CN106293676B CN201510309050.2A CN201510309050A CN106293676B CN 106293676 B CN106293676 B CN 106293676B CN 201510309050 A CN201510309050 A CN 201510309050A CN 106293676 B CN106293676 B CN 106293676B
Authority
CN
China
Prior art keywords
project
detection
detected
construction
detection program
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510309050.2A
Other languages
Chinese (zh)
Other versions
CN106293676A (en
Inventor
黄耀庆
林家仁
吴廷昌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Teco Electric and Machinery Co Ltd
Original Assignee
Teco Electric and Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Teco Electric and Machinery Co Ltd filed Critical Teco Electric and Machinery Co Ltd
Priority to CN201510309050.2A priority Critical patent/CN106293676B/en
Publication of CN106293676A publication Critical patent/CN106293676A/en
Application granted granted Critical
Publication of CN106293676B publication Critical patent/CN106293676B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Test And Diagnosis Of Digital Computers (AREA)
  • Air Conditioning Control Device (AREA)

Abstract

A kind of method and system generating whole detection program, utilize at least one prestored in a database construction detection project, one whole detection program is generated at least test system comprising an at least functional module, in the above method, the device information of test system is first parsed into at least testing requirements corresponding to each functional module, uses and establishes a detection program comparison table to show at least one project to be detected that it is included;It will test the project to be detected in program comparison table to be compared with construction detection project one by one;When comparing out identical, the detection project of construction coincideing with project to be detected is replaced into project to be detected, and the project to be detected misfitted is included in construction detection project inventory and builds up a newly-increased detection project to be combined into whole detection program with construction detection project.

Description

Generate the method and system of whole detection program
Technical field
The present invention relates to it is a kind of generate whole detection program method and system more particularly to it is a kind of by project to be detected by One is compared and generates the method and system of the generation whole detection program of whole detection program with construction detection project.
Background technique
With the development of science and technology as household appliances and the hand-held mobile such as mobile phone, tablet computer of TV, air conditioner fill The fast development set brings the sizable convenience of people, wherein the said goods are required to be detected after finalization of the manufacture, with true Whether whether the functional module for recognizing interiors of products normal operation or can meet international norm.
In general, in above-mentioned the step of detecting to product, detection program generally need to be first write, and after writing Detection program be stored in detection board or controller with control board according to detection program to the functional module in above-mentioned product into Row detection.However, if another similar product need to be tested, in general needing to write another inspection again generally after having detected Ranging sequence or be the change program write for the first time, and the function being directed in this product is stored in detection board or controller Module is tested, however, aforesaid way needs to take quite a lot of time for programming personnel, in addition, if programming personnel Different people, then needing to spend more time when rewriting the detection program of first time detection again.In addition, if the product of different departments (such as motor department, household electrical appliances department or solar energy operating divisions), detection program are write with greater need for flower more time, and different The programming personnel of the department also more difficult detection program write each other, therefore, the prior art still has improvement space.
Summary of the invention
In view of the prior art after carrying out product testing, if need to detect again to another product, generally having is needed The problem of rewriting detection program and need to taking considerable time.Edge this, the present invention, which provides, a kind of generates whole detection program Method and system, mainly using the construction detection project stored at present, by project to be detected one by one with construction detection Mesh is compared and generates whole detection program, to solve the above problem.
Based on above-mentioned purpose, technical way of the present invention is to provide a kind of side for generating whole detection program Method generates a whole detection to an at least test system using at least one prestored in a database construction detection project Program, test system include an at least functional module, parse a device information of test system comprising step (a) and correspond to An at least testing requirements for each functional module, use according to an at least functional module and this at least a testing requirements establish an inspection Program comparison table is surveyed, uses and shows at least one item to be detected included in whole detection program using detection program comparison table Mesh, wherein each project to be detected correspond to this at least one of functional module in this at least a testing requirements One, then executing step (b) will test at least one project to be detected in program comparison table at least one is built with this one by one Structure detection project is compared, use compare out this at least one construction detection project whether coincide each other with project to be detected, Then executing step (c), at least one there are one and the project to be detected to coincide each other in construction detection project comparing out this When, by with project to be detected coincide this construction detection project has replaced project to be detected, and the project to be detected that will be misfitted One is included in construction detection project inventory, builds up a newly-increased detection according to the project to be detected in construction detection project inventory Project, and construction detection project has been combined into whole detection program with this by newly-increased detection project.
Wherein, in the preferred embodiment of the attached technological means of the method for above-mentioned generation whole detection program, in step (c) After execute a step (d) and store newly-increased detection project to database, use and generate another construction detection project, this at least one Construction detection project is corresponding with one first identification code, which is corresponding with one second identification code, in step (b) in, compare whether the first identification code matches with the second identification code.In addition, test system is a motor, a cold air, one watches One of device, a refrigerator and a washing machine are taken, which is an operating frequency, an operating timing, a survey Try at least one of voltage, a test electric current, an acceleration and a deceleration.
Technical way of the present invention also provides a kind of system for generating whole detection program, to at least One test system generates a whole detection program, and test system includes an at least functional module, and generate whole detection program is System includes a database, a parsing module and a comparison module.Database prestores at least one construction detection project, parsing Module is electrically connected at database, a device information of test system to be parsed at least one corresponding to each functional module Testing requirements are used and establish a detection program comparison table according to an at least functional module and an at least testing requirements, use At least one project to be detected included in whole detection program is showed using detection program comparison table, wherein each to be checked Survey project corresponds at least an one of functional module and at least one of the testing requirements.Comparison module electrically connects It is connected to parsing module, is examined one by one at least one construction will test at least one project to be detected in program comparison table Survey project is compared, and comparing out this, at least one there are one and project to be detected to coincide each other in construction detection project When, the detection project of construction coincideing with project to be detected is replaced into project to be detected, and the project to be detected misfitted is arranged Enter one to construction detection project inventory, foundation builds up a newly-increased detection to the project to be detected in construction detection project inventory Mesh, and newly-increased detection project and construction detection project are combined into whole detection program.
Wherein, in the preferred embodiment of the attached technological means of the system of above-mentioned generation whole detection program, comparison module It is electrically connected at database, to store after building up newly-increased detection project, then by newly-increased detection project to database, is used Generate another construction detection project, this at least one construction detection project be corresponding with one first identification code, at least one is to be checked for this Survey project is corresponding with one second identification code, and comparison module according to the first identification code compares out this with the second identification code, and at least one is built Whether structure detection project matches at least one project to be detected.In addition, test system is a motor, a cold air, a servo One of device, a refrigerator and a washing machine, an at least testing requirements are an operating frequency, an operating timing, a test At least one of voltage, a test electric current, an acceleration and a deceleration.
After technical way by the method and system of the present invention for generating whole detection program, due to being Test system is parsed into multiple functional modules, and then detection project can be marked off according to functional module and testing requirements, with according to It is compared according to project to be detected with construction detection project, if being consistent, can directly replace and continue to use, be mentioned again if not being consistent Show that programming personnel write this subprogram, therefore programming personnel do not need to spend a lot of time again and integrally compile again It writes, and then promotes convenience.
Below in conjunction with the drawings and specific embodiments, the present invention will be described in detail, but not as a limitation of the invention.
Detailed description of the invention
Fig. 1 shows the block diagram of the system of the generation whole detection program of present pre-ferred embodiments;And
Fig. 2 shows the flow diagram of the method for the generation whole detection program of present pre-ferred embodiments.
Wherein, appended drawing reference
1 system for generating whole detection program
11 databases
111,111a construction detection project
12 parsing modules
13 comparison modules
Specific embodiment
Structural principle and working principle of the invention are described in detail with reference to the accompanying drawing:
Due to it is provided by the present invention generate whole detection program method and system in, a combination thereof embodiment be unequal to piece It lifts, therefore this is no longer going to repeat them, only enumerates a preferred embodiment and is illustrated.
Also referring to Fig. 1 and Fig. 2, Fig. 1 shows the system of the generation whole detection program of present pre-ferred embodiments Block diagram, Fig. 2 show the flow diagram of the method for the generation whole detection program of present pre-ferred embodiments.As schemed Show, the system 1 that whole detection program is generated provided by present pre-ferred embodiments is to an at least test system, (figure is not Show) a whole detection program (not shown) is generated, test system includes an at least functional module (not shown), wherein dress to be measured It is set to one of a motor, a cold air, a servomechanism, a refrigerator and a washing machine, but without being limited thereto in other embodiments, It can be other such as the household appliances of TV or such as mobile phone, the handheld mobile device of plate.And functional module may be, for example, The functional modules such as controller, memory body, motor, compressor, condenser, heater, heat exchanger, therefore, the present invention is preferably real It applies functional module defined in example and refers to the module that discrete function can be performed in test system, for example, if test system is Refrigerator, then functional module can be the other functions modules such as compressor, condenser, heater;If test system is cold air, that Functional module can be the other functions modules such as compressor, radiator, heat exchanger;If test system is mobile phone, then function Energy module can be the functional modules such as storage module, wireless transport module, display module, in addition, whole detection program will be under It is described in detail.
The system 1 for generating whole detection program includes a database 11, a parsing module 12 and a comparison module 13, number Prestore at least one construction detection project 111 according to library 11, and the above-mentioned detection project of construction 111 refer to detection program (or Detect program), and the detection program that construction detection project 111 is write when previous detected.In addition, database 11 It may be, for example, existing hard disc, cloud server or memory body, depending on the design of practice.
Parsing module 12 is electrically connected at database 11, and can be to be existing such as central processing unit (Central Processing Unit;CPU), graphics processor (Graphics Processing Unit;) or OverDrive Processor ODP GPU (Accelerated Processing Unit;APU processor).Comparison module 13 is electrically connected at database 11 and parsing Module 12 equally can be above-mentioned processor, preferably, parsing module 12 and comparison module 13 can be integrated in the same processing In device, and corresponding function is executed by a processor, is depending on the design of practice.
In order to make those skilled in the art can be appreciated that it is provided by the present invention generate whole detection program method and System will be described in detail below with method flow diagram, as shown in Fig. 2, generating whole inspection provided by present pre-ferred embodiments The method of ranging sequence comprises the steps of:
Step S101: a device information of test system is parsed and is wanted corresponding at least one detection of each functional module It asks, uses and establish a detection program comparison table according to an at least functional module and an at least testing requirements, use and utilize inspection It surveys program comparison table and shows at least one project to be detected included in whole detection program;
Step S102: compare this at least one construction detection project whether coincide each other with project to be detected;
Step S103: the detection project of construction coincideing with project to be detected is replaced into project to be detected;
Step S104: project to be detected is included in one to construction detection project inventory, according to construction detection project inventory In project to be detected build up a newly-increased detection project, and it is newly-increased detection project is integral in conjunction with construction detection project Detect program;And
Step S105: newly-increased detection project is stored to database, is used and is generated another construction detection project.
Before step starts, database 11 be prestore at least one construction detection project 111 it is as shown in Table 1, wherein Construction detection project 111 is corresponding operating timing, and construction detection project 111a corresponds to operating frequency, and operates timing Refer to testing requirements with operating frequency, this will be described in detail below.
Operate timing Operating frequency
Construction detection project 111 Construction detection project 111a
One > of < table
After step starts, executes step S101 and parse a device information of test system corresponding to each functional module An at least testing requirements, use and establish a detection program with an at least testing requirements according to an at least functional module and compare Table is used and shows at least one project to be detected included in whole detection program using detection program comparison table, wherein is every One project to be detected corresponds at least an one of functional module and at least one of the testing requirements.
For example, detection program comparison table is as shown in Table 2, and in this preferred embodiment, test system is intelligent ice Case, and each functional module for including in test system be respectively controller, compressor and memory body (only illustrate above, not All functional modules are listed), and parsing module 12 is respectively to operate to the testing requirements that the device information of test system parses (analysis mode for example can receive for timing, running speed, operating frequency, acceleration, deceleration, test voltage and test electric current As specification table device information and parse possible functional module and corresponding testing requirements), project to be detected is then analyzed Need detection project PAa to project PAh to be detected out, and project to be detected is all corresponding with functional module and testing requirements, such as Project PAa to be detected is corresponding compressor and operating timing, and project PAe to be detected corresponds to the class according to this such as controller and test voltage It pushes away, wherein not illustrated project to be detected indicates to have no corresponding testing requirements in following table, chats hereby bright.
Intelligent refrigerator Controller Compressor Memory body
Operate timing X Project PAa to be detected X
Operating frequency X Project PAb to be detected X
Acceleration X Project PAc to be detected X
Deceleration X Project PAd to be detected X
Test voltage Project PAe to be detected X Project PAf to be detected
Test electric current Project PAg to be detected X Project PAh to be detected
Two > of < table
After executing the step S101, execute step S102 compare this at least one construction detection project whether with it is to be detected Project is coincide each other, and in this step, comparison module 13 will test at least one project to be detected in program comparison table one by one With this at least one construction detection project be compared, use to compare out and coincide whether each other, for example, such as table one and table two Shown, the meeting self-analytic data module 12 of comparison module 13 obtains detection program comparison table, and the detection of construction is captured into database 11 Project 111,111a, so by project PAa to be detected to project PAh to be detected one by one with construction detection project 111,111a into Row compares.
Then it executes step S103 and the detection project of construction coincideing with project to be detected is replaced into project to be detected, specifically For, by table one and table two can be expressly understood that construction detection project 111,111a respectively with project PAa, PAb to be detected that This is consistent, therefore construction detection project 111,111a directly can be replaced project PAa, PAb to be detected respectively and generated new Detection program comparison table (as shown in Table 3).
Intelligent refrigerator Controller Compressor Memory body
Operate timing X Construction detection project 111 X
Operating frequency X Construction detection project 111a X
Acceleration X Project PAc to be detected X
Deceleration X Project PAd to be detected X
Test voltage Project PAe to be detected X Project PAf to be detected
Test electric current Project PAg to be detected X Project PAh to be detected
Three > of < table
Wherein, it executes the step and executes step S104 after S103 that project to be detected is included in one is clear to construction detection project It is single, a newly-increased detection project is built up according to the project to be detected in construction detection project inventory, and by newly-increased detection project Whole detection program is combined into construction detection project.Specifically, the project Pac to be detected that above-mentioned residue does not meet to In detection project PAh, above-mentioned project Pac to be detected to project PAh to be detected can be included in one and examined to construction by comparison module 13 It surveys project list (as shown in Table 4), foundation should be to the project Pac to be detected in construction detection project inventory to project to be detected PAh builds up newly-increased detection project Pb to Pg, and this newly-increased detection project Pb to Pg needs programming personnel to write, And after the completion of writing, comparison module is integral in conjunction with construction detection project 111,111a by newly-increased detection project Pb to Pg It detects program (as shown in Table 5), wherein whole detection program refers to newly-increased detection project Pb to Pg and construction detection project 111, the combined program out of 111a, rather than a other program, are chatted bright hereby.
To construction detection project inventory
Project PAc to be detected
Project PAd to be detected
Project PAe to be detected
Project PAf to be detected
Project PAg to be detected
Project PAh to be detected
Four > of < table
Intelligent refrigerator Controller Compressor Memory body
Operate timing X Construction detection project 111 X
Operating frequency X Construction detection project 111a X
Acceleration X Newly-increased detection project Pb X
Deceleration X Newly-increased detection project Pc X
Test voltage Newly-increased detection project Pd X Newly-increased detection project Pe
Test electric current Newly-increased detection project Pf X Newly-increased detection project Pg
Five > of < table
Step S105 is executed after executing the step S104 to store newly-increased detection project to database, and it is another to use generation Construction detection project, specifically, after programming personnel complete the writing of newly-increased detection project Pb to Pg, comparison module 13 can directly store newly-increased detection project Pb to Pg into database 11, and then be stored as another construction detection project, also I.e. table increases above-mentioned newly-increased detection project Pb to Pg newly again for a moment, so that generating whole detection provided by present pre-ferred embodiments The system 1 of program has the function of study, as long as therefore next time when carrying out similar detection again, can be not required to write newly-increased inspection again Survey project Pb to Pg and can directly continue to use.
In addition, directly skip step S103 when the judging result of step S102 is no and execute step S104, Yi Ji This at least one construction detection project 111, do not deposit in 111a any one and project PAa to be detected to project PAh to be detected that When this coincide, the movement of step S104 is directly executed, remaining is identical as above-mentioned step S104, repeats no more.
In addition, in the other embodiments of the judgment method of step S102, this at least one construction detection project 111, 111a is to be corresponding with one first identification code, this first identification code may be, for example, program code, project PAa to be detected to item to be detected Mesh PAh has respectively corresponded one second identification code, and the second identification code for example can also be program code, therefore, in step s 102, Comparison module 13 be compared out according to the first identification code and the second identification code this at least one construction detection project 111,111a with Whether at least one project PAa to be detected to project PAh to be detected matches, this specific alignments is can to confirm the first identification Whether code is identical as the second identification code, but not limited to this.
In summary, after the method and system of generation whole detection program, due to being to parse test system Multiple functional modules, and then detection project can be marked off according to functional module and testing requirements, according to project to be detected and Construction detection project is compared, and if being consistent, can directly replace and continue to use, and reresents programming personnel volume if not being consistent This subprogram is write, therefore programming personnel do not need to spend a lot of time again and integrally rewrite, and also have study Function, and then promoted and use upper convenience.
Certainly, the invention may also have other embodiments, without deviating from the spirit and substance of the present invention, ripe It knows those skilled in the art and makes various corresponding changes and modifications, but these corresponding changes and change in accordance with the present invention Shape all should fall within the scope of protection of the appended claims of the present invention.

Claims (10)

1. a kind of method for generating whole detection program, using at least one prestored in a database construction detection project, One whole detection program is generated to an at least test system, which includes an at least functional module, which is characterized in that packet Containing following steps:
(a) device information of the test system is parsed into at least testing requirements corresponding to each functional module, use according to A detection program comparison table is established according to an at least functional module and an at least testing requirements, uses and utilizes the detection program pair At least one project to be detected included in the whole detection program is showed according to table, wherein each project to be detected is corresponding In at least an one of functional module and at least one of the testing requirements;
(b) by least one project to be detected in the detection program comparison table one by one with this at least one construction detection project into Row compare, use compare out this at least one construction detection project whether coincide each other with the project to be detected;And
(c) compare out this at least one coincide each other in construction detection project there are one and the project to be detected when, will be with The project to be detected coincide this construction detection project replaces the project to be detected, and project column to be detected that will be misfitted Enter one to construction detection project inventory, increases inspection newly according to one should be built up to the project to be detected in construction detection project inventory Survey project, and by this increase newly detection project and this construction detection project has been combined into the whole detection program.
2. the method according to claim 1 for generating whole detection program, which is characterized in that executed after the step (c) One step (d) increases this newly detection project and stores to the database, uses and generates another construction detection project.
3. the method according to claim 1 for generating whole detection program, which is characterized in that at least one construction detection Project is corresponding with one first identification code, which is corresponding with one second identification code, in the step (b), than Whether match to first identification code with second identification code.
4. the method according to claim 1 for generating whole detection program, which is characterized in that the test system is a horse It reaches, one of a cold air, a servomechanism, a refrigerator and a washing machine.
5. the method according to claim 1 for generating whole detection program, which is characterized in that at least a testing requirements are for this At least one of one operating frequency, an operating timing, a test voltage, a test electric current, an acceleration and a deceleration.
6. a kind of system for generating whole detection program should be to generate a whole detection program to an at least test system Surveying device includes an at least functional module, which is characterized in that the system of the generation whole detection program includes:
One database prestores at least one construction detection project;
One parsing module is electrically connected at the database, corresponds to respectively to parse a device information of the test system An at least testing requirements for functional module, use according to an at least functional module and this at least a testing requirements establish a detection Program comparison table, uses that show included in the whole detection program at least one using the detection program comparison table to be detected Project, which is characterized in that each project to be detected corresponds at least an one of functional module and at least one detection One of it is required that;And
One comparison module is electrically connected at the parsing module, to by this in the detection program comparison table, at least one is to be detected Project one by one with this at least one construction detection project be compared, at least one existed in construction detection project comparing out this When one and the project to be detected are coincide each other, by coincide with the project to be detected this construction detection project has replaced this to be checked Survey project, and the project to be detected misfitted is included in one to construction detection project inventory, foundation should be to construction detection project The project to be detected in inventory builds up a newly-increased detection project, and increases this newly detection project and the construction detection project It is combined into the whole detection program.
7. the system according to claim 6 for generating whole detection program, which is characterized in that the comparison module is electrically connected In the database, to increase this newly detection project and store to the database, use production after building up the newly-increased detection project Raw another construction detection project.
8. the system according to claim 6 for generating whole detection program, which is characterized in that at least one construction detection Project is corresponding with one first identification code, which is corresponding with one second identification code, and comparison module foundation should First identification code and second identification code compare out this at least one construction detection project and at least one project to be detected whether It matches.
9. the system according to claim 6 for generating whole detection program, which is characterized in that the test system is a horse It reaches, one of a cold air, a servomechanism, a refrigerator and a washing machine.
10. the system according to claim 6 for generating whole detection program, which is characterized in that an at least testing requirements For at least one in an operating frequency, an operating timing, a test voltage, a test electric current, an acceleration and a deceleration Person.
CN201510309050.2A 2015-06-08 2015-06-08 Generate the method and system of whole detection program Active CN106293676B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510309050.2A CN106293676B (en) 2015-06-08 2015-06-08 Generate the method and system of whole detection program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510309050.2A CN106293676B (en) 2015-06-08 2015-06-08 Generate the method and system of whole detection program

Publications (2)

Publication Number Publication Date
CN106293676A CN106293676A (en) 2017-01-04
CN106293676B true CN106293676B (en) 2019-05-10

Family

ID=57659962

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510309050.2A Active CN106293676B (en) 2015-06-08 2015-06-08 Generate the method and system of whole detection program

Country Status (1)

Country Link
CN (1) CN106293676B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007179488A (en) * 2005-12-28 2007-07-12 Fujitsu Ltd Program for predicting source code problem
TW200901030A (en) * 2007-06-22 2009-01-01 Benq Corp Portable multimedia playing device capable of operating a command according to information provided by a GPS system and related method
CN102322943A (en) * 2011-06-13 2012-01-18 河北省电力公司超高压输变电分公司 Detection system and method for sound abnormality of power equipment
CN102636704A (en) * 2012-03-05 2012-08-15 深圳市英威腾电气股份有限公司 Testing method, device and system for electronic product
TW201333722A (en) * 2012-02-03 2013-08-16 Chunghwa Telecom Co Ltd Mechanism and method for mass diversified data screening and management
CN104198972A (en) * 2014-09-05 2014-12-10 国家电网公司 Concentrator for automated test of assembly line field calibration
CN104483587A (en) * 2014-12-05 2015-04-01 深圳市创荣发电子有限公司 Control product batch testing method
CN104515956A (en) * 2013-09-27 2015-04-15 国家电网公司 Method and device for detecting intelligent ammeter power module

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007179488A (en) * 2005-12-28 2007-07-12 Fujitsu Ltd Program for predicting source code problem
TW200901030A (en) * 2007-06-22 2009-01-01 Benq Corp Portable multimedia playing device capable of operating a command according to information provided by a GPS system and related method
CN102322943A (en) * 2011-06-13 2012-01-18 河北省电力公司超高压输变电分公司 Detection system and method for sound abnormality of power equipment
TW201333722A (en) * 2012-02-03 2013-08-16 Chunghwa Telecom Co Ltd Mechanism and method for mass diversified data screening and management
CN102636704A (en) * 2012-03-05 2012-08-15 深圳市英威腾电气股份有限公司 Testing method, device and system for electronic product
CN104515956A (en) * 2013-09-27 2015-04-15 国家电网公司 Method and device for detecting intelligent ammeter power module
CN104198972A (en) * 2014-09-05 2014-12-10 国家电网公司 Concentrator for automated test of assembly line field calibration
CN104483587A (en) * 2014-12-05 2015-04-01 深圳市创荣发电子有限公司 Control product batch testing method

Also Published As

Publication number Publication date
CN106293676A (en) 2017-01-04

Similar Documents

Publication Publication Date Title
CN104700962B (en) Method for manufacturing wirning harness
US20190236844A1 (en) Augmented reality system
CN105205038B (en) Complete material inventory table generating method and device
CN112948427B (en) Data query method, device, equipment and storage medium
CN105517676A (en) Whole-machine testing method and device of smart bracelets, and mobile terminal
US9916331B2 (en) Method and device for automatically processing static test data of rail transit vehicle
CN109978565B (en) Product packaging data management method and device, terminal equipment and readable storage medium
CN105491140A (en) Remote testing method and system for terminal
CN103199041A (en) Management system of wafer acceptable test procedure and application method thereof
CN105302413A (en) UI test method and system for control
CN102646080A (en) System and method for configuring USB (universal serial bus) equipment in virtual environment
CN107908442A (en) Resource loading method, device, terminal device and computer-readable recording medium based on spring
US20180254661A1 (en) Information output apparatus, and information output method
CN106293676B (en) Generate the method and system of whole detection program
CN104483964A (en) Automatic testing method, device and system
JP2021177402A (en) Information processor, information processing method, and computer program
US10885577B2 (en) System and method for retail space management
CN107491316A (en) Extended method, device and the electronic equipment of baseboard management controller
CN103593429A (en) Commodity template failure detection method and device
CN117631821A (en) Digital twinning of physical environments for augmented reality applications
TWI537571B (en) Overall detection program generation method and system thereof
CN110874365A (en) Information query method and related equipment thereof
CN113705752B (en) Ink screen layer rack label system and bookshelf
CN105786690A (en) Test method and system by using generated test embodiment steps
CN115220740A (en) Database environment deployment method and device, electronic equipment and storage medium

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant