A1 (en) * 2007-10-25 2009-04-30 Abb Research Operating a substation automation system
CN103729805A (en) * 2014-01-04 2014-04-16 国家电网公司 500kV intelligent substation security arrangement ticket expert system
CN105429027A (en) * 2015-11-12 2016-03-23 国网宁夏电力公司 Secondary safety measure support system in operation and maintenance of intelligent substation and construction method
CN105490387A (en) * 2015-12-29 2016-04-13 武汉凯默电气有限公司 Online verification apparatus and method for safety measures for intelligent substation relay protection equipment

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
HAIHUA SHENG ET AL: "The warning strategy research on safety measures of smart substation according to correlation model", 《2015 5TH INTERNATIONAL CONFERENCE ON ELECTRIC UTILITY DEREGULATION AND RESTRUCTURING AND POWER TECHNOLOGIES (DRPT)》 *
孙志鹏 等: "智能变电站安措技术及可视化研究", 《智能电网》 *
熊华强 等: "智能变电站SCD文件可视化管理和分析决策***的设计与实现", 《电力自动化设备》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107133883A (en) * 2017-04-28 2017-09-05 国网黑龙江省电力有限公司电力科学研究院 Based on the intelligent substation safety measure automatic generation method and device that safety measure is semantic
CN107153946A (en) * 2017-04-28 2017-09-12 国家电网公司 Intelligent station is secondary to pacify automatic generation method and the system of arranging
CN107563520A (en) * 2017-07-26 2018-01-09 国网安徽省电力公司 A kind of intelligent substation secondary safety measure method for visualizing
CN110930122A (en) * 2019-11-29 2020-03-27 国网宁夏电力有限公司检修公司 Method for executing and testing automatic safety measures of relay protection of intelligent station

Also Published As

Publication number Publication date
CN106296456B (en) 2019-05-24

Similar Documents

Publication Publication Date Title
CN103218398B (en) Intelligent substation SCL (substation configuration description language) file difference comparison method
CN108549650B (en) Intelligent substation anti-misoperation lockout logic rule source end configuration method and system
CN102622463B (en) Drawing-model uniformity based method for automatic check of design drawings
CN106296456B (en) Intelligent substation secondary maintenance safety measure support system and construction method
CN110674282B (en) Expert knowledge rule base-based one-key sequential control operation order intelligent simulation method
CN105335342A (en) Method for automatic examination of wiring correctness of intelligent substation SCD configuration file virtual terminator
CN103730894B (en) EMS image checking mehtod and device
CN107153946A (en) Intelligent station is secondary to pacify automatic generation method and the system of arranging
CN104091289A (en) Large-scale power distribution network N-1 rapid verification method based on wiring mode rules
CN103514336A (en) Intelligent substation optical cable connection automatic design method based on virtual-true mapping mode
CN115599750A (en) Intelligent substation virtual circuit checking method, system, equipment and storage medium
US10210291B2 (en) Apparatus and method for analyzing power system
CN111027746A (en) Intelligent distribution network system ring network diagram automatic generation method and device
CN107067081A (en) Substation secondary maintenance safety measure generation method based on many object models
CN110569557A (en) Intelligent autonomous design platform for power transmission and transformation project and working method thereof
CN113095059B (en) Method, device, equipment and storage medium for verifying substation configuration description file
CN110704700A (en) One-key sequential control equipment state intelligent simulation method based on expert knowledge rule base
CN110705001A (en) Equipment-based monitoring information objectification modeling method for power system
CN109191006A (en) A kind of method of 110 kV main transformer N-1 risk automatically scanning of power grid analysis
CN109460896B (en) Automatic scanning analysis method for N-1 risk of 110kV line of power grid
CN104298421B (en) Power distribution network safety control method based on rapid simulation analysis technology
CN106055684A (en) SCD file comparison method of transformer substation
CN107871030B (en) Substation secondary maintenance safety measure generation method based on SCD file object model
CN115224687A (en) Power failure overhaul safety checking method and system for power transmission and transformation equipment below 220KV
CN104134162A (en) Marketing, distribution and scheduling whole power grid modeling method of integrated distribution power supply

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant