CN106251607A - Master station protocol supports the method and system of transparent task protocol extension - Google Patents

Master station protocol supports the method and system of transparent task protocol extension Download PDF

Info

Publication number
CN106251607A
CN106251607A CN201610834145.0A CN201610834145A CN106251607A CN 106251607 A CN106251607 A CN 106251607A CN 201610834145 A CN201610834145 A CN 201610834145A CN 106251607 A CN106251607 A CN 106251607A
Authority
CN
China
Prior art keywords
task
transparent
protocol
master station
transparent task
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610834145.0A
Other languages
Chinese (zh)
Other versions
CN106251607B (en
Inventor
杨金成
童光华
张科
王刚
刘卫新
高红
白银平
党仲波
张伟
李娜
杨胜东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Marketing Service Center Of State Grid Xinjiang Electric Power Co Ltd Capital Intensive Center Metering Center
State Grid Corp of China SGCC
Original Assignee
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Xinjiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Xinjiang Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201610834145.0A priority Critical patent/CN106251607B/en
Publication of CN106251607A publication Critical patent/CN106251607A/en
Application granted granted Critical
Publication of CN106251607B publication Critical patent/CN106251607B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G08SIGNALLING
    • G08CTRANSMISSION SYSTEMS FOR MEASURED VALUES, CONTROL OR SIMILAR SIGNALS
    • G08C19/00Electric signal transmission systems
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/50Network services
    • H04L67/56Provisioning of proxy services
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/50Network services
    • H04L67/56Provisioning of proxy services
    • H04L67/561Adding application-functional data or data for application control, e.g. adding metadata
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L9/00Cryptographic mechanisms or cryptographic arrangements for secret or secure communications; Network security protocols
    • H04L9/32Cryptographic mechanisms or cryptographic arrangements for secret or secure communications; Network security protocols including means for verifying the identity or authority of a user of the system or for message authentication, e.g. authorization, entity authentication, data integrity or data verification, non-repudiation, key authentication or verification of credentials
    • H04L9/3297Cryptographic mechanisms or cryptographic arrangements for secret or secure communications; Network security protocols including means for verifying the identity or authority of a user of the system or for message authentication, e.g. authorization, entity authentication, data integrity or data verification, non-repudiation, key authentication or verification of credentials involving time stamps, e.g. generation of time stamps

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Economics (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Security & Cryptography (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Water Supply & Treatment (AREA)
  • General Business, Economics & Management (AREA)
  • Public Health (AREA)
  • Theoretical Computer Science (AREA)
  • Library & Information Science (AREA)
  • Communication Control (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The present invention relates to power information and gather communications protocol technical field, it is the method and system of a kind of master station protocol transparent task protocol extension of support, comprises the following steps: the first step, task is arranged definition, newly-increased data cell mark Fn it is set and measures some Pn, entering second step afterwards;Second step, task status, defined the execution state of transparent task by newly-increased data cell mark, enter the 3rd step afterwards;3rd step, task reports, and reports the execution result of transparent task.There is effect duration in the present invention only authentication in whole transparent flow of task, it is to avoid different route time-out times is different and the trouble that causes.The Extended Protocol of the present invention is applicable to all remote task performed with transparent mission mode, the direct initiator of this remote task is concentrator, mutual between main website and electric energy meter is converted into asynchronous by synchronization, improve communication efficiency, reduce main website holding time, be effectively increased the success rate that task sends.

Description

Master station protocol supports the method and system of transparent task protocol extension
Technical field
The present invention relates to power information and gather communications protocol technical field, be that a kind of master station protocol supports transparent task agreement The method and system of extension.
Background technology
Along with expanding economy and the raising of living standards of the people, the power consumption during life produces rapidly increases, and gives Power network safety operation brings bigger test.Along with Utilities Electric Co.'s access customer number amount is increased sharply, based on remote reading system System, new business continues to bring out in various places.Instantly main website-acquisition terminal communications protocol belongs to service-oriented type agreement, namely Formulate agreement for the concrete business of each Utilities Electric Co., once occur that the business outside agreement can not be according to existing task flow Cheng Zhihang.In this case, mainly concentrator is performed transparent transmission as terminal, the most indirectly achieve main website with The direct interaction of electric energy meter.But existing communications channel imperfect stability, causes the mission failure rate under this kind of pattern Be 20% to 30%.
Summary of the invention
The invention provides a kind of master station protocol and support the method and system of transparent task protocol extension, overcome above-mentioned existing Having the deficiency of technology, the transmission channel instability existed when it can effectively solve existing enforcement power information new business causes Communication overtime, the problem that mission failure rate is high.
One of technical scheme is realized by following measures: a kind of master station protocol supports transparent task association The method of view extension, it is characterised in that comprise the following steps:
The first step, arranges definition to task, in transparent task, arranges newly-increased data cell mark Fn and measures some Pn, afterwards Enter second step;
Second step, query task performs state, is defined the execution state of transparent task by newly-increased data cell mark Fn, it Rear entrance the 3rd step;
3rd step, task reports, and reports the execution result of transparent task.
Further optimization and/or improvements to foregoing invention technical scheme are presented herein below:
Above-mentioned in the first step, described data cell mark Fn leaves in corresponding different application layer function code AFN, application layer Message corresponding to function code AFN includes asking 1 class data, asking 3 class data and data to forward, and 1 described class data are real-time Data, 3 described class data are event data.
Above-mentioned in the first step, described application level function code AFN uses hexadecimal to encode.
Above-mentioned in the first step, described newly-increased message corresponding for data cell mark Fn includes as AFN=10H Remove transparent task F305, transparent task F306 is set and inquires about transparent task F307, the transparent tasks carrying as AFN=OCH State F305 and transparent task action result F306, the transparent task action result ERC64 event as AFN=OEH.
Above-mentioned in second step, the execution state of transparent task includes waiting identity authentication result, reporting events and inquiry Whether there is non-reporting measurement point.
The two of technical scheme are realized by following measures: a kind of master station protocol supports transparent task Protocol extension system, including system main website, acquisition terminal, measurement point and communication link, described acquisition terminal is by extension Communication link accepts the request message that system main website sends, and measures and communicates to connect between point and acquisition terminal, and described request disappears Breath includes that the request change effective duration of electric energy meter authentication, request adjust electricity price and request gathers electricity price.
Above-mentioned acquisition terminal can be concentrator.
Above-mentioned measurement point can be electric energy meter.
There is effect duration in the present invention only authentication in whole transparent flow of task, it is unconfined etc. that this avoids task Treat, also unified the timeout threshold of whole system, it is to avoid different route time-out times is different and the trouble that causes.Different electricity The task that issues of energy table uses priority policy, does not affect daily collection and transparent electricity price issues task and can realize taking turns more Secondary execution, is successfully issued to all electric energy meters meeting authentication by electricity price.The Extended Protocol of the present invention be applicable to all with The remote task that transparent mission mode performs, the direct initiator of this remote task is concentrator, by between main website and electric energy meter It is converted into by synchronization asynchronous alternately, improves communication efficiency, reduce main website holding time, be effectively increased the success that task sends Rate.
Accompanying drawing explanation
Accompanying drawing 1 embodiment of the present invention 2 changes electric energy meter authentication effective duration flow chart.
Accompanying drawing 2 embodiment of the present invention 3 adjusts electric price parameter flow chart.
Accompanying drawing 3 embodiment of the present invention 4 gathers electricity price information flow chart.
Accompanying drawing 4 present invention transparent task state unit price issues archives checking procedure schematic diagram.
Accompanying drawing 5 issues electricity price setting up procedure schematic diagram for the present invention transparent task state electricity price.
Detailed description of the invention
The present invention is not limited by following embodiment, can determine specifically according to technical scheme and practical situation Embodiment.
In the present invention, for the ease of describing, the description of the relative position relation of each parts is all according to Figure of description 1 Butut mode be described, such as: the position relationship of forward and backward, upper and lower, left and right etc. is based on the Butut of Figure of description Direction determines.
Below in conjunction with embodiment and accompanying drawing, the invention will be further described:
Embodiment 1: as shown in table 1,2,3,4,5,6, master station protocol supports the method for transparent task protocol extension, including following step Rapid:
The first step, arranges definition to task, in transparent task, arranges newly-increased data cell mark Fn and measures some Pn, afterwards Enter second step;
Second step, query task performs state, is defined the execution state of transparent task by newly-increased data cell mark Fn, it Rear entrance the 3rd step;
3rd step, task reports, and reports the execution result of transparent task.
According to actual needs above-mentioned power information capturing service transparent transmission method can be made further optimization and/or improvements:
As shown in table 1,2,3,4,5,6, in the first step, described data cell mark Fn leaves corresponding different application layer merit in In energy code AFN, message corresponding for application level function code AFN includes asking 1 class data, asking 3 class data and data to forward, described 1 class data be real time data, 3 described class data are event data.
As shown in table 1,2,3,4,5,6, in the first step, described application level function code AFN uses hexadecimal to carry out Coding.
As shown in table 1,2,3,4,5,6, in the first step, described newly-increased message bag corresponding for data cell mark Fn Include transparent task F305 of the removing as AFN=10H, transparent task F306 is set and inquires about transparent task F307, work as AFN=OCH Time transparent execution status of task F305 and transparent task action result F306, the transparent task action result as AFN=OEH ERC64 event.
As table 1,2,3,4,5,6, shown in accompanying drawing 2, in second step, the execution state of transparent task includes waiting that identity is recognized Whether card result, reporting events and inquiry have non-reporting measurement point.
Embodiment 2: as shown in accompanying drawing 1,4,5, master station protocol supports the protocol extension request change electric energy meter of transparent task The method of the effective duration of authentication, comprises the following steps:
The first step: system main website removes all transparent tasks of terminal, confirms the terminal task of not being carrying out, and enters the afterwards Two steps;
Second step: batch setting authentication task, task priority, higher than freezing task, enters the 3rd step afterwards;
3rd step: wait authentication task result, is not intended to the execution duration of task, enters the 4th step afterwards;
4th step: checked whether reporting events, the most then enter the 5th step;If it is not, then perform the 3rd step;
5th step: whether have authentication event, the most then enter the 6th step;If it is not, then measure point do not put Success Flag, it Rear entrance the 7th step;
6th step: this measurement point effective duration of authentication is set, enters the 8th step afterwards;
7th step: record is measured point and arranged duration result, enters the 8th step afterwards;
8th step: check whether the measurement point not reported, if having, then performs the 3rd step, if not having, then measures point and is set to merit mark Will, task terminates.
According to actual needs, above-mentioned master station protocol can be supported the protocol extension request change electric energy meter identity of transparent task The method of the effective duration of certification makes further optimization and/or improvements:
As shown in Figure 1, in the third step, authentication task result is by ERC64 reporting events main website.
As shown in Figure 1, in the 6th step, when this measurement point authentication is effective a length of 3 minutes.
Embodiment 3: as shown in accompanying drawing 2,4,5, master station protocol supports that the protocol extension request of transparent task adjusts electricity price Method, comprises the following steps:
The first step: system main website removes all transparent tasks of acquisition terminal, confirms the terminal task of not being carrying out, laggard Enter second step;
Second step: batch setting authentication task, task priority, higher than day freezing copy reading, enters the 3rd step afterwards;
3rd step: wait identity authentication result, is not intended to the execution duration of task, enters the 4th step afterwards;
4th step: whether active reporting is to system main website for identity authentication result, the most then enter the 5th step;If it is not, then perform Three steps;
5th step: system main website arranges the specific tasks measuring point, and batch is issued to terminal, measures some execution task, afterwards Enter the 6th step;
6th step: whether examination exists the measurement point not reported, if existing, then performs the 3rd step, if not existing, then enters the 7th Step;
7th step: query task performs state, and whether confirmation task completes, if task completes, then measures point and puts Success Flag, it Rear entrance the 9th step;If not completing task, enter the 8th step afterwards;
8th step: task is not fully complete, continues time delay and waits, performs the 7th step afterwards.
9th step: batch query task action result, task terminates.
According to actual needs, above-mentioned master station protocol can be supported the method that the protocol extension request of transparent task adjusts electricity price Make further optimization and/or improvements:
As shown in accompanying drawing 2,4,5, in the above-mentioned first step, described acquisition terminal is concentrator.
As shown in accompanying drawing 2,4,5, above-mentioned 5th step, described measurement point is electric energy meter.
Embodiment 4: as shown in Fig. 3,4,5, a kind of master station protocol supports that the protocol extension request of transparent task gathers electricity price Method, comprise the following steps:
The first step: system main website removes all transparent tasks of terminal, confirms the terminal task of not being carrying out, and enters the afterwards Two steps;
Second step: the transparent task of batch setting, task priority, higher than day freezing copy reading, enters the 3rd step afterwards;
3rd step: query task performs state, and whether confirmation task completes, if task completes, then measures point and puts Success Flag, it Rear entrance the 5th step;If not completing task, enter the 4th step afterwards;
4th step: task is not fully complete, continues time delay and waits, performs the 3rd step afterwards;
5th step: batch query task action result, terminates.
Embodiment 5: as shown in Figure 4,5, a kind of master station protocol supports the protocol extension system of transparent task, including system master Stand, acquisition terminal, measurement point and communication link, described acquisition terminal accepts system main website by the communication link of extension and sends Request message, measure point and acquisition terminal between communicate to connect, described request message include request change electric energy meter identity The effective duration of certification, request adjust electricity price and request gathers electricity price.
As shown in Figure 4,5, described acquisition terminal is concentrator.
As shown in Figure 4,5, described measurement point is electric energy meter.
Here, owing to system main website is rather than waiting for the reply of concentrator, but use the mode actively calling survey together, thus main Stand and between concentrator, electric energy meter, there is not overtime phenomenon.
Above technical characteristic constitutes embodiments of the invention, and it has stronger adaptability and implementation result, can basis It is actually needed the non-essential technical characteristic of increase and decrease, meets the demand of different situations.

Claims (9)

1. the method that a master station protocol supports transparent task protocol extension, it is characterised in that comprise the following steps:
The first step, arranges definition to task, in transparent task, arranges newly-increased data cell mark Fn and measures some Pn, afterwards Enter second step;
Second step, query task performs state, is defined the execution state of transparent task by newly-increased data cell mark Fn, it Rear entrance the 3rd step;
3rd step, task reports, and reports the execution result of transparent task.
Master station protocol the most according to claim 1 supports the method for transparent task protocol extension, it is characterised in that the first step In, described data cell mark Fn leaves in corresponding different application layer function code AFN, and code AFN is corresponding for application level function Message includes asking 1 class data, asking 3 class data and data to forward, and 1 described class data are real time data, 3 described class numbers According to for event data.
Master station protocol the most according to claim 2 supports the method for transparent task protocol extension, it is characterised in that the first step In, described application level function code AFN uses hexadecimal to encode.
4. the method supporting transparent task protocol extension according to the master station protocol described in claim 1 or 2 or 3, it is characterised in that In the first step, described newly-increased message corresponding for data cell mark Fn include transparent task F305 of the removing as AFN=10H, Transparent task F306 is set and inquires about transparent task F307, the transparent execution status of task F305 as AFN=OCH and transparent Business performs result F306, the transparent task action result ERC64 event as AFN=OEH.
5. the method supporting transparent task protocol extension according to the master station protocol described in claim 1 or 2 or 3, it is characterised in that In second step, the execution state of transparent task includes waiting whether identity authentication result, reporting events and inquiry do not report survey Amount point.
Master station protocol the most according to claim 4 supports the method for transparent task protocol extension, it is characterised in that second step In, the execution state of transparent task includes waiting whether identity authentication result, reporting events and inquiry have non-reporting measurement point.
7. a master station protocol supports the protocol extension system of transparent task, it is characterised in that include system main website, acquisition terminal, Measuring point and communication link, described acquisition terminal accepts, by the communication link of extension, the request message that system main website sends, Measuring and communicate to connect between point and acquisition terminal, described request message includes when request change electric energy meter authentication is effective Long, request adjusts electricity price and request gathers electricity price.
Master station protocol the most according to claim 7 supports the protocol extension system of transparent task, it is characterised in that described Acquisition terminal is concentrator.
9. support the protocol extension system of transparent task according to the master station protocol described in claim 7 or 8, it is characterised in that described Measurement point be electric energy meter.
CN201610834145.0A 2016-09-20 2016-09-20 Master station protocol supports the method and system of transparent task protocol extension Active CN106251607B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610834145.0A CN106251607B (en) 2016-09-20 2016-09-20 Master station protocol supports the method and system of transparent task protocol extension

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610834145.0A CN106251607B (en) 2016-09-20 2016-09-20 Master station protocol supports the method and system of transparent task protocol extension

Publications (2)

Publication Number Publication Date
CN106251607A true CN106251607A (en) 2016-12-21
CN106251607B CN106251607B (en) 2019-07-09

Family

ID=57600024

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610834145.0A Active CN106251607B (en) 2016-09-20 2016-09-20 Master station protocol supports the method and system of transparent task protocol extension

Country Status (1)

Country Link
CN (1) CN106251607B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109005247A (en) * 2018-09-13 2018-12-14 国家电网有限公司 Take the concentrator of control order execution mechanism and executes method
CN109246131A (en) * 2018-10-17 2019-01-18 国家电网有限公司 The safety encryption and system of power information acquisition terminal
CN111369773A (en) * 2020-02-14 2020-07-03 国网新疆电力有限公司电力科学研究院 Electricity price parameter issuing method and system based on transparent task

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101420774A (en) * 2008-12-12 2009-04-29 南京大学 Wireless sensor network system and method for processing data
CN101925058A (en) * 2009-06-16 2010-12-22 杭州华三通信技术有限公司 Identity authentication method, system and authenticator entity
CN105282249A (en) * 2015-10-30 2016-01-27 国网新疆电力公司电力科学研究院 Device and method for remotely issuing electric energy meter parameters and control commands based on transparent collection tasks

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101420774A (en) * 2008-12-12 2009-04-29 南京大学 Wireless sensor network system and method for processing data
CN101925058A (en) * 2009-06-16 2010-12-22 杭州华三通信技术有限公司 Identity authentication method, system and authenticator entity
CN105282249A (en) * 2015-10-30 2016-01-27 国网新疆电力公司电力科学研究院 Device and method for remotely issuing electric energy meter parameters and control commands based on transparent collection tasks

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
帝大武汉: "Q/GDW1376.1-2013电力用户用电信息采集***通信协议:主站与采集终端通信协议", 《百度文库》 *
王刚: "集中抄表方式电价下发方案的理论与验证", 《科技创新导报》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109005247A (en) * 2018-09-13 2018-12-14 国家电网有限公司 Take the concentrator of control order execution mechanism and executes method
CN109246131A (en) * 2018-10-17 2019-01-18 国家电网有限公司 The safety encryption and system of power information acquisition terminal
CN111369773A (en) * 2020-02-14 2020-07-03 国网新疆电力有限公司电力科学研究院 Electricity price parameter issuing method and system based on transparent task

Also Published As

Publication number Publication date
CN106251607B (en) 2019-07-09

Similar Documents

Publication Publication Date Title
Chen et al. Integration of IoT with smart grid
CN103248122B (en) Power failure active reporting system
Li et al. Research on water meter reading system based on LoRa communication
CN105427571A (en) Binary channel communication remote meter reading monitoring and analysis system
CN204990657U (en) Remote meter reading system
CN106384495A (en) Transmission method and transmission device for transparent tasks of electricity consumption information acquisition service
CN106251607A (en) Master station protocol supports the method and system of transparent task protocol extension
CN201937603U (en) Electricity information acquisition system and concentrator
CN103312563A (en) Automatic information collection method and system based on power line carrier communication
CN105046928A (en) Method for automatically detecting and managing meter records
CN104112350A (en) Additional apparatus for ammeter
CN102446398B (en) Mobile meter reading system based on wireless point-of-sale (POS) terminal
CN105119377A (en) Super-ZigBee Internet of Things-based power grid intelligent monitoring system and method
CN101701972A (en) Electrical energy data acquiring system based on wireless mesh ad hoc network
CN103680103A (en) Intelligent acquiring system for electricity utilization information of power supply areas
CN201563007U (en) Electrical energy real-time monitoring and line loss analysis system based on wireless net-like self-organizing network
CN108093039B (en) Method for processing sleeping electric meter based on national network Q/GDW3761 protocol
CN101702540A (en) Electrical energy real time monitoring and line loss analysis system based on wireless mesh ad hoc network
CN105204466A (en) Online electric energy managing device based on CDMA network telecommunication
CN110969829B (en) Power failure data sharing method based on cloud platform computing and message bus technology
CN205070602U (en) Electric wire netting intelligent monitoring system based on networking of super -ZigBee thing
CN202904325U (en) Electric energy consumption data remote-monitoring matching device
Joe et al. Design and implementation of AMI system using binary CDMA for smart grid
CN104201781A (en) Small-power wireless private network system applied to smart grid
CN202443515U (en) Attendance checking system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210415

Address after: 830011 No.200 Hengda street, Changchun middle road, high tech Zone, Urumqi, Xinjiang Uygur Autonomous Region

Patentee after: Marketing service center of State Grid Xinjiang Electric Power Co., Ltd. (capital intensive center, metering center)

Patentee after: State Grid Corporation of China

Address before: No.66, East 2nd Lane, Changchun middle road, Xinshi District, Urumqi, Xinjiang Uygur Autonomous Region 830011

Patentee before: ELECTRIC POWER SCIENCES RESEARCH INSTITUTE OF STATE GRID XINJIANG ELECTRIC POWER Co.

Patentee before: State Grid Corporation of China