Prior art keywords
rov
folding arm
arm device
well site
control method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610712819.XA
Other languages
Chinese (zh)
Other versions
CN106194026B (en
Inventor
张振波
于欣哲
刘宾
轩义华
薛志刚
龙黎
李东方
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Oilfield Services Ltd
China National Offshore Oil Corp CNOOC
CNOOC Deepwater Development Ltd
CNOOC China Ltd Shenzhen Branch
Original Assignee
China Oilfield Services Ltd
China National Offshore Oil Corp CNOOC
CNOOC Deepwater Development Ltd
CNOOC China Ltd Shenzhen Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Oilfield Services Ltd, China National Offshore Oil Corp CNOOC, CNOOC Deepwater Development Ltd, CNOOC China Ltd Shenzhen Branch filed Critical China Oilfield Services Ltd
Priority to CN201610712819.XA priority Critical patent/CN106194026B/en
Publication of CN106194026A publication Critical patent/CN106194026A/en
Application granted granted Critical
Publication of CN106194026B publication Critical patent/CN106194026B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/12Underwater drilling
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/001Survey of boreholes or wells for underwater installation

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geophysics (AREA)
  • Earth Drilling (AREA)

Abstract

The present invention relates to the control method of a kind of well site survey system for marine dynamically-positioned drilling platform, this control method comprises the following steps: S1: after dynamically-positioned drilling platform arrives well location to be measured, the framework of ROV is installed the hydraulic folding arm device for carrying TSS440 system, meanwhile, described ROV carries well site survey equipment;S2: described hydraulic folding arm device is adjusted to erected state, operator control described ROV and enter water, and mobile to predetermined operation position, seabed;S3: operator control described hydraulic folding arm device and are adjusted to the state of balancing, the search coil keeping described TSS440 system is parallel with the horizontal median axis of described ROV, control described ROV to carry out investigating operation according to default investigation survey line, obtain described TSS440 system and the survey data of described well site survey equipment, and by described survey data real-time Transmission to described platform.The present invention realizes better controling over the well site survey system for marine dynamically-positioned drilling platform and carries out the investigation work of well site, seabed.

Description

A kind of control method of the well site survey system for marine dynamically-positioned drilling platform
Technical field
The present invention relates to offshore petroleum drilling technical field, bore for marine dynamic positioning more particularly, it relates to a kind of The control method of the well site survey system of platform shaft.
Background technology
Along with the development of China's economic, petroleum-based energy demand is continuously increased.Single land exploitation oil gas Resource can not meet needs, and following increasing exploitation will focus on sea.China's Marine oil and gas resource exploitation at present is main Continental shelf that will be shallower in coastal waters, but the oil and gas reserves at deep-sea accounts for 1/3rd of Chinese Petroliferous total resources, along with stone The progress of exploration activity production technique, marches deep-sea and has become inevitable.
Marine dynamically-positioned drilling platform is as the carrier of deep water hydrocarbon resource exploitation, relative to the semi-submersible type drilling well in shallow sea Platform has DP dynamic positioning system, provides good operating condition for deep water hydrocarbon resource drilling.General drilling platforms exists Need before spudding in that design well head is carried out well site to investigate in advance.
Traditional deep water well site investigation method is with special investigation vessel traction tube workpiece, carries multibeam echosounder, side Sweep sonar, region, well site is investigated by the shallow equipment such as system, magnetometer that cuts open.Owing to investigation vessel and tube workpiece are relatively costly, In addition be limited to the impact of sea situation and operating water depth in region, deep-sea, working performance is low, and the expense causing deep water well site survey is non- Chang Gao.Owing to the depth of water is very big, fact-finding process is difficult by double ship positionnings, data transmission distance length, at the middle and upper levels flow instability etc. because of Element impact, the error in data obtained is bigger.For reducing drillng operation risk, generally require drill ship away from the pre-location of well, this Reduce exploration success ratio to a certain extent.
Accordingly, it would be desirable to better control over well site survey system to carry out the investigation work of well site, seabed.
Summary of the invention
The technical problem to be solved in the present invention is, for the drawbacks described above of prior art, it is provided that a kind of dynamic for sea The control method of the well site survey system of power spitting drill platform shaft.
The technical solution adopted for the present invention to solve the technical problems is: structure one is put down for marine dynamic positioning drilling well The control method of the well site survey system of platform, comprises the following steps:
After S1: dynamically-positioned drilling platform arrives well location to be measured, the framework of ROV is installed and is used for carrying TSS440 system Hydraulic folding arm device, meanwhile, described ROV carries well site survey equipment;
S2: described hydraulic folding arm device is adjusted to erected state, operator control described ROV and enter water, and move extremely Predetermined operation position, seabed;
S3: operator control described hydraulic folding arm device and are adjusted to the state of balancing, and keep the spy of described TSS440 system Test coil is parallel with the horizontal median axis of described ROV, controls described ROV and carries out investigating operation according to default investigation survey line, obtains Described TSS440 system and the survey data of described well site survey equipment, and by described survey data real-time Transmission to described flat Platform.
In control method of the present invention, also include:
S4: after completing to investigate operation, operator control described hydraulic folding arm device by the umbilical cables of described ROV and adjust For erected state, and described ROV is recycled to described platform;
Described hydraulic folding arm device, described TSS440 system and described well site survey equipment under dismantling from described ROV.
In control method of the present invention, described S4 includes: after completing to investigate operation, by described hydraulic folding arm device Being adjusted to erected state, described ROV returns to described platform from seabed to by the moon pool door of described platform, hydraulic pressure folding described in period Arm assembly keeps erected state.
In control method of the present invention, described S1 includes: the afterframe at described ROV installs described hydraulic folding arm Device, installs described TSS440 system on described hydraulic folding arm device, and hold up by controlling described hydraulic folding arm device or Balance the search coil of described TSS440.
In control method of the present invention, described S2 includes: after described hydraulic folding arm device is adjusted to erected state, Described ROV enters water by the moon pool door of described platform, and before described ROV arrives described predetermined operation position, described hydraulic pressure is rolled over Arm assembly keeps erected state.
In control method of the present invention, described S3 includes: install photographic head, described photographic head on described ROV The duty of hydraulic folding arm device described in Real-time Collection, and transmitted to described platform by the umbilical cables of described ROV;
Operator are according to hydraulic folding arm device described in the duty feedback adjustment of described hydraulic folding arm device.
In control method of the present invention, described S3 also includes: operator judge described ROV by monitoring device Whether deviate described default investigation survey line, the most then control described ROV and return to described default investigation survey line.
In control method of the present invention, control described hydraulic folding arm device and be adjusted to erected state or balance state Including:
Operator send control signal, and described control signal transmits the liquid to described ROV by the umbilical cables of described ROV Pressure control valve;
Described control signal is transmitted to hydraulic motor by described hydraulic control valve, and described hydraulic motor controls described hydraulic pressure folding The folding arm of arm assembly is holded up or is balanced.
In control method of the present invention, described default investigation survey line includes a plurality of investigation survey line, and adjacent described Repetitive rate between survey line is no less than 20%, and described survey line density increases along with the reduction of the distance of distance well head.
In control method of the present invention, described well site survey equipment includes: multibeam echosounder, side scan sonar, Shallow system of cuing open, the survey data of described well site survey equipment includes: depth information, earth surface reflection strength information, bottom section are believed Breath.
Implement the control method of the well site survey system for marine dynamically-positioned drilling platform of the present invention, have following Beneficial effect: achieve in the case of dynamically-positioned drilling platform moon pool insufficient space, dynamically-positioned drilling platform at sea On better control over ROV and carry water under the researching tools such as TSS440 system, carry out seabed well site survey operation, and investigation efficiency High, precision height.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the invention will be further described, in accompanying drawing:
Fig. 1 is the present invention program circuit for the control method of the well site survey system of marine dynamically-positioned drilling platform Figure;
Fig. 2 is the control principle drawing of the well site survey system in the present invention.
Detailed description of the invention
In order to be more clearly understood from the technical characteristic of the present invention, purpose and effect, now comparison accompanying drawing describes in detail The detailed description of the invention of the present invention.
The invention discloses the control method of a kind of well site survey system for marine dynamically-positioned drilling platform, it is achieved The well site survey system for marine dynamically-positioned drilling platform that better controls over carries out the investigation work of well site, seabed.
The described well site survey system for marine dynamically-positioned drilling platform includes ROV (Remote Operated Vehicle, unmanned remotely controlled submersible vehicle), and TSS440 system.Drilling platforms includes bottom founded rig, jack-up rigs Platform, floating vessel type drilling platforms (drill ship) and semisubmersible drilling platform, be primarily used for drilling the offshore structures of well, upper dress There are the equipment such as drilling well, power, communication, navigation.ROV is the underwater robot that can be used for underwater observation, check and construct;TSS440 System is to can be used for pipeline and the magnetic survey system of submarine optical fiber cable detection.At ROV afterframe, hydraulic folding arm device, hydraulic pressure are installed Installing TSS440 system on folding arm device, the search coil of TSS440 system can be bundled in hydraulic folding arm device by installing band On two armed levers, and with armed lever keeping parallelism state, ROV controls hydraulic folding arm device in real time and holds up or balance TSS440 system The search coil of system, the video camera of ROV lift-launch simultaneously, multibeam echosounder, side scan sonar, the shallow well site survey equipment such as system that cut open enter Row well site survey.As in figure 2 it is shown, after ROV operator send control signal, by the umbilical cables transmission signal of ROV to ROV Hydraulic control valve on, hydraulic control valve is made corresponding action according to signal and is rolled over by hydraulic pressure to hydraulic motor, hydraulic motor The steering linkage of arm assembly controls the armed lever swing arm of hydraulic folding arm device, thus controls holding up of the search coil of TSS440 system With balance, when the armed lever of hydraulic folding arm device is erected state, armed lever and seabed keep vertical, the detection line of TSS440 system Circle is the most correspondingly holded up, and keeps vertical with seabed;When the armed lever of hydraulic folding arm device is for balancing state, armed lever keeps with seabed Parallel, the search coil of TSS440 system is the most correspondingly balanced, with seabed keeping parallelism carry out operation.Operator are led to simultaneously Crossing the rearmounted video camera of ROV can be with the state of Real Time Observation hydraulic folding arm device.
The heretofore described well site survey system for marine dynamically-positioned drilling platform, can control ROV, hydraulic pressure Folding arm device and well site survey operation process, it is achieved in the case of dynamically-positioned drilling platform moon pool insufficient space, ROV carries Water under the researching tools such as TSS440, and complete well site survey operation.Namely utilize dynamically-positioned drilling platform and its configuration ROV, it is achieved that deep water well site survey operation.And this well site survey operation make use of the time of drilling platforms jointed rod, and ROV is in rest and reorganization state the most during this period, so this operation scheme the most additionally increases the drilling platforms activity duration.This is System achieves the well site survey mode that a kind of efficiency is high, precision is high.
Refering to Fig. 1, the control method of the well site survey system for marine dynamically-positioned drilling platform of the present invention, including Following steps:
After S1: dynamically-positioned drilling platform arrives well location to be measured, the framework of ROV is installed and is used for carrying TSS440 system Hydraulic folding arm device, meanwhile, ROV carries well site survey equipment.Well site survey equipment includes: sound is swept in multibeam echosounder, side , shallow cut open system, by multibeam echosounder, side scan sonar, shallow cut open that system respectively obtains depth information, earth surface reflection intensity is believed The survey datas such as breath, bottom profile information.
Specifically, S1 includes: dynamically-positioned drilling platform arrives well location to be measured, and after starting dynamic positioning state, then Starting jointed rod, the afterframe at ROV installs hydraulic folding arm device, installs TSS440 system on hydraulic folding arm device, and The search coil of TSS440 is holded up or balances by controlling hydraulic folding arm device.Control hydraulic folding arm device and be adjusted to erected state Or state of balancing includes:
Operator send control signal, and control signal is by the hydraulic control valve of the umbilical cables transmission of ROV to ROV;
Hydraulic control valve is by control signal transmission to hydraulic motor, and hydraulic motor controls the folding arm of hydraulic folding arm device and holds up Or balance.
S2: hydraulic folding arm device is adjusted to erected state, operator control ROV and enter water, and mobile predetermined to seabed Job position.
Specifically, S2 includes: after hydraulic folding arm device is adjusted to erected state, and operator control ROV by platform Moon pool door enters water, and before ROV arrives predetermined operation position, hydraulic folding arm device keeps erected state.
S3: operator control hydraulic folding arm device and are adjusted to the state of balancing, keep the search coil of TSS440 system with The horizontal median axis of ROV is parallel, controls ROV and carries out investigating operation according to default investigation survey line, obtains TSS440 system and well The survey data of field investigation apparatus, and by survey data real-time Transmission to platform.
Specifically, S3 includes: installation photographic head on ROV, the duty of photographic head Real-time Collection hydraulic folding arm device, And transmitted to platform by the umbilical cables of ROV;
Operator are according to the duty feedback adjustment hydraulic folding arm device of hydraulic folding arm device.
In control method of the present invention, S3 also includes: by monitoring device, operator judge whether ROV deviates Described default investigation survey line, the most then control ROV and return to preset investigation survey line.
In the control method of the present invention, also include:
S4: after completing to investigate operation, operator control described hydraulic folding arm device by the umbilical cables of ROV and are adjusted to perpendicular The state of rising, and ROV is recycled to described platform;
Described hydraulic folding arm device, TSS440 system and well site survey equipment under dismantling from ROV.
Specifically, S4 includes: complete to investigate after operation, hydraulic folding arm device is adjusted to erected state, ROV from seabed to Returning to platform by the moon pool door of platform, period hydraulic folding arm device keeps erected state.
In control method of the present invention, preset investigation survey line and include a plurality of investigation survey line, and between adjacent survey line Repetitive rate no less than 20%, survey line density increases along with the reduction of the distance of distance well head.
It should be understood that above example only have expressed the preferred embodiment of the present invention, it describes more concrete and detailed Carefully, but therefore can not be interpreted as the restriction to the scope of the claims of the present invention;It should be pointed out that, for the common skill of this area For art personnel, without departing from the inventive concept of the premise, above-mentioned technical characterstic can be carried out independent assortment, it is also possible to do Going out some deformation and improvement, these broadly fall into protection scope of the present invention;Therefore, all done with scope of the invention as claimed Equivalents and modification, all should belong to the covering scope of the claims in the present invention.

Claims (10)

1. the control method for the well site survey system of marine dynamically-positioned drilling platform, it is characterised in that include with Lower step:
After S1: dynamically-positioned drilling platform arrives well location to be measured, the framework of ROV is installed the liquid for carrying TSS440 system Folded arm device, meanwhile, described ROV carries well site survey equipment;
S2: described hydraulic folding arm device is adjusted to erected state, operator control described ROV and enter water, and mobile to seabed Predetermined operation position;
S3: operator control described hydraulic folding arm device and are adjusted to the state of balancing, and keep the detection line of described TSS440 system Enclose parallel with the horizontal median axis of described ROV, control described ROV and carry out investigating operation according to default investigation survey line, obtain described TSS440 system and the survey data of described well site survey equipment, and by described survey data real-time Transmission to described platform.
Control method the most according to claim 1, it is characterised in that also include:
S4: after completing to investigate operation, operator control described hydraulic folding arm device by the umbilical cables of described ROV and are adjusted to perpendicular The state of rising, and described ROV is recycled to described platform;
Described hydraulic folding arm device, described TSS440 system and described well site survey equipment under dismantling from described ROV.
Control method the most according to claim 2, it is characterised in that described S4 includes: after completing to investigate operation, by described Hydraulic folding arm device is adjusted to erected state, and described ROV returns to described platform, phase from seabed to by the moon pool door of described platform Between described hydraulic folding arm device keep erected state.
Control method the most according to claim 1, it is characterised in that described S1 includes: the afterframe at described ROV is installed Described hydraulic folding arm device, installs described TSS440 system on described hydraulic folding arm device, and rolls over by controlling described hydraulic pressure The search coil of described TSS440 is holded up or balanced to arm assembly.
Control method the most according to claim 1, it is characterised in that described S2 includes: described hydraulic folding arm device adjusts After erected state, described ROV enters water by the moon pool door of described platform, described ROV arrive described predetermined operation position it Before, described hydraulic folding arm device keeps erected state.
Control method the most according to claim 1, it is characterised in that described S3 includes: install shooting on described ROV Head, the duty of hydraulic folding arm device described in described photographic head Real-time Collection, and transmitted to institute by the umbilical cables of described ROV State platform;
Operator are according to hydraulic folding arm device described in the duty feedback adjustment of described hydraulic folding arm device.
Control method the most according to claim 1, it is characterised in that described S3 also includes: operator are set by monitoring For judging whether described ROV deviates described default investigation survey line, the most then control described ROV and return to described default investigation survey line.
Control method the most according to claim 1, it is characterised in that control described hydraulic folding arm device and be adjusted to and hold up shape State or state of balancing include:
Operator send control signal, and described control signal transmits the hydraulic pressure control to described ROV by the umbilical cables of described ROV Valve processed;
Described control signal is transmitted to hydraulic motor by described hydraulic control valve, and described hydraulic motor controls described hydraulic folding arm dress The folding arm put is holded up or is balanced.
Control method the most according to claim 1, it is characterised in that described default investigation survey line includes that a plurality of investigation is surveyed Repetitive rate between line, and adjacent described survey line is no less than 20%, and described survey line density is along with the reduction of the distance of distance well head And increase.
Control method the most according to claim 1, it is characterised in that described well site survey equipment includes: multibeam echosounding Instrument, side scan sonar, shallow cut open system;
The survey data of described well site survey equipment includes: depth information, earth surface reflection strength information, bottom profile information.
CN201610712819.XA 2016-08-23 2016-08-23 A kind of control method of the well site survey system for marine dynamically-positioned drilling platform Active CN106194026B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610712819.XA CN106194026B (en) 2016-08-23 2016-08-23 A kind of control method of the well site survey system for marine dynamically-positioned drilling platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610712819.XA CN106194026B (en) 2016-08-23 2016-08-23 A kind of control method of the well site survey system for marine dynamically-positioned drilling platform

Publications (2)

Publication Number Publication Date
CN106194026A true CN106194026A (en) 2016-12-07
CN106194026B CN106194026B (en) 2019-01-04

Family

ID=57524875

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610712819.XA Active CN106194026B (en) 2016-08-23 2016-08-23 A kind of control method of the well site survey system for marine dynamically-positioned drilling platform

Country Status (1)

Country Link
CN (1) CN106194026B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108413926A (en) * 2018-01-31 2018-08-17 上海荟蔚信息科技有限公司 Method for marine wind electric field clump of piles pile foundation underwater topography elevation high-acruracy survey

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103303449A (en) * 2013-05-30 2013-09-18 河北工业大学 Underwater working robot
CN203786566U (en) * 2014-03-21 2014-08-20 中国海洋石油总公司 Submarine cable maintenance underwater robot system
CN104777845A (en) * 2015-04-15 2015-07-15 上海海事大学 Underwater main body device of underwater robot and autonomous obstacle avoidance method
CN105020538A (en) * 2015-08-04 2015-11-04 浙江水利水电学院 Sewage pipe network diving robot and detection method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103303449A (en) * 2013-05-30 2013-09-18 河北工业大学 Underwater working robot
CN203786566U (en) * 2014-03-21 2014-08-20 中国海洋石油总公司 Submarine cable maintenance underwater robot system
CN104777845A (en) * 2015-04-15 2015-07-15 上海海事大学 Underwater main body device of underwater robot and autonomous obstacle avoidance method
CN105020538A (en) * 2015-08-04 2015-11-04 浙江水利水电学院 Sewage pipe network diving robot and detection method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
宋春娜: "TSS440在海管检测中的应用", 《中国石油和化工标准与质量》 *
陶林等: "水下机器人在渤海海底光缆调查中的应用", 《石油钻采工艺》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108413926A (en) * 2018-01-31 2018-08-17 上海荟蔚信息科技有限公司 Method for marine wind electric field clump of piles pile foundation underwater topography elevation high-acruracy survey
CN108413926B (en) * 2018-01-31 2020-12-04 上海荟蔚信息科技有限公司 High-precision measurement method for underwater topography elevation of pile foundation of offshore wind farm

Also Published As

Publication number Publication date
CN106194026B (en) 2019-01-04

Similar Documents

Publication Publication Date Title
KR100302149B1 (en) Multi-working offshore exploration and / or development drilling methods and / or devices
KR101670303B1 (en) Offshore drilling installation and method for offshore drilling
US3199613A (en) Method and apparatus for drilling an underwater well
JP2013532091A (en) Subsea anchoring system and method
WO2014060741A2 (en) Improvements in or relating to marine operations
CN107476798B (en) Wellhead attitude monitoring system and method suitable for whole process of deepwater jet downcomer
CN112253036B (en) Efficient operation equipment and method for running blowout preventer stack without guide rope and moving blowout preventer stack between wells
US4260291A (en) Installation of an offshore structure
CN103395479A (en) Multifunctional installation and investigation vessel
CN106194026B (en) A kind of control method of the well site survey system for marine dynamically-positioned drilling platform
NO814490L (en) SUBMITTED, OFFSHORE DRILLING AND PRODUCTION SOILS WITH BUILDING
AU2012362727B2 (en) Method and system for wireline intervention in a subsea well from a floating vessel
EP2871285B1 (en) Device and method for performing well interventions offshore
EA006866B1 (en) System and method of installing and maintaining an offshore exploration and production system having an adjustable buoyancy chamber
CN203844977U (en) Offshore platform device used for offshore static sounding
CN106285480B (en) A kind of well site survey method for marine dynamically-positioned drilling platform
RU2731010C1 (en) Processing system for sea cluster drilling
KR20150043083A (en) Derrick system capable of adjust horizontal position of top drive
RU2818392C1 (en) Method for advance drilling of pilot shafts during construction of wells on shelf
Max et al. Leveraging Technology for NGH Development and Production
NO347421B1 (en) A deep-sea underwater drilling system for drilling and core sampling on a seabed
CN117166923A (en) System-integrated movable submarine shallow drilling equipment and laying method thereof
Namba et al. Technical Challenges for Mantle Drilling
Hovland Analysis of global forces in the wellhead/wellhead connector as a function of wellhead lateral support and stiffness
Pheasant et al. Development of seismic profiling, remotely operated coring and shallow drilling for deepwater areas

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 100010 Chaoyangmen North Street, Dongcheng District, Dongcheng District, Beijing

Applicant after: China Offshore Oil Group Co., Ltd.

Applicant after: CNOOC (China) Co., Ltd. Shenzhen Branch

Applicant after: China Oilfield Services Limited

Applicant after: CNOOC Deepwater Development Limited

Address before: 100010 Chaoyangmen North Street, Dongcheng District, Dongcheng District, Beijing

Applicant before: China National Offshore Oil Corporation

Applicant before: CNOOC (China) Co., Ltd. Shenzhen Branch

Applicant before: China Oilfield Services Limited

Applicant before: CNOOC Deepwater Development Limited

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant