CN202745356U - Hydraulic climb material platform - Google Patents

Hydraulic climb material platform Download PDF

Info

Publication number
CN202745356U
CN202745356U CN 201220401910 CN201220401910U CN202745356U CN 202745356 U CN202745356 U CN 202745356U CN 201220401910 CN201220401910 CN 201220401910 CN 201220401910 U CN201220401910 U CN 201220401910U CN 202745356 U CN202745356 U CN 202745356U
Authority
CN
China
Prior art keywords
material platform
hydraulic
guide rail
adheres
jacking system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220401910
Other languages
Chinese (zh)
Inventor
韩今强
关庆裕
刘辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baoding Yu Sheng construction and installation limited company
Original Assignee
BAODING CITY YUSHENG BUILDING INSTALL Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BAODING CITY YUSHENG BUILDING INSTALL Co Ltd filed Critical BAODING CITY YUSHENG BUILDING INSTALL Co Ltd
Priority to CN 201220401910 priority Critical patent/CN202745356U/en
Application granted granted Critical
Publication of CN202745356U publication Critical patent/CN202745356U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model discloses a hydraulic climb material platform. The hydraulic climb material platform comprises a material platform, an attached beam, a hydraulic jacking system and a guiderail, wherein the hydraulic jacking system is fixedly arranged on the attached beam, the guiderail is fixedly connected with the material platform, the attached beam is fixed on a building structure by a bolt, a jacking rod is arranged on the guiderail, a groove at the top of the hydraulic jacking system is contacted with the jacking rod, and a falling preventer is hinged on the attached beam. The hydraulic climb material platform using the structure can improve the construction efficiency of a construction site, and the safety of construction workers can be increased.

Description

The hydraulic climbing material platform
Technical field
The utility model relates to a kind of high level and multistoried building platform mechanism, especially relates to a kind of hydraulic climbing material platform.
Background technology
Along with the development of society and the raising of Building technology, the mechanization degree of construction operation also improves gradually, in high level and construction of super highrise building process, material platform is indispensable building material turnover platform, tradition assembly welding platform all adopts the tower crane lifting to realize changing layer, the tower crane platform that must always play in material platform fixation procedure, until fixing complete, take the tower crane time longer; Because change layer all must fix in lifting at every turn, original material platform is the shaped steel assembly welding, need in use with the tower crane whole lifting to required floor, and with the off-load of building oblique pull, all need to lift a supreme floor with tower crane after each floor discharging is complete, take the tower crane time longer, the danger coefficient of operating worker is higher, the mechanization of building operation degree is lower, has affected efficiency of construction.
The utility model content
The purpose of this utility model provides a kind of hydraulic climbing material platform, can improve the efficiency of construction of building site, improves simultaneously construction workman's safety.
For achieving the above object, the utility model provides a kind of hydraulic climbing material platform, comprise the material platform, also comprise and adhere to beam, be fixedly mounted on the described hydraulic jacking system and the guide rail that is fixedly connected with described material platform that adheres on the beam, the described beam that adheres to is bolted in the building structure, described guide rail is provided with lifting pin, and groove and the described lifting pin at described hydraulic jacking system top contact, and described adhering to is hinged with catching device on the beam.
Preferably, the described beam that adheres to is provided with the anti-dumping guide wheel group, and it is inner that described anti-dumping guide wheel group is positioned at described guide rail.
Preferably, described material platform is fixedly connected with bearing pin by diagonal member.
Preferably, described material platform both sides respectively are provided with a described guide rail, and every described guide rail is provided with three and adheres to beam, and every described guide rail is provided with a cover hydraulic jacking system.
Preferably, described guide rail is U-bar guide rail.
Preferably, the described beam that adheres to is for adhering to girder steel.
Preferably, described guide rail adheres to beam and also connects by bumper bar with being connected.
Therefore, the utility model uses the hydraulic climbing material platform of said structure, can improve the efficiency of construction of building site, improves simultaneously construction workman's safety.
Below by drawings and Examples, the technical solution of the utility model is described in further detail.
Description of drawings
Fig. 1 is the structural representation of the utility model hydraulic climbing material platform embodiment;
Fig. 2 is the cross section structure for amplifying schematic diagram at A place among Fig. 1;
Fig. 3 is the cross section structure for amplifying schematic diagram at B place among Fig. 1;
Fig. 4 is the cross section structure for amplifying schematic diagram at C place among Fig. 1.
The specific embodiment
Embodiment
Fig. 1 is the structural representation of the utility model hydraulic climbing material platform embodiment, Fig. 2 is the cross section structure for amplifying schematic diagram at A place among Fig. 1, Fig. 3 is the cross section structure for amplifying schematic diagram at B place among Fig. 1, Fig. 4 is the cross section structure for amplifying schematic diagram at C place among Fig. 1, such as Fig. 1, Fig. 2, Fig. 3 and shown in Figure 4, comprise material platform 1, also comprise and adhere to beam 2, be fixedly mounted on the hydraulic jacking system 3 that adheres on the beam 2 and the guide rail 4 that is fixedly connected with material platform 1, adhering to beam 2 is fixed in the building structure 6 by bolt 5, guide rail 4 is provided with lifting pin 7, groove 31 and the lifting pin 7 at hydraulic jacking system 3 tops contact, and adhere to be hinged with catching device 8 on the beam 2.The present embodiment middle guide 4 is selected U-bar guide rail, adheres to beam 2 and selects and adhere to girder steel.Adhere to beam 2 and be provided with anti-dumping guide wheel group 9, anti-dumping guide wheel group 9 is positioned at guide rail 4 inside, so that guide rail 4 can only move up and down along adhering to beam 2.Material platform 1 is fixedly connected with bearing pin 11 by diagonal member 10.Material platform 1 both sides respectively are provided with a guide rail in the present embodiment, and every guide rail is provided with three and adheres to beam, and every guide rail is provided with a cover hydraulic jacking system.
When material platform 1 rises, by about 1 two elongation of cover hydraulic jacking system and the shortenings of line traffic control case control material platform, can be by the lifting pin 7 of two guide rails about groove 31 jackings at hydraulic jacking system 3 tops when hydraulic jacking system extends, thereby will overlap with guide rail 4 fixing material platform 1 jackings one together the stroke height of hydraulic jacking systems, when hydraulic jacking system 3 shortens, the lifting pin 7 of guide rail 4 can drop on and adhere on the hinged catching device 8 of beam 2, thereby whole material platform is held, be articulated structure owing to adhering to beam 2 and catching device 8, therefore thereby rotation can not stop advancing of lifting pin 7 under hydraulic jacking system 3 can the effect at top lift during with guide rail 4 jacking, and at lifting pin 7 through automatically reseting to reach later the effect that whole material platform is held.Because evenly be provided with a plurality of lifting pins on the guide rail 4, when hydraulic jacking system 3 foreshortens to the last process that repeats the most again, therefore until will expect platform 1 jacking to the needs floor, be the safety factor that further increases platform, the present embodiment middle guide 4 and be connected beam 2 and also pass through bumper bar 12 connections.With bumper bar 12 with guide rail 4 with adhere to beam 2 and connect together.
The present embodiment is by once assembling and hoisted in position, no longer taking the tower crane time in the work progress carries out the lifting of platform, only needing installation once to adhere to beam is that available hydraulic jacking system will be expected floor of platform jacking, operating worker only need stand in the building structure the inside in the jacking process, can control the jacking of material platform by control line traffic control case, the safety factor of mechanization of building operation and operating worker is all higher.Therefore, the present embodiment is improved to hydraulic lifting by tradition being expected platform by the tower crane lifting, can improve the efficiency of construction of building site, improves simultaneously construction workman's safety.
It should be noted that at last: above embodiment is only in order to the technical solution of the utility model to be described but not limit it, although with reference to preferred embodiment the utility model is had been described in detail, those of ordinary skill in the art is to be understood that: it still can be made amendment or be equal to replacement the technical solution of the utility model, and these modifications or be equal to replacement and also can not make amended technical scheme break away from the spirit and scope of technical solutions of the utility model.

Claims (7)

1. hydraulic climbing material platform, comprise the material platform, it is characterized in that: also comprise and adhere to beam, be fixedly mounted on the described hydraulic jacking system and the guide rail that is fixedly connected with described material platform that adheres on the beam, the described beam that adheres to is bolted in the building structure, described guide rail is provided with lifting pin, groove and the described lifting pin at described hydraulic jacking system top contact, and described adhering to is hinged with catching device on the beam.
2. hydraulic climbing material platform according to claim 1, it is characterized in that: the described beam that adheres to is provided with the anti-dumping guide wheel group, and it is inner that described anti-dumping guide wheel group is positioned at described guide rail.
3. hydraulic climbing material platform according to claim 2, it is characterized in that: described material platform is fixedly connected with bearing pin by diagonal member.
4. hydraulic climbing material platform according to claim 3, it is characterized in that: described material platform both sides respectively are provided with a described guide rail, and every described guide rail is provided with three and adheres to beam, and every described guide rail is provided with a cover hydraulic jacking system.
5. hydraulic climbing material platform according to claim 4, it is characterized in that: described guide rail is U-bar guide rail.
6. hydraulic climbing material platform according to claim 5, it is characterized in that: the described beam that adheres to is for adhering to girder steel.
7. hydraulic climbing material platform according to claim 6 is characterized in that: described guide rail adheres to beam and also connects by bumper bar with being connected.
CN 201220401910 2012-08-11 2012-08-11 Hydraulic climb material platform Expired - Fee Related CN202745356U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220401910 CN202745356U (en) 2012-08-11 2012-08-11 Hydraulic climb material platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220401910 CN202745356U (en) 2012-08-11 2012-08-11 Hydraulic climb material platform

Publications (1)

Publication Number Publication Date
CN202745356U true CN202745356U (en) 2013-02-20

Family

ID=47704775

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220401910 Expired - Fee Related CN202745356U (en) 2012-08-11 2012-08-11 Hydraulic climb material platform

Country Status (1)

Country Link
CN (1) CN202745356U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104060812A (en) * 2014-07-03 2014-09-24 武汉天蝎建筑装备有限公司 Conveyance type automatically climbing material platform
CN106121252A (en) * 2016-08-30 2016-11-16 中建三局第建设工程有限责任公司 A kind of hydraulic stepping turns material device and method from climbing

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104060812A (en) * 2014-07-03 2014-09-24 武汉天蝎建筑装备有限公司 Conveyance type automatically climbing material platform
CN104060812B (en) * 2014-07-03 2016-05-25 武汉天蝎建筑装备有限公司 Transport formula automatic climbing material platform
CN106121252A (en) * 2016-08-30 2016-11-16 中建三局第建设工程有限责任公司 A kind of hydraulic stepping turns material device and method from climbing
CN106121252B (en) * 2016-08-30 2018-04-27 中建三局第一建设工程有限责任公司 A kind of hydraulic stepping is from climbing material transfering device and method

Similar Documents

Publication Publication Date Title
CN203639826U (en) Steel truss girder bridge inspection vehicle
CN205772984U (en) A kind of hanging apparatus of monolithic steel truss
CN101537976A (en) Dual-tower-mast giant self-lifting crane and following-carrying lifting method thereof
CN105484502A (en) Combination installation method for steel structure roofing purlins and support bars of industrial factory building
CN204629404U (en) Gear-driven navigational lighting aid tower fragile stem jacking system
CN203255892U (en) Heightened gantry type crane
CN103967263B (en) Hydraulic automatic jumping discharging platform
CN202745356U (en) Hydraulic climb material platform
CN106567542A (en) Super high-rise double tower building steel structure corridor assembling method
CN103277112A (en) Tunnel engineering train type rapid lifting and folding working platform
CN204629405U (en) Navigational lighting aid tower fragile stem jacking system
CN204626930U (en) A kind of integrated form crane operating platform
CN203947758U (en) Novel hydraulic automatic climbing discharging platform
CN101818563B (en) Jack-up integral lifting mobile platform and using method
CN203321529U (en) Train type rapid lifting and folding work platform for tunnel engineering
CN107013044A (en) The modularization installation method of lighting roof and the lowering or hoisting gear for installing lighting roof
CN209873572U (en) Interim navigation lifting station of adjustable vertical lift height
CN111439673B (en) Building handling system
CN202729645U (en) Tower crane with elevator
CN206753087U (en) A kind of lighting roof operating platform structure
CN210856930U (en) Maintenance system of cable-stay bridge inverted Y-shaped tower column
CN112456348B (en) Heat absorber hoisting method
CN205369948U (en) Lifting device for daylighting top is used for installing
CN201722937U (en) Sliding platform for installation of net rack
CN104912339B (en) Long-distance multi-span welding H-section steel roof beam installation method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: BAODING CITY YUSHENG BUILDING INSTALLATION CO., LT

Free format text: FORMER NAME: BAODING CITY YUSHENG BUILDING INSTALLATION LTD.

CP03 Change of name, title or address

Address after: 071000, the Great Wall, Hebei, Baoding, North Main Street and North Third Ring Road intersection westbound, 200 Qiaodong Road East

Patentee after: Baoding Yu Sheng construction and installation limited company

Address before: 071000, Baoding, Hebei province the Great Wall North Street, south Chang Industrial Zone

Patentee before: BaoDing City YuSheng Building Install Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130220

Termination date: 20190811

CF01 Termination of patent right due to non-payment of annual fee