CN106284094A CN201610828283.8A CN201610828283A CN106284094A CN 106284094 A CN106284094 A CN 106284094A CN 201610828283 A CN201610828283 A CN 201610828283A CN 106284094 A CN106284094 A CN 106284094A
Authority
CN
China
Prior art keywords
plate
fastener inserts
buried
assembly
tripod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610828283.8A
Other languages
Chinese (zh)
Inventor
马建会
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 21st Bureau Group Co Ltd
Original Assignee
China Railway 21st Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 21st Bureau Group Co Ltd filed Critical China Railway 21st Bureau Group Co Ltd
Priority to CN201610828283.8A priority Critical patent/CN106284094A/en
Publication of CN106284094A publication Critical patent/CN106284094A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

A kind of bridge construction concrete adhesion type prestressed girder support, the present invention relates to technical field of bridge construction;One end of four identical upper fastener inserts is embedded in the top of two concrete pier bases the most in advance, one end of four identical lower fastener inserts is embedded in the bottom of two concrete pier bases the most in advance, the tripod assembly upper one end that the other end of four identical upper fastener inserts utilizes pin identical with four respectively is connected, the tripod assembly lower end that the other end of four identical lower fastener inserts is identical with four respectively is connected, the lower end of four ends of two identical lower boom assemblies and four identical tripod assemblies connects, four ends of two identical vertical connecting assemblies and four identical tripod assembly top other ends connect.Overcome linear deformation under support outer load effect and produce to bridge pier, the active force of platform, it is ensured that bridge pier, abutment safety, after saving pre-pressing bracket, secondary adjusts the operation of height simultaneously.

Description

A kind of bridge construction concrete adhesion type prestressed girder support
Technical field
The present invention relates to technical field of bridge construction, be specifically related to a kind of bridge construction concrete adhesion type prestressed girder Support.
Background technology
At present, China railways, highway and urban traffic engineering are greatly developed, and bridge structure is traffic engineering primary structure Thing.In bridge, cast-in-situ concrete beam, bent cap and binder are essential engineering projects.Complete this project concrete to water Building construction bracket is a requisite subitem equally.Possesses support rational in infrastructure, that economy, form are simple, easily operated It is to ensure that construction quality, increases benefit, the key problem in technology of reduction of erection time.Existing support mainly has steel pipe full hall support, framed bent to face Time pier beam type support, it is big generally to there is material usage in them, and original ground processes complexity, secondary adjusting pole difficulty, labor after precompressed The defects such as power puts into many, long in time limit, quality assurance difference.If meeting high pier, and need across petroleum pipeline, water supply and sewerage pipeline, The situations such as heat supply pipeline, national defence optical cable, river, ground and existing highway, railway, drawback more manifests.
Summary of the invention
Present invention aims to defect and the deficiency of prior art, it is provided that a kind of simple in construction, reasonable in design, make With convenient bridge construction concrete adhesion type prestressed girder support, linear deformation under support outer load effect is overcome to produce Raw to bridge pier, the active force of platform, it is ensured that bridge pier, abutment safety, after saving pre-pressing bracket, secondary adjusts the operation of height simultaneously.
For achieving the above object, the technical solution used in the present invention is: it comprises two concrete pier bases;It also comprises four Individual identical upper fastener inserts, four identical lower fastener inserts, four identical tripod assemblies, two identical lower booms Assembly and two identical vertical connecting assemblies;One end of four identical upper fastener inserts is embedded in two concrete piers the most in advance The top of platform, one end of four identical lower fastener inserts is embedded in the bottom of two concrete pier bases the most in advance, and four identical The tripod assembly upper one end that the other end of upper fastener inserts utilizes pin identical with four respectively is connected, under four identical The tripod assembly lower end that the other end of fastener inserts is identical with four respectively is connected, four ends of two identical lower boom assemblies The lower end of the tripod assembly identical with four is connected, four ends of two identical vertical connecting assemblies and four identical triangles The frame assembly top other end connects;The lower end of four described identical tripod assemblies and four identical lower fastener inserts The other end is slidably connected;Described tripod assembly, vertical connecting assembly constitute a unit system with lower boom assembly;Described Upper fastener inserts include two blocks of upper pre-buried side plates;The one end side of upper pre-buried side plate is welded with removable pin orifice plate, and two pieces upper pre- Burying and be welded with pre-buried dividing plate on polylith between side plate, one end of removable pin orifice plate is provided with elliptical aperture;Described lower fastener inserts bag Include pre-buried side plate under two pieces;The upper weld of pre-buried side plate pre-buried top board, welding between pre-buried side plate under two pieces under having under two pieces Pre-buried dividing plate under having;Described tripod assembly includes horizon bar, middle brace, limit brace, limiting plate, horizontal fagging, vertically supports Plate and backing plate;One end of horizon bar is provided with horizon bar arrangement connecting hole, and its other end is provided with horizon bar connecting hole;In described tiltedly The upper end of bar and limit brace is all welded in the bottom of horizon bar, and middle brace is all welded on backing plate with the lower end of limit brace;Two pieces The first half of limiting plate is welded on the lower end side of middle brace and limit brace;Described horizontal fagging and vertical fagging level respectively To be vertically welded on the outside of limiting plate, vertical fagging is provided with fagging hole;Described vertical connecting assembly includes two pressures Bar, the two ends of depression bar are welded with clamping plate, and clamping plate are provided with clamping plate connecting hole, are welded with polylith batten plate between two depression bars;Described Lower boom assembly include two chord members, anchor bolt and anchor plate;The two ends of described chord member are provided with anchor plate, the two ends of chord member It is connected with anchor bolt thread after anchor plate.
Further, described horizon bar is made up of two shape steel plates and several connecting plates, welds between two shape steel plates It is connected to polylith connecting plate;Described middle brace, limit brace are identical with the structure of horizon bar.
Further, the spelling prescription method of described unit system is as follows: arrange with horizon bar through clamping plate connecting hole with bolt Row connecting hole, is connected fixing to vertical connecting assembly and tripod assembly, and the two ends of two chord members are through the support of tripod assembly After plate hole, then threadeding with anchor plate and anchor bolt, the i.e. two ends of chord member utilize anchor plate and anchor to be bolted to vertically On fagging.
The construction process of the present invention is as follows: pre-buried side plate under the upper pre-buried side plate of upper fastener inserts and lower fastener inserts In the Transducers Embedded in Concrete pier the most in advance of one end;After pin passes the elliptical aperture in removable pin orifice plate and horizon bar connecting hole, will be single Unit's system is fixing with upper fastener inserts to be connected;The backing plate of tripod assembly is with pre-buried top board slidingtype under lower fastener inserts even Connect, i.e. in lower fastener inserts under the end face coating butter of pre-buried top board, then the backing plate in tripod assembly is placed on down Under in fastener inserts on pre-buried Roof yellowish complexion oil reservoir, by the bottom of the limiting plate in tripod assembly under pre-buried group The both sides of pre-buried side plate be provided with gap under part;It is provided with gap between limiting plate and pier concrete.
After using said structure, present invention have the beneficial effect that
1, overcome linear deformation under support outer load effect and produce to bridge pier, the active force of platform, it is ensured that bridge pier, bridge Platform safety;
2, in an installation through in lower boom assembly high tensile reinforcement make chord member carry out stretch-draw make structure create arch become Shape thus meet the camber that design requires, eliminate secondary after pre-pressing bracket and adjust the operation of height;
3, population structure is the girder system being made up of triangular unit, makes rod member stress simple, understands, given full play to each rod member The performance of material.
Accompanying drawing explanation
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing In having technology to describe, the required accompanying drawing used is briefly described, it should be apparent that, the accompanying drawing in describing below is only this Some embodiments of invention, for those of ordinary skill in the art, on the premise of not paying creative work, also may be used To obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is overall structure front view of the present invention;
Fig. 2 is Fig. 1's-Sectional view;
Fig. 3 is the top view of Fig. 1;
Fig. 4 is the front view of lower fastener inserts;
Fig. 5 is the side view of Fig. 4;
Fig. 6 is the top view of Fig. 4;
Fig. 7 is the front view of upper fastener inserts;
Fig. 8 is the side view of Fig. 7 figure;
Fig. 9 is the top view of Fig. 7;
Figure 10 is the front view of tripod assembly;
Figure 11 is the side view of Figure 10;
Figure 12 is Figure 10 top view;
Figure 13 is longitudinally connected bar component drawings front view;
Figure 14 is the side view of Figure 13;
Figure 15 is the top view of Figure 13;
Figure 16 is lower boom component drawings front view;
Figure 17 is the side view of Figure 16;
Figure 18 is the top view of Figure 16;
Figure 19 is the front view of unit system;
Figure 20 is the side view of Figure 19;
Figure 21 is the top view of Figure 19.
In figure: fastener inserts on 1, pre-buried side plate on 101,102 removable pin orifice plates, pre-buried dividing plate on 103, 104 elliptical apertures, 2 times fastener inserts, 201 times pre-buried side plates, 202 times pre-buried top boards, 203 times pre-buried dividing plates, 3 Tripod assembly, 301 horizon bars, brace in 302,303 limit braces, 304 limiting plates, 305 horizontal faggings, 306 vertical faggings, 307 connecting plates, 308 backing plates, 309 shape steel plates, 310 horizon bar arrangement connecting hole, 311 water Flat lever attachment hole, 312 fagging holes, 4 lower boom assemblies, 401 chord members, 402 anchor bolts, 403 anchor plates, 5 indulge Mono-to connecting assembly, 501 depression bars, 502 clamping plate, 503 batten plates, 504 clamping plate connecting holes, 6 concrete pier bases, A Unit's system.
Detailed description of the invention
The present invention is further illustrated below in conjunction with the accompanying drawings.
Referring to as shown in Fig. 1-Figure 21, this detailed description of the invention the technical scheme is that it comprises two concrete piers Platform 6;It also comprises four identical 2, four identical tripod assemblies of lower fastener inserts of identical upper fastener inserts 1, four 3, the vertical connecting assembly 5 that two identical lower boom assemblies 4 are identical with two;One end of four identical upper fastener inserts 1 Being embedded in the top of two concrete pier bases 6 the most in advance, one end of four identical lower fastener inserts 2 is embedded in two coagulations the most in advance The bottom of knoll platform 6, the other end of four identical upper fastener inserts 1 utilizes the tripod assembly that pin is identical with four respectively 3 upper one end connect, and tripod assembly 3 lower end that the other end of four identical lower fastener inserts 2 is identical with four respectively connects Connecing, the lower end of four ends of two identical lower boom assemblies 4 and four identical tripod assemblies 3 connects, two identical indulging The tripod assembly 3 top other end identical to four ends and four that connect assembly 5 connects;Four described identical tripods The other end of the lower fastener inserts 2 that the lower end of assembly 3 is identical with four is slidably connected;Described tripod assembly 3, longitudinally connected Assembly 5 and lower boom assembly 4 constitute a unit system A;Described upper fastener inserts 1 includes two blocks of upper pre-buried side plates 101;On The one end side of pre-buried side plate is welded with removable pin orifice plate 102, be welded with between two blocks of upper pre-buried side plates 101 on polylith pre-buried every Plate 103, one end of removable pin orifice plate 102 is provided with elliptical aperture 104;Described upper pre-buried side plate 101, upper pre-buried removable orifice plate 102 It is made by steel plate with upper pre-buried dividing plate 103;Described lower fastener inserts 2 includes pre-buried side plate 201 under two pieces;Under two pieces The upper weld of pre-buried side plate 201 is pre-buried top board 202 under having, and is welded with down pre-buried dividing plate under two pieces between pre-buried side plate 201 203;Pre-buried side plate 201 under described, under pre-buried top board 202 with under pre-buried dividing plate 203 be made by steel plate;Described three Corner bracket assembly 3 includes horizon bar 301, middle brace 302, limit brace 303, limiting plate 304, horizontal fagging 305, vertical fagging 306 With backing plate 308;One end of horizon bar 301 is provided with horizon bar arrangement connecting hole 310, and its other end is provided with horizon bar connecting hole 311; Described middle brace 302 and the upper end of limit brace 303 are all welded in the bottom of horizon bar 301, middle brace 302 and limit brace 303 Lower end be all welded on backing plate 308;The first half of two pieces of limiting plates 304 is welded on the lower end of middle brace 302 and limit brace 303 Side;Described horizontal fagging 305 and vertical fagging 306 level respectively to and be vertically welded on the outside of limiting plate 304, vertically Fagging 306 is provided with fagging hole 312;Described limiting plate 304, horizontal fagging 305, vertical fagging 306, connecting plate 307 and pad Plate 308 is made by steel plate;Described vertical connecting assembly 5 includes two depression bars 501, and the two ends of depression bar 501 are welded with Clamping plate 502, clamping plate 502 are provided with clamping plate connecting hole 504, are welded with polylith batten plate 503 between two depression bars 501;Described pressure Bar 501 is formed by section steel manufacture;Described clamping plate 502 are made by steel plate with batten plate 503;Described lower boom assembly 4 Including two chord members 401, anchor bolt 402 and anchor plate 403;The two ends of described chord member 401 are provided with anchor plate 403, chord member 401 Two ends through threadeding with anchor bolt 402 after anchor plate 403;Described chord member 401 is by factory's standard fining twisted steel system Make;Described anchor plate 403 is made by steel plate.
Further, described horizon bar 301, middle brace 302 are identical with the structure of limit brace 303, (with horizon bar 301 As a example by) described in horizon bar 301 be made up of two shape steel plates 309 and several connecting plates 307, weld between two shape steel plates 309 It is connected to polylith connecting plate 307.
Further, the spelling prescription method of described unit system A is as follows: with bolt through clamping plate connecting hole 504 and level Bar arrangement connecting hole 310, is connected fixing with tripod assembly 3 for vertical connecting assembly 5, and the two ends of two chord members 401 pass three Behind the fagging hole 312 of corner bracket assembly, then the two ends of threadeding with anchor plate 403 and anchor bolt 402, i.e. chord member 401 utilize Anchor plate 403 and anchor bolt 402 are connected on vertical fagging 306.
The construction process of this detailed description of the invention is as follows: the upper pre-buried side plate 101 of upper fastener inserts 1 and lower fastener inserts 2 Under pre-buried side plate 201 one end Transducers Embedded in Concrete pier 6 the most in advance in;Pin is through the elliptical aperture in removable pin orifice plate 102 104 and horizon bar connecting hole 311 after, be connected fixing with upper fastener inserts 1 for unit system A;The backing plate 308 of tripod assembly 3 Be connected with 2 times pre-buried top board 202 slidingtypes of lower fastener inserts, i.e. in lower fastener inserts 2 under the end face of pre-buried top board 202 Coating butter, more pre-buried top board 202 end face butter under the backing plate 308 in tripod assembly 3 is placed in lower fastener inserts 2 On layer, by the bottom of the limiting plate 304 in tripod assembly 3 in the both sides of 2 times pre-buried side plates 201 of lower fastener inserts also It is provided with gap;It is provided with gap between limiting plate 304 and pier concrete 6.
After using said structure, it is longitudinal that this detailed description of the invention has the beneficial effect that it overcomes under support outer load effect Deformation and produce to bridge pier, the active force of platform, it is ensured that bridge pier, abutment safety, save secondary after pre-pressing bracket simultaneously and adjust height The operation of degree.
Embodiment:
The present invention is applied in bent cap concreting support at Zhun Chi railway Shenchi County, Shanxi south grand bridge five;Pier shaft is high Being 35~40m, bent cap length 25~30m, bent cap sectional dimension is that 3.2 × 3m, concrete and additional load weigh 780 tons, uses altogether 5 Pin adhesion type prestressed girder supports, Shan, capital gas piping crossed over by this bent cap.
The above, only in order to technical scheme to be described and unrestricted, those of ordinary skill in the art are to this Other amendment or equivalent that bright technical scheme is made, without departing from the spirit and scope of technical solution of the present invention, All should contain in the middle of scope of the presently claimed invention.

Claims (4)

1. a bridge construction concrete adhesion type prestressed girder support, it is characterised in that: it comprises two concrete pier bases; It also comprises four identical upper fastener inserts, four identical lower fastener inserts, four identical tripod assemblies, two phases With lower boom assembly and two identical vertical connecting assemblies;One end of four identical upper fastener inserts is embedded in two the most in advance The top of individual concrete pier base, one end of four identical lower fastener inserts is embedded in the bottom of two concrete pier bases the most in advance, The tripod assembly upper one end that the other end of four identical upper fastener inserts utilizes pin identical with four respectively is connected, and four The tripod assembly lower end that the other end of individual identical lower fastener inserts is identical with four respectively is connected, two identical lower booms The lower end of four ends of assembly and four identical tripod assemblies connects, four ends of two identical vertical connecting assemblies and four The identical tripod assembly top other end connects;Under the lower end of four described identical tripod assemblies is identical with four The other end of fastener inserts is slidably connected;Described tripod assembly, vertical connecting assembly constitute a list with lower boom assembly Unit's system;Described upper fastener inserts includes two blocks of upper pre-buried side plates;The one end side of upper pre-buried side plate is welded with movable pin-and-hole Plate, is welded with pre-buried dividing plate on polylith between two blocks of upper pre-buried side plates, and one end of removable pin orifice plate is provided with elliptical aperture;Under described Fastener inserts includes pre-buried side plate under two pieces;The upper weld of pre-buried side plate pre-buried top board, pre-buried side under two pieces under having under two pieces Pre-buried dividing plate it is welded with down between plate;Described tripod assembly includes horizon bar, middle brace, limit brace, limiting plate, horizontal brace Plate, vertical fagging and backing plate;One end of horizon bar is provided with horizon bar arrangement connecting hole, and its other end is provided with horizon bar connecting hole; The upper end of described middle brace and limit brace is all welded in the bottom of horizon bar, and middle brace is all welded in pad with the lower end of limit brace On plate;The first half of two pieces of limiting plates is welded on the lower end side of middle brace and limit brace;Described horizontal fagging and vertical support Plate level respectively to be vertically welded on the outside of limiting plate, vertical fagging is provided with fagging hole;Described vertical connecting assembly Including two depression bars, the two ends of depression bar are welded with clamping plate, and clamping plate are provided with clamping plate connecting hole, are welded with polylith between two depression bars Batten plate;Described lower boom assembly includes two chord members, anchor bolt and anchor plate;The two ends of described chord member are provided with anchor plate, The two ends of chord member are connected with anchor bolt thread after anchor plate.
A kind of bridge construction concrete adhesion type prestressed girder support the most according to claim 1, it is characterised in that: institute The horizon bar stated is made up of two shape steel plates and several connecting plates, is welded with polylith connecting plate between two shape steel plates;Described Middle brace, limit brace identical with the structure of horizon bar.
A kind of bridge construction concrete adhesion type prestressed girder support the most according to claim 1, it is characterised in that: institute The spelling prescription method of the unit system stated is as follows: arrange connecting hole through clamping plate connecting hole with horizon bar with bolt, by longitudinally connected Assembly and tripod assembly are fixing to be connected, the two ends of two chord members through behind the fagging hole of tripod assembly, then with anchor plate and Anchor bolt threaded, the i.e. two ends of chord member utilize anchor plate and anchor to be bolted on vertical fagging.
A kind of bridge construction concrete adhesion type prestressed girder support the most according to claim 1, it is characterised in that: it Construction process as follows: under the upper pre-buried side plate of upper fastener inserts and lower fastener inserts, one end of pre-buried side plate is imbedded the most in advance In concrete pier base;After pin passes the elliptical aperture in removable pin orifice plate and horizon bar connecting hole, unit system is pre-buried with upper Assembly is fixing to be connected;The backing plate of tripod assembly is connected with pre-buried top board slidingtype under lower fastener inserts, i.e. under pre-buried group The end face coating butter of pre-buried top board under in part, then the backing plate in tripod assembly is placed in lower fastener inserts lower pre- Bury on Roof yellowish complexion oil reservoir, by the bottom of the limiting plate in tripod assembly pre-buried side plate under lower fastener inserts Both sides are also provided with gap;It is provided with gap between limiting plate and pier concrete.
CN201610828283.8A 2016-09-18 2016-09-18 A kind of bridge construction concrete adhesion type prestressed girder support Pending CN106284094A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610828283.8A CN106284094A (en) 2016-09-18 2016-09-18 A kind of bridge construction concrete adhesion type prestressed girder support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610828283.8A CN106284094A (en) 2016-09-18 2016-09-18 A kind of bridge construction concrete adhesion type prestressed girder support

Publications (1)

Publication Number Publication Date
CN106284094A true CN106284094A (en) 2017-01-04

Family

ID=57712473

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610828283.8A Pending CN106284094A (en) 2016-09-18 2016-09-18 A kind of bridge construction concrete adhesion type prestressed girder support

Country Status (1)

Country Link
CN (1) CN106284094A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108643047A (en) * 2018-05-18 2018-10-12 中铁十六局集团第四工程有限公司 A kind of lower support built-in fitting of large bridge bracket

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11158812A (en) * 1997-12-01 1999-06-15 Dps Bridge Works Co Ltd Hollow floor slab bridge and construction thereof
CN101353912A (en) * 2008-08-28 2009-01-28 温州建设集团公司 Construction method of structure conversion layer concrete girder steel bracket formwork support
CN201648977U (en) * 2010-04-28 2010-11-24 中铁三局集团有限公司 Slant legged rigid frame bracket system of cast-in-place prestressed concrete continuous beam at bridge site
CN103628416A (en) * 2013-12-18 2014-03-12 中铁大桥局股份有限公司 Stiffening girder counter-straining near-pier bracket of suspension bridge
CN204475179U (en) * 2014-11-25 2015-07-15 中铁二十一局集团有限公司 Bridge construction Cast-in-situ Beam, bent cap, binder concrete attaching prestressed girder support
CN105648911A (en) * 2014-11-25 2016-06-08 中铁二十局集团有限公司 Concrete attached type prestress truss support for cast-in-place beam, cover beam and straining beam in bridge construction

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11158812A (en) * 1997-12-01 1999-06-15 Dps Bridge Works Co Ltd Hollow floor slab bridge and construction thereof
CN101353912A (en) * 2008-08-28 2009-01-28 温州建设集团公司 Construction method of structure conversion layer concrete girder steel bracket formwork support
CN201648977U (en) * 2010-04-28 2010-11-24 中铁三局集团有限公司 Slant legged rigid frame bracket system of cast-in-place prestressed concrete continuous beam at bridge site
CN103628416A (en) * 2013-12-18 2014-03-12 中铁大桥局股份有限公司 Stiffening girder counter-straining near-pier bracket of suspension bridge
CN204475179U (en) * 2014-11-25 2015-07-15 中铁二十一局集团有限公司 Bridge construction Cast-in-situ Beam, bent cap, binder concrete attaching prestressed girder support
CN105648911A (en) * 2014-11-25 2016-06-08 中铁二十局集团有限公司 Concrete attached type prestress truss support for cast-in-place beam, cover beam and straining beam in bridge construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108643047A (en) * 2018-05-18 2018-10-12 中铁十六局集团第四工程有限公司 A kind of lower support built-in fitting of large bridge bracket

Similar Documents

Publication Publication Date Title
US11105084B1 (en) Dry connection prefabricated assembly steel-concrete composite beam
CN203393848U (en) Connection node structure of reinforced concrete column and steel I-beam
CN105839510A (en) Steel-ultra-high-performance concrete combined continuous beam bridge structure and construction method thereof
CN107386435A (en) The assembled of prestressed node connection can recover function steel frame support system
CN105780989B (en) A kind of twin beams building cover structure
CN105421210A (en) Rapid assembling type steel box-precast concrete plank bridge structure and construction method thereof
CN113653235A (en) Laminated slab, connecting structure of laminated slab and combination beam and construction method
CN102926504A (en) Connecting steel construction member for steel and concrete overlapped beam combined part and construction method thereof
CN201133085Y (en) Structure for enhancing external prestressing force effect
CN111749364B (en) Assembled composite wall based on C-shaped steel and construction method thereof
CN107794833B (en) Side girder of superposed girder segment and assembling method thereof
CN212895944U (en) Cross-line skew cast-in-place construction device based on main beam being Bailey beam
CN204475179U (en) Bridge construction Cast-in-situ Beam, bent cap, binder concrete attaching prestressed girder support
CN103205930B (en) Structure for continuous transformation of existing simply supported hollow slab girder bridge and construction method of structure
CN211396201U (en) Connection structure of embedded steel beam and prefabricated composite floor slab
CN106284094A (en) A kind of bridge construction concrete adhesion type prestressed girder support
CN105648911B (en) Bridge construction Cast-in-situ Beam, bent cap, binder concrete adhesion type prestressed girder support
CN202099879U (en) Box type steel pedestal supporting base with shear key
CN113700153A (en) Connecting structure of assembled laminated slab and combination beam and construction method thereof
CN205474785U (en) Steel - ultra high performance concrete combination continuous bridge structure
CN210049373U (en) Assembly type I-steel composite floor slab mounting structure
CN211340374U (en) Novel steel-concrete composite beam shear force connecting key
CN110318557B (en) Prestressed concrete hollow slab reinforcing device and method
CN112962427A (en) Off-standard span cast-in-place beam support across valley and construction method
CN210507799U (en) Connector of semi-prefabricated section steel concrete column-section steel concrete beam node unit and section steel concrete beam

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170104