CN106293676B - Generate the method and system of whole detection program - Google Patents
Generate the method and system of whole detection program Download PDFInfo
- Publication number
- CN106293676B CN106293676B CN201510309050.2A CN201510309050A CN106293676B CN 106293676 B CN106293676 B CN 106293676B CN 201510309050 A CN201510309050 A CN 201510309050A CN 106293676 B CN106293676 B CN 106293676B
- Authority
- CN
- China
- Prior art keywords
- project
- detection
- detected
- construction
- detection program
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Test And Diagnosis Of Digital Computers (AREA)
- Air Conditioning Control Device (AREA)
Abstract
A kind of method and system generating whole detection program, utilize at least one prestored in a database construction detection project, one whole detection program is generated at least test system comprising an at least functional module, in the above method, the device information of test system is first parsed into at least testing requirements corresponding to each functional module, uses and establishes a detection program comparison table to show at least one project to be detected that it is included;It will test the project to be detected in program comparison table to be compared with construction detection project one by one;When comparing out identical, the detection project of construction coincideing with project to be detected is replaced into project to be detected, and the project to be detected misfitted is included in construction detection project inventory and builds up a newly-increased detection project to be combined into whole detection program with construction detection project.
Description
Technical field
The present invention relates to it is a kind of generate whole detection program method and system more particularly to it is a kind of by project to be detected by
One is compared and generates the method and system of the generation whole detection program of whole detection program with construction detection project.
Background technique
With the development of science and technology as household appliances and the hand-held mobile such as mobile phone, tablet computer of TV, air conditioner fill
The fast development set brings the sizable convenience of people, wherein the said goods are required to be detected after finalization of the manufacture, with true
Whether whether the functional module for recognizing interiors of products normal operation or can meet international norm.
In general, in above-mentioned the step of detecting to product, detection program generally need to be first write, and after writing
Detection program be stored in detection board or controller with control board according to detection program to the functional module in above-mentioned product into
Row detection.However, if another similar product need to be tested, in general needing to write another inspection again generally after having detected
Ranging sequence or be the change program write for the first time, and the function being directed in this product is stored in detection board or controller
Module is tested, however, aforesaid way needs to take quite a lot of time for programming personnel, in addition, if programming personnel
Different people, then needing to spend more time when rewriting the detection program of first time detection again.In addition, if the product of different departments
(such as motor department, household electrical appliances department or solar energy operating divisions), detection program are write with greater need for flower more time, and different
The programming personnel of the department also more difficult detection program write each other, therefore, the prior art still has improvement space.
Summary of the invention
In view of the prior art after carrying out product testing, if need to detect again to another product, generally having is needed
The problem of rewriting detection program and need to taking considerable time.Edge this, the present invention, which provides, a kind of generates whole detection program
Method and system, mainly using the construction detection project stored at present, by project to be detected one by one with construction detection
Mesh is compared and generates whole detection program, to solve the above problem.
Based on above-mentioned purpose, technical way of the present invention is to provide a kind of side for generating whole detection program
Method generates a whole detection to an at least test system using at least one prestored in a database construction detection project
Program, test system include an at least functional module, parse a device information of test system comprising step (a) and correspond to
An at least testing requirements for each functional module, use according to an at least functional module and this at least a testing requirements establish an inspection
Program comparison table is surveyed, uses and shows at least one item to be detected included in whole detection program using detection program comparison table
Mesh, wherein each project to be detected correspond to this at least one of functional module in this at least a testing requirements
One, then executing step (b) will test at least one project to be detected in program comparison table at least one is built with this one by one
Structure detection project is compared, use compare out this at least one construction detection project whether coincide each other with project to be detected,
Then executing step (c), at least one there are one and the project to be detected to coincide each other in construction detection project comparing out this
When, by with project to be detected coincide this construction detection project has replaced project to be detected, and the project to be detected that will be misfitted
One is included in construction detection project inventory, builds up a newly-increased detection according to the project to be detected in construction detection project inventory
Project, and construction detection project has been combined into whole detection program with this by newly-increased detection project.
Wherein, in the preferred embodiment of the attached technological means of the method for above-mentioned generation whole detection program, in step (c)
After execute a step (d) and store newly-increased detection project to database, use and generate another construction detection project, this at least one
Construction detection project is corresponding with one first identification code, which is corresponding with one second identification code, in step
(b) in, compare whether the first identification code matches with the second identification code.In addition, test system is a motor, a cold air, one watches
One of device, a refrigerator and a washing machine are taken, which is an operating frequency, an operating timing, a survey
Try at least one of voltage, a test electric current, an acceleration and a deceleration.
Technical way of the present invention also provides a kind of system for generating whole detection program, to at least
One test system generates a whole detection program, and test system includes an at least functional module, and generate whole detection program is
System includes a database, a parsing module and a comparison module.Database prestores at least one construction detection project, parsing
Module is electrically connected at database, a device information of test system to be parsed at least one corresponding to each functional module
Testing requirements are used and establish a detection program comparison table according to an at least functional module and an at least testing requirements, use
At least one project to be detected included in whole detection program is showed using detection program comparison table, wherein each to be checked
Survey project corresponds at least an one of functional module and at least one of the testing requirements.Comparison module electrically connects
It is connected to parsing module, is examined one by one at least one construction will test at least one project to be detected in program comparison table
Survey project is compared, and comparing out this, at least one there are one and project to be detected to coincide each other in construction detection project
When, the detection project of construction coincideing with project to be detected is replaced into project to be detected, and the project to be detected misfitted is arranged
Enter one to construction detection project inventory, foundation builds up a newly-increased detection to the project to be detected in construction detection project inventory
Mesh, and newly-increased detection project and construction detection project are combined into whole detection program.
Wherein, in the preferred embodiment of the attached technological means of the system of above-mentioned generation whole detection program, comparison module
It is electrically connected at database, to store after building up newly-increased detection project, then by newly-increased detection project to database, is used
Generate another construction detection project, this at least one construction detection project be corresponding with one first identification code, at least one is to be checked for this
Survey project is corresponding with one second identification code, and comparison module according to the first identification code compares out this with the second identification code, and at least one is built
Whether structure detection project matches at least one project to be detected.In addition, test system is a motor, a cold air, a servo
One of device, a refrigerator and a washing machine, an at least testing requirements are an operating frequency, an operating timing, a test
At least one of voltage, a test electric current, an acceleration and a deceleration.
After technical way by the method and system of the present invention for generating whole detection program, due to being
Test system is parsed into multiple functional modules, and then detection project can be marked off according to functional module and testing requirements, with according to
It is compared according to project to be detected with construction detection project, if being consistent, can directly replace and continue to use, be mentioned again if not being consistent
Show that programming personnel write this subprogram, therefore programming personnel do not need to spend a lot of time again and integrally compile again
It writes, and then promotes convenience.
Below in conjunction with the drawings and specific embodiments, the present invention will be described in detail, but not as a limitation of the invention.
Detailed description of the invention
Fig. 1 shows the block diagram of the system of the generation whole detection program of present pre-ferred embodiments;And
Fig. 2 shows the flow diagram of the method for the generation whole detection program of present pre-ferred embodiments.
Wherein, appended drawing reference
1 system for generating whole detection program
11 databases
111,111a construction detection project
12 parsing modules
13 comparison modules
Specific embodiment
Structural principle and working principle of the invention are described in detail with reference to the accompanying drawing:
Due to it is provided by the present invention generate whole detection program method and system in, a combination thereof embodiment be unequal to piece
It lifts, therefore this is no longer going to repeat them, only enumerates a preferred embodiment and is illustrated.
Also referring to Fig. 1 and Fig. 2, Fig. 1 shows the system of the generation whole detection program of present pre-ferred embodiments
Block diagram, Fig. 2 show the flow diagram of the method for the generation whole detection program of present pre-ferred embodiments.As schemed
Show, the system 1 that whole detection program is generated provided by present pre-ferred embodiments is to an at least test system, (figure is not
Show) a whole detection program (not shown) is generated, test system includes an at least functional module (not shown), wherein dress to be measured
It is set to one of a motor, a cold air, a servomechanism, a refrigerator and a washing machine, but without being limited thereto in other embodiments,
It can be other such as the household appliances of TV or such as mobile phone, the handheld mobile device of plate.And functional module may be, for example,
The functional modules such as controller, memory body, motor, compressor, condenser, heater, heat exchanger, therefore, the present invention is preferably real
It applies functional module defined in example and refers to the module that discrete function can be performed in test system, for example, if test system is
Refrigerator, then functional module can be the other functions modules such as compressor, condenser, heater;If test system is cold air, that
Functional module can be the other functions modules such as compressor, radiator, heat exchanger;If test system is mobile phone, then function
Energy module can be the functional modules such as storage module, wireless transport module, display module, in addition, whole detection program will be under
It is described in detail.
The system 1 for generating whole detection program includes a database 11, a parsing module 12 and a comparison module 13, number
Prestore at least one construction detection project 111 according to library 11, and the above-mentioned detection project of construction 111 refer to detection program (or
Detect program), and the detection program that construction detection project 111 is write when previous detected.In addition, database 11
It may be, for example, existing hard disc, cloud server or memory body, depending on the design of practice.
Parsing module 12 is electrically connected at database 11, and can be to be existing such as central processing unit (Central
Processing Unit;CPU), graphics processor (Graphics Processing Unit;) or OverDrive Processor ODP GPU
(Accelerated Processing Unit;APU processor).Comparison module 13 is electrically connected at database 11 and parsing
Module 12 equally can be above-mentioned processor, preferably, parsing module 12 and comparison module 13 can be integrated in the same processing
In device, and corresponding function is executed by a processor, is depending on the design of practice.
In order to make those skilled in the art can be appreciated that it is provided by the present invention generate whole detection program method and
System will be described in detail below with method flow diagram, as shown in Fig. 2, generating whole inspection provided by present pre-ferred embodiments
The method of ranging sequence comprises the steps of:
Step S101: a device information of test system is parsed and is wanted corresponding at least one detection of each functional module
It asks, uses and establish a detection program comparison table according to an at least functional module and an at least testing requirements, use and utilize inspection
It surveys program comparison table and shows at least one project to be detected included in whole detection program;
Step S102: compare this at least one construction detection project whether coincide each other with project to be detected;
Step S103: the detection project of construction coincideing with project to be detected is replaced into project to be detected;
Step S104: project to be detected is included in one to construction detection project inventory, according to construction detection project inventory
In project to be detected build up a newly-increased detection project, and it is newly-increased detection project is integral in conjunction with construction detection project
Detect program;And
Step S105: newly-increased detection project is stored to database, is used and is generated another construction detection project.
Before step starts, database 11 be prestore at least one construction detection project 111 it is as shown in Table 1, wherein
Construction detection project 111 is corresponding operating timing, and construction detection project 111a corresponds to operating frequency, and operates timing
Refer to testing requirements with operating frequency, this will be described in detail below.
Operate timing | Operating frequency |
Construction detection project 111 | Construction detection project 111a |
One > of < table
After step starts, executes step S101 and parse a device information of test system corresponding to each functional module
An at least testing requirements, use and establish a detection program with an at least testing requirements according to an at least functional module and compare
Table is used and shows at least one project to be detected included in whole detection program using detection program comparison table, wherein is every
One project to be detected corresponds at least an one of functional module and at least one of the testing requirements.
For example, detection program comparison table is as shown in Table 2, and in this preferred embodiment, test system is intelligent ice
Case, and each functional module for including in test system be respectively controller, compressor and memory body (only illustrate above, not
All functional modules are listed), and parsing module 12 is respectively to operate to the testing requirements that the device information of test system parses
(analysis mode for example can receive for timing, running speed, operating frequency, acceleration, deceleration, test voltage and test electric current
As specification table device information and parse possible functional module and corresponding testing requirements), project to be detected is then analyzed
Need detection project PAa to project PAh to be detected out, and project to be detected is all corresponding with functional module and testing requirements, such as
Project PAa to be detected is corresponding compressor and operating timing, and project PAe to be detected corresponds to the class according to this such as controller and test voltage
It pushes away, wherein not illustrated project to be detected indicates to have no corresponding testing requirements in following table, chats hereby bright.
Intelligent refrigerator | Controller | Compressor | Memory body |
Operate timing | X | Project PAa to be detected | X |
Operating frequency | X | Project PAb to be detected | X |
Acceleration | X | Project PAc to be detected | X |
Deceleration | X | Project PAd to be detected | X |
Test voltage | Project PAe to be detected | X | Project PAf to be detected |
Test electric current | Project PAg to be detected | X | Project PAh to be detected |
Two > of < table
After executing the step S101, execute step S102 compare this at least one construction detection project whether with it is to be detected
Project is coincide each other, and in this step, comparison module 13 will test at least one project to be detected in program comparison table one by one
With this at least one construction detection project be compared, use to compare out and coincide whether each other, for example, such as table one and table two
Shown, the meeting self-analytic data module 12 of comparison module 13 obtains detection program comparison table, and the detection of construction is captured into database 11
Project 111,111a, so by project PAa to be detected to project PAh to be detected one by one with construction detection project 111,111a into
Row compares.
Then it executes step S103 and the detection project of construction coincideing with project to be detected is replaced into project to be detected, specifically
For, by table one and table two can be expressly understood that construction detection project 111,111a respectively with project PAa, PAb to be detected that
This is consistent, therefore construction detection project 111,111a directly can be replaced project PAa, PAb to be detected respectively and generated new
Detection program comparison table (as shown in Table 3).
Intelligent refrigerator | Controller | Compressor | Memory body |
Operate timing | X | Construction detection project 111 | X |
Operating frequency | X | Construction detection project 111a | X |
Acceleration | X | Project PAc to be detected | X |
Deceleration | X | Project PAd to be detected | X |
Test voltage | Project PAe to be detected | X | Project PAf to be detected |
Test electric current | Project PAg to be detected | X | Project PAh to be detected |
Three > of < table
Wherein, it executes the step and executes step S104 after S103 that project to be detected is included in one is clear to construction detection project
It is single, a newly-increased detection project is built up according to the project to be detected in construction detection project inventory, and by newly-increased detection project
Whole detection program is combined into construction detection project.Specifically, the project Pac to be detected that above-mentioned residue does not meet to
In detection project PAh, above-mentioned project Pac to be detected to project PAh to be detected can be included in one and examined to construction by comparison module 13
It surveys project list (as shown in Table 4), foundation should be to the project Pac to be detected in construction detection project inventory to project to be detected
PAh builds up newly-increased detection project Pb to Pg, and this newly-increased detection project Pb to Pg needs programming personnel to write,
And after the completion of writing, comparison module is integral in conjunction with construction detection project 111,111a by newly-increased detection project Pb to Pg
It detects program (as shown in Table 5), wherein whole detection program refers to newly-increased detection project Pb to Pg and construction detection project
111, the combined program out of 111a, rather than a other program, are chatted bright hereby.
To construction detection project inventory |
Project PAc to be detected |
Project PAd to be detected |
Project PAe to be detected |
Project PAf to be detected |
Project PAg to be detected |
Project PAh to be detected |
Four > of < table
Intelligent refrigerator | Controller | Compressor | Memory body |
Operate timing | X | Construction detection project 111 | X |
Operating frequency | X | Construction detection project 111a | X |
Acceleration | X | Newly-increased detection project Pb | X |
Deceleration | X | Newly-increased detection project Pc | X |
Test voltage | Newly-increased detection project Pd | X | Newly-increased detection project Pe |
Test electric current | Newly-increased detection project Pf | X | Newly-increased detection project Pg |
Five > of < table
Step S105 is executed after executing the step S104 to store newly-increased detection project to database, and it is another to use generation
Construction detection project, specifically, after programming personnel complete the writing of newly-increased detection project Pb to Pg, comparison module
13 can directly store newly-increased detection project Pb to Pg into database 11, and then be stored as another construction detection project, also
I.e. table increases above-mentioned newly-increased detection project Pb to Pg newly again for a moment, so that generating whole detection provided by present pre-ferred embodiments
The system 1 of program has the function of study, as long as therefore next time when carrying out similar detection again, can be not required to write newly-increased inspection again
Survey project Pb to Pg and can directly continue to use.
In addition, directly skip step S103 when the judging result of step S102 is no and execute step S104, Yi Ji
This at least one construction detection project 111, do not deposit in 111a any one and project PAa to be detected to project PAh to be detected that
When this coincide, the movement of step S104 is directly executed, remaining is identical as above-mentioned step S104, repeats no more.
In addition, in the other embodiments of the judgment method of step S102, this at least one construction detection project 111,
111a is to be corresponding with one first identification code, this first identification code may be, for example, program code, project PAa to be detected to item to be detected
Mesh PAh has respectively corresponded one second identification code, and the second identification code for example can also be program code, therefore, in step s 102,
Comparison module 13 be compared out according to the first identification code and the second identification code this at least one construction detection project 111,111a with
Whether at least one project PAa to be detected to project PAh to be detected matches, this specific alignments is can to confirm the first identification
Whether code is identical as the second identification code, but not limited to this.
In summary, after the method and system of generation whole detection program, due to being to parse test system
Multiple functional modules, and then detection project can be marked off according to functional module and testing requirements, according to project to be detected and
Construction detection project is compared, and if being consistent, can directly replace and continue to use, and reresents programming personnel volume if not being consistent
This subprogram is write, therefore programming personnel do not need to spend a lot of time again and integrally rewrite, and also have study
Function, and then promoted and use upper convenience.
Certainly, the invention may also have other embodiments, without deviating from the spirit and substance of the present invention, ripe
It knows those skilled in the art and makes various corresponding changes and modifications, but these corresponding changes and change in accordance with the present invention
Shape all should fall within the scope of protection of the appended claims of the present invention.
Claims (10)
1. a kind of method for generating whole detection program, using at least one prestored in a database construction detection project,
One whole detection program is generated to an at least test system, which includes an at least functional module, which is characterized in that packet
Containing following steps:
(a) device information of the test system is parsed into at least testing requirements corresponding to each functional module, use according to
A detection program comparison table is established according to an at least functional module and an at least testing requirements, uses and utilizes the detection program pair
At least one project to be detected included in the whole detection program is showed according to table, wherein each project to be detected is corresponding
In at least an one of functional module and at least one of the testing requirements;
(b) by least one project to be detected in the detection program comparison table one by one with this at least one construction detection project into
Row compare, use compare out this at least one construction detection project whether coincide each other with the project to be detected;And
(c) compare out this at least one coincide each other in construction detection project there are one and the project to be detected when, will be with
The project to be detected coincide this construction detection project replaces the project to be detected, and project column to be detected that will be misfitted
Enter one to construction detection project inventory, increases inspection newly according to one should be built up to the project to be detected in construction detection project inventory
Survey project, and by this increase newly detection project and this construction detection project has been combined into the whole detection program.
2. the method according to claim 1 for generating whole detection program, which is characterized in that executed after the step (c)
One step (d) increases this newly detection project and stores to the database, uses and generates another construction detection project.
3. the method according to claim 1 for generating whole detection program, which is characterized in that at least one construction detection
Project is corresponding with one first identification code, which is corresponding with one second identification code, in the step (b), than
Whether match to first identification code with second identification code.
4. the method according to claim 1 for generating whole detection program, which is characterized in that the test system is a horse
It reaches, one of a cold air, a servomechanism, a refrigerator and a washing machine.
5. the method according to claim 1 for generating whole detection program, which is characterized in that at least a testing requirements are for this
At least one of one operating frequency, an operating timing, a test voltage, a test electric current, an acceleration and a deceleration.
6. a kind of system for generating whole detection program should be to generate a whole detection program to an at least test system
Surveying device includes an at least functional module, which is characterized in that the system of the generation whole detection program includes:
One database prestores at least one construction detection project;
One parsing module is electrically connected at the database, corresponds to respectively to parse a device information of the test system
An at least testing requirements for functional module, use according to an at least functional module and this at least a testing requirements establish a detection
Program comparison table, uses that show included in the whole detection program at least one using the detection program comparison table to be detected
Project, which is characterized in that each project to be detected corresponds at least an one of functional module and at least one detection
One of it is required that;And
One comparison module is electrically connected at the parsing module, to by this in the detection program comparison table, at least one is to be detected
Project one by one with this at least one construction detection project be compared, at least one existed in construction detection project comparing out this
When one and the project to be detected are coincide each other, by coincide with the project to be detected this construction detection project has replaced this to be checked
Survey project, and the project to be detected misfitted is included in one to construction detection project inventory, foundation should be to construction detection project
The project to be detected in inventory builds up a newly-increased detection project, and increases this newly detection project and the construction detection project
It is combined into the whole detection program.
7. the system according to claim 6 for generating whole detection program, which is characterized in that the comparison module is electrically connected
In the database, to increase this newly detection project and store to the database, use production after building up the newly-increased detection project
Raw another construction detection project.
8. the system according to claim 6 for generating whole detection program, which is characterized in that at least one construction detection
Project is corresponding with one first identification code, which is corresponding with one second identification code, and comparison module foundation should
First identification code and second identification code compare out this at least one construction detection project and at least one project to be detected whether
It matches.
9. the system according to claim 6 for generating whole detection program, which is characterized in that the test system is a horse
It reaches, one of a cold air, a servomechanism, a refrigerator and a washing machine.
10. the system according to claim 6 for generating whole detection program, which is characterized in that an at least testing requirements
For at least one in an operating frequency, an operating timing, a test voltage, a test electric current, an acceleration and a deceleration
Person.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510309050.2A CN106293676B (en) | 2015-06-08 | 2015-06-08 | Generate the method and system of whole detection program |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510309050.2A CN106293676B (en) | 2015-06-08 | 2015-06-08 | Generate the method and system of whole detection program |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106293676A CN106293676A (en) | 2017-01-04 |
CN106293676B true CN106293676B (en) | 2019-05-10 |
Family
ID=57659962
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510309050.2A Active CN106293676B (en) | 2015-06-08 | 2015-06-08 | Generate the method and system of whole detection program |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106293676B (en) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007179488A (en) * | 2005-12-28 | 2007-07-12 | Fujitsu Ltd | Program for predicting source code problem |
TW200901030A (en) * | 2007-06-22 | 2009-01-01 | Benq Corp | Portable multimedia playing device capable of operating a command according to information provided by a GPS system and related method |
CN102322943A (en) * | 2011-06-13 | 2012-01-18 | 河北省电力公司超高压输变电分公司 | Detection system and method for sound abnormality of power equipment |
CN102636704A (en) * | 2012-03-05 | 2012-08-15 | 深圳市英威腾电气股份有限公司 | Testing method, device and system for electronic product |
TW201333722A (en) * | 2012-02-03 | 2013-08-16 | Chunghwa Telecom Co Ltd | Mechanism and method for mass diversified data screening and management |
CN104198972A (en) * | 2014-09-05 | 2014-12-10 | 国家电网公司 | Concentrator for automated test of assembly line field calibration |
CN104483587A (en) * | 2014-12-05 | 2015-04-01 | 深圳市创荣发电子有限公司 | Control product batch testing method |
CN104515956A (en) * | 2013-09-27 | 2015-04-15 | 国家电网公司 | Method and device for detecting intelligent ammeter power module |
-
2015
- 2015-06-08 CN CN201510309050.2A patent/CN106293676B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007179488A (en) * | 2005-12-28 | 2007-07-12 | Fujitsu Ltd | Program for predicting source code problem |
TW200901030A (en) * | 2007-06-22 | 2009-01-01 | Benq Corp | Portable multimedia playing device capable of operating a command according to information provided by a GPS system and related method |
CN102322943A (en) * | 2011-06-13 | 2012-01-18 | 河北省电力公司超高压输变电分公司 | Detection system and method for sound abnormality of power equipment |
TW201333722A (en) * | 2012-02-03 | 2013-08-16 | Chunghwa Telecom Co Ltd | Mechanism and method for mass diversified data screening and management |
CN102636704A (en) * | 2012-03-05 | 2012-08-15 | 深圳市英威腾电气股份有限公司 | Testing method, device and system for electronic product |
CN104515956A (en) * | 2013-09-27 | 2015-04-15 | 国家电网公司 | Method and device for detecting intelligent ammeter power module |
CN104198972A (en) * | 2014-09-05 | 2014-12-10 | 国家电网公司 | Concentrator for automated test of assembly line field calibration |
CN104483587A (en) * | 2014-12-05 | 2015-04-01 | 深圳市创荣发电子有限公司 | Control product batch testing method |
Also Published As
Publication number | Publication date |
---|---|
CN106293676A (en) | 2017-01-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104700962B (en) | Method for manufacturing wirning harness | |
US20190236844A1 (en) | Augmented reality system | |
CN105205038B (en) | Complete material inventory table generating method and device | |
CN112948427B (en) | Data query method, device, equipment and storage medium | |
CN105517676A (en) | Whole-machine testing method and device of smart bracelets, and mobile terminal | |
US9916331B2 (en) | Method and device for automatically processing static test data of rail transit vehicle | |
CN109978565B (en) | Product packaging data management method and device, terminal equipment and readable storage medium | |
CN105491140A (en) | Remote testing method and system for terminal | |
CN103199041A (en) | Management system of wafer acceptable test procedure and application method thereof | |
CN105302413A (en) | UI test method and system for control | |
CN102646080A (en) | System and method for configuring USB (universal serial bus) equipment in virtual environment | |
CN107908442A (en) | Resource loading method, device, terminal device and computer-readable recording medium based on spring | |
US20180254661A1 (en) | Information output apparatus, and information output method | |
CN106293676B (en) | Generate the method and system of whole detection program | |
CN104483964A (en) | Automatic testing method, device and system | |
JP2021177402A (en) | Information processor, information processing method, and computer program | |
US10885577B2 (en) | System and method for retail space management | |
CN107491316A (en) | Extended method, device and the electronic equipment of baseboard management controller | |
CN103593429A (en) | Commodity template failure detection method and device | |
CN117631821A (en) | Digital twinning of physical environments for augmented reality applications | |
TWI537571B (en) | Overall detection program generation method and system thereof | |
CN110874365A (en) | Information query method and related equipment thereof | |
CN113705752B (en) | Ink screen layer rack label system and bookshelf | |
CN105786690A (en) | Test method and system by using generated test embodiment steps | |
CN115220740A (en) | Database environment deployment method and device, electronic equipment and storage medium |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |