CN106294039A - The method of a kind of test terminal performance and terminal - Google Patents
The method of a kind of test terminal performance and terminal Download PDFInfo
- Publication number
- CN106294039A CN106294039A CN201510288498.0A CN201510288498A CN106294039A CN 106294039 A CN106294039 A CN 106294039A CN 201510288498 A CN201510288498 A CN 201510288498A CN 106294039 A CN106294039 A CN 106294039A
- Authority
- CN
- China
- Prior art keywords
- terminal
- boot
- test
- beta version
- parameter
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/22—Detection or location of defective computer hardware by testing during standby operation or during idle time, e.g. start-up testing
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Computer Hardware Design (AREA)
- Quality & Reliability (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Mobile Radio Communication Systems (AREA)
- Telephone Function (AREA)
- Stored Programmes (AREA)
- Test And Diagnosis Of Digital Computers (AREA)
Abstract
The invention discloses method and the terminal of a kind of test terminal performance, described method includes: utilize Boot, obtains beta version and test parameter from main frame;The beta version got and test parameter are stored to internal memory;Utilize Boot, start the beta version in internal memory, and from described internal memory, read the test parameter run needed for described beta version, to complete the test to terminal capabilities;Wherein, described beta version includes: Boot, operating system, driver abstracts, radio-frequency module.
Description
Technical field
The present invention relates to communication class terminal production test technology, the method particularly relating to a kind of test terminal performance
And terminal.
Background technology
At present, the production test scheme of traditional communication products substantially have employed dual system or same system
Unite double mode testing scheme.Wherein, dual system testing scheme is by leaving normally making in terminal memory in
Version and the corresponding version composition used for production test;Same system is double mode
Scheme then have employed after terminal normal boot-strap, makes terminal enter into production test by special instruction
Pattern, completes corresponding production test function.The conventional production test method of both on startup, all
Need to start formal version, and the version of intelligent machine is usually quite huge at present, has the startup time slow
Problem.
Summary of the invention
For solving above-mentioned technical problem, embodiments provide method and the end of a kind of test terminal performance
End.
The method of the test terminal performance that the embodiment of the present invention provides includes:
Utilize startup program (Boot), obtain beta version and test parameter from main frame;
The beta version got and test parameter are stored to internal memory;
Utilize Boot, start the beta version in internal memory, and from described internal memory, read the described beta version of operation
Test parameter needed for Ben, to complete the test to terminal capabilities;
Wherein, described beta version includes: Boot, operating system (OS, Operating System), drive
Dynamic program abstract (drv, drviver), radio-frequency module.
In the embodiment of the present invention, described utilization startup program Boot, obtain beta version and test from main frame
Parameter, including:
Start Boot, carry out Tong Bu handshake operation with main frame;
After synchronization is shaken hands successfully, utilize Boot mutual with main frame, obtain beta version and test ginseng from main frame
Number.
In the embodiment of the present invention, described method also includes:
Cancel described beta version to the incidence relation of parameter in flash memory (Flash), and set up described beta version
This is to the incidence relation of parameter in internal memory;
In the embodiment of the present invention, described method also includes:
Cancel described radio-frequency module to the incidence relation of parameter in Flash.
In the embodiment of the present invention, described method also includes:
Start Boot, carry out Tong Bu handshake operation with main frame;
Synchronization shake hands failure time, utilize Boot start normal version.
The terminal that the embodiment of the present invention provides includes:
Acquiring unit, is used for utilizing Boot, obtains beta version and test parameter from main frame;
Memory element, for storing the beta version got and test parameter to internal memory;
Test cell, is used for utilizing Boot, starts the beta version in internal memory, and reads from described internal memory
Run the test parameter needed for described beta version, to complete the test to terminal capabilities;
Wherein, described beta version includes: Boot, operating system, driver abstracts, radio-frequency module.
In the embodiment of the present invention, described acquiring unit, it is additionally operable to start Boot, synchronization shakes hands with main frame
Operation;After synchronization is shaken hands successfully, utilize Boot mutual with main frame, obtain beta version and test from main frame
Parameter.
In the embodiment of the present invention, described terminal also includes: arrange unit, is used for cancelling described beta version pair
The incidence relation of parameter in flash memory Flash, and set up described beta version to the incidence relation of parameter in internal memory.
In the embodiment of the present invention, described terminal also includes: arrange unit, is used for cancelling described radio-frequency module phy
To the incidence relation of parameter in Flash.
In the embodiment of the present invention, described terminal also includes: start unit, is used for starting Boot, enters with main frame
Row synchronizes handshake operation;Synchronization shake hands failure time, utilize Boot start normal version.
In the technical scheme of the embodiment of the present invention, alignment type version carries out cutting, crops production test version
Unwanted module, meanwhile, by changing by the demand reading Flash in production test version as reading internal memory into
Demand method peel off the terminal dependence to Flash.When terminal system starts, no longer read from Flash
Parameter, and directly read the parameter of internal memory, thus reach whole beta version and thoroughly eliminate the reliance on Flash
In data.Production test when, mutual with the Boot of terminal by main frame (PC), will test
Version downloads in the internal memory of terminal, and utilizes Boot to start firm just-downloaded beta version.Beta version opens
After moving up, the various functions in test process can be completed.Use the technical scheme of the embodiment of the present invention,
Achieve the progress of testing efficiency tremendous increase, reached to reduce the effect of startup time, saved and tested
The startup time of journey.
Accompanying drawing explanation
Fig. 1 is the beta version schematic diagram of the embodiment of the present invention;
Fig. 2 is beta version and the test parameter download schematic diagram of the embodiment of the present invention;
Fig. 3 is the schematic flow sheet of the method for the test terminal performance of the embodiment of the present invention;
Fig. 4 is the structure composition schematic diagram of the terminal of the embodiment of the present invention.
Detailed description of the invention
In order to more fully hereinafter understand feature and the technology contents of the embodiment of the present invention, below in conjunction with the accompanying drawings
Realization to the embodiment of the present invention is described in detail, appended accompanying drawing purposes of discussion only for reference, is not used for
Limit the embodiment of the present invention.
In the embodiment of the present invention, the version of complete terminal is become official release, by test terminal performance
Version is referred to as beta version.With reference to Fig. 1, the version of a complete terminal is carried out by the embodiment of the present invention must
The cutting wanted, due to the purpose of the production test of terminal mainly check its hardware performance, material batch quality,
The productive concept such as paster quality, beta version itself does not include the business module on upper strata, such as: telephone directory,
The application functions such as web browser, without carrying out searching the business functions such as net, therefore, it can beta version
It is cropped to only comprise following functional module: Boot, OS, driver abstracts (drv), radio frequency
Module (phy).
Below each functional module of beta version is described in detail:
Boot: the special Booting sequence required for beta version is provided.
Operating system (OS): OS is minimum OS, it is provided that basic thread scheduling function;Ensure test
Carry out in real time.
Driver abstracts (drv): comprise the driver of plate level, it is provided that unified abstraction interface;Ensure
Terminal and the communication function of main frame, such as USB (universal serial bus) (USB, Universal Serial Bus);Ensure
Non-radio frequencies class testing function, such as: button, liquid crystal display (LCD, Liquid Crystal Display) etc..
Radio-frequency module (phy): comprise the radio frequency test module of various standard;Ensure radio frequency class testing function,
As: Long Term Evolution (LTE, Long Term Evolution), WCDMA (WCDMA, Wideband
Code Division Multiple Access) etc..
Relative to official release, omit at least following functional module: protocol stack (ps), AT order (at),
Network (net), application (app).
In the embodiment of the present invention, the Boot of terminal is different from existing Boot, in existing Boot function
Add new Starting mode, specific as follows:
After Boot starts, within a specified time complete with main frame synchronization to shake hands.
After successful handshake, Boot is mutual with main frame, completes the parameter required for beta version and beta version
Download.Here, the parameter required for beta version and beta version is downloaded in the internal memory of terminal.
Being not fully complete, after starting, the in the case of of shaking hands, Boot starts normal version.
Boot is responsible for starting the production test version in tag memory.
In the embodiment of the present invention, beta version departs from the dependence to terminal flash, and beta version is in internal memory
After starting up, owing to the Flash of now terminal not having any valid data, therefore, beta version
The part data downloaded in internal memory can only be used.This is accomplished by removing the beta version after cutting
The action relied on except Flash.Particularly as follows:
Removing beta version in start-up course to the dependence of parameter in Flash, beta version is in start-up course
In more or less need from Flash read configuration parameter, read action here will will from Flash read
Parameter changes reading parameter into from internal memory.
Go unless each that functional module is to the dependence of parameter in Flash, owing to having been completed beta version
Cutting, therefore, has only to consider the radio frequency part dependence to Flash here.
In the embodiment of the present invention, with reference to Fig. 2, terminal needs to download respectively the file of following two part:
Beta version: the function required for test is provided.
Test parameter: formed a set by multiple configuration parameter files, downloads to specify the interior of position respectively
In depositing.
The technical scheme of the embodiment of the present invention, production test when, by the Boot of main frame Yu terminal
Alternately, beta version and test parameter are downloaded in the internal memory of terminal, and utilization allows Boot start just
The beta version downloaded.After beta version starts up, the various functions in test process can be completed.
Below in conjunction with specific embodiment, technical scheme is described in further detail.
Fig. 3 is the schematic flow sheet of the method for the test terminal performance of the embodiment of the present invention, the survey in this example
The method of examination terminal capabilities is applied in terminal, and described terminal can be the communication class such as mobile phone, panel computer
Electric terminal;As it is shown on figure 3, the method for described test terminal performance comprises the following steps:
Step 301: utilize Boot, obtains beta version and test parameter from main frame.
In the embodiment of the present invention, main frame can be computer (PC).Described utilize Boot, obtain from main frame and survey
Test run basis and test parameter, including: start Boot, carry out Tong Bu handshake operation with main frame;Synchronization is shaken hands
After success, utilize Boot mutual with main frame, obtain beta version and test parameter from main frame.
Wherein, described beta version includes: Boot, operating system, driver abstracts, radio-frequency module.
In the embodiment of the present invention, the version of complete terminal is become official release, by test terminal performance
Version is referred to as beta version.With reference to Fig. 1, the version of a complete terminal is carried out by the embodiment of the present invention must
The cutting wanted, due to the purpose of the production test of terminal mainly check its hardware performance, material batch quality,
The productive concept such as paster quality, beta version itself does not include the business module on upper strata, such as: telephone directory,
The application functions such as web browser, without carrying out searching the business functions such as net, therefore, it can beta version
It is cropped to only comprise following functional module: Boot, OS, driver abstracts (drv), radio frequency
Module (phy).
Below each functional module of beta version is described in detail:
Boot: the special Booting sequence required for beta version is provided.
Operating system (OS): OS is minimum OS, it is provided that basic thread scheduling function;Ensure test
Carry out in real time.
Driver abstracts (drv): comprise the driver of plate level, it is provided that unified abstraction interface;Ensure
Terminal and the communication function of main frame, such as USB (universal serial bus) (USB, Universal Serial Bus);Ensure
Non-radio frequencies class testing function, such as: button, liquid crystal display (LCD, Liquid Crystal Display) etc..
Radio-frequency module (phy): comprise the radio frequency test module of various standard;Ensure radio frequency class testing function,
As: Long Term Evolution (LTE, Long Term Evolution), WCDMA (WCDMA, Wideband
Code Division Multiple Access) etc..
Relative to official release, omit at least following functional module: protocol stack (ps), AT order (at),
Network (net), application (app).
In the embodiment of the present invention, start Boot, carry out Tong Bu handshake operation with main frame;Synchronization shake hands failure time,
Boot is utilized to start normal version.
Step 302: the beta version got and test parameter are stored to internal memory.
In the embodiment of the present invention, the Boot of terminal is different from existing Boot, in existing Boot function
Add new Starting mode, specific as follows:
After Boot starts, within a specified time complete with main frame synchronization to shake hands.
After successful handshake, Boot is mutual with main frame, completes the parameter required for beta version and beta version
Download.Here, the parameter required for beta version and beta version is downloaded in the internal memory of terminal.
Being not fully complete, after starting, the in the case of of shaking hands, Boot starts normal version.
Boot is responsible for starting the production test version in tag memory.
In the embodiment of the present invention, cancel described beta version to the incidence relation of parameter in flash memory Flash, and
Set up described beta version to the incidence relation of parameter in internal memory.
In the embodiment of the present invention, cancel described radio-frequency module to the incidence relation of parameter in Flash.
In the embodiment of the present invention, beta version departs from the dependence to terminal flash, and beta version is in internal memory
After starting up, owing to the Flash of now terminal not having any valid data, therefore, beta version
The part data downloaded in internal memory can only be used.This is accomplished by removing the beta version after cutting
The action relied on except Flash.Particularly as follows:
Removing beta version in start-up course to the dependence of parameter in Flash, beta version is in start-up course
In more or less need from Flash read configuration parameter, read action here will will from Flash read
Parameter changes reading parameter into from internal memory.
Go unless each that functional module is to the dependence of parameter in Flash, owing to having been completed beta version
Cutting, therefore, has only to consider the radio frequency part dependence to Flash here.
Step 303: utilize Boot, starts the beta version in internal memory, and reads operation from described internal memory
Test parameter needed for described beta version, to complete the test to terminal capabilities.
Before the technology using the embodiment of the present invention, need to start normal version and could enter test mode,
Time-consuming about 60 seconds.And use the technical scheme of the embodiment of the present invention, open to beta version from downloading beta version
Dynamic, it is only necessary to about 10 seconds, test mode can be entered, thus drastically increase the time of startup, improve
The efficiency produced, gets a desired effect.
Fig. 4 is the structure composition schematic diagram of the terminal of the embodiment of the present invention, as shown in Figure 4, described terminal bag
Include:
Acquiring unit 41, is used for utilizing Boot, obtains beta version and test parameter from main frame;
Memory element 42, for storing the beta version got and test parameter to internal memory;
Test cell 43, is used for utilizing Boot, starts the beta version in internal memory, and reads from described internal memory
Take the test parameter run needed for described beta version, to complete the test to terminal capabilities;
Wherein, described beta version includes: Boot, operating system, driver abstracts, radio-frequency module.
In the embodiment of the present invention, described acquiring unit 41, it is additionally operable to start Boot, synchronization holds with main frame
Hands operates;After synchronization is shaken hands successfully, utilize Boot mutual with main frame, obtain beta version and survey from main frame
Examination parameter.
In the embodiment of the present invention, described terminal also includes: arrange unit 44, is used for cancelling described beta version
To the incidence relation of parameter in flash memory Flash, and set up described beta version to the association pass of parameter in internal memory
System.
In another embodiment of the present invention, described terminal also includes: arrange unit 44, is used for cancelling described radio frequency
Module phy is to the incidence relation of parameter in Flash.
In the embodiment of the present invention, described terminal also includes: start unit 45, is used for starting Boot, with main frame
Carry out synchronizing handshake operation;Synchronization shake hands failure time, utilize Boot start normal version.
In the technical scheme of the embodiment of the present invention, alignment type version carries out cutting, crops beta version and is not required to
The module wanted, meanwhile, by changing by the demand reading Flash in beta version as the demand of reading internal memory into
Method peels off the terminal dependence to Flash.When terminal system starts, no longer read the parameter from Flash,
And directly read the parameter of internal memory, thus reach whole beta version and thoroughly eliminate the reliance on the data in Flash.
Test when, mutual with the Boot of terminal by main frame (PC), beta version is downloaded to terminal
Internal memory in, and utilize Boot start firm just-downloaded beta version.After beta version starts up, i.e.
The various functions in test process can be completed.Use the technical scheme of the embodiment of the present invention, achieve test effect
The progress of rate tremendous increase, has reached to reduce the effect of startup time, has saved the startup time of test process.
The above, only presently preferred embodiments of the present invention, it is not intended to limit the protection model of the present invention
Enclose.
Claims (12)
1. the method for a test terminal performance, it is characterised in that described method includes:
Utilize startup program Boot, obtain beta version and test parameter from main frame;
The beta version got and test parameter are stored to internal memory;
Utilize Boot, start the beta version in internal memory, and from described internal memory, read the test parameter run needed for described beta version, to complete the test to terminal capabilities.
The method of test terminal the most according to claim 1 performance, it is characterised in that described beta version includes: Boot, operating system, driver abstracts, radio-frequency module.
The method of test terminal the most according to claim 2 performance, it is characterised in that described utilization starts program Boot, obtains beta version and test parameter from main frame, including:
Start Boot, carry out Tong Bu handshake operation with main frame;
After synchronization is shaken hands successfully, utilize Boot mutual with main frame, obtain beta version and test parameter from main frame.
The method of test terminal the most according to claim 3 performance, it is characterised in that described method also includes:
Cancel described beta version to the incidence relation of parameter in flash memory Flash, and set up described beta version to the incidence relation of parameter in internal memory.
The method of test terminal the most according to claim 2 performance, it is characterised in that described method also includes:
Cancel described radio-frequency module to the incidence relation of parameter in Flash.
6. according to the method for the test terminal performance described in any one of claim 2 to 5, it is characterised in that described method also includes:
Start Boot, carry out Tong Bu handshake operation with main frame;
Synchronization shake hands failure time, utilize Boot start normal version.
7. a terminal, it is characterised in that described terminal includes:
Acquiring unit, is used for utilizing Boot, obtains beta version and test parameter from main frame;
Memory element, for storing the beta version got and test parameter to internal memory;
Test cell, is used for utilizing Boot, starts the beta version in internal memory, and reads the test parameter run needed for described beta version from described internal memory, to complete the test to terminal capabilities.
Terminal the most according to claim 7, it is characterised in that described beta version includes: Boot, operating system, driver abstracts, radio-frequency module.
Terminal the most according to claim 8, it is characterised in that described acquiring unit, is additionally operable to start Boot, carries out Tong Bu handshake operation with main frame;After synchronization is shaken hands successfully, utilize Boot mutual with main frame, obtain beta version and test parameter from main frame.
Terminal the most according to claim 9, it is characterised in that described terminal also includes: arrange unit, for cancelling described beta version to the incidence relation of parameter in flash memory Flash, and sets up described beta version to the incidence relation of parameter in internal memory.
11. terminals according to claim 8, it is characterised in that described terminal also includes: arrange unit, for cancelling described radio-frequency module to the incidence relation of parameter in Flash.
12. according to Claim 8 to the terminal described in 11 any one, it is characterised in that described terminal also includes: start unit, is used for starting Boot, carries out Tong Bu handshake operation with main frame;Synchronization shake hands failure time, utilize Boot start normal version.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510288498.0A CN106294039A (en) | 2015-05-29 | 2015-05-29 | The method of a kind of test terminal performance and terminal |
PCT/CN2015/093615 WO2016192296A1 (en) | 2015-05-29 | 2015-11-02 | Method for testing terminal performance, terminal, and storage medium |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510288498.0A CN106294039A (en) | 2015-05-29 | 2015-05-29 | The method of a kind of test terminal performance and terminal |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106294039A true CN106294039A (en) | 2017-01-04 |
Family
ID=57440002
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510288498.0A Withdrawn CN106294039A (en) | 2015-05-29 | 2015-05-29 | The method of a kind of test terminal performance and terminal |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN106294039A (en) |
WO (1) | WO2016192296A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116953418A (en) * | 2023-09-21 | 2023-10-27 | 通力科技股份有限公司 | Radio frequency test method, system, equipment and computer readable storage medium |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2009245292A (en) * | 2008-03-31 | 2009-10-22 | Fujitsu Ltd | Device to be tested, testing system, testing method, and program |
CN102724343A (en) * | 2012-05-31 | 2012-10-10 | 青岛海信移动通信技术股份有限公司 | Mobile phone hardware module test method and test device |
CN103744824A (en) * | 2013-12-18 | 2014-04-23 | 乐视致新电子科技(天津)有限公司 | Outgoing testing method and testing system |
CN104166610A (en) * | 2014-07-24 | 2014-11-26 | 深圳天珑无线科技有限公司 | Mobile terminal detection method and detection system |
CN104375911A (en) * | 2014-11-24 | 2015-02-25 | 上海盈方微电子有限公司 | Fast android whole machine function detection method based on android platform engineering mode |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101055539A (en) * | 2006-04-12 | 2007-10-17 | 鸿富锦精密工业(深圳)有限公司 | Computer test system and method |
CN104202454B (en) * | 2014-09-24 | 2017-12-08 | 福建联迪商用设备有限公司 | The method and system that a kind of handset compatibility test case performs automatically |
-
2015
- 2015-05-29 CN CN201510288498.0A patent/CN106294039A/en not_active Withdrawn
- 2015-11-02 WO PCT/CN2015/093615 patent/WO2016192296A1/en active Application Filing
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2009245292A (en) * | 2008-03-31 | 2009-10-22 | Fujitsu Ltd | Device to be tested, testing system, testing method, and program |
CN102724343A (en) * | 2012-05-31 | 2012-10-10 | 青岛海信移动通信技术股份有限公司 | Mobile phone hardware module test method and test device |
CN103744824A (en) * | 2013-12-18 | 2014-04-23 | 乐视致新电子科技(天津)有限公司 | Outgoing testing method and testing system |
CN104166610A (en) * | 2014-07-24 | 2014-11-26 | 深圳天珑无线科技有限公司 | Mobile terminal detection method and detection system |
CN104375911A (en) * | 2014-11-24 | 2015-02-25 | 上海盈方微电子有限公司 | Fast android whole machine function detection method based on android platform engineering mode |
Non-Patent Citations (1)
Title |
---|
知乎用户: "小米手机是如何实现双***的?", 《HTTPS://WWW.ZHIHU.COM/QUESTION/19985274》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116953418A (en) * | 2023-09-21 | 2023-10-27 | 通力科技股份有限公司 | Radio frequency test method, system, equipment and computer readable storage medium |
CN116953418B (en) * | 2023-09-21 | 2023-12-05 | 通力科技股份有限公司 | Radio frequency test method, system, equipment and computer readable storage medium |
Also Published As
Publication number | Publication date |
---|---|
WO2016192296A1 (en) | 2016-12-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11099923B2 (en) | Systems and methods to reprogram mobile devices | |
CN103176824B (en) | A kind of method and device of system upgrade | |
CN102129375B (en) | Method and equipment for system upgrade of mobile terminal | |
CN107079283A (en) | Equipment automatic configuration system and process based on many SIM | |
CN105117268B (en) | A kind of installation method and system for realizing that Linux system is installed automatically | |
CN103853586A (en) | Method of realizing wireless card driver in UEFI (unified extensible firmware interface) layer | |
CN103577210B (en) | The system and method for carry between mobile terminal | |
CN103761088A (en) | Multiple operation system switching method applicable to ARM (advanced risc machine) framework mobile equipment | |
KR101674975B1 (en) | System upgrade method, apparatus, device, program, and recording medium | |
CN104461667B (en) | The brush machine method and apparatus of intelligent terminal | |
CN103118171A (en) | Application software shared system and method | |
CN103220342A (en) | Grouped remote and synchronous program updating method for terminals | |
CN106102083B (en) | Configuration method and equipment | |
CN111371610A (en) | Network card firmware batch refreshing method, system, terminal and storage medium | |
CN106294039A (en) | The method of a kind of test terminal performance and terminal | |
CN106569854A (en) | Method and system for setting device firmware and realizing factory testing | |
CN101896003A (en) | Cell phone apparatus capable of replacing different network formats and implementation method thereof | |
CN201700006U (en) | Mobile phone equipment capable of changing different network standards | |
CN111786852B (en) | Test method and related equipment | |
CN109542524A (en) | A kind of Linux and the mutual fast switch over method of Android | |
CN113031999A (en) | Method, device and equipment for controlling firmware upgrade of server component and storage medium | |
CN111787555A (en) | Method and equipment for testing intelligent terminal | |
US9294865B2 (en) | Enhanced system and method for custom programming of large groups of phones without requiring additional equipment | |
CN110083484A (en) | FPGA reloads method, equipment, storage medium and system | |
CN112306843A (en) | Test method, test device and storage medium |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20170104 |
|
WW01 | Invention patent application withdrawn after publication |