CN106248366A - Automatically flow into control valve and flow into characteristic test device - Google Patents

Automatically flow into control valve and flow into characteristic test device Download PDF

Info

Publication number
CN106248366A
CN106248366A CN201610804121.0A CN201610804121A CN106248366A CN 106248366 A CN106248366 A CN 106248366A CN 201610804121 A CN201610804121 A CN 201610804121A CN 106248366 A CN106248366 A CN 106248366A
Authority
CN
China
Prior art keywords
control valve
flow
automatically
flows
fluid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610804121.0A
Other languages
Chinese (zh)
Inventor
刘合
俞佳庆
郑立臣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Natural Gas Co Ltd
Original Assignee
China Petroleum and Natural Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Natural Gas Co Ltd filed Critical China Petroleum and Natural Gas Co Ltd
Priority to CN201610804121.0A priority Critical patent/CN106248366A/en
Publication of CN106248366A publication Critical patent/CN106248366A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M13/00Testing of machine parts

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)

Abstract

This application provides one and automatically flow into control valve inflow characteristic test device, it automatically flows into the inflow characteristic of control valve for test, including: storage tank, control valve, stress test unit and flow test units.Storage tank is connected with automatically flowing into control valve, its for store there is the first preset pressure treat fluid measured.Control valve is connected with storage tank, and control valve treats the flow of fluid measured for regulation.Stress test unit flows through, for testing fluid, the pressure automatically flowing into control valve.Flow test units flows through, for testing fluid, the flow automatically flowing into control valve.The control valve that automatically flows into of the present invention flows into characteristic test device by testing different fluid, the control valve pressure flow relation property to different viscosity fluid is automatically flowed into for test, and then can be according to realistic well condition needs, the different control valves that automatically flows into rationally is selected, Guiding Practice.

Description

Automatically flow into control valve and flow into characteristic test device
Technical field
The application belongs to technical field of petroleum extraction, is specifically related to one and automatically flows into control valve inflow characteristic test dress Put.
Background technology
Owing to most oil field is all heterogeneous body, multiple zone sandstone oil reservoir, pressure and Permeability Distribution between stratum Uneven.The uneven flow profile along pit shaft direction being consequently formed can cause too early aqueous vapor to break through, filter net jam, Sand proof well corrodes, the service life of the reduction oil well that this will be serious and production capacity.
In order to eliminate this problem, automatically flow into control valve and start gradually to be used.Automatically flowing into control valve is one to finish Well device, it can identify fluid viscosity (such as: Oil, Water, Gas) automatically, produces different pressure drops to limit flowing, adjusts pit shaft In pressure distribution, finally realize inflow profile and be uniformly distributed, thus reach good control gas, control water effect.
Generally when oil well carries out completion, according to hole condition select difference flow into characteristic automatically flow into control valve.But mesh Front shortage flows into, to automatically flowing into control valve, the means that characteristic is tested, and thus results in selection and automatically flows into control valve and carry out During completion, it will usually select according to the experience of operator, so can cause automatically flowing into control valve and can not well control Gas, control water.
Summary of the invention
In order to overcome the drawbacks described above of prior art, the technical problem to be solved is to provide one and automatically flows into Control valve flows into characteristic test device, and it may be used for testing the pressure-flow automatically flowing into control valve to different viscosity fluid Relation property.
The concrete technical scheme of the present invention is:
The present invention provides one to automatically flow into control valve and flows into characteristic test device, and it automatically flows into control valve for test Inflow characteristic, including:
Automatically flow into, with described, the storage tank that control valve is connected, its for store there is the first preset pressure treat flow measurement Body;
The control valve being connected with described storage tank, described control valve treats the flow of fluid measured described in regulate;
Stress test unit, its for test fluid flow through described in automatically flow into the pressure of control valve;
Flow test units, its for test fluid flow through described in automatically flow into the flow of control valve.
In one preferred embodiment, described in automatically flow into control valve flow into characteristic test device include switch valve, It is the break-make of fluid in controlling described storage tank.
In one preferred embodiment, described first preset pressure is more than the pressure under on-the-spot oil well.
In one preferred embodiment, described fluid is liquid.
In one preferred embodiment, the heating element heater that described fluid is heated, institute it are provided with in described storage tank State automatically flow into control valve flow into characteristic test device include temperature measurement unit, its for measurement flow through described in automatically flow into control The fluid temperature (F.T.) of valve processed.
In one preferred embodiment, described storage tank has the first opening and the second opening, and described fluid passes through institute State the first opening flow to described in automatically flow into control valve and test, after completing test by described second opening be back to In described storage tank.
In one preferred embodiment, automatically flow into control valve inflow characteristic test device described in include and described storage The liquid pump of tank connection, described liquid pump from described storage tank after withdrawn fluid, flow to described in automatically flow in control valve.
In one preferred embodiment, described storage tank includes the 3rd opening;The described control valve that automatically flows into flows into spy System safety testing device includes showing the Pressure gauge of outgoing fluid pressure in described storage tank, and respectively with described liquid pump and described storage The overflow valve of tank the 3rd opening in communication;When described manometric pressure is more than the second preset pressure, described overflow valve is opened, Will be greater than the fluid of the second preset pressure by described 3rd open closed to described storage tank, and by satisfied test pressure Automatically flow in control valve described in fluid feeding and test.
In one preferred embodiment, described second preset pressure is less than the first preset pressure.
In one preferred embodiment, automatically flow into described in control valve flow into characteristic test device include with described from The observation window that dynamic inflow control valve is connected with described storage tank.
In one preferred embodiment, described fluid is gas.
In one preferred embodiment, the external world can be immediately discharged to from the described fluid automatically flowing into control valve outflow.
By above technical scheme, the application has the beneficial effects that: the control valve that automatically flows into of the present invention flows into spy System safety testing device, by testing different fluid, automatically flows into the control valve pressure to different viscosity fluid for test Power discharge relation characteristic, and then according to realistic well condition needs, the different control valves that automatically flows into rationally can be selected Select, Guiding Practice.
With reference to explanation hereinafter and accompanying drawing, disclose in detail the particular implementation of the application, specify the former of the application Reason can be in adopted mode.It should be understood that presently filed embodiment is not so limited in scope.In appended power In the range of the spirit and terms that profit requires, presently filed embodiment includes many changes, revises and be equal to.
The feature described for a kind of embodiment and/or illustrate can be in same or similar mode one or more Other embodiment individual uses, combined with the feature in other embodiment, or substitute the feature in other embodiment.
It should be emphasized that term " includes/comprises " existence referring to feature, one integral piece, step or assembly herein when using, but also It is not excluded for the existence of one or more further feature, one integral piece, step or assembly or additional.
Accompanying drawing explanation
Accompanying drawing described here is only used for task of explanation, and is not intended to limit model disclosed in the present application by any way Enclose.It addition, the shape of each parts in figure and proportional sizes etc. are only schematically, it is adapted to assist in the understanding to the application, and It not shape and the proportional sizes specifically limiting each parts of the application.Those skilled in the art, can under teachings of the present application To select various possible shape and proportional sizes to implement the application as the case may be.In the accompanying drawings:
Fig. 1 is that the control valve that automatically flows into of the application flows into the structural representation of first embodiment of characteristic test device Figure;
Fig. 2 is that the control valve that automatically flows into of the application flows into the structural representation of second embodiment of characteristic test device Figure;
Fig. 3 is that the control valve that automatically flows into of the application flows into the structural representation of the 3rd embodiment of characteristic test device Figure;
Fig. 4 is that the control valve that automatically flows into of the application flows into the pressure-stream of the different viscosity fluid of characteristic test device test Magnitude relation characteristic curve schematic diagram.
The reference of the figures above: 1, automatically flow into control valve;2, storage tank;21, heating element heater;22, the first opening; 23, the second opening;24, the 3rd opening;3, control valve;4, stress test unit;5, flow test units;6, switch valve;7, temperature Degree measuring unit;8, liquid pump;9, motor;10, Pressure gauge;11, overflow valve;12, observation window.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the application embodiment, the technical scheme in the application embodiment is carried out clearly Chu, it is fully described by, it is clear that described embodiment is only a part of embodiment of the application rather than whole realities Execute mode.Based on the embodiment in the application, those of ordinary skill in the art are institute under not making creative work premise The every other embodiment obtained, broadly falls into the scope of the application protection.
It should be noted that when element is referred to as " being arranged at " another element, and it can be directly on another element Or element placed in the middle can also be there is.When an element is considered as " connection " another element, and it can be to be directly connected to To another element or may be simultaneously present centering elements.Term as used herein " vertical ", " level ", " left ", For illustrative purposes only, being not offered as is unique embodiment for " right " and similar statement.
Unless otherwise defined, all of technology used herein and scientific terminology and the technical field belonging to the application The implication that technical staff is generally understood that is identical.Term used in the description of the present application is intended merely to describe tool herein The purpose of the embodiment of body, it is not intended that in limiting the application.Term as used herein "and/or" includes one or more Arbitrary and all of combination of relevant Listed Items.
As it is shown in figure 1, the present invention provides one to automatically flow into control valve flows into characteristic test device, it is used for testing automatically The inflow characteristic of inflow control valve 1, it includes: storage tank 2, control valve 3, stress test unit 4 and flow test units 5.Storage Tank 2 automatically flows into what control valve 1 was connected with described, its for store there is the first preset pressure treat fluid measured.Control valve 3 Being connected with described storage tank 2, described control valve 3 treats the flow of fluid measured described in regulate.Stress test unit 4 is used for testing Fluid automatically flows into the pressure of control valve 1 described in flowing through.Flow test units 5 be used for testing fluid flow through described in automatically flow into control The flow of valve 1 processed.
In the present embodiment, the fluid to be tested with the first preset pressure can be stored in storage tank 2.Normal conditions Under, the first preset pressure is greater than the pressure under on-the-spot oil well, automatically flows into ensureing that the fluid in storage tank 2 can enter smoothly In control valve 1.This fluid can be that the fluid of liquid can also be for the fluid of gaseous state.Storage tank 2 generally flows with the automatic of test Enter control valve 1 to be connected, so so that the fluid entrance flowed out in storage tank 2 automatically flows into control valve 1, with to this stream The inflow characteristic of body is tested.
Described control valve 3 can be connected with described storage tank 2, and control valve 3 is for regulating the flow of described fluid.In test In, by regulating this control valve 3, the flow flowing out fluid in storage tank 2 can be carried out Reasonable Regulation And Control.Such as, reality can be simulated The uninterrupted of border hole condition Crude Oil is tested.
Stress test unit 4 generally can be connected with the described control valve 1 that automatically flows into, and it can test stream in storage tank 2 The fluid gone out automatically flows into the pressure of control valve 1 described in flowing through.This stress test unit 4 can be pressure transducer.
Flow test units 5 generally also can be connected with the described control valve 1 that automatically flows into, and it is used for testing fluid and flows through The described flow automatically flowing into control valve 1.It is to say, the fluid in storage tank 2 flows through after automatically flowing into control valve 1, Ke Yiyou Stress test unit 4 detects that fluid flows through the pressure automatically flowing into control valve 1, is detected stream by flow test units 5 simultaneously Body flows through the flow automatically flowing into control valve 1, this flow test units 5 typically effusion meter.
Thus can test out the spy automatically flowing into control valve 1 to the pressure flow relation of the fluid of different viscositys Property.Such as, for utilizing the pressure automatically flowing into the fluid that control valve flows into the different viscosity of characteristic test device test in Fig. 4 Discharge relation performance diagram.Wherein viscosity is 1mm2The curve of/s is the pressure flow characteristic curve figure of water;Viscosity is 150mm2The curve of/s is the pressure flow characteristic curve figure of hydraulic oil.
The present invention automatically flow into control valve flow into characteristic test device by different fluid is tested, be used for testing Automatically flow into the control valve 1 pressure flow relation property to different viscosity fluid, so can according to realistic well condition needs, The different control valves 1 that automatically flows into rationally is selected, Guiding Practice.
Further, referring to accompanying drawing 2 and accompanying drawing 3, this automatically flows into control valve inflow characteristic test device and includes switch Valve 6, it can be connected with this storage tank 2, to control the break-make of fluid in described storage tank 2.Specifically, switch valve 6, storage tank are opened Fluid in 2 can flow out storage tank 2, enters and automatically flows in control valve 1.Closing switch valve 6, fluid will be no longer from storage tank 2 Flow out.
When the fluid in storage tank 2 is liquid, can be provided with, in described storage tank 2, the heating that convection cell (liquid) carries out heating Element 21, this heating element heater 21 typically thermal resistance.This testing liquid generally can choose water or different shaped as required Number hydraulic oil.
Owing to fluid is liquid, the viscosity of liquid and temperature have much relations.When generally testing at low ambient temperatures, Need to be heated by heating element heater 21 (thermal resistance).The described control valve inflow characteristic test device that automatically flows into includes temperature Measuring unit 7, its for measure flow through described in automatically flow into the temperature of fluid of control valve 1, this temperature measurement unit 7 generally may be used To select thermometer.The temperature information shown by temperature measurement unit 7 (thermometer), can be met in testing liquid temperature and want When asking, then carry out flowing into characteristic test test.
It addition, when the fluid in storage tank 2 is liquid, this fluid flow through described in automatically flow into control valve 1 and complete to test it After, can be back in described storage tank 2.I.e. this automatically flows into control valve and flows into the loop that characteristic test device can be a Guan Bi. Specifically, described storage tank 2 has the first opening 22 and the second opening 23, and described fluid (liquid) is flowed by described first opening 22 Automatically flow into control valve 1 described in entering to test, after completing test, be back to described storage tank 2 by described second opening 23 Middle recovery is stand-by.
In a preferred embodiment, this automatically flow into control valve flow into characteristic test device also include and described storage tank 2 The liquid pump 8 of connection, this liquid pump 8 can be that fluid (liquid) provides certain energy, makes fluid (liquid) pump smoothly enter certainly In dynamic inflow control valve 1.Described liquid pump 8 can be controlled to flow to automatically flow into after withdrawn fluid from described storage tank 2 by motor 9 Control valve 1.
Further, described storage tank 2 includes the 3rd opening 24.The described control valve that automatically flows into flows into characteristic test device bag Include and show the Pressure gauge 10 of fluid (liquid) outflow pressure in described storage tank 2, and respectively with described liquid pump 8 and described storage tank The overflow valve 11 that 2 the 3rd openings 24 are connected.This Pressure gauge 10 would generally set second preset pressure value, when described pressure When the pressure of table 10 is more than the second preset pressure, described overflow valve 11 opens, and passes through will be greater than the fluid of the second preset pressure In described 3rd open closed to described storage tank 2, and automatically flow in control valve 1 described in the fluid feeding of satisfied test pressure Test.So can ensure that the pressure in the loop automatically flowing into control valve inflow characteristic test device meets test and wants Ask.Usual second preset pressure is less than the first preset pressure.
Under normal conditions, when needing fluid (liquid) flow of test less, the second pre-of Pressure gauge 10 can be turned down If force value.And when fluid (liquid) flow needing test is bigger, the second of Pressure gauge 10 can be tuned up accordingly and preset Force value.Pressure gauge 10 sets second preset pressure, is that flow is carried out coarse adjustment in fact.After coarse adjustment flow, then regulate Control valve 3 can realize the accurate regulation of convection cell (liquid) flow.
It addition, this automatically flow into control valve flow into characteristic test device also include being arranged on described in automatically flow into control valve 1 And the observation window 12 on loop between described storage tank 2.Color and the quality of fluid (liquid) can be observed by this observation window 12. When fluid (liquid) color is fouling turbid, or when fluid (liquid) amount is not enough, convection cell (liquid) to be replaced or add.
In another embodiment, when the fluid in storage tank 2 is gas, referring to accompanying drawing 3, this control valve 3 is permissible For gas throttling valve.The quantity of this storage tank 2 rationally can be arranged according to the number of gas.One storage such as can be set The storage tank 2 of gas, it is also possible to two storage tanks 2 storing gas are set.When arranging the storage tank 2 that two store gas, switch valve 6 Quantity should be two mutually.Two switch valves 6 can control the break-make of fluid (gas) in two storage tanks 2 respectively.
In a preferred embodiment, when the fluid in storage tank 2 is gas, flow out from the described control valve 1 that automatically flows into Fluid can be immediately discharged to the external world.The generally gas of test can choose the gas of nontoxic pollution-free, such as can be nitrogen. So complete test, drain into from automatically flowing into control valve 1 effluent air ambient atmosphere does not results in any pollution, very ring Protect.
It should be noted that the storage tank 2 etc. that the present embodiment provides can select the existing structure of any appropriate.For understanding letter Strategic point illustrates the technical scheme that the present embodiment is provided, and no longer will repeat above-mentioned part at this, and Figure of description also enters Go corresponding simplification.However, it should be understood that the most therefore the present embodiment is restricted in scope.
Herein cited any digital value all include between lower limit to higher limit with the lower value of an incremented and , between any lower value and any much higher value, there is the interval of at least two unit in all values of upper value.For example, as Fruit elaborates that the quantity of parts or the value of process variable (such as temperature, pressure, time etc.) are from 1 to 90, preferably from 20 To 80, more preferably from 30 to 70, then list such as 15 to 85,22 during purpose illustrates that this description the most clearly and arrive 68,43 to 51,30 to 32 is equivalent.For the value less than 1, suitably think that a unit is 0.0001,0.001,0.01,0.1. These only want the example clearly expressed, it is believed that the institute of the numerical value enumerated between minimum and peak is likely Combination is expressly set forth in this description the most in a similar manner.
Except as otherwise noted, all scopes all include all numerals between end points and end points.It is used together with scope " about " or " approximation " be suitable for two end points of this scope.Thus, " about 20 to 30 " are intended to cover that " about 20 to about 30 ", the end points indicated at least is included.
The all articles disclosed and reference material, including patent application and publication, for various purposes by quoting knot Together in this.Describe combination term " substantially by ... constitute " should include determined by element, composition, parts or step and reality Other elements, composition, parts or the step of the basic novel feature of this combination is not affected in matter.Use term " comprise " or " include " combination describing element, composition, parts or step here it is also contemplated that basic by these elements, composition, parts Or the embodiment that step is constituted.Here by use term " can ", it is intended to illustrate that " permissible " include is described any Attribute is all optional.
Multiple elements, composition, parts or step can be provided by single integrated component, composition, parts or step.Alternative Ground, single integrated component, composition, parts or step can be divided into multiple elements, composition, parts or the step of separation.It is used for The open "a" or "an" describing element, composition, parts or step is not said to get rid of other element, composition, parts Or step.
It should be understood that above description is to illustrate rather than to limit.By reading above-mentioned retouching Stating, the many embodiments outside the example provided and many application will be the most all aobvious and easy See.Therefore, the scope of this teaching should not determine with reference to foregoing description, but should with reference to aforementioned claim and this The four corner of the equivalent that a little claim are had determines.Include specially for comprehensive purpose, all articles and reference The disclosure of profit application and bulletin is all passed through with reference to being incorporated herein.Theme disclosed herein is omitted in aforementioned claim Any aspect is not intended to abandon this body matter, also should not be considered as applicant and is not thought of as disclosed by this theme A part for application theme.

Claims (12)

1. automatically flowing into control valve and flow into a characteristic test device, it automatically flows into the inflow characteristic of control valve for test, It is characterized in that, including:
Automatically flow into, with described, the storage tank that control valve is connected, its for store there is the first preset pressure treat fluid measured;
The control valve being connected with described storage tank, described control valve treats the flow of fluid measured described in regulate;
Stress test unit, its for test fluid flow through described in automatically flow into the pressure of control valve;
Flow test units, its for test fluid flow through described in automatically flow into the flow of control valve.
The control valve that automatically flows into the most according to claim 1 flows into characteristic test device, it is characterised in that described automatic stream Entering control valve inflow characteristic test device and include switch valve, it is the break-make of fluid in controlling described storage tank.
The control valve that automatically flows into the most according to claim 1 flows into characteristic test device, it is characterised in that described first pre- If pressure is more than the pressure under on-the-spot oil well.
The control valve that automatically flows into the most according to claim 1 and 2 flows into characteristic test device, it is characterised in that described stream Body is liquid.
The control valve that automatically flows into the most according to claim 4 flows into characteristic test device, it is characterised in that in described storage tank Be provided with the heating element heater that described fluid is heated, described in automatically flow into control valve flow into characteristic test device include that temperature is surveyed Amount unit, its for measure flow through described in automatically flow into the fluid temperature (F.T.) of control valve.
The control valve that automatically flows into the most according to claim 4 flows into characteristic test device, it is characterised in that described storage tank has Have the first opening and the second opening, described fluid by described first opening flow to described in automatically flow into control valve and test, It is back to described storage tank by described second opening after completing test.
The control valve that automatically flows into the most according to claim 4 flows into characteristic test device, it is characterised in that described automatic stream Entering control valve and flow into the liquid pump that characteristic test device includes connecting with described storage tank, described liquid pump extracts from described storage tank After fluid, flow to described in automatically flow in control valve.
The control valve that automatically flows into the most according to claim 7 flows into characteristic test device, it is characterised in that described storage tank bag Include the 3rd opening;The described control valve that automatically flows into flows into characteristic test device and includes showing outgoing fluid pressure in described storage tank Pressure gauge, and respectively with described liquid pump and the overflow valve of described storage tank the 3rd opening in communication;When described manometric pressure When power is more than the second preset pressure, described overflow valve opens, and opens by the described 3rd will be greater than the fluid of the second preset pressure Mouth is back in described storage tank, and tests automatically flowing in control valve described in the fluid feeding of satisfied test pressure.
The control valve that automatically flows into the most according to claim 8 flows into characteristic test device, it is characterised in that described second pre- If pressure is less than the first preset pressure.
The most according to claim 4 automatically flow into control valve flow into characteristic test device, it is characterised in that described automatically Inflow control valve flows into the observation window that characteristic test device includes automatically flowing into control valve with described and described storage tank is connected.
11. control valves that automatically flow into according to claim 1 and 2 flow into characteristic test device, it is characterised in that described stream Body is gas.
12. according to claim 11 automatically flow into control valves flow into characteristic test device, it is characterised in that from described from The fluid that dynamic inflow control valve flows out can be immediately discharged to the external world.
CN201610804121.0A 2016-09-05 2016-09-05 Automatically flow into control valve and flow into characteristic test device Pending CN106248366A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610804121.0A CN106248366A (en) 2016-09-05 2016-09-05 Automatically flow into control valve and flow into characteristic test device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610804121.0A CN106248366A (en) 2016-09-05 2016-09-05 Automatically flow into control valve and flow into characteristic test device

Publications (1)

Publication Number Publication Date
CN106248366A true CN106248366A (en) 2016-12-21

Family

ID=57599413

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610804121.0A Pending CN106248366A (en) 2016-09-05 2016-09-05 Automatically flow into control valve and flow into characteristic test device

Country Status (1)

Country Link
CN (1) CN106248366A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109032104A (en) * 2018-05-23 2018-12-18 中国海洋石油集团有限公司 One kind automatically flowing into control device Performance Test System and method
CN114088361A (en) * 2020-08-06 2022-02-25 中国石油天然气股份有限公司 ICD testing device and system and application thereof

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2002005048A1 (en) * 2000-07-12 2002-01-17 Robert Bosch Gmbh Method and device for controlling at least one valve
DE102005049088B4 (en) * 2005-10-13 2010-06-17 Airbus Deutschland Gmbh Test arrangement for valves
CN101788380A (en) * 2009-01-22 2010-07-28 上海华普汽车有限公司 Simulation system for diaphragm spring of clutch
CN201600239U (en) * 2010-01-18 2010-10-06 浙江艾迪西流体控制股份有限公司 Flow characteristics testing system for pressure reducing valve
CN202351030U (en) * 2011-12-01 2012-07-25 宁波路润冷却器制造有限公司 Detector for pressure limiting valve
CN203249760U (en) * 2013-04-07 2013-10-23 卓旦春 Detecting device of temperature control valve
CN205300835U (en) * 2015-12-28 2016-06-08 北航温州研究院 Flow flow resistance coefficient detection device of valve
CN205352677U (en) * 2016-01-04 2016-06-29 上海市特种设备监督检验技术研究院 Valve flow flow resistance test device

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2002005048A1 (en) * 2000-07-12 2002-01-17 Robert Bosch Gmbh Method and device for controlling at least one valve
DE102005049088B4 (en) * 2005-10-13 2010-06-17 Airbus Deutschland Gmbh Test arrangement for valves
CN101788380A (en) * 2009-01-22 2010-07-28 上海华普汽车有限公司 Simulation system for diaphragm spring of clutch
CN201600239U (en) * 2010-01-18 2010-10-06 浙江艾迪西流体控制股份有限公司 Flow characteristics testing system for pressure reducing valve
CN202351030U (en) * 2011-12-01 2012-07-25 宁波路润冷却器制造有限公司 Detector for pressure limiting valve
CN203249760U (en) * 2013-04-07 2013-10-23 卓旦春 Detecting device of temperature control valve
CN205300835U (en) * 2015-12-28 2016-06-08 北航温州研究院 Flow flow resistance coefficient detection device of valve
CN205352677U (en) * 2016-01-04 2016-06-29 上海市特种设备监督检验技术研究院 Valve flow flow resistance test device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
符林芳等: "《液压与气压传动技术》", 31 July 2016 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109032104A (en) * 2018-05-23 2018-12-18 中国海洋石油集团有限公司 One kind automatically flowing into control device Performance Test System and method
CN109032104B (en) * 2018-05-23 2020-06-26 中国海洋石油集团有限公司 System and method for testing performance of automatic inflow control device
CN114088361A (en) * 2020-08-06 2022-02-25 中国石油天然气股份有限公司 ICD testing device and system and application thereof

Similar Documents

Publication Publication Date Title
CN111207010B (en) Ground test device and test method for directly pressurizing cold helium in liquid oxygen temperature zone
CN104819926A (en) Multi-field coupling penetration test device and method for cracked rock
US20140133519A1 (en) Equipment and methods for designing geothermal heat exchange systems
CN104535470A (en) Penetration and corrosion triaxial testing apparatus for gravel soil and testing method thereof
CN103868838B (en) Soil body osmotic coefficient measuring system
CN102562040A (en) Dynamic evaluation instrument for high-temperature and high-pressure drilling fluid loss
CN107063962A (en) Rock couples infiltration experiment device and method
CN107062385A (en) Floor heating control method, device and system
CN106248366A (en) Automatically flow into control valve and flow into characteristic test device
CN104198169B (en) Rupture disk test system
US9506883B2 (en) Scale deposition testing device
CN107014629A (en) Water purifier structure performance testing equipment and test method
CN103939064B (en) For two-layer note supercritical CO2Analogue means and the method for the research of mouth properties of flow
CN105021513A (en) Full-size sand-prevention high-temperature and high-pressure steam simulation system
CN101644633B (en) Dynamic simulating detection test platform for properties of wire wound filter element and powdered resin
CN106978994A (en) A kind of foam discharging agent inspection system
CN204831980U (en) Full -scale high temperature high pressure steam sand control analog system that takes in and send out
CN110658120B (en) Method and device for testing permeability coefficient of foam-improved sandy residue soil under high water pressure
CN103308212B (en) Temperature testing system for instant water heater
CN105866388A (en) Measurement apparatus used for researching characteristic of oil-containing refrigerant, and measurement method thereof
CN110375984A (en) A kind of complete series balanced valve test macro and test method
CN111271050A (en) Horizontal well AICD intelligent water control sieve tube performance testing method
CN207215620U (en) Servo explosion circulation test device
CN107387072A (en) A kind of HTHP gas-liquid replaces lab simulation evaluating apparatus
CN204098906U (en) Leak stopping reverse pressure-bearing determinator

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20161221