CN106285691A - The method for tunnel construction that a kind of shield formula multi-arm development machine combines with New Austrian Tunneling Method - Google Patents

The method for tunnel construction that a kind of shield formula multi-arm development machine combines with New Austrian Tunneling Method Download PDF

Info

Publication number
CN106285691A
CN106285691A CN201610646165.5A CN201610646165A CN106285691A CN 106285691 A CN106285691 A CN 106285691A CN 201610646165 A CN201610646165 A CN 201610646165A CN 106285691 A CN106285691 A CN 106285691A
Authority
CN
China
Prior art keywords
shield
quarrel
construction
arch
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610646165.5A
Other languages
Chinese (zh)
Other versions
CN106285691B (en
Inventor
李建斌
王全胜
于少辉
肖威
焦磊
李建伟
李洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Engineering Equipment Group Co Ltd CREG
Original Assignee
China Railway Engineering Equipment Group Co Ltd CREG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Engineering Equipment Group Co Ltd CREG filed Critical China Railway Engineering Equipment Group Co Ltd CREG
Priority to CN201610646165.5A priority Critical patent/CN106285691B/en
Publication of CN106285691A publication Critical patent/CN106285691A/en
Application granted granted Critical
Publication of CN106285691B publication Critical patent/CN106285691B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • E21D9/0607Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining the shield being provided with devices for lining the tunnel, e.g. shuttering
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/12Devices for removing or hauling away excavated material or spoil; Working or loading platforms

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Environmental & Geological Engineering (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The present invention provides the method for tunnel construction that a kind of shield formula multi-arm development machine combines with New Austrian Tunneling Method, carries out in the following manner: step one, tunnel excavation;Step 2, muck removal;Step 3, preliminary bracing;Step 4, change step operation: use walking supporting construction to control the overall movement of equipment and tuning;Step 5, inverted arch and secondary lining: use corollary equipment to carry out inverted arch, geotextiles, splash guard laying, reinforcing bar binding and two lining constructions.Instant invention overcomes tradition drill bursting construction operation many, complicated organization, the duration is longer, and out break amount is big, the shortcoming of poor stability, achieve shield formula multi-arm development machine to combine with New Austrian Tunneling Method, there is fast, efficient, safe reliable, the advantage such as construction quality is good.

Description

The method for tunnel construction that a kind of shield formula multi-arm development machine combines with New Austrian Tunneling Method
Technical field
The present invention relates to constructing tunnel field, be specifically related to the tunnel that a kind of shield formula multi-arm development machine combines with New Austrian Tunneling Method Pipeline construction method.
Background technology
Due to special quality, construction period, tradition construction of explosion method is difficult in adapt to engineering construction needs, and tunnel digging Enter machine construction method have fast, efficient, safe reliable, construction quality is good, low cost and other advantages, becomes long tunnel first The key technology and equipment of choosing.Compared with traditional tunnel piercing technology, shield formula multi-arm development machine can realize tunneling continuously, can be same Time complete brokenly the operations such as rock muck removal and supporting, there is higher drivage efficiency, the 3 of the generally conventional drilling and blasting method of its driving speed ~ 10 times;Additionally, tunneler construction also has cavitation quality high, economical, safe and environment-friendly and saves the advantages such as labour force.
Shield formula tunneler can be prevented effectively from tunnel vault and cave in, prominent mud retention of excessive fluid, just props up the thing such as unstability, malformation Therefore generation, work progress is safe and reliable, and development machine excavation surface is substantially smooth simultaneously, it is to avoid stress raisers, reduces The disturbance of tunnel perimeter surrouding rock stress, saves its globality from damage.Shield formula tunneler achieve driving, muck removal, preliminary bracing, Cavitation work progress such as inverted arch pours, secondary lining.
New Austrian Tunneling Method is that application rock mass mechanics is theoretical, with safeguard and utilize the self-bearing ability of country rock as basic point, use anchor pole and Gunite concrete is main supporting means, carries out supporting timely, controls the deformation of country rock and relaxes, making country rock become prop The ingredient of system, and by instructing constructing tunnel and underground engineering design to construct the measurement of country rock and supporting, monitoring Method and principle.
If shield formula tunneler can be combined with the method for tunnel construction of New Austrian Tunneling Method, big tunnel will be had There is important meaning.
Summary of the invention
The present invention provides the method for tunnel construction that a kind of shield formula multi-arm development machine combines with New Austrian Tunneling Method, overcomes tradition Drill bursting construction operation is many, complicated organization, and the duration is longer, and out break amount is big, the shortcoming of poor stability.
The technical scheme is that and be achieved in that: tunnel that a kind of shield formula multi-arm development machine combines with New Austrian Tunneling Method Construction method, is carried out in the following manner:
Step one, tunnel excavation: configure three development machines, wherein two, bottom, excavate bottom charge tunnel, hold together quarrel, top one Portion, charge tunnel top is excavated;Three development machines cooperate, it is achieved full face tunneling or two bench excavations;
Step 2, muck removal: scraper chain, ballast collecting bucket, dial quarrel device, pull out quarrel mechanical hand, swelling device, drive system constitution equipment muck removal System, uses scraper chain and ballast collecting bucket collection quarrel, by pulling over to scraping on slag plate of the soil that is cut in collection quarrel device, pulls out quarrel mechanical hand for assisting Receive quarrel, collection quarrel, use continuous conveyor system or mine car to be transported to outside hole afterwards;
Step 3, preliminary bracing: shield formula multi-arm development machine arranges shield and median septum, and wherein shield includes pushing up shield, side is protected Shield, face is divided into two by median septum, plays the effect of stable face, and median septum is additionally operable to collect the first half simultaneously It is cut, is cut clearly;Use the steel arch-shelf erector after being arranged on shield to carry out the supporting of vertical arch, store in steel arch and store a fixed number on platform The steel arch-shelf of amount, makes driving, the synchronization of vertical arch carry out, and steel arch-shelf is lifted by steel arch tightening mechanism, stretching to setting position, by steel arch Bolt is tight, installs lock foot anchoring stock, completes steel arch and installs;Bar-mat reinforcement uses artificial linked network;Muscle row install, and reinforcing bar is arranged one end and inserted top Portion's shield, the other end is connected in steel arch;Employing can rotate and the shotcrete robot that moves axially by hoop, is directly sprayed by concrete It is mapped to shield rear portion, it is achieved immediate support;
Step 4, change step operation: use walking supporting construction to control the overall movement of equipment and tuning;
Step 5, inverted arch and secondary lining: use corollary equipment to carry out inverted arch, geotextiles, splash guard laying, reinforcing bar binding and two Lining construction.
The present invention is carried out according to following order: uses development machine to realize tunnel excavation → collection quarrel device and coordinates belt feeder to go out Quarrel → use steel arch-shelf fitting machine and shotcrete robot immediate support → inverted arch pouring construction → geotextiles, splash guard to lay → bis- Secondary lining cutting.
Instant invention overcomes tradition drill bursting construction operation many, complicated organization, the duration is longer, and out break amount is big, peace The shortcoming of full property difference, it is achieved that shield formula multi-arm development machine combines with New Austrian Tunneling Method, has fast, efficient, safe reliable, construction The advantages such as quality is good.
Accompanying drawing explanation
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing In having technology to describe, the required accompanying drawing used is briefly described, it should be apparent that, the accompanying drawing in describing below is only this Some embodiments of invention, for those of ordinary skill in the art, on the premise of not paying creative work, it is also possible to Other accompanying drawing is obtained according to these accompanying drawings.
Fig. 1 is shield formula multi-arm tunneler profilograph of the present invention
Fig. 2 is shield formula multi-arm tunneler cross-sectional view of the present invention
In figure: 1. development machine, 2. top shield, 3. side shield, 4. collection quarrel device, 5. continuous conveyor system, 6. mine car, 7. steel Bow member erector, 8. steel arch stores platform, 9. shotcrete robot, and 10. walking supports.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Describe, it is clear that described embodiment is only a part of embodiment of the present invention rather than whole embodiments wholely.Based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under not paying creative work premise Embodiment, broadly falls into the scope of protection of the invention.
The method for tunnel construction that a kind of shield formula multi-arm development machine combines with New Austrian Tunneling Method, is to carry out in the following manner :
Step one, tunnel excavation: configure three development machines 1, wherein two, bottom, excavate bottom charge tunnel, hold together quarrel, top one Portion, charge tunnel top is excavated;Three development machines 1 cooperate, it is achieved full face tunneling or two bench excavations;
Step 2, muck removal: scraper chain, ballast collecting bucket, dial quarrel device, pull out quarrel mechanical hand, swelling device, drive system constitution equipment muck removal System, uses scraper chain and ballast collecting bucket collection quarrel, quickly pulls over quarrel soil in collection quarrel device 4 to scraping on slag plate, pulls out quarrel mechanical hand and use Receive quarrel, collection quarrel in auxiliary, use continuous conveyor system 5 or mine car 6 to be transported to outside hole afterwards;
Step 3, preliminary bracing: shield formula multi-arm development machine arranges shield and median septum, and wherein shield includes pushing up shield 2, side is protected Shield 3, face is divided into two by median septum, plays the effect of stable face, and median septum is additionally operable to carry out the first half simultaneously Collection is cut, is cut clearly;Use the steel arch-shelf erector 7 after being arranged on shield to carry out the supporting of vertical arch, store in steel arch and on platform 8, store one The steel arch-shelf of determined number, makes driving, the synchronization of vertical arch carry out, and steel arch-shelf is lifted by steel arch tightening mechanism, stretching to setting position, will Steel arch bolt is tight, installs lock foot anchoring stock, completes steel arch and installs;Bar-mat reinforcement uses artificial linked network;Muscle row install, and reinforcing bar is arranged one end and inserted Entering top shield, the other end is connected in steel arch;Employing can rotate and the shotcrete robot 9 that moves axially by hoop, directly will mix Solidifying soil is ejected into shield rear portion, it is achieved immediate support;
Step 4, change step operation: use walking supporting construction to control the overall movement of equipment and tuning;
Step 5, inverted arch and secondary lining: use corollary equipment to carry out inverted arch, geotextiles, splash guard laying, reinforcing bar binding and two Lining construction.
The present invention is carried out according to following order: uses development machine to realize tunnel excavation → collection quarrel device and coordinates belt feeder to go out Quarrel → use steel arch-shelf fitting machine and shotcrete robot immediate support → inverted arch pouring construction → geotextiles, splash guard paving If → secondary lining.The present invention uses three development machines to cooperate, it is achieved full face tunneling or two bench excavations;Collection quarrel device In conjunction with belt feeder muck removal, it is achieved excavation, muck removal synchronize;Use steel arch-shelf fitting machine, shotcrete robot carry out in time steel arch-shelf and Concrete preliminary bracing, constructs in conjunction with inverted arch fast pouring, utilizes corollary equipment to closely follow laying geotextiles, splash guard, colligation steel Muscle, cast two lining lining cutting;Use walking supporting construction to control heading equipment to move, it is achieved Fully-mechanized constructing tunnel, improve Efficiency of construction and safety.
As illustrated in fig. 1 and 2, the operating procedure in the specific embodiment of the invention is as follows:
1, tunnel excavation muck removal
Shield formula multi-arm development machine three development machines 1 of configuration, two, bottom, cover tunnel bottom excavation, hold together quarrel, one, top, Covering tunnel top excavates;Three development machines 1 cooperate, it is achieved full face tunneling or two bench excavations.Arrange top shield 2, Side shield 3 is to protect development machine, staff.Scraper chain and collection quarrel device 4 is utilized to carry out collection quarrel, by quarrel soil in collection quarrel device 4 quickly Pull over to scraping on slag plate, pull out quarrel mechanical hand for assisting receipts quarrel, collection quarrel, use continuous conveyor system 5 or mine car 6 to be transported to afterwards Outside hole.
2, preliminary bracing
Steel arch-shelf erector 7 after the shield 2 of use top carries out the supporting of vertical arch, stores 8 storages on platform in steel arch a number of Steel arch-shelf, can reduce steel arch transport number of times, makes driving, the synchronization of vertical arch carry out, and steel arch tightening mechanism is by steel arch-shelf lifting, stretching extremely Setting position, workman, by tight for steel arch bolt, installs lock foot anchoring stock, completes steel arch and installs;Use manually installed bar-mat reinforcement, steel is installed Insertion top, one end shield during muscle row, the other end is connected in steel arch;Use the shotcrete robot that hoop rotates and moves axially 9, by concrete ejection to shield rear portion, it is achieved immediate support.
3, step operation is changed
Walking is utilized to support the overall movement of 10 control development machines and tuning.
4, inverted arch and secondary lining
Utilize inverted arch formwork for placing and inverted arch trestle, it is achieved inverted arch synchronous construction.Corollary equipment is used to carry out geotextiles, splash guard Lay, reinforcing bar binding and two serves as a contrast construction.
The key points for operation of the present invention are as follows:
1, use three development machines, scraper chain and belt feeder to cooperate, it is achieved full section of tunnel or two bench excavations, hold together quarrel and Muck removal synchronizes.
2, carry out supporting after digging excavation in time, close country rock, make the disturbing influence of country rock control in minimum zone, and Reinforce country rock, improve Surrounding Rock Strength, the self-bearing capacity of protection tunnel surrounding.
3, allow country rock by a certain amount of deformation, be beneficial to play the inherent strength of country rock, the supporting construction in tunnel simultaneously, Also should have predetermined contracted amount, to relax tunnel pressure.
4, construction carries out preliminary bracing in time so that it is with country rock tight bond, shared pressure from surrounding rock.
The present invention compared with prior art has the following advantages
1, the construction under the conditions of being difficult to spending hole and construction period relatively tight, work under bad environment etc. of the profound tunnel can be solved difficult Topic.
2, speed of application is fast, and environmental effect is little, and operation benefits is obvious.
3, mechanization degree is high, and construction risk is little.
The foregoing is only presently preferred embodiments of the present invention, not in order to limit the present invention, all essences in the present invention Within god and principle, any modification, equivalent substitution and improvement etc. made, should be included within the scope of the present invention.

Claims (2)

1. the method for tunnel construction that a shield formula multi-arm development machine combines with New Austrian Tunneling Method, it is characterised in that be according to following side Formula is carried out:
Step one, tunnel excavation: configure three development machines (1), wherein two, bottom, excavate bottom charge tunnel, hold together quarrel, top One, charge tunnel top is excavated;Three development machines (1) cooperate, it is achieved full face tunneling or two bench excavations;
Step 2, muck removal: scraper chain, ballast collecting bucket, dial quarrel device, pull out quarrel mechanical hand, swelling device, drive system constitution equipment muck removal System, uses scraper chain and ballast collecting bucket collection quarrel, will the pulling over to scraping on slag plate of quarrel soil in collection quarrel device (4), pull out quarrel mechanical hand for Auxiliary receives quarrel, collection quarrel, uses continuous conveyor system (5) or mine car (6) to be transported to outside hole afterwards;
Step 3, preliminary bracing: shield formula multi-arm development machine arranges shield and median septum, and wherein shield includes pushing up shield (2), side Shield (3), face is divided into two by median septum, plays the effect of stable face, and median septum is additionally operable to the first half simultaneously Carry out collection quarrel, be cut clearly;Use the steel arch-shelf erector (7) after being arranged on shield to carry out the supporting of vertical arch, store platform (8) in steel arch The a number of steel arch-shelf of upper storage, makes driving, the synchronization of vertical arch carry out, and steel arch-shelf is lifted by steel arch tightening mechanism, stretching is to setting Location is put, and by tight for steel arch bolt, installs lock foot anchoring stock, completes steel arch and installs;Bar-mat reinforcement uses artificial linked network;Muscle row install, steel Muscle arranges insertion top, one end shield, and the other end is connected in steel arch;Employing can rotate and the shotcrete robot that moves axially by hoop (9), directly by concrete ejection to shield rear portion, it is achieved immediate support;
Step 4, change step operation: use walking supporting construction to control the overall movement of equipment and tuning;
Step 5, inverted arch and secondary lining: use corollary equipment to carry out inverted arch, geotextiles, splash guard laying, reinforcing bar binding and two Lining construction.
2. the method for tunnel construction that shield formula multi-arm development machine as claimed in claim 1 combines with New Austrian Tunneling Method, it is special Levy and be that and carry out according to following order: use development machine to realize tunnel excavation → collection quarrel device cooperation belt feeder muck removal → use Steel arch-shelf fitting machine and shotcrete robot immediate support → inverted arch pouring construction → geotextiles, splash guard laying → secondary lining.
CN201610646165.5A 2016-08-05 2016-08-05 A kind of method for tunnel construction that shield formula multi-arm development machine is combined with New Austrian Tunneling Method Active CN106285691B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610646165.5A CN106285691B (en) 2016-08-05 2016-08-05 A kind of method for tunnel construction that shield formula multi-arm development machine is combined with New Austrian Tunneling Method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610646165.5A CN106285691B (en) 2016-08-05 2016-08-05 A kind of method for tunnel construction that shield formula multi-arm development machine is combined with New Austrian Tunneling Method

Publications (2)

Publication Number Publication Date
CN106285691A true CN106285691A (en) 2017-01-04
CN106285691B CN106285691B (en) 2018-08-03

Family

ID=57666942

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610646165.5A Active CN106285691B (en) 2016-08-05 2016-08-05 A kind of method for tunnel construction that shield formula multi-arm development machine is combined with New Austrian Tunneling Method

Country Status (1)

Country Link
CN (1) CN106285691B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110145315A (en) * 2019-05-13 2019-08-20 中铁十六局集团第四工程有限公司 A kind of driving method weakening city shallow tunnel concussion of blasting
CN110424990A (en) * 2019-07-11 2019-11-08 华北科技学院 A kind of driving poured support construction equipment and method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007092412A (en) * 2005-09-29 2007-04-12 Shimizu Corp Recovery method for shield machine, and shield machine using the same
JP2011246977A (en) * 2010-05-27 2011-12-08 Kajima Corp Starting method of tunnel boring machine and starting mechanism of tunnel boring machine
CN103557013A (en) * 2013-11-06 2014-02-05 王静 Annular steel structure supporting construction method with open type TBM (tunnel boring machine)
CN103711504A (en) * 2013-12-18 2014-04-09 西南交通大学 Propelling method for combined portion between shield tunnel segment and mine tunnel segment in subway tunnel

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007092412A (en) * 2005-09-29 2007-04-12 Shimizu Corp Recovery method for shield machine, and shield machine using the same
JP2011246977A (en) * 2010-05-27 2011-12-08 Kajima Corp Starting method of tunnel boring machine and starting mechanism of tunnel boring machine
CN103557013A (en) * 2013-11-06 2014-02-05 王静 Annular steel structure supporting construction method with open type TBM (tunnel boring machine)
CN103711504A (en) * 2013-12-18 2014-04-09 西南交通大学 Propelling method for combined portion between shield tunnel segment and mine tunnel segment in subway tunnel

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110145315A (en) * 2019-05-13 2019-08-20 中铁十六局集团第四工程有限公司 A kind of driving method weakening city shallow tunnel concussion of blasting
CN110424990A (en) * 2019-07-11 2019-11-08 华北科技学院 A kind of driving poured support construction equipment and method

Also Published As

Publication number Publication date
CN106285691B (en) 2018-08-03

Similar Documents

Publication Publication Date Title
CN108533272A (en) A kind of minimum clear-distance tunnel goes out cavity construction method
CN103306687B (en) Soft rock tunnel long cantilever horizontal jet grouting Deformation control construction method
JP4958035B2 (en) Shield roof construction method
CN106884665B (en) A kind of Double Multi-Arch start tunneling method based on arch set arch
CN202707075U (en) Long-span subway station main structure constructed based on column and arch method
CN101864960A (en) Carst region double-arch road tunnel construction method
CN207377565U (en) Constructing metro tunnel structure containing complicated geological and without shield launching place
CN102606168B (en) Construction method for preventing settlement and deformation of shallow-buried-excavation tunnel in excavation
CN108005660A (en) A kind of Optimization of Expressway Tunnel Construction method
CN107023300A (en) A kind of use canopy, which is defended the doctrine, builds the construction method of subway station
CN102587920A (en) Tunnel entrance bias section construction method
CN102748040A (en) Main structure for metro long-span station and pillar arching construction method thereof
CN109026026A (en) Under wear existing piping lane the multi-thread more arcading bored tunnel groups of big cross section construction method
CN110043269A (en) A kind of excavation construction process of freeway tunnel barrel
CN102400694A (en) Reinforcement method for combined part of shield tunnel and mining-method tunnel
WO2000032906A1 (en) Sardine-bone construction method for large-section tunnel
KR101536209B1 (en) Steel Pipe Multi Step Grouting device Open and cut and NATM complex excavation tunnel construction method
CN107420104A (en) The horizontal prebored hole static blasting excavation construction method of shallow tunnel super-large diameter
CN109209443A (en) A kind of construction method of breaking surrounding rock tunnel structure
CN107165641B (en) High inclination-angle ladder way opposite direction excavating construction method in thin layer breaking up hard rock stratum
CN112177635A (en) Construction method of step multiple advanced small guide pipe and construction method of overlapped tunnel
CN101302933A (en) Method for developing rock lane comprehensive mechanization developing operation
CN106285691B (en) A kind of method for tunnel construction that shield formula multi-arm development machine is combined with New Austrian Tunneling Method
CN109339800A (en) A kind of Rapid Construction of Tunnels method in the connected section of bridge tunnel
CN113931637A (en) Shallow-buried water-rich softer rock tunnel construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant