time
based maintenance
equipment time
board
equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610613017.3A
Other languages
Chinese (zh)
Other versions
CN106295811A (en
Inventor
龚丹莉
陈旭
邵雄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Huali Microelectronics Corp
Original Assignee
Shanghai Huali Microelectronics Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Huali Microelectronics Corp filed Critical Shanghai Huali Microelectronics Corp
Priority to CN201610613017.3A priority Critical patent/CN106295811B/en
Publication of CN106295811A publication Critical patent/CN106295811A/en
Application granted granted Critical
Publication of CN106295811B publication Critical patent/CN106295811B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention provides a kind of equipment time-based maintenance effect analysis methods, comprising: obtains the equipment time-based maintenance information of board within a predetermined period of time;Obtain each product white pixel value in predetermined amount of time;White pixel value is grouped before and after carrying out equipment time-based maintenance based on dichotomy;MR value is compared before and after the equipment time-based maintenance of each processing step by HC formula calculator platform;Board equipment time-based maintenance front and back comparative analysis is carried out based on HC formula;The comprehensive condition of the multiple equipment time-based maintenance of board in the predetermined amount of time is judged based on Apriori algorithm.

Description

Equipment time-based maintenance effect analysis method
Technical field
The present invention relates to field of semiconductor manufacture and information technology fields, it is more particularly related to which one kind is set Standby time-based maintenance effect analysis method.
Background technique
For at present, generally requires and time-based maintenance is carried out to technique board.Analysis for time-based maintenance effect, existing machine Platform time-based maintenance analysis only carries out the analysis of equipment time-based maintenance effect quality, such analysis side according to simple equipment index Formula can only be conceived to single board maintenance whether Analysis to reach standard, the quality for product processing procedure is without reference to meaning.Together When, the analytical model of this single is unable to satisfy the control that engineer analyzes board long-time stability.
It is set accordingly, it is desirable to be capable of providing a kind of can be realized to what the long-time stability of board were effectively analyzed Standby time-based maintenance effect analysis method.
Summary of the invention
The technical problem to be solved by the present invention is to for drawbacks described above exists in the prior art, providing one kind be can be realized The equipment time-based maintenance effect analysis method that the long-time stability of board are effectively analyzed.
In order to achieve the above technical purposes, according to the present invention, a kind of equipment time-based maintenance effect analysis method is provided, is wrapped It includes:
First step: the equipment time-based maintenance information of board within a predetermined period of time is obtained;
Second step: each product white pixel value in predetermined amount of time is obtained;
Third step: white pixel value is grouped before and after carrying out equipment time-based maintenance based on dichotomy;
Four steps: MR is compared before and after the equipment time-based maintenance of each processing step by HC formula calculator platform Value;
5th step: the synthesis of the multiple equipment time-based maintenance of board in the predetermined amount of time is judged based on Apriori algorithm Situation.
Preferably, the equipment of board within a predetermined period of time is obtained from equipment time-based maintenance information database in first step Time-based maintenance information.
Preferably, each product white pixel value in predetermined amount of time is obtained from white pixel Value Data library in second step.
Preferably, it is grouped into four steps according to white pixel characteristic with the equipment time-based maintenance that white pixel mean value is minimum Benchmark, remaining is with reference to group;
It calculates:
MR1=ABS (Avg (Y)-Avg (X))/Std (X)
MR2=Std (Y)/Std (X)
Wherein, X, Y are respectively grouping before and after equipment time-based maintenance, and Avg (X) < Avg (Y).
Preferably, in four steps, determine that board is periodically protected in the step equipment in MR1 > 100% or MR2 > 1.5 It is unstable after supporting, otherwise determine that board is stablized after the step equipment time-based maintenance.
Preferably, in the 5th step, support supp (X)=occur (X)/count (D)=P (X) is calculated;Wherein supp (X)∈[-1,1];As unit of board, Occur (X)=Bad PM Cnt-Good PM Cnt;Bad PM Cnt indicates equipment The time-based maintenance frequency of failure, Good PM Cnt indicate equipment time-based maintenance number of success;Count (D)=Total PM Cnt; Total PM Cnt indicates equipment time-based maintenance total degree.
Preferably, in the 6th step, if supp (X) > 0, determine that board integral device in the predetermined amount of time is fixed Phase maintenance effect is deteriorated, otherwise to determine that board integral device time-based maintenance effect in the predetermined amount of time improves.
Preferably, in the 6th step, the report of board long-time stability is generated.
The present invention solves the problems, such as that existing equipment time-based maintenance can not carry out long-term board stability monitoring.The present invention is logical The association analysis between the processing procedure index of each product and equipment is crossed, influence of the board equipment time-based maintenance to product, side are obtained Help control product quality and the judgement of board long-time stability.Effective solution of the present invention existing equipment maintenance analysis method can not The shortcomings that meeting the monitoring of board long-time stability, be grouped before and after equipment time-based maintenance based on dichotomy, artificial without carrying out Division operation;And carry out changing before and after the time-based maintenance of board equipment automatically based on HC formula, improve system reliability.It is based on Apriori algorithm judges board long-time stability, compensates for the defect of existing analysis gimmick.
Detailed description of the invention
In conjunction with attached drawing, and by reference to following detailed description, it will more easily have more complete understanding to the present invention And its adjoint advantage and feature is more easily to understand, in which:
Fig. 1 schematically shows the process of equipment time-based maintenance effect analysis method according to the preferred embodiment of the invention Figure.
It should be noted that attached drawing is not intended to limit the present invention for illustrating the present invention.Note that indicating that the attached drawing of structure can It can be not necessarily drawn to scale.Also, in attached drawing, same or similar element indicates same or similar label.
Specific embodiment
In order to keep the contents of the present invention more clear and understandable, combined with specific embodiments below with attached drawing in of the invention Appearance is described in detail.
The present invention carries out the association of equipment time-based maintenance with WP (white Pixel, white pixel) parameter as reference index Analysis.By obtaining board equipment time-based maintenance situation interior for a period of time, white pixel value is grouped to correspondence by dichotomy Board equipment time-based maintenance before and after;The time-based maintenance fore-and-aft stability comparative analysis of single board equipment is carried out by HC formula, Judge that influence of the board equipment time-based maintenance to product, help control product quality.Finally, the board based on Apriori algorithm Long-time stability discriminatory analysis.
Fig. 1 schematically shows the process of equipment time-based maintenance effect analysis method according to the preferred embodiment of the invention Figure.
Specifically, as shown in Figure 1, equipment time-based maintenance effect analysis method according to the preferred embodiment of the invention includes:
First step S1: equipment time-based maintenance information of the board within predetermined amount of time (concern period) is obtained;For example, The equipment time-based maintenance information of board within a predetermined period of time is obtained from equipment time-based maintenance information database in first step S1.
Second step S2: each product white pixel value in predetermined amount of time is obtained;For example, in second step S2 from white pixel value Database obtains each product white pixel value in predetermined amount of time.
Third step S3: white pixel value is grouped before and after carrying out equipment time-based maintenance based on dichotomy;
Four steps S4: MR is compared before and after the equipment time-based maintenance of each processing step by HC formula calculator platform Value;
Preferably, can there was only the board equipment time-based maintenance information of single data before and after first sweep equipment time-based maintenance.
In four steps S4, board equipment time-based maintenance front and back comparative analysis is carried out based on HC formula;
According to white pixel characteristic, on the basis of the equipment time-based maintenance grouping minimum by white pixel mean value, remaining is with reference to group;
HC formula is one more commonly used formula of semicon industry, is defined as foloows calculation formula:
MR1=ABS (Avg (Y)-Avg (X))/Std (X)
MR2=Std (Y)/Std (X)
Wherein, X, Y are respectively grouping before and after equipment time-based maintenance, and Avg (X) < Avg (Y).Wherein function ABS is for asking It takes absolute value, function Avg is used for averaged, and function Std is for seeking standard deviation (identical as the function in Excel).
For example, equipment time-based maintenance validity is judgement basis by professional standard: in MR1 > 100% in four steps S4 Or determine that board is unstable after the step equipment time-based maintenance when MR2 > 1.5, otherwise determine that board is fixed in the step equipment Stablize after phase maintenance.
The report of board single plant time-based maintenance stability is produced as a result,;
5th step S5: the comprehensive of the multiple equipment time-based maintenance of board in the predetermined amount of time is judged based on Apriori algorithm Close situation.
In the 5th step S5, support supp (X)=occur (X)/count (D)=P (X) is calculated;Wherein supp (X) ∈ [-1,1];As unit of board, Occur (X)=Bad PM Cnt-Good PM Cnt;Bad PM Cnt indicates that equipment is periodically protected The frequency of failure is supported, Good PM Cnt indicates equipment time-based maintenance number of success;Count (D)=Total PM Cnt;Total PM Cnt indicates equipment time-based maintenance total degree.
Specifically, in the 6th step S6, if supp (X) > 0, determine board integral device in the predetermined amount of time Time-based maintenance effect is deteriorated, otherwise to determine that board integral device time-based maintenance effect in the predetermined amount of time improves.
The report of board long-time stability is produced as a result,.
The present invention solves the problems, such as that existing equipment time-based maintenance can not carry out long-term board stability monitoring.The present invention is logical The association analysis between the processing procedure index of each product and equipment is crossed, influence of the board equipment time-based maintenance to product, side are obtained Help control product quality and the judgement of board long-time stability.Effective solution of the present invention existing equipment maintenance analysis method can not The shortcomings that meeting the monitoring of board long-time stability, be grouped before and after equipment time-based maintenance based on dichotomy, artificial without carrying out Division operation;And carry out changing before and after the time-based maintenance of board equipment automatically based on HC formula, improve system reliability.It is based on Apriori algorithm judges board long-time stability, compensates for the defect of existing analysis gimmick.
In addition, it should be noted that, unless stated otherwise or point out, the otherwise term " first " in specification, " Two ", the descriptions such as " third " are used only for distinguishing various components, element, the step etc. in specification, each without being intended to indicate that Component, element, the logical relation between step or ordinal relation etc..
It is understood that although the present invention has been disclosed in the preferred embodiments as above, above-described embodiment not to Limit the present invention.For any person skilled in the art, without departing from the scope of the technical proposal of the invention, Many possible changes and modifications all are made to technical solution of the present invention using the technology contents of the disclosure above, or are revised as With the equivalent embodiment of variation.Therefore, anything that does not depart from the technical scheme of the invention are right according to the technical essence of the invention Any simple modifications, equivalents, and modifications made for any of the above embodiments still fall within the range of technical solution of the present invention protection It is interior.

Claims (6)

1. a kind of equipment time-based maintenance effect analysis method, characterized by comprising:
First step: the equipment time-based maintenance information of board within a predetermined period of time is obtained;
Second step: each product white pixel value in predetermined amount of time is obtained;
Third step: white pixel value is grouped before and after carrying out equipment time-based maintenance based on dichotomy;
Four steps: MR value is compared before and after the equipment time-based maintenance of each processing step by HC formula calculator platform;HC Formula is the comparison of two group objects, comprehensive judgement is carried out with two values of MR1 and MR2, according to white pixel characteristic, with white pixel mean value On the basis of minimum equipment time-based maintenance grouping, remaining is with reference to group;
HC formula is defined as foloows calculation formula:
MR1=ABS (Avg (Y)-Avg (X))/Std (X)
MR2=Std (Y)/Std (X)
Wherein, X, Y are respectively grouping before and after equipment time-based maintenance, and Avg (X) < Avg (Y), MR1 refer to the deviation of mean parameter, MR2 refers to the deviation of parameter standard value, and function ABS is absolute value formula, and function Avg is Mean Value Formulas, and function Std is standard Poor formula;
5th step: judging the comprehensive condition of the multiple equipment time-based maintenance of board in the predetermined amount of time based on Apriori algorithm, In the 5th step, support supp (X)=occur (X)/count (D)=P (X) is calculated;Wherein supp (X) ∈ [- 1,1];With Board is unit, and P (X) is support, and X is board, and D is whole boards, Occur (X)=Bad PM Cnt-Good PM Cnt; Bad PM Cnt indicates the equipment time-based maintenance frequency of failure, and Good PM Cnt indicates equipment time-based maintenance number of success;Count (D)=Total PM Cnt;Total PM Cnt indicates equipment time-based maintenance total degree.
2. equipment time-based maintenance effect analysis method according to claim 1, which is characterized in that in first step from equipment Time-based maintenance information database obtains the equipment time-based maintenance information of board within a predetermined period of time.
3. equipment time-based maintenance effect analysis method according to claim 1 or 2, which is characterized in that second step from White pixel Value Data library obtains each product white pixel value in predetermined amount of time.
4. equipment time-based maintenance effect analysis method according to claim 1 or 2, which is characterized in that in four steps, MR1 > 100% determines that board is unstable after the step equipment time-based maintenance when MR2 > 1.5, otherwise determines board in the step Stablize after rapid equipment time-based maintenance.
5. equipment time-based maintenance effect analysis method according to claim 1 or 2, which is characterized in that in the 6th step, if Supp (X) > 0 then determines that board integral device time-based maintenance effect in the predetermined amount of time is deteriorated, otherwise to determine the machine Platform integral device time-based maintenance effect in the predetermined amount of time improves.
6. equipment time-based maintenance effect analysis method according to claim 1 or 2, which is characterized in that raw in the 6th step It is reported at board long-time stability.
CN201610613017.3A 2016-07-29 2016-07-29 Equipment time-based maintenance effect analysis method Active CN106295811B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610613017.3A CN106295811B (en) 2016-07-29 2016-07-29 Equipment time-based maintenance effect analysis method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610613017.3A CN106295811B (en) 2016-07-29 2016-07-29 Equipment time-based maintenance effect analysis method

Publications (2)

Publication Number Publication Date
CN106295811A CN106295811A (en) 2017-01-04
CN106295811B true CN106295811B (en) 2019-08-23

Family

ID=57663628

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610613017.3A Active CN106295811B (en) 2016-07-29 2016-07-29 Equipment time-based maintenance effect analysis method

Country Status (1)

Country Link
CN (1) CN106295811B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111125166A (en) * 2018-10-31 2020-05-08 长鑫存储技术有限公司 Online product information acquisition method and device
CN114397125B (en) * 2022-01-11 2024-01-05 长鑫存储技术有限公司 Method and device for checking running state of machine, electronic equipment and storage medium

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101901230A (en) * 2009-05-31 2010-12-01 国际商业机器公司 Information retrieval method, user comment processing method and system thereof
CN103325072A (en) * 2013-06-18 2013-09-25 国家电网公司 Equipment condition maintenance fuzzy decision-making method of servers in power distribution system and power system
CN104750144A (en) * 2015-02-03 2015-07-01 北京金控自动化技术有限公司 Method of early warning operating condition of equipment
CN105580352A (en) * 2014-09-01 2016-05-11 索尼公司 Solid-state imaging element, signal processing method therefor, and electronic device
CN105677837A (en) * 2016-01-05 2016-06-15 中国科学院深圳先进技术研究院 Association rule mining method and association rule mining device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101901230A (en) * 2009-05-31 2010-12-01 国际商业机器公司 Information retrieval method, user comment processing method and system thereof
CN103325072A (en) * 2013-06-18 2013-09-25 国家电网公司 Equipment condition maintenance fuzzy decision-making method of servers in power distribution system and power system
CN105580352A (en) * 2014-09-01 2016-05-11 索尼公司 Solid-state imaging element, signal processing method therefor, and electronic device
CN104750144A (en) * 2015-02-03 2015-07-01 北京金控自动化技术有限公司 Method of early warning operating condition of equipment
CN105677837A (en) * 2016-01-05 2016-06-15 中国科学院深圳先进技术研究院 Association rule mining method and association rule mining device

Also Published As

Publication number Publication date
CN106295811A (en) 2017-01-04

Similar Documents

Publication Publication Date Title
CN107086944A (en) A kind of method for detecting abnormality and device
CN111143102B (en) Abnormal data detection method and device, storage medium and electronic equipment
CN103345209B (en) production monitoring method and system
CN106295811B (en) Equipment time-based maintenance effect analysis method
US20140297374A1 (en) Production management system and management method
TW201820213A (en) Scheduling system and method
CN110231528A (en) Transformer family based on load characteristic model library becomes anomalous identification method and device
CN110932901B (en) Alarm level adjusting method and system
CN108932217A (en) The method and device of energy consumption statistic
CN104679858B (en) A kind of method and apparatus of inquiry data
CN107784314A (en) Normal the abnormal data division methods and system of a kind of multivariable warning system
CN111198891B (en) Data source fusion method, electronic device and non-transitory computer readable storage medium
CN110059070B (en) Collecting data from a data source to a manufacturing operations management data warehouse
CN107437804B (en) Method and device for checking grid-related constant value
CN101782763A (en) Method for monitoring statistical process control
CN110888949A (en) Equipment alarm shielding method, device, equipment and medium based on three-dimensional map
CN105759748A (en) Semiconductor production machine hardware performance dynamic monitoring system and monitoring method
US20100332907A1 (en) System and method for testing different computer types
KR20110121014A (en) System and method of tracking and diagnosing an unfavorable trade balance status and monitoring technologies using patent analysis
CN114462298A (en) Electric power measurement asset management method, device, equipment and storage medium
CN108988340B (en) Method and device for reducing line loss and server
KR101543828B1 (en) An apparatus and method for managing a performance indicator
CN105743667B (en) A kind of access management-control method, apparatus and system
CN209199879U (en) The positioning device of integrated circuit manufacture process exception
CN107621957B (en) Component measurement method, server and computer readable storage medium

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant