CN106295811A - Equipment time-based maintenance effect analysis method - Google Patents

Equipment time-based maintenance effect analysis method Download PDF

Info

Publication number
CN106295811A
CN106295811A CN201610613017.3A CN201610613017A CN106295811A CN 106295811 A CN106295811 A CN 106295811A CN 201610613017 A CN201610613017 A CN 201610613017A CN 106295811 A CN106295811 A CN 106295811A
Authority
CN
China
Prior art keywords
time
based maintenance
equipment time
equipment
board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610613017.3A
Other languages
Chinese (zh)
Other versions
CN106295811B (en
Inventor
龚丹莉
陈旭
邵雄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Huali Microelectronics Corp
Original Assignee
Shanghai Huali Microelectronics Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Huali Microelectronics Corp filed Critical Shanghai Huali Microelectronics Corp
Priority to CN201610613017.3A priority Critical patent/CN106295811B/en
Publication of CN106295811A publication Critical patent/CN106295811A/en
Application granted granted Critical
Publication of CN106295811B publication Critical patent/CN106295811B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides a kind of equipment time-based maintenance effect analysis method, including: obtain board equipment time-based maintenance information within a predetermined period of time;Obtain each product white pixel value in predetermined amount of time;Before and after carrying out equipment time-based maintenance based on two way classification, white pixel value is grouped;Before and after each processes the equipment time-based maintenance of step, MR value is contrasted by HC formula calculator platform;Relative analysis before and after board equipment time-based maintenance is carried out based on HC formula;The comprehensive condition of board many secondary devices time-based maintenance in this predetermined amount of time is judged based on Apriori algorithm.

Description

Equipment time-based maintenance effect analysis method
Technical field
The present invention relates to field of semiconductor manufacture and areas of information technology, it is more particularly related to one sets Standby time-based maintenance effect analysis method.
Background technology
For Mu Qian, it is generally required to technique board is carried out time-based maintenance.For the analysis of time-based maintenance effect, existing machine The analysis only carrying out equipment time-based maintenance effect quality according to simple equipment index, such analysis side are analyzed in platform time-based maintenance Formula can only be conceived to the maintenance whether Analysis to reach standard of single board, for the quality of product processing procedure without reference to meaning.With Time, the analytical model of this single cannot meet the management and control that engineer analyzes for board long-time stability.
Accordingly, it is desirable to can provide a kind of be capable of the long-time stability of board are effectively analyzed set Standby time-based maintenance effect analysis method.
Summary of the invention
The technical problem to be solved is for there is drawbacks described above in prior art, it is provided that one is capable of The equipment time-based maintenance effect analysis method that the long-time stability of board are effectively analyzed.
In order to realize above-mentioned technical purpose, according to the present invention, it is provided that a kind of equipment time-based maintenance effect analysis method, bag Include:
First step: obtain board equipment time-based maintenance information within a predetermined period of time;
Second step: obtain each product white pixel value in predetermined amount of time;
Third step: before and after carrying out equipment time-based maintenance based on two way classification, white pixel value is grouped;
4th step: contrast MR before and after each processes the equipment time-based maintenance of step by HC formula calculator platform Value;
5th step: judge the comprehensive of board many secondary devices time-based maintenance in this predetermined amount of time based on Apriori algorithm Situation.
Preferably, board equipment within a predetermined period of time is obtained at first step from equipment time-based maintenance information database Time-based maintenance information.
Preferably, each product white pixel value in predetermined amount of time is obtained at second step from white pixel Value Data storehouse.
Preferably, in the 4th step, according to white pixel characteristic, it is grouped into the equipment time-based maintenance that white pixel average is minimum Benchmark, remaining is with reference to group;
Calculate:
MR1=ABS (Avg (Y)-Avg (X))/Std (X)
MR2=Std (Y)/Std (X)
Wherein, X, Y are grouped before and after being respectively equipment time-based maintenance, and Avg (X) < Avg (Y).
Preferably, in the 4th step, at MR1 > 100% or MR2 > 1.5 time judge board periodically protect at this step equipment Instability after supporting, otherwise judges that board is stable after this step equipment time-based maintenance.
Preferably, in the 5th step, calculate support supp (X)=occur (X)/count (D)=P (X);Wherein supp (X)∈[-1,1];In units of board, Occur (X)=Bad PM Cnt Good PM Cnt;Bad PM Cnt represents equipment The time-based maintenance frequency of failure, Good PM Cnt represents equipment time-based maintenance number of success;Count (D)=Total PM Cnt; Total PM Cnt represents equipment time-based maintenance total degree.
Preferably, in the 6th step, if supp (X) > 0, then judge that this board integral device in this predetermined amount of time is fixed Phase maintenance effect is deteriorated, otherwise for judging that this board integral device time-based maintenance effect in this predetermined amount of time improves.
Preferably, in the 6th step, generate the report of board long-time stability.
The present invention solves the problem that existing equipment time-based maintenance cannot be carried out the monitoring of long-term board stability.The present invention is led to Cross the correlation analysis between processing procedure index and the equipment of each product, obtain the board equipment time-based maintenance impact on product, side Control product quality and board long-time stability are helped to judge.The present invention effectively solves existing equipment maintenance analysis method cannot The shortcoming meeting the monitoring of board long-time stability, is grouped before and after carrying out equipment time-based maintenance based on two way classification, it is not necessary to carry out artificial Division operation;And change before and after automatically carrying out board equipment time-based maintenance based on HC formula, improve system reliability.Based on Apriori algorithm judges board long-time stability, compensate for the defect of existing analysis maneuver.
Accompanying drawing explanation
In conjunction with accompanying drawing, and by with reference to detailed description below, it will more easily the present invention is had more complete understanding And its adjoint advantage and feature is more easily understood, wherein:
Fig. 1 schematically shows the flow process of equipment time-based maintenance effect analysis method according to the preferred embodiment of the invention Figure.
It should be noted that accompanying drawing is used for illustrating the present invention, and the unrestricted present invention.Note, represent that the accompanying drawing of structure can Can be not necessarily drawn to scale.Further, in accompanying drawing, same or like element indicates same or like label.
Detailed description of the invention
In order to make present disclosure more clear and understandable, below in conjunction with specific embodiments and the drawings in the present invention Appearance is described in detail.
The present invention carries out the association of equipment time-based maintenance with WP (white Pixel, white pixel) parameter as reference index Analyze.By obtaining the equipment time-based maintenance situation in board a period of time, by two way classification by the packet of white pixel value to corresponding Board equipment time-based maintenance before and after;Single board equipment time-based maintenance fore-and-aft stability relative analysis is carried out by HC formula, Judge the board equipment time-based maintenance impact on product, help to control product quality.Finally, board based on Apriori algorithm Long-time stability discriminatory analysis.
Fig. 1 schematically shows the flow process of equipment time-based maintenance effect analysis method according to the preferred embodiment of the invention Figure.
Specifically, as it is shown in figure 1, according to the preferred embodiment of the invention equipment time-based maintenance effect analysis method include:
First step S1: obtain board equipment time-based maintenance information in predetermined amount of time (paying close attention to the time period);Such as, Board equipment time-based maintenance information within a predetermined period of time is obtained from equipment time-based maintenance information database at first step S1.
Second step S2: obtain each product white pixel value in predetermined amount of time;Such as, at second step S2 from white pixel value Data base is each product white pixel value in obtaining predetermined amount of time.
Third step S3: before and after carrying out equipment time-based maintenance based on two way classification, white pixel value is grouped;
4th step S4: contrast MR before and after each processes the equipment time-based maintenance of step by HC formula calculator platform Value;
Preferably, can the board equipment time-based maintenance information of only single data before and after first sweep equipment time-based maintenance.
In the 4th step S4, carry out relative analysis before and after board equipment time-based maintenance based on HC formula;
According to white pixel characteristic, being grouped into benchmark with the equipment time-based maintenance that white pixel average is minimum, remaining is with reference to group;
HC formula is one the more commonly used formula of semicon industry, and it is defined as foloows computing formula:
MR1=ABS (Avg (Y)-Avg (X))/Std (X)
MR2=Std (Y)/Std (X)
Wherein, X, Y are grouped before and after being respectively equipment time-based maintenance, and Avg (X) < Avg (Y).Wherein function ABS is used for asking Taking absolute value, function Avg is used for averaged, and function Std is used for asking for standard deviation (identical with the function in Excel).
Such as, in the 4th step S4, equipment time-based maintenance effectiveness is judgement basis by industry standard: at MR1 > 100% Or judge during MR2 > 1.5 that board is unstable after this step equipment time-based maintenance, otherwise judge that board is fixed at this step equipment Stablize after phase maintenance.
Thus, the report of board single plant time-based maintenance stability can be generated;
5th step S5: judge combining of board many secondary devices time-based maintenance in this predetermined amount of time based on Apriori algorithm Conjunction situation.
In the 5th step S5, calculate support supp (X)=occur (X)/count (D)=P (X);Wherein supp (X) ∈ [-1,1];In units of board, Occur (X)=Bad PM Cnt Good PM Cnt;Bad PM Cnt represents that equipment is periodically protected Supporting the frequency of failure, Good PM Cnt represents equipment time-based maintenance number of success;Count (D)=Total PM Cnt;Total PM Cnt represents equipment time-based maintenance total degree.
Specifically, in the 6th step S6, if supp (X) > 0, then judge this board integral device in this predetermined amount of time Time-based maintenance effect is deteriorated, otherwise for judging that this board integral device time-based maintenance effect in this predetermined amount of time improves.
Thus, the report of board long-time stability can be generated.
The present invention solves the problem that existing equipment time-based maintenance cannot be carried out the monitoring of long-term board stability.The present invention is led to Cross the correlation analysis between processing procedure index and the equipment of each product, obtain the board equipment time-based maintenance impact on product, side Control product quality and board long-time stability are helped to judge.The present invention effectively solves existing equipment maintenance analysis method cannot The shortcoming meeting the monitoring of board long-time stability, is grouped before and after carrying out equipment time-based maintenance based on two way classification, it is not necessary to carry out artificial Division operation;And change before and after automatically carrying out board equipment time-based maintenance based on HC formula, improve system reliability.Based on Apriori algorithm judges board long-time stability, compensate for the defect of existing analysis maneuver.
Furthermore, it is necessary to explanation, unless stated otherwise or point out, otherwise the term in description " first ", " the Two ", " the 3rd " etc. describe be used only for distinguishing in description each assembly, element, step etc. rather than for representing each Logical relation between assembly, element, step or ordering relation etc..
Although it is understood that the present invention discloses as above with preferred embodiment, but above-described embodiment being not used to Limit the present invention.For any those of ordinary skill in the art, without departing under technical solution of the present invention ambit, Technical solution of the present invention is made many possible variations and modification by the technology contents that all may utilize the disclosure above, or is revised as Equivalent embodiments with change.Therefore, every content without departing from technical solution of the present invention, according to the technical spirit pair of the present invention Any simple modification made for any of the above embodiments, equivalent variations and modification, all still fall within the scope of technical solution of the present invention protection In.

Claims (8)

1. an equipment time-based maintenance effect analysis method, it is characterised in that including:
First step: obtain board equipment time-based maintenance information within a predetermined period of time;
Second step: obtain each product white pixel value in predetermined amount of time;
Third step: before and after carrying out equipment time-based maintenance based on two way classification, white pixel value is grouped;
4th step: contrast MR value before and after each processes the equipment time-based maintenance of step by HC formula calculator platform;
5th step: judge the comprehensive condition of board many secondary devices time-based maintenance in this predetermined amount of time based on Apriori algorithm.
Equipment time-based maintenance effect analysis method the most according to claim 1, it is characterised in that at first step from equipment Time-based maintenance information database obtains board equipment time-based maintenance information within a predetermined period of time.
Equipment time-based maintenance effect analysis method the most according to claim 1 and 2, it is characterised in that second step from White pixel Value Data storehouse obtains each product white pixel value in predetermined amount of time.
Equipment time-based maintenance effect analysis method the most according to claim 1 and 2, it is characterised in that at the 4th step, root According to white pixel characteristic, being grouped into benchmark with the equipment time-based maintenance that white pixel average is minimum, remaining is with reference to group;
Calculate:
MR1=ABS (Avg (Y)-Avg (X))/Std (X)
MR2=Std (Y)/Std (X)
Wherein, X, Y are grouped before and after being respectively equipment time-based maintenance, and Avg (X) < Avg (Y).
Equipment time-based maintenance effect analysis method the most according to claim 1 and 2, it is characterised in that in the 4th step, Judge during MR1 > 100% or MR2 > 1.5 that board is unstable after this step equipment time-based maintenance, otherwise judge that board is in this step Stablize after rapid equipment time-based maintenance.
Equipment time-based maintenance effect analysis method the most according to claim 1 and 2, it is characterised in that at the 5th step, meter Calculate support supp (X)=occur (X)/count (D)=P (X);Wherein supp (X) ∈ [-1,1];In units of board, Occur (X)=Bad PM Cnt Good PM Cnt;Bad PM Cnt represents the equipment time-based maintenance frequency of failure, Good PM Cnt represents equipment time-based maintenance number of success;Count (D)=Total PM Cnt;Total PM Cnt represents that equipment is periodically protected Support total degree.
Equipment time-based maintenance effect analysis method the most according to claim 1 and 2, it is characterised in that in the 6th step, if Supp (X) > 0, then judge that this board integral device time-based maintenance effect in this predetermined amount of time is deteriorated, otherwise for judging this machine Platform integral device time-based maintenance effect in this predetermined amount of time improves.
Equipment time-based maintenance effect analysis method the most according to claim 1 and 2, it is characterised in that in the 6th step, raw Become the report of board long-time stability.
CN201610613017.3A 2016-07-29 2016-07-29 Equipment time-based maintenance effect analysis method Active CN106295811B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610613017.3A CN106295811B (en) 2016-07-29 2016-07-29 Equipment time-based maintenance effect analysis method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610613017.3A CN106295811B (en) 2016-07-29 2016-07-29 Equipment time-based maintenance effect analysis method

Publications (2)

Publication Number Publication Date
CN106295811A true CN106295811A (en) 2017-01-04
CN106295811B CN106295811B (en) 2019-08-23

Family

ID=57663628

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610613017.3A Active CN106295811B (en) 2016-07-29 2016-07-29 Equipment time-based maintenance effect analysis method

Country Status (1)

Country Link
CN (1) CN106295811B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111125166A (en) * 2018-10-31 2020-05-08 长鑫存储技术有限公司 Online product information acquisition method and device
CN114397125A (en) * 2022-01-11 2022-04-26 长鑫存储技术有限公司 Machine running state detection method and device, electronic equipment and storage medium

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101901230A (en) * 2009-05-31 2010-12-01 国际商业机器公司 Information retrieval method, user comment processing method and system thereof
CN103325072A (en) * 2013-06-18 2013-09-25 国家电网公司 Equipment condition maintenance fuzzy decision-making method of servers in power distribution system and power system
CN104750144A (en) * 2015-02-03 2015-07-01 北京金控自动化技术有限公司 Method of early warning operating condition of equipment
CN105580352A (en) * 2014-09-01 2016-05-11 索尼公司 Solid-state imaging element, signal processing method therefor, and electronic device
CN105677837A (en) * 2016-01-05 2016-06-15 中国科学院深圳先进技术研究院 Association rule mining method and association rule mining device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101901230A (en) * 2009-05-31 2010-12-01 国际商业机器公司 Information retrieval method, user comment processing method and system thereof
CN103325072A (en) * 2013-06-18 2013-09-25 国家电网公司 Equipment condition maintenance fuzzy decision-making method of servers in power distribution system and power system
CN105580352A (en) * 2014-09-01 2016-05-11 索尼公司 Solid-state imaging element, signal processing method therefor, and electronic device
CN104750144A (en) * 2015-02-03 2015-07-01 北京金控自动化技术有限公司 Method of early warning operating condition of equipment
CN105677837A (en) * 2016-01-05 2016-06-15 中国科学院深圳先进技术研究院 Association rule mining method and association rule mining device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111125166A (en) * 2018-10-31 2020-05-08 长鑫存储技术有限公司 Online product information acquisition method and device
CN114397125A (en) * 2022-01-11 2022-04-26 长鑫存储技术有限公司 Machine running state detection method and device, electronic equipment and storage medium
CN114397125B (en) * 2022-01-11 2024-01-05 长鑫存储技术有限公司 Method and device for checking running state of machine, electronic equipment and storage medium

Also Published As

Publication number Publication date
CN106295811B (en) 2019-08-23

Similar Documents

Publication Publication Date Title
CN104020724B (en) alarm monitoring method and device
TWI616827B (en) Scheduling system and method
US20150235133A1 (en) Data concentration prediction device, data concentration prediction method, and recording medium recording program thereof
CN103345209B (en) production monitoring method and system
CN102612314B (en) Inspection system, simulation method and system, suitability determination method for determination standard value
CN111324639A (en) Data monitoring method and device and computer readable storage medium
CN103197623B (en) A kind of streamline method for managing and monitoring and device
CN104809663B (en) Power specialty technological service safeguards system and its measure of supervision
CN116859857A (en) Intelligent management system of fuel pump assembly production line based on remote control
CN101266486A (en) Semiconductor manufacture flow path assistant decision-making system
CN107767024A (en) One kind is used for cover-plate glass product of production line quality real-time monitoring system and method
CN106295811A (en) Equipment time-based maintenance effect analysis method
CN107341202B (en) Business datum table corrects appraisal procedure, device and the storage medium of danger level
CN116993532A (en) Method and system for improving preparation efficiency of battery parts
CN109726068A (en) A kind of data detection method and device
US8340800B2 (en) Monitoring a process sector in a production facility
CN103631900A (en) Data comparing method based on main gateway and standby gateway comparison
CN105759748B (en) A kind of dynamic monitoring system and monitoring method of semiconductor production board hardware performance
CN103412091B (en) pH value measuring method and device
CN104078381B (en) A kind of method of measurement platform monitoring figure specification limit setting
Burduk Stability analysis of the production system using simulation models
KR101367550B1 (en) Collaborative facilities production system
CN105474239A (en) A method for redesigning one or more product or process parameters of a manufactured article
WO2018073611A2 (en) System and method for integrating production process
CN114462298A (en) Electric power measurement asset management method, device, equipment and storage medium

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant