CN106276603A - Lifting device and using method thereof for cooling tower Construction of Steel Structure - Google Patents

Lifting device and using method thereof for cooling tower Construction of Steel Structure Download PDF

Info

Publication number
CN106276603A
CN106276603A CN201610760282.4A CN201610760282A CN106276603A CN 106276603 A CN106276603 A CN 106276603A CN 201610760282 A CN201610760282 A CN 201610760282A CN 106276603 A CN106276603 A CN 106276603A
Authority
CN
China
Prior art keywords
cooling tower
steel structure
lifting device
support
bracket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610760282.4A
Other languages
Chinese (zh)
Other versions
CN106276603B (en
Inventor
常华
刘明路
何月峰
王军
唐启旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Original Assignee
Shanghai Ershiye Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Ershiye Construction Co Ltd filed Critical Shanghai Ershiye Construction Co Ltd
Priority to CN201610760282.4A priority Critical patent/CN106276603B/en
Publication of CN106276603A publication Critical patent/CN106276603A/en
Application granted granted Critical
Publication of CN106276603B publication Critical patent/CN106276603B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/04Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
    • B66C13/08Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for depositing loads in desired attitudes or positions
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/12Slings comprising chains, wires, ropes, or bands; Nets
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C17/00Overhead travelling cranes comprising one or more substantially horizontal girders the ends of which are directly supported by wheels or rollers running on tracks carried by spaced supports
    • B66C17/06Overhead travelling cranes comprising one or more substantially horizontal girders the ends of which are directly supported by wheels or rollers running on tracks carried by spaced supports specially adapted for particular purposes, e.g. in foundries, forges; combined with auxiliary apparatus serving particular purposes

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Jib Cranes (AREA)

Abstract

The present invention relates to steel structure cooling tower construction field, a kind of lifting device for cooling tower Construction of Steel Structure, it is characterized in that: it includes substrate, rail brackets, lifting device and bracket;Described guide rail is laid on substrate, support is arranged on guide rail and can be along guide rail toward polyslip, lifting device is arranged on support, described lifting device includes the lifter being arranged on support and the connection wirerope being connected respectively with lifter and bracket, the steel structure module of cooling tower is placed on bracket and is promoted by lifter after ground is set up and carries out follow-up lifting operation.By this lifting device, the steel structure module of cooling tower can assemble on ground, can realize the integral hoisting operation of cooling tower steel structure module afterwards by arranging multiple lifting devices.So, comparing the method that tradition cooling tower steel construction needs to assemble the most respectively, be respectively mounted, this lifting device has the advantage that installation accuracy is high, construction quality is good and working security is high.

Description

Lifting device and using method thereof for cooling tower Construction of Steel Structure
Technical field
The present invention relates to steel structure cooling tower construction field, a kind of lifting for cooling tower Construction of Steel Structure fills Put and using method.
Background technology
Steel construction has the advantage that deadweight is light, anti-seismic performance is good, speed of application is fast, therefore is applied on cooling tower by steel construction Construction cost can be saved and realize the purpose of environmental protection operation.The installation at high altitude construction method of tradition side carries out steel structure cooling tower and executes In man-hour, there is problem big by Wind effects, that splicing accuracy is poor, construction cost is high, security risk is high;Simultaneously because cooling tower Diameter is continually changing along short transverse, and traditional lifting device is not suitable for steel structure cooling tower lifting construction yet.
Summary of the invention
It is an object of the invention to, it is provided that one make cooling tower steel structure module at installation on ground the most in place, thus It is easy to the device directly carrying out installing in high-altitude.
In order to achieve the above object, the present invention is achieved in that
A kind of lifting device for cooling tower Construction of Steel Structure, it includes substrate, guide rail, support, lifting device and bracket;Institute Stating guide rail to be laid on substrate, support is arranged on guide rail and can be along guide rail toward polyslip, and lifting device is arranged on support, institute State lifting device and include the lifter being arranged on support and the connection wirerope being connected with lifter and bracket respectively, by cooling tower Steel structure module be placed on bracket and promoted by lifter and carry out follow-up lifting operation after ground is set up.
The described lifting device for cooling tower Construction of Steel Structure, support is tower structure, it include two parallel Bottom girder, diagonal brace, column and the back timber arranged, described two foundation beams are symmetricly set on guide rail, are provided above column at bottom girder, Between two root posts, back timber is set, diagonal brace is set between column top and bottom girder, thus constitutes the support of tower structure.
The described lifting device for cooling tower Construction of Steel Structure, bracket include the truss girder that is connected with connection cable with And the bearing beam being arranged on truss girder, the inside bottom of cooling tower steel structure module is welded with temporary support bracket, cold during operation But the steel structure module of tower is arranged on bearing beam by the temporary support bracket of bottom and carries out promoting operation.
The using method of described lifting device, including
Step 1, along place, the cooling tower center of circle circumferentially disposed substrate of axis and on substrate lay track, arrange in orbit and originally carry Rise device;
Step 2, carry out the assembly of cooling tower steel structure module in ground design position, and weld in steel structure module inside bottom Temporary support bracket;
Step 3, move this lifting device along track, make the bearing beam of lifting device be positioned at the temporary support cattle of cooling tower assembling module The underface of lower limb;
Step 4, by lifter, assembled good cooling tower steel structure module is carried out Integral synchronous and promote operation;
Step 5, in the bottom of hoisting module assembled next layer of cooling tower prefabricated unit, equally in steel structure assembling module Side bottom welding temporary support bracket;
Step 6, lifter unload, and now lower floor's prefabricated unit is just as the support of upper strata prefabricated unit, excises upper strata The temporary support bracket of cooling tower steel structure module;
Step 7, along track traversing carriage, make the bearing beam of support just be positioned at the bottom temporary support bracket of cooling tower layer to be hoisted Lower section, carries out overall lifting operation to assembled good cooling tower steel structure module;
Step 8, repetition step 5 step 7, until whole cooling tower construction completes.
By this lifting device, the steel structure module of cooling tower can assemble on ground, multiple by arranging afterwards This lifting device can realize the integral hoisting operation of cooling tower steel structure module.So, compare tradition cooling tower steel construction to need The method to assemble the most respectively, being respectively mounted, this lifting device has that installation accuracy is high, construction quality is good and peace of constructing The advantage of Quan Xinggao.
Accompanying drawing explanation
Fig. 1 is the structural representation of single lifting device in the present invention.
Fig. 2 is the schematic diagram that in the present invention, the complete cooling tower steel structure module of assembling is promoted by lifting device.
Fig. 3 is the construction method of the present invention, is i.e. promoted cooling tower steel construction Integral synchronous also by multiple lifting devices Carry out executing the schematic diagram of installation.
Detailed description of the invention
The present invention is further illustrated below by way of specific embodiment.
As it is shown in figure 1, a kind of lifting device for cooling tower Construction of Steel Structure, it include substrate 8, guide rail 9, support, Lifting device and bracket;Described guide rail 9 is laid on the substrate 8, and support arranges on the rail 9 and can carry along guide rail 9 toward polyslip Rise device to be arranged on support, described lifting device include the lifter 1 that is arranged on support and respectively with lifter 1 and bracket The connection wirerope 2 connected, is placed on the steel structure module of cooling tower on bracket and by lifter 1 after ground is set up Promote and carry out follow-up lifting operation.
The described lifting device for cooling tower Construction of Steel Structure, support is tower structure, it include two parallel Bottom girder 6, diagonal brace 7, column 5 and the back timber 4 arranged, described two foundation beams 5 are symmetrical arranged on the rail 9, are provided above at bottom girder 6 Column 5, arranges back timber 4 between two root posts 5, arranges diagonal brace 7, thus constitute frame-type between column 5 top and bottom girder 6 The support of structure.
The described lifting device for cooling tower Construction of Steel Structure, bracket includes the truss girder 3 being connected with connection cable 2 And the bearing beam 10 being arranged on truss girder 3, the inside bottom of cooling tower steel structure module is welded with temporary support bracket, operation Time cooling tower steel structure module be arranged on bearing beam by the temporary support bracket of bottom carry out promote operation.
As shown in Figure 2 and Figure 3, the using method of described lifting device, including
Step 1, along place, the cooling tower center of circle circumferentially disposed substrate of axis 8 and on the substrate 8 lay track 9, on track 9 arrange This lifting device;
Step 2, carry out the assembly of cooling tower steel structure module in ground design position, and weld in steel structure module inside bottom Temporary support bracket;
Step 3, move this lifting device along track 9, make the bearing beam 10 of lifting device be positioned at interim of cooling tower assembling module The underface of support bracket;
Step 4, by lifter 1, assembled good cooling tower steel structure module is carried out Integral synchronous and promote operation;
Step 5, in the bottom of hoisting module assembled next layer of cooling tower prefabricated unit, equally in steel structure assembling module Side bottom welding temporary support bracket;
Step 6, lifter 1 unload, and now lower floor's prefabricated unit is just as the support of upper strata prefabricated unit, excises upper strata The temporary support bracket of cooling tower steel structure module;
Step 7, along track 9 traversing carriage, make the bearing beam 10 of support be positioned at the bottom temporary support bracket of cooling tower layer to be hoisted Underface, carry out assembled good cooling tower steel structure module overall promoting operation;
Step 8, repetition step 5 step 7, until whole cooling tower construction completes.
By this lifting device, the steel structure module of cooling tower can assemble on ground, multiple by arranging afterwards This lifting device can realize the integral hoisting operation of cooling tower steel structure module.So, compare tradition cooling tower steel construction to need The method to assemble the most respectively, being respectively mounted, this lifting device has that installation accuracy is high, construction quality is good and peace of constructing The advantage of Quan Xinggao.

Claims (4)

1. for a lifting device for cooling tower Construction of Steel Structure, it is characterized in that: it includes substrate, guide rail, support, lifting dress Put and bracket;Described guide rail is laid on substrate, and support is arranged on guide rail and can arrange toward polyslip, lifting device along guide rail On support, described lifting device includes the lifter being arranged on support and the connection steel being connected respectively with lifter and bracket Cable, is placed on bracket by the steel structure module of cooling tower and is promoted by lifter after ground is set up and carry out follow-up Lifting operation.
Lifting device for cooling tower Construction of Steel Structure the most according to claim 1, is characterized in that: support is frame-type Structure, it includes that two bottom girders be arrangeding in parallel, diagonal brace, column and back timber, described two foundation beams are symmetricly set on guide rail, Bottom girder is provided above column, arranges back timber between two root posts, arranges diagonal brace, thus constitute between column top and bottom girder The support of tower structure.
Lifting device for cooling tower Construction of Steel Structure the most according to claim 1, is characterized in that: bracket includes and connects Connecing the truss girder that hawser connects and the bearing beam being arranged on truss girder, the inside bottom of cooling tower steel structure module is welded with faces Time support bracket, during operation, the steel structure module of cooling tower is arranged on bearing beam by the temporary support bracket of bottom and promotes Operation.
4. the using method of lifting device described in claim 1, is characterized in that: include
Step 1, along place, the cooling tower center of circle circumferentially disposed substrate of axis and on substrate lay track, arrange in orbit and originally carry Rise device;
Step 2, carry out the assembly of cooling tower steel structure module in ground design position, and weld in steel structure module inside bottom Temporary support bracket;
Step 3, move this lifting device along track, make the bearing beam of lifting device be positioned at the temporary support cattle of cooling tower assembling module The underface of lower limb;
Step 4, by lifter, assembled good cooling tower steel structure module is carried out Integral synchronous and promote operation;
Step 5, in the bottom of hoisting module assembled next layer of cooling tower prefabricated unit, equally in steel structure assembling module Side bottom welding temporary support bracket;
Step 6, lifter unload, and now lower floor's prefabricated unit is just as the support of upper strata prefabricated unit, excises upper strata The temporary support bracket of cooling tower steel structure module;
Step 7, along track traversing carriage, make the bearing beam of support just be positioned at the bottom temporary support bracket of cooling tower layer to be hoisted Lower section, carries out overall lifting operation to assembled good cooling tower steel structure module;
Step 8, repetition step 5 step 7, until whole cooling tower construction completes.
CN201610760282.4A 2016-08-30 2016-08-30 Lifting device and its application method for cooling tower Construction of Steel Structure Active CN106276603B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610760282.4A CN106276603B (en) 2016-08-30 2016-08-30 Lifting device and its application method for cooling tower Construction of Steel Structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610760282.4A CN106276603B (en) 2016-08-30 2016-08-30 Lifting device and its application method for cooling tower Construction of Steel Structure

Publications (2)

Publication Number Publication Date
CN106276603A true CN106276603A (en) 2017-01-04
CN106276603B CN106276603B (en) 2018-07-13

Family

ID=57674589

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610760282.4A Active CN106276603B (en) 2016-08-30 2016-08-30 Lifting device and its application method for cooling tower Construction of Steel Structure

Country Status (1)

Country Link
CN (1) CN106276603B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107697791A (en) * 2017-09-27 2018-02-16 云南建投第二安装工程公司 A kind of limited large-scale component of lifting condition pushes away certainly without anchor point hangs sliding method for carrying
CN114014158A (en) * 2021-11-05 2022-02-08 上海二十冶建设有限公司 High-altitude assembly adjustment method for super-huge modular air separation cold box

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07242390A (en) * 1994-03-04 1995-09-19 Hitachi Plant Eng & Constr Co Ltd Assembly method for indoor portal crane and device thereof
CN1243494A (en) * 1997-12-03 2000-02-02 三菱重工业株式会社 Crane
CN201301173Y (en) * 2008-10-09 2009-09-02 天津二十冶建设有限公司 Auxiliary lifting appliance for large-sized component
CN201785768U (en) * 2010-09-20 2011-04-06 山西科工龙盛科技有限公司 Cooling tower with circular top and square bottom
CN201809030U (en) * 2010-09-27 2011-04-27 中国葛洲坝集团机械船舶有限公司 Lifting appliance of double gantry cranes for lifting large-scale workpieces
CN202704868U (en) * 2012-07-16 2013-01-30 中铁十一局集团有限公司 Integrated lifting transportation device for ballastless track construction
CN203845712U (en) * 2014-05-12 2014-09-24 浙江省火电建设公司 Heavy-duty equipment hoisting device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07242390A (en) * 1994-03-04 1995-09-19 Hitachi Plant Eng & Constr Co Ltd Assembly method for indoor portal crane and device thereof
CN1243494A (en) * 1997-12-03 2000-02-02 三菱重工业株式会社 Crane
CN201301173Y (en) * 2008-10-09 2009-09-02 天津二十冶建设有限公司 Auxiliary lifting appliance for large-sized component
CN201785768U (en) * 2010-09-20 2011-04-06 山西科工龙盛科技有限公司 Cooling tower with circular top and square bottom
CN201809030U (en) * 2010-09-27 2011-04-27 中国葛洲坝集团机械船舶有限公司 Lifting appliance of double gantry cranes for lifting large-scale workpieces
CN202704868U (en) * 2012-07-16 2013-01-30 中铁十一局集团有限公司 Integrated lifting transportation device for ballastless track construction
CN203845712U (en) * 2014-05-12 2014-09-24 浙江省火电建设公司 Heavy-duty equipment hoisting device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107697791A (en) * 2017-09-27 2018-02-16 云南建投第二安装工程公司 A kind of limited large-scale component of lifting condition pushes away certainly without anchor point hangs sliding method for carrying
CN107697791B (en) * 2017-09-27 2019-04-19 云南建投第二安装工程公司 A kind of limited large-scale component of lifting condition hangs sliding method for carrying from pushing away without anchor point
CN114014158A (en) * 2021-11-05 2022-02-08 上海二十冶建设有限公司 High-altitude assembly adjustment method for super-huge modular air separation cold box
CN114014158B (en) * 2021-11-05 2024-05-10 上海二十冶建设有限公司 High-altitude group adjusting method of oversized modularized air separation cooling box

Also Published As

Publication number Publication date
CN106276603B (en) 2018-07-13

Similar Documents

Publication Publication Date Title
CN104234200B (en) A kind of suspen-shell structure rope leverage is by ring lifting installation method
CN113235948B (en) Spatial vertical rotation construction method for steel structure roof of large-scale venue
CN202248941U (en) Integral lifting, positioning and mounting device for large-scale steel members
CN105970819A (en) Installation construction method for steel anchor beams
CN105442839A (en) Erecting method of cantilever structure formwork bent
US20170121998A1 (en) Wind turbine assembly system and associated method
CN109138454A (en) A kind of installation method of super high-rise building outline border bandy truss
CN106276603A (en) Lifting device and using method thereof for cooling tower Construction of Steel Structure
EP2563994B1 (en) Method for assembling a wind turbine tower on an erection foundation and a device
CN204629405U (en) Navigational lighting aid tower fragile stem jacking system
CN106544959A (en) The construction method of the lifting sections of the king-tower containing saddle and bridge main tower saddle
CN104775363A (en) Assembling method of upper tower column reinforcing steel bar segment
CN112523090A (en) Initial internode installation mode of steel truss girder cable-stayed bridge
JP6736226B2 (en) Structure and construction method of the structure constructed on the tower-shaped building
CN113404199B (en) Installation method of umbrella-shaped roof structure
EP3326959B1 (en) Lifting arrangement for a mast, a mast divided into elements, and methods for assembling, dismantling and servicing of a mast
CN202745356U (en) Hydraulic climb material platform
CN209873587U (en) Simply supported steel truss four-point supporting and pushing system
CN203008390U (en) Roof truss installation device
CN102660924A (en) Construction method for steel-column combined support and steel-column combined support frame
CN106835984A (en) The reverse construction method of installation of slug matching bridge Bridge Erector
KR101041540B1 (en) Temporary construction frame system for the automation of building projects
CN208122345U (en) High-rise connected buildings high building lateral displacement control device
CN205452514U (en) Adopt novel installation to maintain shortwave antenna system of platform
CN206187889U (en) But push -and -pull translation of main equipment turns to construction system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190730

Address after: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Co-patentee after: China Twenty Metallurgical Group Co., Ltd.

Patentee after: Shanghai twenty Metallurgical Construction Co., Ltd.

Address before: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Patentee before: Shanghai twenty Metallurgical Construction Co., Ltd.