CN106296456A - Intelligent substation secondary maintenance safety measure support system and construction method - Google Patents
Intelligent substation secondary maintenance safety measure support system and construction method Download PDFInfo
- Publication number
- CN106296456A CN106296456A CN201610654677.6A CN201610654677A CN106296456A CN 106296456 A CN106296456 A CN 106296456A CN 201610654677 A CN201610654677 A CN 201610654677A CN 106296456 A CN106296456 A CN 106296456A
- Authority
- CN
- China
- Prior art keywords
- secondary maintenance
- maintenance safety
- safety measure
- standard data
- measures standard
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000012423 maintenance Methods 0.000 title claims abstract description 213
- 238000010276 construction Methods 0.000 title claims abstract description 16
- 238000005457 optimization Methods 0.000 claims abstract description 13
- 238000012545 processing Methods 0.000 claims description 34
- 238000000034 method Methods 0.000 claims description 29
- 230000008569 process Effects 0.000 claims description 19
- 238000013507 mapping Methods 0.000 claims description 14
- 238000012217 deletion Methods 0.000 claims description 8
- 230000037430 deletion Effects 0.000 claims description 8
- 239000000284 extract Substances 0.000 claims description 7
- 238000007689 inspection Methods 0.000 claims description 6
- 238000011017 operating method Methods 0.000 claims description 5
- 230000008439 repair process Effects 0.000 claims description 4
- 230000009466 transformation Effects 0.000 claims 1
- 230000008859 change Effects 0.000 description 8
- 230000001681 protective effect Effects 0.000 description 8
- 230000003247 decreasing effect Effects 0.000 description 5
- 230000000694 effects Effects 0.000 description 3
- 239000013307 optical fiber Substances 0.000 description 3
- 230000008521 reorganization Effects 0.000 description 3
- 230000008901 benefit Effects 0.000 description 2
- 238000004891 communication Methods 0.000 description 2
- 230000007547 defect Effects 0.000 description 2
- 230000008030 elimination Effects 0.000 description 2
- 238000003379 elimination reaction Methods 0.000 description 2
- 239000013589 supplement Substances 0.000 description 2
- 230000009471 action Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 230000008034 disappearance Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000002955 isolation Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000009666 routine test Methods 0.000 description 1
- 238000005204 segregation Methods 0.000 description 1
- 230000005477 standard model Effects 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
- 239000011800 void material Substances 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Business, Economics & Management (AREA)
- Health & Medical Sciences (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Human Resources & Organizations (AREA)
- Marketing (AREA)
- Primary Health Care (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention relates to technical field of power systems, particularly relate to a kind of intelligent substation secondary maintenance safety measure support system and construction method.The invention provides the construction method of a kind of intelligent substation secondary maintenance safety measure, including: step 1, according to the secondary maintenance safety measure implementation principle obtained, generate secondary maintenance safety Measures Standard data base;Step 2, from standard database, searches the secondary maintenance safety Measures Standard that acquisition matches according to obtaining in secondary maintenance safety measure ticket the column information carried;Step 3, acquisition intelligent substation preset the key word that operational factor is corresponding, if judging to know that key word is present in secondary maintenance safety Measures Standard data, then obtain Artificial Control instruction;According to optimization secondary maintenance safety Measures Standard data, obtain secondary maintenance safety measure.By above-mentioned construction method, maintainer can location complete, intuitive and accurate isolated subject and determine quarantine measures, establishment efficiency is high, and workload is little.
Description
Technical field
The present invention relates to technical field of power systems, particularly relate to a kind of intelligent substation secondary maintenance safety measure support
System and construction method, be specifically related to a kind of to be effectively improved the establishment efficiency of intelligent substation secondary maintenance safety measure, carry
High maintenance integrity degree, the support system that operator workload is simultaneously greatly decreased and construction method.
Background technology
Intelligent substation have employed modern communications and digital modeling technique, and on Form of Technique, relatively conventional station occurs
The change of essence.For impact specific to secondary maintenance safety measure, it is mainly reflected in secondary maintenance safety measure
Operation object and the observability of secondary safety measure implementation effect there occurs fundamental change.Wherein, the change of object is operated
Change includes: 1, empty loop instead of the hardwire in normal station;2, soft pressing plate instead of original hard pressing plate;3, maintenance is introduced
Pressing plate;The observability change of implementation effect then includes: 1, loop is the most directly perceived;2, pressing plate is the most directly perceived with associating of loop.
Above-mentioned change there is problems in that during causing the establishment of secondary maintenance safety measure, execution
1) maintainer not only needs to be grasped station relevant knowledge, simultaneously need to be familiar with that IEC61850 is relevant to be known
Knowing, even other Professional knowledges, such as communication speciality, Automation Specialty, this carries to the O&M maintainer being familiar with tradition transformer station
Having carried out huge challenge, the most also the reliability to secondary safety measure proposes new challenge.
2) the secondary maintenance safety measure implementation principle in the maintenance regulation performed at present and operations specification or typical case two
Secondary safety measure is all general rule, needs technical staff manually to convert thereof into a certain of some intelligent substation concrete
Secondary safety measure.Conversion work not only needs deep to understand compilation principles or typical case's secondary safety measure, in addition it is also necessary to completely
Understand intelligent substation secondary model even device software logic, technical staff is required higher and workload is huge.
3) the operable ability of device there are differences because of the difference of manufacturer or device version, overhauls regulation and runs
There is unmatched situation in implementation principle or the operable ability of reality of typical case's secondary safety measure and device in specification, returns
Road and soft pressing plate invisible causes these not mate phenomenon being not easy to be found.
Summary of the invention
(1) to solve the technical problem that
It is an object of the invention to: a kind of establishment effect that can be effectively improved intelligent substation secondary maintenance safety measure is provided
Rate, raising maintenance integrity degree, the support system that operator workload is simultaneously greatly decreased and construction method, existing to solve
Intelligent substation secondary maintenance to the requirement of maintainer compared with high, maintainer's workload big, establishment inefficient and maintenance complete
Spend low problem.
(2) technical scheme
In order to solve above-mentioned technical problem, the invention provides the structure of a kind of intelligent substation secondary maintenance safety measure
Method, it includes following operating procedure:
Step 1, the safety measure implementation principle of acquisition secondary maintenance, generate secondary according to described safety measure implementation principle
Maintenance safety Measures Standard data base;
Step 2, acquisition secondary maintenance safety measure ticket, according to the column letter carried in described secondary maintenance safety measure ticket
Breath searches the secondary maintenance peace obtained with described column information match from described secondary maintenance safety Measures Standard data base
Full Measures Standard data;
Step 3, obtain described intelligent substation and preset the key word that operational factor is corresponding, if judging to know described key word
Being present in described secondary maintenance safety Measures Standard data, then obtain Artificial Control instruction, the instruction of described Artificial Control is root
Generate according to the real-time running data of described intelligent substation;According to secondary maintenance safety described in described Artificial Control optimization
Measures Standard data, to obtain secondary maintenance safety measure.
Wherein, step 1 specifically includes:
Step 1.1, obtaining pre-established classification chart, described classification chart includes that multiple classification item and each classification item are corresponding
Categorical data;
Step 1.2, according to described classification chart, multiple secondary maintenance safety measure tickets are classified, obtain the maintenance of each secondary
The type of safety measure ticket;
Step 1.3, to extract in same type of secondary maintenance safety measure ticket loop corresponding with operation object classification item
Keyword, according to default mapping ruler, loop is carried out formalization process with operation keyword corresponding to object classification item,
Obtain secondary maintenance safety Measures Standard data base.
Wherein, described column information includes the type of Awaiting Overhaul equipment, the mode of connection of described intelligent substation, Yi Jiyu
The operation conditions of the primary equipment of Awaiting Overhaul equipment association;
Correspondingly, described maintenance from described secondary according to the column information carried in described secondary maintenance safety measure ticket is pacified
Full Measures Standard data base searches the step obtaining the secondary maintenance safety Measures Standard data with described column information match
Suddenly specifically include:
Type according to described Awaiting Overhaul equipment, the mode of connection of described intelligent substation, and close with Awaiting Overhaul equipment
Connection primary equipment operation conditions, in conjunction with described default mapping ruler, described predetermined keyword is carried out instantiation process, with from
Described secondary maintenance safety Measures Standard data base obtains the secondary maintenance safety Measures Standard data matched.
Wherein, described key word includes: loop, soft pressing plate and empty loop;
Correspondingly, described judgement knows that described key word is present in described secondary maintenance safety Measures Standard data, then
The step obtaining Artificial Control instruction specifically includes:
If judging to know that the loop in described secondary maintenance safety Measures Standard data and soft pressing plate exist in described intelligence
Empty loop in the SCD file of transformer station and in described SCD file exists in described secondary maintenance safety Measures Standard data,
Obtain the instruction of described Artificial Control.
Wherein, described according to secondary maintenance safety Measures Standard data described in described Artificial Control optimization, obtain two
The step of secondary maintenance safety measure specifically includes:
Increase/deletion the control instruction carried in instructing according to described Artificial Control, increases/deletes described secondary maintenance peace
Full Measures Standard data;
Or,
The sequential carried in instructing according to described Artificial Control adjusts instruction, adjusts described secondary maintenance safety Measures Standard
The execution sequence of data correspondence step, obtains secondary maintenance safety measure.
Present invention also offers a kind of intelligent substation secondary maintenance safety measure support system, comprising:
First module, for obtaining the safety measure implementation principle of secondary maintenance, according to described safety measure implementation principle
Generate secondary maintenance safety Measures Standard data base;
Second module, is used for obtaining secondary maintenance safety measure ticket, carries according in described secondary maintenance safety measure ticket
Column information search from described secondary maintenance safety Measures Standard data base and obtain and the two of described column information match
Secondary maintenance safety Measures Standard data;
Three module, presets, for obtaining described intelligent substation, the key word that operational factor is corresponding, if judging to know institute
State key word to be present in described secondary maintenance safety Measures Standard data, then obtain Artificial Control instruction, described Artificial Control
According to instruction, the real-time running data of described intelligent substation generates;According to secondary described in described Artificial Control optimization
Maintenance safety Measures Standard data, to obtain secondary maintenance safety measure.
Wherein, described first module includes the first processing unit, the second processing unit and the 3rd processing unit:
Described first processing unit, for obtaining pre-established classification chart, described classification chart include multiple classification item and
The categorical data that each classification item is corresponding;
Described second processing unit, for multiple secondary maintenance safety measure tickets being classified according to described classification chart,
Obtain the type of each secondary maintenance safety measure ticket;
Described 3rd processing unit, extracts loop and operation object classification in same type of secondary maintenance safety measure ticket
The keyword that project is corresponding, carries out form according to default mapping ruler to the keyword that loop is corresponding with operation object classification item
Change processes, and obtains secondary maintenance safety Measures Standard data base.
Wherein, described column information includes the type of Awaiting Overhaul equipment, the mode of connection of described intelligent substation, Yi Jiyu
The operation conditions of the primary equipment of Awaiting Overhaul equipment association;
Described second module includes fourth processing unit, and described fourth processing unit is for according to described Awaiting Overhaul equipment
Type, the mode of connection of described intelligent substation, and the primary equipment operation conditions associated with Awaiting Overhaul equipment, in conjunction with described
Preset mapping ruler, described predetermined keyword is carried out instantiation process, with from described secondary maintenance safety Measures Standard data
Storehouse obtains the secondary maintenance safety Measures Standard data matched.
Wherein, described key word includes: loop, soft pressing plate and empty loop;
Described three module includes the 5th processing unit, if for judgement, described 5th processing unit knows that described secondary is examined
Repair the loop in safety measure normal data and soft pressing plate exists in the SCD file of described intelligent substation and described SCD literary composition
Empty loop in part exists in described secondary maintenance safety Measures Standard data, obtains the instruction of described Artificial Control.
Wherein, described three module also includes the 6th processing unit, described 6th processing unit for according to described manually
The increase carried in control instruction/deletion control instruction, increases/deletes described secondary maintenance safety Measures Standard data;
Or,
The sequential carried in instructing according to described Artificial Control adjusts instruction, adjusts described secondary maintenance safety Measures Standard
The execution sequence of data correspondence step, obtains secondary maintenance safety measure.
(3) beneficial effect
The technique scheme of the present invention has the advantage that and the invention provides a kind of intelligent substation secondary maintenance peace
The construction method of full measure, including following operating procedure: step 1, the safety measure implementation principle of acquisition secondary maintenance, according to peace
Full measure implementation principle generates secondary maintenance safety Measures Standard data base;Step 2, acquisition secondary maintenance safety measure ticket, root
According to the column information carried in secondary maintenance safety measure ticket search from secondary maintenance safety Measures Standard data base acquisition with
The secondary maintenance safety Measures Standard data of column information match;Step 3, acquisition intelligent substation preset operational factor correspondence
Key word, if judge know key word exist in secondary maintenance safety Measures Standard data, then obtain Artificial Control instruction,
Artificial Control instruction is that the real-time running data according to intelligent substation generates;Overhaul according to Artificial Control optimization secondary
Safety measure normal data, to obtain secondary maintenance safety measure.The application is by the realization of above-mentioned construction method, maintainer
Can be in the reorganization and expansion of intelligent substation, O&M and maintenance process, location complete, intuitive and accurate isolated subject and determining
Quarantine measures, this establishment efficiency being possible not only to improve secondary safety measure, workload, at the scene work also can be greatly decreased simultaneously
Work has the strongest universality and practicality.
Accompanying drawing explanation
Fig. 1 is the concrete operations flow process of the embodiment of the present invention a kind of intelligent substation secondary maintenance safety measure construction method
Figure.
Detailed description of the invention
For making the purpose of the embodiment of the present invention, technical scheme and advantage clearer, below in conjunction with the embodiment of the present invention
In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is
A part of embodiment of the present invention rather than whole embodiments.Based on the embodiment in the present invention, ordinary skill people
The every other embodiment that member is obtained on the premise of not making creative work, broadly falls into the scope of protection of the invention.
As it is shown in figure 1, embodiments provide the construction method of a kind of intelligent substation secondary maintenance safety measure,
It includes following operating procedure:
Step 1, the safety measure implementation principle of acquisition secondary maintenance, generate secondary maintenance according to safety measure implementation principle
Safety measure standard database;In the present embodiment, the safety measure implementation principle of secondary maintenance includes maintenance regulation or runs
Secondary maintenance safety measure implementation principle in code;And by edit tool, safety measure implementation principle is compiled as computer
The secondary maintenance safety Measures Standard data base that software is capable of identify that;
Step 2, obtain secondary maintenance safety measure ticket, according to the column information carried in secondary maintenance safety measure ticket from
Secondary maintenance safety Measures Standard data base searches the secondary maintenance safety Measures Standard number obtained with column information match
According to;Specifically, column information can include the mode of connection of transformer station belonging to equipment to be checked, the type of equipment to be checked, type of work,
Primary equipment blackout condition, obtains the secondary maintenance safety Measures Standard data matched according to above-mentioned column information searching;
Step 3, acquisition intelligent substation preset the key word that operational factor is corresponding, if judging to know that key word exists two
In secondary maintenance safety Measures Standard data, then obtaining Artificial Control instruction, Artificial Control instruction is the reality according to intelligent substation
Time service data generate;According to Artificial Control optimization secondary maintenance safety Measures Standard data, to obtain secondary maintenance
Safety measure.Wherein, optimize and refer to instruct according to Artificial Control, graphical increase or deletion secondary maintenance safety Measures Standard
Data, the execution sequence of adjustment secondary maintenance safety Measures Standard data correspondence step, when secondary maintenance safety Measures Standard number
During secondary safety measure newly-increased according to needs, by manually increasing, finally realize all dimension secondary maintenance safety measures complete
Whole generation.
Specifically, the application by the realization of above-mentioned construction method, maintainer can the reorganization and expansion of intelligent substation,
In O&M and maintenance process, location complete, intuitive and accurate isolated subject and determine quarantine measures, this is possible not only to improve two
The establishment efficiency of secondary safety measure, also can be greatly decreased workload simultaneously, have the strongest universality and reality in working at the scene
The property used.
In the present embodiment, step 1 specifically includes:
Step 1.1, obtaining pre-established classification chart, classification chart includes multiple classification item and class corresponding to each classification item
Type data;Specifically, in the present embodiment, classification item includes device type, primary equipment power failure range and maintenance type etc.;
Device type includes busbar protective device, line protective devices, main transformer protection, combining unit, intelligent terminal, prepared auto restart etc.;One
Secondary device power failure range include entirely standing power failure, electric pressure has a power failure, interval has a power failure, do not has a power failure;Maintenance type includes first inspection, routine
Test, defect elimination upgrading;
Step 1.2, according to classification chart, multiple secondary maintenance safety measure tickets are classified, obtain each secondary maintenance safety
The type of measure ticket;Table 1 is that in the 220kV transformer station of double female modes of connection as a example by route protection, its classification chart is as follows:
Route protection classification chart in table 1 220kV transformer station
Step 1.3, to extract in same type of secondary maintenance safety measure ticket loop corresponding with operation object classification item
Keyword, according to default mapping ruler, loop is carried out formalization process with operation keyword corresponding to object classification item,
Obtain secondary maintenance safety Measures Standard data base.In the present embodiment, with circuit in the 220kV transformer station of double female modes of connection
As a example by the protection first inspection work when line segregation has a power failure, extract the pass of secondary maintenance exemplary secure measure ticket PL-BAYPF-FM
Key word (is only listed and is opened malfunctioning loop), the most as shown in table 2:
The keyword of 2 two maintenance exemplary secure measure ticket PL-BAYPF-FM of table
Wherein, circuit form turns to: [space from start type] [initial type of device] [purpose fills to [purpose interval type]
Put type] for [loop-type].As a example by the 220kV transformer station of double female modes of connection, the startup of route protection to bus protection
Malfunctioning circuit form turns to: [LINE] [PRO] to [BUS] [PRO] for [STARTFAILURE];Safety measure form turns to:
[action type] [operating interval] [operation device] [operation object].
Preset mapping ruler: according to national standard " IEC61850 relay protection engineer applied model specification " to empty terminal and
The semanteme of soft pressing plate, the empty loop of definition and the search rule of soft pressing plate;And for using general semantics (such as: logical node is
GGIO, DO are SPCS) the empty loop that defines and soft pressing plate, use the fuzzy match mode of desc to define its search rule.This reality
Executing example as a example by the 220kV transformer station of double female modes of connection, the start failure protection loop of route protection to bus protection can be set up such as
Lower search rule, the most as shown in table 3:
Table 3 route protection is regular to the start failure protection loop map of bus protection
Specifically, in the present embodiment, column information includes the type of Awaiting Overhaul equipment, the wiring side of intelligent substation
Formula, and the operation conditions of the primary equipment associated with Awaiting Overhaul equipment;Correspondingly, take according in secondary maintenance safety measure ticket
The column information of band searches the secondary maintenance obtained with column information match from secondary maintenance safety Measures Standard data base
The step of safety measure normal data specifically includes: according to type, the mode of connection of intelligent substation of Awaiting Overhaul equipment, and
The primary equipment operation conditions associated with Awaiting Overhaul equipment, in conjunction with default mapping ruler, is carried out at instantiation predetermined keyword
Reason, to obtain the secondary maintenance safety Measures Standard data matched from secondary maintenance safety Measures Standard data base.
Specifically, the key word that intelligent substation presets operational factor corresponding includes: loop, soft pressing plate and empty loop;Phase
Ying Di, it is judged that know that key word exists in secondary maintenance safety Measures Standard data, then obtain the step of Artificial Control instruction
Specifically include: if judging to know that the loop in secondary maintenance safety Measures Standard data and soft pressing plate exist at intelligent substation
Empty loop in SCD file and in SCD file exists in secondary maintenance safety Measures Standard data, obtains Artificial Control and refers to
Order, wherein, Artificial Control instruction is that the real-time running data according to intelligent substation generates.
Wherein, according to Artificial Control optimization secondary maintenance safety Measures Standard data, obtain secondary maintenance safety and arrange
The step executed specifically includes: the increase/deletion control instruction carried in instructing according to Artificial Control, increases/delete secondary maintenance
Safety measure normal data;Or, the sequential carried in instructing according to Artificial Control adjusts instruction, adjusts secondary maintenance safety measure
The execution sequence of normal data correspondence step, obtains secondary maintenance safety measure.Specifically, in the present embodiment, secondary maintenance
The optimization of safety measure normal data is broadly divided into two parts, i.e. integrity check and timing is checked.
Integrity check is in two kinds of situation: present in first and second safety measure ticket, loop or soft pressing plate are in SCD file
In can not find.Two, present in SCD file, empty loop does not exists in secondary safety measure ticket.Divide for both of these case
Do not provide prompting, check for scene.
Timing refers to violate the specification such as secondary equipment of intelligent converting station relay protective scheme, trouble free service regulation, requirement
Operation order.When timing mistake occurs in secondary safety measure, provide alarm prompt and manually adjust.
In the present embodiment, first the SCD file from intelligent substation parses all of secondary device;Secondly choosing
Select equipment to be checked, according to the mode of connection of transformer station belonging to equipment to be checked, the type of equipment to be checked, type of work, primary equipment
Blackout condition, finds out corresponding and after formalization processes the secondary maintenance safety measure ticket of this maintenance;Furthermore according to through shape
Formulaization process after secondary maintenance safety measure ticket in optical fiber, maintenance pressing plate, the secondary circuit key word such as in flakes, carry out example
Change processes, and obtains: " extracting on XXXX line protective devices, the straight daylighting connecting XXXX circuit combining unit is fine " or " by XXXX
The maintenance pressing plate of circuit is put point " pattern;Furthermore according to above-mentioned key word and empty loop, the lookup in SCD file of the soft pressing plate
Mapping ruler, and then void loop and soft pressing plate are carried out instantiation process;Finally, prompting to uninstantiated successful empty loop and
Soft pressing plate, carries out integrity according to real time data and timing adjusts and checks, and according to optical fiber corresponding to loop (typical case's ticket
Described in), provide back-up safety measure;Wherein, for the describing mode of secondary safety measure cannot be changed, such as: use and " extract
On XX line protective devices, the straight daylighting connecting XX circuit combining unit is fine " replacement " extracts on line protective devices port x X
Optical fiber ", by control end automatically by this part secondary safety measure instantiation (only needing device instantiation), thus can ensure
The integrity of secondary safety measure.
Present invention also offers a kind of intelligent substation secondary maintenance safety measure support system, comprising:
First module, for obtaining the safety measure implementation principle of secondary maintenance, generates according to safety measure implementation principle
Secondary maintenance safety Measures Standard data base;Wherein, the safety measure implementation principle of secondary maintenance includes maintenance regulation or runs
Secondary maintenance safety measure implementation principle in code;
Second module, is used for obtaining secondary maintenance safety measure ticket, according to the hurdle carried in secondary maintenance safety measure ticket
Mesh information is searched the secondary maintenance safety obtained with column information match from secondary maintenance safety Measures Standard data base and is arranged
Execute normal data;
Wherein, matching way includes two kinds of situations:
Excavate based on to the degree of depth of grammatical and semantic in the SCD file model in intelligent substation and describe based on isolated subject
Method of Fuzzy Matching, take empty loop, soft pressing plate, physical port Auto-matching pattern, it is achieved non-thing in secondary safety measure
Automatically identifying and isolation of reason isolated subject;
The secondary device information of non-standard model or disappearance supplements replacement scheme.According to state's net icd standard storehouse and general set
Meter standard, supplements complete by model nonstandard in SCD file or missing information itself, and model and loop that part of standards is not directed to depend on
According to soft pressing plate and the empty relation in loop, function pressing plate and the relation of defencive function, secondary safety measure instantiation degree is reduced
To device aspect, realize all dimension secondary maintenance safety measures and completely generate.
Three module, presets, for obtaining intelligent substation, the key word that operational factor is corresponding, if judging to know key word
Existing in secondary maintenance safety Measures Standard data, then obtain Artificial Control instruction, according to Artificial Control instruction, intelligence becomes
The real-time running data in power station generates;According to Artificial Control optimization secondary maintenance safety Measures Standard data, to obtain
Secondary maintenance safety measure.Wherein, optimize and refer to instruct according to Artificial Control, graphical increase or deletion secondary maintenance safety
Measures Standard data, the execution sequence of adjustment secondary maintenance safety Measures Standard data correspondence step, when secondary maintenance safety is arranged
Execute normal data when needing newly-increased secondary safety measure, by manually increasing, finally realize all dimension secondaries maintenance peace
Full measure completely generates.
Specifically, in the present embodiment, the first module includes that the first processing unit, the second processing unit and the 3rd process list
Unit:
First processing unit, for obtaining pre-established classification chart, classification chart includes multiple classification item and each sorting item
The categorical data that mesh is corresponding;Wherein, classification item includes device type, primary equipment power failure range and maintenance type etc.;Equipment
Type includes busbar protective device, line protective devices, main transformer protection, combining unit, intelligent terminal, prepared auto restart etc.;Once set
Standby power failure range include entirely standing powers failure, electric pressure has a power failure, interval power failure, does not has a power failure;Maintenance type includes first inspection, customary examination
Test, defect elimination is upgraded;
Second processing unit, for being classified by multiple secondary maintenance safety measure tickets according to classification chart, obtains each two
The type of secondary maintenance safety measure ticket;
3rd processing unit, extracts loop and operation object classification item in same type of secondary maintenance safety measure ticket
Corresponding keyword, is carried out at formalization the keyword that loop is corresponding with operation object classification item according to default mapping ruler
Reason, obtains secondary maintenance safety Measures Standard data base.
Wherein, column information includes the mode of connection of the type of Awaiting Overhaul equipment, intelligent substation, and sets with Awaiting Overhaul
The operation conditions of the primary equipment of standby association;
Specifically, the second module includes fourth processing unit, fourth processing unit for according to the type of Awaiting Overhaul equipment,
The mode of connection of intelligent substation, and the primary equipment operation conditions associated with Awaiting Overhaul equipment, in conjunction with default mapping ruler,
Predetermined keyword is carried out instantiation process, to obtain the secondary inspection matched from secondary maintenance safety Measures Standard data base
Repair safety measure normal data.
Wherein, key word includes: loop, soft pressing plate and empty loop;
Three module includes the 5th processing unit, if the 5th processing unit knows secondary maintenance safety measure mark for judgement
There is the empty loop in the SCD file of intelligent substation and in SCD file and exist two in loop and soft pressing plate in quasi-data
In secondary maintenance safety Measures Standard data, obtain Artificial Control instruction.
Further, three module also includes the 6th processing unit, and the 6th processing unit is for instructing according to Artificial Control
In increase/deletion control instruction of carrying, increase/delete secondary maintenance safety Measures Standard data;Or, refer to according to Artificial Control
The sequential carried in order adjusts instruction, adjusts the execution sequence of secondary maintenance safety Measures Standard data correspondence step, obtains two
Secondary maintenance safety measure.Wherein, or refer to increase/delete control instruction and sequential and adjust instruction and both can the most independently carry out,
Also can carry out simultaneously, select to adjust accordingly instruction according to concrete implementation principle condition.
In sum, the invention provides the construction method of a kind of intelligent substation secondary maintenance safety measure, including such as
Lower operating procedure: step 1, the safety measure implementation principle of acquisition secondary maintenance, generates secondary according to safety measure implementation principle
Maintenance safety Measures Standard data base;Step 2, acquisition secondary maintenance safety measure ticket, according in secondary maintenance safety measure ticket
The column information carried searches the secondary inspection obtained with column information match from secondary maintenance safety Measures Standard data base
Repair safety measure normal data;Step 3, acquisition intelligent substation preset the key word that operational factor is corresponding, if judging to know pass
Keyword exists in secondary maintenance safety Measures Standard data, then obtain Artificial Control instruction, and Artificial Control instruction is for according to intelligence
The real-time running data of energy transformer station generates;According to Artificial Control optimization secondary maintenance safety Measures Standard data, with
Obtain secondary maintenance safety measure.The application is by the realization of above-mentioned construction method, and maintainer can be at intelligent substation
In reorganization and expansion, O&M and maintenance process, location complete, intuitive and accurate isolated subject and determine quarantine measures, this is possible not only to
Improve the establishment efficiency of secondary safety measure, simultaneously workload also can be greatly decreased, have the strongest pervasive in working at the scene
Property and practicality.
Last it is noted that above example is only in order to illustrate technical scheme, it is not intended to limit;Although
With reference to previous embodiment, the present invention is described in detail, it will be understood by those within the art that: it still may be used
So that the technical scheme described in foregoing embodiments to be modified, or wherein portion of techniques feature is carried out equivalent;
And these amendment or replace, do not make appropriate technical solution essence depart from various embodiments of the present invention technical scheme spirit and
Scope.
Claims (10)
1. the construction method of an intelligent substation secondary maintenance safety measure, it is characterised in that include following operating procedure:
Step 1, the safety measure implementation principle of acquisition secondary maintenance, generate secondary maintenance according to described safety measure implementation principle
Safety measure standard database;
Step 2, obtain secondary maintenance safety measure ticket, according to the column information carried in described secondary maintenance safety measure ticket from
Described secondary maintenance safety Measures Standard data base searches the secondary maintenance safety obtained with described column information match arrange
Execute normal data;
Step 3, obtain described intelligent substation and preset the key word that operational factor is corresponding, if judging to know that described key word exists
In described secondary maintenance safety Measures Standard data, then obtain Artificial Control instruction, institute according to the instruction of described Artificial Control
State the real-time running data generation of intelligent substation;According to secondary maintenance safety measure described in described Artificial Control optimization
Normal data, to obtain secondary maintenance safety measure.
Method the most according to claim 1, it is characterised in that step 1 specifically includes:
Step 1.1, obtaining pre-established classification chart, described classification chart includes multiple classification item and class corresponding to each classification item
Type data;
Step 1.2, according to described classification chart, multiple secondary maintenance safety measure tickets are classified, obtain each secondary maintenance safety
The type of measure ticket;
Step 1.3, extract the pass that loop in same type of secondary maintenance safety measure ticket is corresponding with operation object classification item
Key word, carries out formalization process according to default mapping ruler to the keyword that loop is corresponding with operation object classification item, obtains
Secondary maintenance safety Measures Standard data base.
Method the most according to claim 2, it is characterised in that described column information includes the type of Awaiting Overhaul equipment, described
The mode of connection of intelligent substation, and the operation conditions of the primary equipment associated with Awaiting Overhaul equipment;
Correspondingly, described arrange from described secondary maintenance safety according to the column information carried in described secondary maintenance safety measure ticket
Execute and standard database is searched the step tool obtaining the secondary maintenance safety Measures Standard data with described column information match
Body includes:
Type according to described Awaiting Overhaul equipment, the mode of connection of described intelligent substation, and associate with Awaiting Overhaul equipment
Primary equipment operation conditions, in conjunction with described default mapping ruler, carries out instantiation process to described predetermined keyword, with from described
Secondary maintenance safety Measures Standard data base obtains the secondary maintenance safety Measures Standard data matched.
Method the most according to claim 1, it is characterised in that described key word includes: loop, soft pressing plate and empty loop;
Correspondingly, described judgement knows that described key word is present in described secondary maintenance safety Measures Standard data, then obtain
The step of Artificial Control instruction specifically includes:
If judging to know that the loop in described secondary maintenance safety Measures Standard data and soft pressing plate exist in the power transformation of described intelligence
Empty loop in the SCD file stood and in described SCD file exists in described secondary maintenance safety Measures Standard data, obtains
Described Artificial Control instructs.
Method the most according to claim 1, it is characterised in that described examine according to secondary described in described Artificial Control optimization
Repairing safety measure normal data, the step obtaining secondary maintenance safety measure specifically includes:
Increase/deletion the control instruction carried in instructing according to described Artificial Control, increases/deletes described secondary maintenance safety and arrange
Execute normal data;
Or,
The sequential carried in instructing according to described Artificial Control adjusts instruction, adjusts described secondary maintenance safety Measures Standard data
The execution sequence of corresponding step, obtains secondary maintenance safety measure.
6. an intelligent substation secondary maintenance safety measure support system, it is characterised in that including:
First module, for obtaining the safety measure implementation principle of secondary maintenance, generates according to described safety measure implementation principle
Secondary maintenance safety Measures Standard data base;
Second module, is used for obtaining secondary maintenance safety measure ticket, according to the hurdle carried in described secondary maintenance safety measure ticket
Mesh information searches the secondary inspection obtained with described column information match from described secondary maintenance safety Measures Standard data base
Repair safety measure normal data;
Three module, presets, for obtaining described intelligent substation, the key word that operational factor is corresponding, if judging to know described pass
Keyword is present in described secondary maintenance safety Measures Standard data, then obtain Artificial Control instruction, and described Artificial Control instructs
According to described intelligent substation real-time running data generate;Overhaul according to secondary described in described Artificial Control optimization
Safety measure normal data, to obtain secondary maintenance safety measure.
System the most according to claim 6, it is characterised in that described first module includes the first processing unit, the second process
Unit and the 3rd processing unit:
Described first processing unit, for obtaining pre-established classification chart, described classification chart includes multiple classification item and each point
The categorical data that intermediate item is corresponding;
Described second processing unit, for being classified by multiple secondary maintenance safety measure tickets according to described classification chart, obtains
The type of each secondary maintenance safety measure ticket;
Described 3rd processing unit, extracts loop and operation object classification item in same type of secondary maintenance safety measure ticket
Corresponding keyword, is carried out at formalization the keyword that loop is corresponding with operation object classification item according to default mapping ruler
Reason, obtains secondary maintenance safety Measures Standard data base.
System the most according to claim 7, it is characterised in that described column information includes the type of Awaiting Overhaul equipment, described
The mode of connection of intelligent substation, and the operation conditions of the primary equipment associated with Awaiting Overhaul equipment;
Described second module includes fourth processing unit, and described fourth processing unit is for the class according to described Awaiting Overhaul equipment
Type, the mode of connection of described intelligent substation, and the primary equipment operation conditions associated with Awaiting Overhaul equipment, in conjunction with described pre-
If mapping ruler, described predetermined keyword is carried out instantiation process, with from described secondary maintenance safety Measures Standard data base
The secondary maintenance safety Measures Standard data that middle acquisition matches.
System the most according to claim 6, it is characterised in that described key word includes: loop, soft pressing plate and empty loop;
Described three module includes the 5th processing unit, if described 5th processing unit is for judging that knowing that described secondary overhauls pacifies
Loop and soft pressing plate in full Measures Standard data exist in the SCD file of described intelligent substation and in described SCD file
Empty loop exist in described secondary maintenance safety Measures Standard data, obtain described Artificial Control instruction.
System the most according to claim 6, it is characterised in that described three module also includes the 6th processing unit, described
Increase/deletion control instruction that six processing units carry in instructing according to described Artificial Control, increases/deletes described secondary
Maintenance safety Measures Standard data;
Or,
The sequential carried in instructing according to described Artificial Control adjusts instruction, adjusts described secondary maintenance safety Measures Standard data
The execution sequence of corresponding step, obtains secondary maintenance safety measure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610654677.6A CN106296456B (en) | 2016-08-10 | 2016-08-10 | Intelligent substation secondary maintenance safety measure support system and construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610654677.6A CN106296456B (en) | 2016-08-10 | 2016-08-10 | Intelligent substation secondary maintenance safety measure support system and construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106296456A true CN106296456A (en) | 2017-01-04 |
CN106296456B CN106296456B (en) | 2019-05-24 |
Family
ID=57669612
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610654677.6A Active CN106296456B (en) | 2016-08-10 | 2016-08-10 | Intelligent substation secondary maintenance safety measure support system and construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106296456B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107133883A (en) * | 2017-04-28 | 2017-09-05 | 国网黑龙江省电力有限公司电力科学研究院 | Based on the intelligent substation safety measure automatic generation method and device that safety measure is semantic |
CN107153946A (en) * | 2017-04-28 | 2017-09-12 | 国家电网公司 | Intelligent station is secondary to pacify automatic generation method and the system of arranging |
CN107563520A (en) * | 2017-07-26 | 2018-01-09 | 国网安徽省电力公司 | A kind of intelligent substation secondary safety measure method for visualizing |
CN110930122A (en) * | 2019-11-29 | 2020-03-27 | 国网宁夏电力有限公司检修公司 | Method for executing and testing automatic safety measures of relay protection of intelligent station |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2009053488A1 (en) * | 2007-10-25 | 2009-04-30 | Abb Research | Operating a substation automation system |
CN103729805A (en) * | 2014-01-04 | 2014-04-16 | 国家电网公司 | 500kV intelligent substation security arrangement ticket expert system |
CN105429027A (en) * | 2015-11-12 | 2016-03-23 | 国网宁夏电力公司 | Secondary safety measure support system in operation and maintenance of intelligent substation and construction method |
CN105490387A (en) * | 2015-12-29 | 2016-04-13 | 武汉凯默电气有限公司 | Online verification apparatus and method for safety measures for intelligent substation relay protection equipment |
-
2016
- 2016-08-10 CN CN201610654677.6A patent/CN106296456B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2009053488A1 (en) * | 2007-10-25 | 2009-04-30 | Abb Research | Operating a substation automation system |
CN103729805A (en) * | 2014-01-04 | 2014-04-16 | 国家电网公司 | 500kV intelligent substation security arrangement ticket expert system |
CN105429027A (en) * | 2015-11-12 | 2016-03-23 | 国网宁夏电力公司 | Secondary safety measure support system in operation and maintenance of intelligent substation and construction method |
CN105490387A (en) * | 2015-12-29 | 2016-04-13 | 武汉凯默电气有限公司 | Online verification apparatus and method for safety measures for intelligent substation relay protection equipment |
Non-Patent Citations (3)
Title |
---|
HAIHUA SHENG ET AL: "The warning strategy research on safety measures of smart substation according to correlation model", 《2015 5TH INTERNATIONAL CONFERENCE ON ELECTRIC UTILITY DEREGULATION AND RESTRUCTURING AND POWER TECHNOLOGIES (DRPT)》 * |
孙志鹏 等: "智能变电站安措技术及可视化研究", 《智能电网》 * |
熊华强 等: "智能变电站SCD文件可视化管理和分析决策***的设计与实现", 《电力自动化设备》 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107133883A (en) * | 2017-04-28 | 2017-09-05 | 国网黑龙江省电力有限公司电力科学研究院 | Based on the intelligent substation safety measure automatic generation method and device that safety measure is semantic |
CN107153946A (en) * | 2017-04-28 | 2017-09-12 | 国家电网公司 | Intelligent station is secondary to pacify automatic generation method and the system of arranging |
CN107563520A (en) * | 2017-07-26 | 2018-01-09 | 国网安徽省电力公司 | A kind of intelligent substation secondary safety measure method for visualizing |
CN110930122A (en) * | 2019-11-29 | 2020-03-27 | 国网宁夏电力有限公司检修公司 | Method for executing and testing automatic safety measures of relay protection of intelligent station |
Also Published As
Publication number | Publication date |
---|---|
CN106296456B (en) | 2019-05-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103218398B (en) | Intelligent substation SCL (substation configuration description language) file difference comparison method | |
CN108549650B (en) | Intelligent substation anti-misoperation lockout logic rule source end configuration method and system | |
CN102622463B (en) | Drawing-model uniformity based method for automatic check of design drawings | |
CN106296456B (en) | Intelligent substation secondary maintenance safety measure support system and construction method | |
CN110674282B (en) | Expert knowledge rule base-based one-key sequential control operation order intelligent simulation method | |
CN105335342A (en) | Method for automatic examination of wiring correctness of intelligent substation SCD configuration file virtual terminator | |
CN103730894B (en) | EMS image checking mehtod and device | |
CN107153946A (en) | Intelligent station is secondary to pacify automatic generation method and the system of arranging | |
CN104091289A (en) | Large-scale power distribution network N-1 rapid verification method based on wiring mode rules | |
CN103514336A (en) | Intelligent substation optical cable connection automatic design method based on virtual-true mapping mode | |
CN115599750A (en) | Intelligent substation virtual circuit checking method, system, equipment and storage medium | |
US10210291B2 (en) | Apparatus and method for analyzing power system | |
CN111027746A (en) | Intelligent distribution network system ring network diagram automatic generation method and device | |
CN107067081A (en) | Substation secondary maintenance safety measure generation method based on many object models | |
CN110569557A (en) | Intelligent autonomous design platform for power transmission and transformation project and working method thereof | |
CN113095059B (en) | Method, device, equipment and storage medium for verifying substation configuration description file | |
CN110704700A (en) | One-key sequential control equipment state intelligent simulation method based on expert knowledge rule base | |
CN110705001A (en) | Equipment-based monitoring information objectification modeling method for power system | |
CN109191006A (en) | A kind of method of 110 kV main transformer N-1 risk automatically scanning of power grid analysis | |
CN109460896B (en) | Automatic scanning analysis method for N-1 risk of 110kV line of power grid | |
CN104298421B (en) | Power distribution network safety control method based on rapid simulation analysis technology | |
CN106055684A (en) | SCD file comparison method of transformer substation | |
CN107871030B (en) | Substation secondary maintenance safety measure generation method based on SCD file object model | |
CN115224687A (en) | Power failure overhaul safety checking method and system for power transmission and transformation equipment below 220KV | |
CN104134162A (en) | Marketing, distribution and scheduling whole power grid modeling method of integrated distribution power supply |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |