CN106250570A - A kind of subdrainage pipe network intelligent management system - Google Patents

A kind of subdrainage pipe network intelligent management system Download PDF

Info

Publication number
CN106250570A
CN106250570A CN201610878424.7A CN201610878424A CN106250570A CN 106250570 A CN106250570 A CN 106250570A CN 201610878424 A CN201610878424 A CN 201610878424A CN 106250570 A CN106250570 A CN 106250570A
Authority
CN
China
Prior art keywords
information
pipeline
module
user
management system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610878424.7A
Other languages
Chinese (zh)
Inventor
刘遂庆
赵贤魁
林忠元
傅加林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou City Base Pipeline Technology Co Ltd
Original Assignee
Hangzhou City Base Pipeline Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou City Base Pipeline Technology Co Ltd filed Critical Hangzhou City Base Pipeline Technology Co Ltd
Priority to CN201610878424.7A priority Critical patent/CN106250570A/en
Publication of CN106250570A publication Critical patent/CN106250570A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/29Geographical information databases
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0637Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Databases & Information Systems (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Educational Administration (AREA)
  • Physics & Mathematics (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Operations Research (AREA)
  • General Business, Economics & Management (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • Game Theory and Decision Science (AREA)
  • Remote Sensing (AREA)
  • Data Mining & Analysis (AREA)
  • General Engineering & Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention proposes a kind of subdrainage pipe network intelligent management system, including data base, administrative unit, processor and display unit.Described data base, is used for storing pipeline information.Described processor, for responding the pipeline management request of user, controls described administrative unit and obtains and manage pipeline information corresponding in described data base.Display unit, is used for showing described pipeline information.This subdrainage pipe network intelligent management system is managed by computer information, realize information sharing, improve each pipeline ownership unit and urban construction department's efficiency of management to underground utilities and the utilization ratio to line resource, for city planning, build and manage offer aid decision.

Description

A kind of subdrainage pipe network intelligent management system
Technical field
The present invention relates to field of computer technology, in particular to a kind of subdrainage pipe network intelligent management system.
Background technology
GIS-Geographic Information System (Geographic Information System, GIS) is with geospatial database as base Plinth, under the support of computer soft and hardware, is acquired spatial relation data, stores, manages, analyzes, simulates and shows, And use mathematics model analysis method, it is provided that and dynamic spatial geographic information, the calculating of foundation is provided for planning, management and decision-making Machine technology system.In recent years, along with computer and the fast development of modern information technologies, Basic Geographic Information System construction was entirely Importance in state's IT application process grows with each passing day.
Underground utilities are be made up of multiple different pipelines and facility huge and the system of complexity, and its data is with drawing, figure The paper medium recordings such as table preserve and management is main, and data is complete, inquiry is inconvenient, renewal speed is slow, causes information not to be inconsistent with present situation. The enlarging of China's City Buried Pipeline, transformation increase severely, and its integrated management problem also becomes increasingly conspicuous.Traditional pipeline data management hands Section uses text or data base to store the attribute data of pipeline mostly, stores the figure of pipeline with DWG graphic file Graphic data, graph data is kept completely separate with basic data, and pipeline data management is chaotic, and data updating speed is slow, does not catches up with the modern times The paces of urban construction, it is impossible to ensure Up-to-date state and the correctness of data.
Summary of the invention
The present invention is based on the problems referred to above, it is proposed that a kind of subdrainage that can efficiently inquire about and manage underground utilities Pipe network intelligent management system.
In view of this, the present invention proposes a kind of subdrainage pipe network intelligent management system, including data base, management list Unit, processor and display unit.
Described data base, is used for storing pipeline information.
Described processor, for responding the pipeline management request of user, controls described administrative unit and obtains and described in management Pipeline information corresponding in data base.
Described display unit, is used for showing described pipeline information.
Further, described acquisition module, it is additionally operable to respond user's selection operation to described map, obtains user and choose Target pipeline.
Further, described administrative unit also includes that monitoring modular and alarm module, described pipeline information include described pipe The cartographic information of line and link information.
Described monitoring modular, for periodically monitoring the dynamic attribute of described target pipeline, and relatively described dynamic attribute Alarm threshold value with the described target pipeline of described database purchase.
Described alarm module, for when described dynamic attribute reaches described alarm threshold value, generates warning message.
Further, described administrative unit also includes arranging module.
Described module is set, is used for responding user's input operation, obtain the alarm threshold value of the described pipeline of user setup.
Further, described administrative unit also includes that monitoring modular and feedback module, described pipeline information include described pipe The cartographic information of line and link information.
Described monitoring modular, for periodically monitoring the dynamic attribute of described target pipeline, and relatively described dynamic attribute With the alarm threshold value of the described target pipeline of described database purchase, generate comparative result.
Described feedback module, for comparative result described in periodic feedback.
Further, described administrative unit also includes monitoring modular.
Described monitoring modular, for periodically monitoring the dynamic attribute of described target pipeline.
Described display unit, is additionally operable to show described dynamic attribute.
Further, described administrative unit also includes that monitoring modular and prediction module, described pipeline information include described pipe The cartographic information of line and link information.
Described acquisition module, is additionally operable to obtain weather forecast information.
Described monitoring modular, for according to preset rules and described weather forecast information, calculates the water of described target pipeline Position information, and compare the watermark threshold of the described target pipeline of described water level information and described database purchase.
Described prediction module, for when described water level information reaches described watermark threshold, generates hydrops information of forecasting.
Further, described administrative unit also includes that statistical module, described pipeline information include the length letter of described pipeline Breath and/or pipe point quantity information.
Described statistical module, for responding the pipeline statistics request of user, adds up length and/or the pipe of described target pipeline Point quantity.
Further, described administrative unit includes map adjustment module, information labeling module, attribute query module or coordinate Enquiry module, described pipeline information includes that the cartographic information of described pipeline, attribute information, coordinate information and user are to described map At least one markup information.
Described map adjustment module, for responding the map regulation request of user, regulates size and/or the ratio of described map Example.
Described information labeling module, for responding the interpolation mark request of this user, or deletes markup information described in Remove or amendment request, update the markup information of described map.
Described attribute query module, for responding the attribute query request of user, obtains the described of described database purchase The attribute information of pipeline.
Further, described coordinate enquiry module, for responding the coordinate inquiry request of user, obtain described data stock The coordinate information of the described pipeline of storage.
Further, described administrative unit includes acquisition module and analyzes module, and described pipeline information includes described pipeline Cartographic information and link information.
Described acquisition module, draws extract operation for responding user to described map, obtains user and draws the analysis section taken.
Described analysis module, for responding the pipeline analysis request of user, analyzes the position of described analysis section gut line Relation and connectedness.
A kind of subdrainage pipe network intelligent management system that the embodiment of the present invention provides, by the pipe of explored underground utilities Line information, is stored in data base with the form of electronic data, and according to inquiry and the management request of user, administrative unit obtains number According to pipeline information corresponding in storehouse and pipeline information is managed, is managed by computer information, it is achieved information sharing, carry High each pipeline ownership unit and urban construction department's efficiency of management to underground utilities and the utilization ratio to line resource, for city Plan, build and manage offer aid decision.
For making the above-mentioned purpose of the present invention, feature and advantage to become apparent, preferred embodiment cited below particularly, and coordinate Appended accompanying drawing, is described in detail below.
Accompanying drawing explanation
In order to be illustrated more clearly that the technical scheme of the embodiment of the present invention, below by embodiment required use attached Figure is briefly described, it will be appreciated that the following drawings illustrate only certain embodiments of the present invention, and it is right to be therefore not construed as The restriction of scope, for those of ordinary skill in the art, on the premise of not paying creative work, it is also possible to according to this A little accompanying drawings obtain other relevant accompanying drawings.
Fig. 1 shows the first structural representation of the subdrainage pipe network intelligent management system that the embodiment of the present invention provides;
Fig. 2 shows the second structural representation of the subdrainage pipe network intelligent management system that the embodiment of the present invention provides.
Main element symbol description:
1000-subdrainage pipe network intelligent management system;100-data base;200-processor;300-display unit;400- Administrative unit;410-acquisition module;421-map adjustment module;422,452-information labeling module;423-attribute query module; 424-coordinate enquiry module;431-arranges module;432-monitoring modular;433-alarm module;434-feedback module;435-predicts Module;416-mark module;441-statistical module;451-three dimensional display module;453-both view angle adjustment module;461-analyzes mould Block;471-imports module;472-derives module;473-correction module;474-temporary library.
Detailed description of the invention
For the ease of understanding the present invention, below with reference to relevant drawings, underground drainage pipeline networks intelligent management system is carried out more Clearly and completely describe.Accompanying drawing gives the preferred embodiment of subdrainage pipe network intelligent management system.Subdrainage pipe network Intelligent management system can be realized by many different forms, however it is not limited to embodiment described herein.Therefore, below Detailed description to the embodiments of the invention provided in the accompanying drawings is not intended to limit the scope of claimed invention, and It it is the selected embodiment being merely representative of the present invention.Based on embodiments of the invention, those skilled in the art are not making creation Property work on the premise of the every other embodiment that obtained, broadly fall into the scope of protection of the invention.
Fig. 1 shows the structural representation of the subdrainage pipe network intelligent management system that the embodiment of the present invention provides.
As it is shown in figure 1, a kind of subdrainage pipe network intelligent management system 1000 that the embodiment of the present invention provides, including data Storehouse 100, processor 200, display unit 300 and administrative unit 400.Data base 100, display unit 300 and administrative unit 400 are equal It is electrically connected with processor 200.
Data base 100 is used for storing pipeline information.
Specifically, buried pipe line end is provided with the equipment such as effusion meter, data acquisition unit or probe, thus obtains underground utilities Pipeline information.Accordingly, it is provided with at the underground utilities of data acquisition equipment and forms a pipe point.Processor 200 controls data Storehouse 100 obtains and stores the pipeline information from buried pipe line end.Described pipeline information includes the cartographic information of underground utilities, genus Property information, coordinate information and the user's at least one markup information to described pipeline.Further, described cartographic information refers to permissible The geographical position of reflection underground utilities and the image etc. of spatial distribution.Described attribute information include the numbering of underground utilities, material, Caliber, the gradient, length, pipe point quantity, flow, catchment area, cross water cross section and adding and continue the information such as station aggregated data.Described coordinate Information refers to reflect the X of underground utilities a certain pipe point particular geographic location, Y coordinate.Described markup information refers to that user is to described The information such as the remarks of underground utilities.Certainly, described pipeline information can also include other guide, such as the buried pipe of manager's typing The repair message etc. of line, does not limits.
Processor 200, for responding the pipeline management request of user, controls administrative unit 400 and obtains and manage data base Pipeline information corresponding in 100.
Display unit 300 is used for showing described pipeline information.
Specifically, in the present embodiment, processor 200 controls display unit 300 and with the cartographic information of described underground utilities is Main interface, and the mark letter of the most markup display attribute information of described underground utilities, coordinate information and user Breath.Preferably, on the map of described underground utilities, this underground utilities duty of simultaneous display, such as buried pipe for the present embodiment Water flow regime in line, consequently facilitating the duty of user's more intuitive understanding target pipeline, thus realize ground, city In drainage pipeline in lower pipe network, the mobility status of water level is monitored in real time.
Fig. 2 shows the structural representation of the subdrainage pipe network intelligent management system that the embodiment of the present invention provides.
As in figure 2 it is shown, in the present embodiment, administrative unit 400 also includes acquisition module 410.
Acquisition module 410, for responding the selection operation of the map that user shows at display unit 300, obtains user and chooses Target pipeline.
Specifically, processor 200 obtains the cartographic information of the pipeline of data base 100 storage, controls display unit 300 and shows Described map, and respond the selection operation of the map that user shows at display unit 300, obtain user and choose in described map Target pipeline.In the present embodiment, target pipeline is chosen and includes three kinds of embodiments.One chooses mode for a side of choosing Formula, processor 200 controls acquisition module 410 and captures user in operations such as the click of described map, movements, obtains what user clicked on Guan Dian;Described target pipeline is the either line that the pipe point chosen with user intersects.It is the rectangle side of choosing that another kind chooses mode Formula, processor 200 controls acquisition module 410 and captures the rectangular area that user marks at described map;Described target pipeline is square All pipe points in shape region and/or pipeline.Further, another chooses mode is that polygon chooses mode, processor 200 Control acquisition module 410 and capture the polygonal region that user marks at described map;Described target pipeline is polygonal region Interior all pipe points and/or pipeline.Certainly, the acquisition of described target pipeline also has a lot of other embodiment, the most superfluous at this State.
In the present embodiment, administrative unit 400 also includes map adjustment module 421, information labeling module 422, attribute query Module 423 or coordinate enquiry module 424.
Map adjustment module 421, for responding the map regulation request of user, regulates size and/or the ratio of described map Example.
Specifically, processor 200 controls display unit 300 and shows the cartographic information of described pipeline, and user is to described in response The amplification request of map, controls map adjustment module 421 and increases the size that described map shows at display unit 300;Or response User's zoom-out request to described map, controls map adjustment module 421 and reduces the chi that described map shows at display unit 300 Very little;Response user shows request to the full figure of described map, controls map adjustment module 421 and increases described map at display unit The ratio of 300 displays;Response user asking according to fixed proportion display described map, obtains the display ratio of user's input Example, control map adjustment module 421 regulating described map in the ratio that display unit 300 shows is the display ratio that user inputs Example.
Information labeling module 422 is for responding the interpolation mark request of this user, or the deletion to markup information described in Or amendment request, update the markup information of described map.
Specifically, processor 200 responds the interpolation mark request of user, and it is defeated that control information labeling module 422 obtains user The markup information entered, the 100 described markup informations of storage of controlling database.Processor 200 responds user and repaiies a markup information Change request, control information labeling module 422 and obtain markup information that user selectes and the amendment to described markup information, and control Data base 100 updates the markup information of storage.Processor 200 responds user's removal request to described markup information, controls letter Breath labeling module 422 obtains the markup information that user selectes, and this markup information of 100 deletion storages of controlling database.
Attribute query module 423, for responding the attribute query request of user, obtains the described pipeline of data base 100 storage Attribute information.
Specifically, processor 200 responds the attribute query request of user, and controlled attribute enquiry module 423 obtains data base The attribute information of the pipeline of 100 storages, and control the attribute information that display unit 300 display obtains.
Coordinate enquiry module 424, for responding the coordinate inquiry request of user, obtains the described pipeline of data base 100 storage Coordinate information.
Specifically, processor 200 responds the coordinate inquiry request of user, controls coordinate enquiry module 424 and obtains data base The coordinate information of the pipeline of 100 storages, and control the coordinate information that display unit 300 display obtains.
In the present embodiment, administrative unit 400 also includes arranging module 431, monitoring modular 432, alarm module 433, feedback Module 434 and prediction module 435.
Module 431 is set for responding user's input operation, obtains the alarm threshold value of the described target pipeline of user setup.
Specifically, processor 200 controls to arrange module 431 and responds user's input operation, obtains the described mesh of user setup The threshold value of mark pipeline.Described alarm threshold value is the marginal value that target pipeline can ensure that the attribute information of normal work, such as alluvial Thing thickness threshold value is the 30% of described target pipeline caliber.Further, processor 200 controls to store the report of described target pipeline Alert threshold value is to data base 100.
Monitoring modular 432 for periodically monitoring the dynamic attribute of described target pipeline, and relatively described dynamic attribute and The alarm threshold value of the described target pipeline of data base 100 storage.
Specifically, processor 200 controls the monitoring modular 432 periodically selected target pipeline of monitoring acquisition module 431 Dynamic attribute.Described dynamic attribute includes the dynamically letter such as gas, flow, water quality, drift thickness in the pipe of described target pipeline Breath.Accordingly, data base 100 storage has the alarm threshold value of each dynamic attribute.
Further, processor 200 controls the dynamic attribute that monitoring modular 432 periodically compares the target pipeline of its acquisition With the alarm threshold value of data base 100 storage, generate comparative result.In the present embodiment, described comparative result is described for including exceeding The information such as the text of the dynamic attribute of alarm threshold value, voice, picture, as " current drift thickness is 6.4cm, exceedes correspondence Drift thickness threshold value 5cm, clears up the most in time ".In another embodiment, described comparative result includes described dynamic attribute and correspondence The comparison information of alarm threshold value, in other words, i.e. include the dynamic attribute exceeding described alarm threshold value, also include being not above The dynamic attribute of described alarm threshold value.
Alarm module 433, for when described dynamic attribute reaches described alarm threshold value, generates warning message.
Specifically, when described comparative result be a dynamic attribute reach alarm threshold value time, represent target pipeline there is safety Hidden danger etc., need to manually make respective handling, and processor 200 controls alarm module 433 and generates corresponding warning message, such as flow Difference warning, the warning of flow velocity difference, overflow accident alarming, stifled disconnected accident alarming, alluvial accident alarming or manhole cover plate difference are reported to the police Deng, consequently facilitating target pipeline is the most quickly responded by user.Such as, excessive when adjacent target pipeline water level difference Time, represent that described target pipeline exists blocking or the possibility of breakage, accordingly, processor 200 controls alarm module 433 and generates stifled Plug accident alarming information.
Feedback module 434 is used for feeding back described comparative result to monitoring center.
Specifically, in the present embodiment, when arbitrary dynamic attribute reaches described alarm threshold value, processor 200 controls feedback Module 434 feeds back described comparative result to monitoring center, consequently facilitating monitoring center is for occurring that abnormal target pipeline is made Process in time.Described monitoring center can be distributed across specifying at least one pipeline management end of position.
In another embodiment, processor 200 controls comparative result described in feedback module 434 periodic feedback to described monitoring Center, in other words, when the described cycle arrives, regardless of whether the dynamic attribute depositing target pipeline reaches described alarm threshold value, Processor 200 all can control to feed back the 433 described comparative results of feedback, the understanding much sooner of this mode, beneficially monitoring center The duty of target pipeline, monitoring center can will exceed the warning level of correspondence according to feedback comparative result to dynamic attribute During value, in advance this section of target pipeline is done pretreatment rather than only when the dynamic attribute of target pipeline reaches corresponding warning During threshold value, just make respective handling.
In the present embodiment, acquisition module 410 is additionally operable to obtain weather forecast information.
Specifically, processor 200 controls acquisition module 410 periodically acquisition weather forecast information.Described weather forecast is believed Breath includes temperature and rainfall etc..In the present embodiment, acquisition module 410 has radio communication function, and processor 200 controls to obtain Module 410 periodically obtains the current weather forecast information of server end storage.Weather according to weather monitoring terminal monitoring Information, and the forecast information that meteorological observatory makes, the weather forecast information real-time update of described server end storage.
In the present embodiment, monitoring modular 432 is additionally operable to, according to preset rules and described weather forecast information, calculate described mesh The water level information of mark pipeline, and compare the watermark threshold of the described target pipeline of described water level information and data base 100 storage.
Specifically, processor 200 controls monitoring modular 432 according to target pipeline caliber, flow etc. and described weather forecast Information, calculates the water level information of described target pipeline.Described water level information includes that described in following rainfall, target pipeline can The water accumulating volume of energy, thus realize rainfall simulation.Accordingly, data base 100 storage has a watermark threshold.Described watermark threshold is for keeping away Exempt from hydrops and people's normal pass is produced the maximum water depth value of impact.
In the present embodiment, module 431 is set and is additionally operable to respond user's input operation, obtain the described target tube of user setup The watermark threshold of line.Described watermark threshold includes the water level bound that underground utilities normally work.Processor 200 controls to arrange mould Block 431 responds user's input operation, obtains the watermark threshold of the described target pipeline of user setup, and controls to store described target The watermark threshold of pipeline is to data base 100.
Further, processor 200 obtains the watermark threshold of this target pipeline of data base 100 storage, controls monitoring mould Block 432 compares the watermark threshold of the described target pipeline of its water level information calculated and data base 100 storage.
Prediction module 435, for when described water level information reaches described watermark threshold, generates hydrops information of forecasting.
Specifically, when described water level information reaches described watermark threshold, represent, at region internal water accumulation, people are had peace Full hidden danger, processor 200 control forecasting module 435 generates hydrops information of forecasting.Described hydrops information of forecasting includes described target The positional information etc. of pipeline, consequently facilitating preventive measure is made in this region by user in time, avoids hydrops to cause to the full extent Loss of personal property.
In the present embodiment, administrative unit 400 also includes mark module 436.
Mark module 436, for responding the pipeline inquiry request of user, obtains and the described mesh of registration database 100 storage The attribute information of mark pipeline.
Specifically, processor 200 responds the pipeline inquiry request of user, obtains the described target tube of data base 100 storage The attribute information of line, and control mark module 436 attribute information of target pipeline is marked, and control display unit 300 Show the attribute information of the target pipeline of described labelling.In the present embodiment, mark module 436 uses the mode being highlighted to mesh The attribute information of mark pipeline is marked, certainly, the most a lot of mark modes, it is not restricted.
Acquisition module 410 is additionally operable to respond the input operation of user, obtains the query statement of user's input.
Specifically, described query statement includes the target map that user selectes, and the attribute of target pipeline in target map The conditional expression of the combination of information or the command type etc. of operation.
Mark module 435 is additionally operable to, according to described query statement, obtain and the corresponding attribute of registration database 100 storage Information.
Specifically, processor 200 responds the input operation of user, obtains the cartographic information of the pipeline of data base 100 storage, Perform described query statement, obtain the attribute information of target pipeline in the target map of data base 100 storage, control mark module The attribute information of the target pipeline in 435 pairs of target maps is marked, and control display unit 300 shows the mesh of described labelling The attribute information of mark pipeline.
In the present embodiment, administrative unit 400 also includes statistical module 441.
Statistical module 441, for responding the pipeline statistics request of user, adds up length and/or the pipe point of described target pipeline Quantity.
Specifically, processor 200 responds the length of pipeline statistics request of user, obtains the target tube of data base 100 storage The length information of line, and control display unit 300 and show the length information of described target pipeline.Processor 200 responds user's Pipe point quantity statistics is asked, and obtains the pipe point quantity information of the target pipeline of data base 100 storage, and controls display unit 300 Show the pipe point quantity information of described target pipeline.
In the present embodiment, administrative unit 400 also includes three dimensional display module 451, information labeling module 452 and/or visual angle Adjustment module 453.
Three dimensional display module 451, for responding the three dimensional display request of user, generates the three-dimensional pipeline of described target pipeline Figure.
Specifically, processor 200 responds the three dimensional display request of user, obtains the target pipeline of data base 100 storage Cartographic information, controls three dimensional display module 451 and generates the three-dimensional tube line chart that described target pipeline is corresponding, and control display unit 300 show described three-dimensional tube line chart.
Information labeling module 452 for responding the information labeling request of user, obtain user's input to described target tube The markup information of line.
Specifically, processor 200 responds user and asks the information labeling of described three-dimensional tube line chart, controls information labeling mould Block 452 obtains the markup information to described pipeline of user's input, and control display unit 300 shows described markup information, just The remark information etc. to pipeline is added at three-dimensional tube line chart in user.
Both view angle adjustment module 453, for responding the both view angle adjustment request of user, regulates the angle of described three-dimensional tube line chart.
Specifically, processor 200 responds user and asks the both view angle adjustment of described three-dimensional tube line chart, obtains user setup Aspect, and controlling both view angle adjustment module 453, to change described three-dimensional tube line chart extremely the most described at the visual angle that display unit 300 show Aspect, consequently facilitating user observes described three-dimensional tube line chart from different perspectives.
In the present embodiment, administrative unit 400 also includes analyzing module 461.
Acquisition module 410 is additionally operable to respond stroke extract operation of the map that user shows at display unit 300, obtains user and draws The analysis section taken.
Specifically, processor 200 responds the pipeline analysis request of user, obtains the map of the pipeline of data base 100 storage Information, controls display unit 300 and shows described map, obtains user and draws the analysis section taken in described map.Described analysis Section is the described pipeline section along a direction, including transverse section and vertical section.
Analyzing module 461 and be used for responding the pipeline analysis request of user, the position analyzing described analysis section gut line is closed System and connectedness.
Specifically, in the present embodiment, described pipeline analysis includes crossed section analysis, vertical section analysis and connectivity analysis. Described pipeline information also includes the pitch information of described pipeline, spatial information, depth information, classification information or link information etc.. Processor 200 responds the crossed section analysis request of user, obtains user and draws the transverse section taken, obtains the institute of data base 100 storage State pitch information and the spatial information of pipeline, analyze the position relationship of described pipeline, mutual spacing etc..Processor 200 response is used The vertical section analysis request at family, obtains user and draws the vertical section taken, and obtains the degree of depth letter of the described pipeline of data base 100 storage Breath, controls to analyze module 461 and analyzes the buried depth etc. of described pipeline.Processor 200 responds the connectivity analysis request of user, obtains The classification information of the described pipeline of data base 100 storage and link information, control to analyze module 461 and analyze the connection of described pipeline Relation etc., it is simple to the pipeline of a certain classification is connected by user, thus provides assosting effect for accident rescue.
In the present embodiment, administrative unit 400 also includes importing module 471 and deriving module 472.
Import module 471 and import request for the data responding user, obtain the data that user imports.
Specifically, processor 200 responds the data of user and imports request, controls to import module 471 and obtains what user imported Data, and the data of the 100 described importings of storage of controlling database.In the present embodiment, subdrainage pipe network intelligent management system 1000 importings supporting the data such as .Dxf form, E00 form .Mif form .mdb form.Certainly, subdrainage pipe network intelligence Management system 1000 can also support extended formatting data, is not restricted.
In another embodiment, administrative unit 400 the most also includes correction module 473 and/or temporary library 474.
Correction module 473 imports request for the data responding user, and the data of described importing are carried out standardization, topology Integrity and/or consistency check.
Specifically, standardization inspection, topological integrity inspection and/or the consistency check etc. that described inspection includes.Data Storehouse 100 also stores the specification information having importing data.Described specification information, can be to importing the form of data, content etc. The template etc. being defined.
Processor 200 responds the data of user and imports request, obtains the specification information of data base 100 storage, and controls to entangle The standardization of the data of described importing is checked by mismatch block 473 according to described specification information.When the data of described importing are full During foot standardization, processor 200 controls temporary library 474 and temporarily stores the data of described importing, and control correction module 473 checks The topological integrity of the data of described importing, and control the concordance that correction module 473 checks the data of described importing.When described The standardization inspection of data, topological integrity inspection and the consistency check that import all do not find that mistake, processor 200 control number The data of described importing are stored according to storehouse 100.Further, when the data of described importing be unsatisfactory for standardization, topological integrity or During concordance, processor 200 generates information, and control display unit 300 shows described information.Described information Including being unsatisfactory for standardization, topological integrity or conforming at least one data.
Derive module 472 and derive request for the data responding user, obtain derivation data, user setup that user selectes The acquiescence deriving path or data base 100 storage derive path, and derive described derivation data to described derivation path or institute State acquiescence and derive path.
Specifically, processor 200 responds the data of user and imports request, obtains the map of the pipeline of data base 100 storage Information, controls display unit 300 and shows described map, and response user is leading that the selected operation of described map obtains that user selectes Going out data, and the input operation of response user obtains the derivation path of user setup, controlling to derive module 472 derives described derivation Data are to the derivation path of user setup.If processor 200 is not detected by user setup and derives path, control to derive module 472 derive the acquiescence derivation path that described derivation data store to data base 100.
A kind of subdrainage pipe network intelligent management system that the embodiment of the present invention provides, by the pipe of explored underground utilities Line information, is stored in data base with the form of electronic data, and according to inquiry and the management request of user, administrative unit obtains number According to pipeline information corresponding in storehouse and pipeline information is managed, is managed by computer information, it is achieved information sharing, carry High each pipeline ownership unit and urban construction department's efficiency of management to underground utilities and the utilization ratio to line resource, for city Plan, build and manage offer aid decision.
In all examples being illustrated and described herein, any occurrence should be construed as merely exemplary, and not It is that therefore, other examples of exemplary embodiment can have different values in order to limit.It should also be noted that similar label and word Female expression similar terms in following accompanying drawing, therefore, is defined in the most a certain Xiang Yi accompanying drawing, then in accompanying drawing subsequently Need not it be defined further and explains.
In several embodiments provided herein, it should be understood that disclosed device can be by other side Formula realizes.Device embodiment described above is only that schematically such as, the division of described unit, the most only one are patrolled Volume function divides, and actual can have other dividing mode when realizing, the most such as, multiple unit or assembly can in conjunction with or can To be integrated into another system, or some features can be ignored, or does not performs.Another point, shown or discussed each other Coupling direct-coupling or communication connection can be the INDIRECT COUPLING by some communication interfaces, device or unit or communication link Connect, can be electrical, machinery or other form.
The described unit illustrated for separating component can be or may not be physically separate, shows for unit Parts can be or may not be physical location, i.e. may be located at a place, or can also be distributed to multiple network On unit.Some or all of unit therein can be selected according to the actual needs to realize the purpose of the present embodiment scheme.
It addition, each functional unit in each embodiment of the present invention can be integrated in a processing unit, it is also possible to It is that unit is individually physically present, it is also possible to two or more unit are integrated in a unit.
The above, the only detailed description of the invention of the present invention, but protection scope of the present invention is not limited thereto, and any Those familiar with the art, in the technical scope that the invention discloses, can readily occur in change or replace, should contain Cover within protection scope of the present invention.Therefore, protection scope of the present invention should described be as the criterion with scope of the claims.

Claims (10)

1. a subdrainage pipe network intelligent management system, it is characterised in that include data base, administrative unit, processor and show Show unit,
Described data base, is used for storing pipeline information;
Described processor, for responding the pipeline management request of user, controls described administrative unit and obtains and manage described data Pipeline information corresponding in storehouse;
Described display unit, is used for showing described pipeline information.
Subdrainage pipe network intelligent management system the most according to claim 1, it is characterised in that
Described acquisition module, is additionally operable to respond user's selection operation to described map, obtains the target pipeline that user chooses.
Subdrainage pipe network intelligent management system the most according to claim 2, it is characterised in that described administrative unit is also wrapped Including monitoring modular and alarm module, described pipeline information includes cartographic information and the link information of described pipeline,
Described monitoring modular, for periodically monitoring the dynamic attribute of described target pipeline, and relatively described dynamic attribute and institute State the alarm threshold value of the described target pipeline of database purchase;
Described alarm module, for when described dynamic attribute reaches described alarm threshold value, generates warning message.
Subdrainage pipe network intelligent management system the most according to claim 3, it is characterised in that described administrative unit is also wrapped Include and module be set,
Described module is set, is used for responding user's input operation, obtain the alarm threshold value of the described pipeline of user setup.
Subdrainage pipe network intelligent management system the most according to claim 2, it is characterised in that described administrative unit is also wrapped Including monitoring modular and feedback module, described pipeline information includes cartographic information and the link information of described pipeline,
Described monitoring modular, for periodically monitoring the dynamic attribute of described target pipeline, and relatively described dynamic attribute and institute State the alarm threshold value of the described target pipeline of database purchase, generate comparative result;
Described feedback module, for comparative result described in periodic feedback.
Subdrainage pipe network intelligent management system the most according to claim 2, it is characterised in that described administrative unit is also wrapped Include monitoring modular,
Described monitoring modular, for periodically monitoring the dynamic attribute of described target pipeline;
Described display unit, is additionally operable to show described dynamic attribute.
Subdrainage pipe network intelligent management system the most according to claim 2, it is characterised in that described administrative unit is also wrapped Including monitoring modular and prediction module, described pipeline information includes cartographic information and the link information of described pipeline,
Described acquisition module, is additionally operable to obtain weather forecast information;
Described monitoring modular, for according to preset rules and described weather forecast information, calculating the water level letter of described target pipeline Breath, and compare the watermark threshold of the described target pipeline of described water level information and described database purchase;
Described prediction module, for when described water level information reaches described watermark threshold, generates hydrops information of forecasting.
Subdrainage pipe network intelligent management system the most according to claim 2, it is characterised in that described administrative unit is also wrapped Including statistical module, described pipeline information includes length information and/or the pipe point quantity information of described pipeline,
Described statistical module, for responding the pipeline statistics request of user, length and/or the pipe of adding up described target pipeline are counted Amount.
Subdrainage pipe network intelligent management system the most according to claim 1, it is characterised in that described administrative unit includes Map adjustment module, information labeling module, attribute query module or coordinate enquiry module, described pipeline information includes described pipeline At least one markup information to described map of cartographic information, attribute information, coordinate information and user,
Described map adjustment module, for responding the map regulation request of user, regulates size and/or the ratio of described map;
Described information labeling module, for responding the interpolation mark request of this user, or to the deletion of markup information described in one or Amendment request, updates the markup information of described map;
Described attribute query module, for responding the attribute query request of user, obtains the described pipeline of described database purchase Attribute information;
Described coordinate enquiry module, for responding the coordinate inquiry request of user, obtains the described pipeline of described database purchase Coordinate information.
Subdrainage pipe network intelligent management system the most according to claim 1, it is characterised in that described administrative unit bag Including acquisition module and analyze module, described pipeline information includes cartographic information and the link information of described pipeline,
Described acquisition module, draws extract operation for responding user to described map, obtains user and draws the analysis section taken;
Described analysis module, for responding the pipeline analysis request of user, analyzes the position relationship of described analysis section gut line And it is connective.
CN201610878424.7A 2016-10-08 2016-10-08 A kind of subdrainage pipe network intelligent management system Pending CN106250570A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610878424.7A CN106250570A (en) 2016-10-08 2016-10-08 A kind of subdrainage pipe network intelligent management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610878424.7A CN106250570A (en) 2016-10-08 2016-10-08 A kind of subdrainage pipe network intelligent management system

Publications (1)

Publication Number Publication Date
CN106250570A true CN106250570A (en) 2016-12-21

Family

ID=57612401

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610878424.7A Pending CN106250570A (en) 2016-10-08 2016-10-08 A kind of subdrainage pipe network intelligent management system

Country Status (1)

Country Link
CN (1) CN106250570A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106971352A (en) * 2017-03-28 2017-07-21 衡水益通管业股份有限公司 System and method for constructing sponge city based on Internet and microcirculation system
CN107274323A (en) * 2017-05-27 2017-10-20 中山市知科应用科技研究有限公司 A kind of dynamic managing and control system of municipal drainage
CN107730214A (en) * 2017-11-06 2018-02-23 中煤航测遥感集团有限公司 Pipeline quality inspection system and equipment
CN108509559A (en) * 2018-03-23 2018-09-07 国网上海市电力公司 A kind of underground electric line resource total management system
CN109255446A (en) * 2018-09-13 2019-01-22 上海万朗水务科技有限公司 Secondary water-supply facility management system for internet of things
CN114860858A (en) * 2022-03-31 2022-08-05 广东爱科环境科技有限公司 Drainage facility investigation system and terminal equipment
CN117540329A (en) * 2024-01-09 2024-02-09 北京建筑大学 Online early warning method and system for defects of drainage pipe network based on machine learning

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102799612A (en) * 2012-06-14 2012-11-28 天津大学 GIS (Geographic Information System)-based comprehensive management system for underground pipelines
CN105023118A (en) * 2015-08-19 2015-11-04 湖南大麓管道工程有限公司 Method and system for managing drainage pipe detection data and assessment result data
CN105022769A (en) * 2015-01-07 2015-11-04 泰华智慧产业集团股份有限公司 Data interaction system of urban underground pipeline, and method thereof
CN105065917A (en) * 2015-08-24 2015-11-18 苏交科集团股份有限公司 Urban drainage network online detection method
CN105550758A (en) * 2016-01-18 2016-05-04 无锡扬晟科技有限公司 GIS-based underground pipeline operation and maintenance system
US20160125338A1 (en) * 2014-10-31 2016-05-05 Mona Serageldin Planning System Using Spatial-Based Visualization Aids

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102799612A (en) * 2012-06-14 2012-11-28 天津大学 GIS (Geographic Information System)-based comprehensive management system for underground pipelines
US20160125338A1 (en) * 2014-10-31 2016-05-05 Mona Serageldin Planning System Using Spatial-Based Visualization Aids
CN105022769A (en) * 2015-01-07 2015-11-04 泰华智慧产业集团股份有限公司 Data interaction system of urban underground pipeline, and method thereof
CN105023118A (en) * 2015-08-19 2015-11-04 湖南大麓管道工程有限公司 Method and system for managing drainage pipe detection data and assessment result data
CN105065917A (en) * 2015-08-24 2015-11-18 苏交科集团股份有限公司 Urban drainage network online detection method
CN105550758A (en) * 2016-01-18 2016-05-04 无锡扬晟科技有限公司 GIS-based underground pipeline operation and maintenance system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
赵立东: "城市综合管网GIS信息化建设探究", 《首都师范大学学报(自然科学版)》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106971352A (en) * 2017-03-28 2017-07-21 衡水益通管业股份有限公司 System and method for constructing sponge city based on Internet and microcirculation system
CN107274323A (en) * 2017-05-27 2017-10-20 中山市知科应用科技研究有限公司 A kind of dynamic managing and control system of municipal drainage
CN107730214A (en) * 2017-11-06 2018-02-23 中煤航测遥感集团有限公司 Pipeline quality inspection system and equipment
CN108509559A (en) * 2018-03-23 2018-09-07 国网上海市电力公司 A kind of underground electric line resource total management system
CN109255446A (en) * 2018-09-13 2019-01-22 上海万朗水务科技有限公司 Secondary water-supply facility management system for internet of things
CN114860858A (en) * 2022-03-31 2022-08-05 广东爱科环境科技有限公司 Drainage facility investigation system and terminal equipment
CN117540329A (en) * 2024-01-09 2024-02-09 北京建筑大学 Online early warning method and system for defects of drainage pipe network based on machine learning
CN117540329B (en) * 2024-01-09 2024-03-29 北京建筑大学 Online early warning method and system for defects of drainage pipe network based on machine learning

Similar Documents

Publication Publication Date Title
CN106250570A (en) A kind of subdrainage pipe network intelligent management system
CN105843942B (en) A kind of Urban Flood control decision support method based on big data technology
US9158035B2 (en) System and method of automated acquisition, correlation and display of power distribution grid operational parameters and weather events
CN109738970A (en) The method, apparatus and storage medium for realizing Lightning Warning are excavated based on lightning data
CN108399652A (en) Method, apparatus, storage medium and the terminal device of City Buried Pipeline three-dimension monitor model foundation
CN104992254B (en) Mountain fire based on power grid GIS and the meteorological trend pre-judging method combined
CN105320811A (en) Method for establishing topological connected model of urban underground electricity pipe network
CN109977185A (en) Atmosphere pollution monitoring and managing method and system based on grid
CN104899922A (en) Three-dimensional holographic generation method for intelligent power grid visualization application
CN111027834A (en) Power cable informatization management system and method based on three-dimensional detection technology
CN105931014A (en) Gridding management service system and method for town community
CN106651074A (en) Intelligent underground pipeline management system
CN103646348B (en) Method for saving factory station wiring diagram panoramic inversion context
CN104077667A (en) Digital campus integrated application system based on two-dimensional and three-dimensional integration
CN106373032B (en) The high-incidence region discrimination method of Distribution Network Failure based on big data
CN109245310A (en) A kind of electric power monitoring system based on real-time data base
CN114357694A (en) Transformer substation digital twinning method and device based on large-scale point cloud
CN108073644A (en) A kind of power grid meteorology mass data processing method
CN112860825A (en) Method and system for realizing one map of irrigation area management
CN114238543A (en) Drainage pipe network geographic information system
CN112328723B (en) Digital steel mill visualization analysis system based on GIS
CN110474431A (en) A kind of power system visualization platform monitoring management method and system
CN106846168A (en) The processing unit and system of transmission line of electricity scissors crossing
CN113885698A (en) Pipeline informatization management and control system
CN111311133B (en) Monitoring system applied to power grid production equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20161221

RJ01 Rejection of invention patent application after publication