CN106193259A - A kind of Rainwater collection system for sponge city and construction method - Google Patents

A kind of Rainwater collection system for sponge city and construction method Download PDF

Info

Publication number
CN106193259A
CN106193259A CN201610567568.0A CN201610567568A CN106193259A CN 106193259 A CN106193259 A CN 106193259A CN 201610567568 A CN201610567568 A CN 201610567568A CN 106193259 A CN106193259 A CN 106193259A
Authority
CN
China
Prior art keywords
rainwater
ditch
water
rain
cistern
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610567568.0A
Other languages
Chinese (zh)
Other versions
CN106193259B (en
Inventor
吴婉玲
刘学应
周杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang University of Water Resources and Electric Power
Original Assignee
Zhejiang University of Water Resources and Electric Power
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University of Water Resources and Electric Power filed Critical Zhejiang University of Water Resources and Electric Power
Priority to CN201610567568.0A priority Critical patent/CN106193259B/en
Publication of CN106193259A publication Critical patent/CN106193259A/en
Application granted granted Critical
Publication of CN106193259B publication Critical patent/CN106193259B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/10Collecting-tanks; Equalising-tanks for regulating the run-off; Laying-up basins
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F9/00Multistage treatment of water, waste water or sewage
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03BINSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
    • E03B3/00Methods or installations for obtaining or collecting drinking water or tap water
    • E03B3/02Methods or installations for obtaining or collecting drinking water or tap water from rain-water
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F1/00Methods, systems, or installations for draining-off sewage or storm water
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/22Adaptations of pumping plants for lifting sewage
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/001Processes for the treatment of water whereby the filtration technique is of importance
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2103/00Nature of the water, waste water, sewage or sludge to be treated
    • C02F2103/001Runoff or storm water
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F3/00Biological treatment of water, waste water, or sewage
    • C02F3/34Biological treatment of water, waste water, or sewage characterised by the microorganisms used
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/108Rainwater harvesting

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Water Supply & Treatment (AREA)
  • Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • Sewage (AREA)
  • Environmental & Geological Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Organic Chemistry (AREA)

Abstract

The invention discloses a kind of Rainwater collection system for sponge city and construction method, this system includes rain water drainage ditch, rainwater-collecting ditch and cistern, rain water drainage ditch is provided with rain water drainage defecator, rainwater-collecting ditch is provided with intercepting pollution for rainwater device, it is provided with regulating reservoir between rain water drainage ditch and rainwater-collecting ditch, regulating reservoir is provided with rainwater purification apparatus.This construction method includes: (a) excavation of foundation pit;B () rainwater gathering tube is laid;C () rain water drainage ditch is built;The construction of (d) regulating reservoir;E () rainwater-collecting ditch is built;The construction of (f) cistern;The sampling detection of (g) cistern water body;H () cistern water body utilizes.The present invention strengthens the naturally vertical penetrating power of rainwater, effectively controls the runoff rainwater of excess, strengthens the collecting amount of rainwater, the rainwater collected is carried out repeated multiple times filtration simultaneously, remove the impurity in rainwater, rainwater is collected, reach to be detained the effect of rainwater, alleviate municipal drainage pressure.

Description

A kind of Rainwater collection system for sponge city and construction method
Technical field
The invention belongs to sponge urban construction technical field, be specifically related to a kind of rainwater catchment system for sponge city System and construction method.
Background technology
In the last few years, rain is met flooded must to be increasingly becoming the urgent problem in a lot of city.The most many cities all use Arranging pattern soon, rainwater falls hardened ground can only concentrate fast row from pipeline, and this pattern allows in city the rainwater of 70% in vain Lost, if major part rainwater being stayed rather than draining, can realize to greatest extent the rainwater accumulation in urban area, Infiltration and purification, promote utilization and the ecological environmental protection of rainwater resource.It is to say, sponge urban construction is expected to original big Amount drain into the water of pipe duct end in advance by absorbing, saving, the link such as infiltration digest, become crack meet rain must flood the most on the way Footpath rather than by repairing big drain pipe.
How rainwater stays?In sponge Process of Urban Development, form substantial amounts of " spongy body ", enable city as sponge one Sample, is adapting to environmental change and the reply aspect such as natural disaster has good " elastic ", water suction when raining, water-retention, infiltration, only Water, " discharges the water stored " and is used when needing.Sponge city is on the premise of guaranteeing municipal drainage prevention waterlogging safety, Realize to limits the rainwater accumulation in urban area, permeate and purify, promote utilization and the ecological environmental protection of rainwater resource. The water systems such as Ru He, lake, pond, and the city auxiliary facility such as greenery patches, garden, permeable road surface.Rainwater passes through these " spongy bodies " Under ooze, stagnant storage, purification, reuse, last remainder is by arranging outside pipe network, pumping plant, thus is effectively improved sewerage system mark Standard, extenuates urban waterlogging pressure.Specifically, it is simply that in sources, place such as urban architecture and community, road, greenery patchess, by greatly Scale carries out the eco-facilities such as Rain Garden, sunk type greenery patches, grass planting ditch, permeable pavement, oozes, regulates and stores under carrying out rainwater.
But in traditional sponge urban construction pattern, during collecting rainwater, rain penetration performance is poor, rainwater-collecting Amount is restricted, and still there will be waterlogging phenomenon, and during rainwater infiltration, the impurity in rainwater easily blocks the pipe buried underground Road, affects whole water-retention process.
Summary of the invention
Present invention aim at solving above-mentioned technical problem present in prior art, it is provided that a kind of for sponge city Rainwater collection system and construction method, strengthen the naturally vertical penetrating power of rainwater, effectively control the runoff rainwater of excess, Strengthen the collecting amount of rainwater, the rainwater collected is carried out repeated multiple times filtration simultaneously, remove the impurity in rainwater, rainwater is carried out Collect, reach to be detained the effect of rainwater, alleviate municipal drainage pressure, rainwater purified simultaneously, store, fresh-keeping integration is received Collection processes, and the rainwater after purification can be used for various place, plays ecological, environmental protective, free of contamination effect, remarkable in economical benefits.
In order to solve above-mentioned technical problem, the present invention adopts the following technical scheme that
A kind of Rainwater collection system for sponge city, it is characterised in that: include rain water drainage ditch, rainwater-collecting Ditch and cistern;
The bottom of rain water drainage ditch is provided with ventilation anti-seepage layer of sand, ventilation anti-seepage layer of sand be arranged over the permeable operculum colpi of sand base Plate, ventilation anti-seepage layer of sand is provided with rain water drainage defecator, and rain water drainage defecator connects abandoned stream ditch water discharge pipe;
The bottom of rainwater-collecting ditch is provided with waterproof layer, waterproof layer be arranged over rain collector, rain collector Be arranged over screed-coat, screed-coat is provided with sand base drainage brick, on rain collector access rain pollution cutting device, rainwater It is provided with rainwater elevator pump at pollution cutting device and collects ditch water discharge pipe, at the inwall of rainwater-collecting ditch, being provided with rainwater return duct, rainwater Return duct is linked on rainwater elevator pump, and the top of rainwater-collecting ditch is provided with biochemical filtering device;
It is provided with regulating reservoir between rain water drainage ditch and rainwater-collecting ditch, regulating reservoir is provided with rainwater purification apparatus, regulating reservoir Connect rainwater return duct, bottom regulating reservoir, be provided with overfall;
Cistern accesses rain gathering tube, and rainwater gathering tube connects abandoned stream ditch water discharge pipe respectively and collects ditch water discharge pipe, The bottom of cistern is provided with ventilation anti-seepage brick, cistern be formed around anti-seepage geotextile, anti-seepage geotextile be arranged over pad Layer, is equipped with Water-storage machine structure in bed course, water storage mechanism is provided with concrete cover.
Further, being provided with side plate building enclosure in rain water drainage ditch, side plate building enclosure is provided with fastener, and fastener is fixed Position rain water drainage defecator.
Further, rain water drainage defecator includes upper plate and lower shoe, is filled with between upper plate and lower shoe Filtering material.
Further, intercepting pollution for rainwater device includes that housing, housing are provided with water inlet, outlet and sewage draining exit, sets in housing Having filtering basket, the top of filtering basket is provided with handle.
Further, being provided with liquid level induction apparatus in regulating reservoir, be provided with flow control valve at overfall, liquid level induction apparatus connects to be had Controller, controller connection traffic control valve.
Further, water storage mechanism includes that silica sand building block, silica sand building block are cellular, is provided with flow-guiding mouth in water storage mechanism.
The construction method of a kind of Rainwater collection system for sponge city, it is characterised in that comprise the steps:
(a) excavation of foundation pit;
B () rainwater gathering tube is laid: according to drawing select the pipeline of regulation model as rainwater gathering tube, and in pipeline Wall is rinsed, then the foundation ditch bottom section laying pipeline at excavation, arranges cushion block in the bottom of foundation ditch, is placed by every segment pipe On cushion block, and being buckled on cushion block by pipeline with clasp, between pipeline, in addition pipe box is protected, and rainwater gathering tube entirety is protected Hold the regulation gradient to lay, keep draining smooth and easy, then at design attitude preserved pipeline access port, then backfill soil;
C () rain water drainage ditch is built: first laying geotextiles at the foundation ditch of rain water drainage ditch, geotextile laying is smooth, takes Spreading degree is at 80mm-120mm, after geotextile laying completes, lays ventilation anti-seepage sand in bottom, and arranges smooth, is formed ventilative Antiseepage layer of sand, then build the permeable roadbed in edge, the permeable roadbed in test edge, it is ensured that edge is saturating by laying bricks or stones at the foundation ditch side of rain water drainage ditch The bearing capacity of water route base is qualified, then punches in the permeable roadbed in edge, then lays abandoned stream ditch water discharge pipe, and by abandoned stream ditch water discharge Pipe is the preformed hole of permeable roadbed through edge, and is linked on the access port of rainwater gathering tube by abandoned stream ditch water discharge pipe, then borrows Help the permeable roadbed in edge that side plate building enclosure is set, then rain water drainage defecator is set between side plate building enclosure, adjust Rain water drainage defecator position, connects rain water drainage defecator with abandoned stream ditch water discharge pipe, then with fastener by rainwater Abandoned stream defecator location is fixing, and then at edge, sand base water permeation channel cover plate is laid at the top of permeable roadbed, more permeable at sand base Turf is laid on trench cover;
(d) regulating reservoir construction: lay the sand of 100mm bottom the foundation ditch of regulating reservoir, then backfill soil, and compaction in layers, Then bottom the foundation ditch of regulating reservoir and surrounding casting concrete, and reserved water exit position, at water exit position, pour overfall, After concrete curing, concrete is set up bracing frame, then rainwater purification apparatus is set on bracing frame, then at regulating reservoir Top formwork, and at formwork, lay one layer of permeable formation, at permeable formation, it is downwardly into liquid level induction apparatus, then on permeable formation upper berth If turf;
E () rainwater-collecting ditch is built: one layer of 200-300mm waterproof layer of laying bottom the foundation ditch of rainwater-collecting ditch, then Arranging personnel on site's assembly rainwater-collecting module on waterproof layer, rainwater-collecting module is pacified according to requirement and the size of design Dress, is fixed into rain collector, is then rinsed rain collector with water pipe, keeps rain collector overall clear Clean, above rain collector, then successively lay screed-coat and sand base drainage brick, then pick out at rain collector Separating tube, the position further according to each separating tube arranges U-type groove, then arranges steel plate in U-type groove, then by intercepting pollution for rainwater device It is fixed on steel plate, and separating tube is connected on intercepting pollution for rainwater device, then collection ditch water discharge pipe is linked into rainwater and collects On the access port of pipe, being then connected with intercepting pollution for rainwater device by rainwater elevator pump, then the lower section at rainwater elevator pump arranges inspection Repair mouth, above sand base drainage brick, then lay rainwater return duct, keep level when rainwater return duct is installed, use U Type rotates and lays, and the pipeline place of rotating uses to insert under metal button member and fixes, and is then linked on regulating reservoir by rainwater return duct, Then backfill soil, and at one piece of biochemical filtering device of surface configuration, then lay turf;
(f) cistern construction: first the foundation ditch surrounding at cistern lays anti-seepage geotextile, and anti-seepage geotextile is laid smooth, Above anti-seepage geotextile, lay the bed course of 400-500mm again, then with side plate, bed course is carried out compacting and fix, then by rainwater Gathering tube is passed in the foundation ditch of cistern, and then the mouth of pipe to rainwater gathering tube is inserted in protection set, then the foundation ditch at cistern Bottom laying ventilation anti-seepage brick, the spaced apart 300-600mm hole of ventilation anti-seepage brick, and casting concrete in hole, then Above concrete, build silica sand building block by laying bricks or stones, constitute cellular water storage mechanism, and flow-guiding mouth is set in water storage mechanism, then backfill Soil, then lays concrete cover on soil;
The sampling detection of (g) cistern water body;
H () cistern water body utilizes.
Further, rainwater, for measure unwrapping wire according to construction drawing, is successively abandoned by step (a) excavation of foundation pit concrete operations Stream ditch, regulating reservoir, rainwater-collecting ditch and cistern excavate, digging machine coordinate each foundation ditch of hand excavation to designed elevation, then Compacting foundation ditch bottom, through site operation technical staff detect qualified after, the surface of foundation ditch lay protection network.
Further, in step (e), arranging of waterproof layer is first laid with one layer of fine sand, as base bed course, and enters fine sand Row watering, keeps the humidity of sand bed, lays protecting film one layer the most successively, strengthens geotextiles one layer.
Due to the fact that and have employed technique scheme, have the advantages that
1, the permeable formation laid in the base water permeation channel cover plate of laying, regulating reservoir in rain water drainage ditch of the present invention and rainwater-collecting The sand base drainage brick laid in ditch is respectively provided with high water permeable ability, strengthens the naturally vertical penetrating power of rainwater so that rainwater Rainwater is collected by abandoned stream ditch and rainwater-collecting ditch, reaches to be detained the effect of rainwater, alleviates municipal drainage pressure;
In rain water drainage ditch, carry rain water drainage defecator, the water oozed under in rain water drainage ditch is carried out impurity screening Effect, carries intercepting pollution for rainwater device in rainwater-collecting ditch, the water oozed under in rainwater-collecting ditch is carried out impurity screening effect, so The rainwater oozed under earth's surface can be filtered, play the effect of purifying water body, and intercepting pollution for rainwater device connects rainwater elevator pump, When opening rainwater elevator pump, the water body that intercepting pollution for rainwater device purifies is driven into regulating reservoir, the rainwater purification apparatus in regulating reservoir Rainwater is carried out filtration, and in the rain penetration in regulating reservoir to rainwater-collecting ditch, rainwater enters in rainwater-collecting ditch repeatedly Row filters, and so the rainwater collected can be carried out repeated multiple times filtration, removes the impurity of 90% in rainwater, improves clean-up effect;
Regulating reservoir the collecting amount that can strengthen rainwater is set, and rainwater return duct is laid with U-shaped rotating, and increases rain Water flow through distance, strengthen further the collecting amount of rainwater, the rainwater simultaneously pumped out rainwater elevator pump carries out cushioning effect, makes Obtain the hydraulic pressure in rainwater return duct impartial, improve the safety of rainwater conveying;
When the rainwater collected in regulating reservoir reaches the upper limit, liquid level induction apparatus senses rainwater liquid level, sends signal, Controller obtains signal and shows that red light carries out alarm condition, and staff turn-on flow rate control valve can open overfall, will adjust Rainwater in joint pond is discharged, and controls the liquid level of rainwater;
The water storage mechanism laid in cistern can increase the dissolved oxygen content in rainwater, builds growth of microorganism environment, right Rainwater carries out purifying, stores, fresh-keeping integration collection processes, and the rainwater after purification can be used for various place, play ecological, environmental protective, Free of contamination effect, remarkable in economical benefits.
2, the present invention is in work progress, successively builds rain water drainage ditch, regulating reservoir, rainwater-collecting ditch according to construction drawing And cistern so that each can carry out the adjustment of area and position at the facility of rear construction according to facility above, accordingly in Part device also can adjust installation further, reduces the waste of material in work progress, it is to avoid phenomenon of doing over again occur;
During rainwater gathering tube is laid by the present invention, segmentation is used to lay, it is simple to pick and place pipeline, and every segment pipe is solid It is scheduled on cushion block, prevents pipeline from inconsistent phenomenon occurring, and rainwater gathering tube entirety keeps the regulation gradient lay, keep draining suitable Freely;
The present invention, when rain water drainage ditch is built, relies on the bearing capacity of the permeable roadbed in edge to set up rain water drainage and filters dress Putting, improve the stability of construction, arrange side plate building enclosure on the permeable roadbed in edge, the fastener in side plate building enclosure will Rain water drainage defecator location is fixing so that loosening now will not occur because of the impact of rainwater in rain water drainage defecator As, it is ensured that rain water drainage defecator reaches optimal to the filtration of rainwater;
The present invention utilizes the bracing frame on concrete to arrange rainwater purification apparatus, and the convenient rainwater purification apparatus that adjusts is in tune Lengthwise position on joint pond, it is ensured that rainwater purification apparatus reaches optimal to the filtration of rainwater;
Rain collector of the present invention is the most assembled, just according to requirement and the size of design by rainwater-collecting module In the construction quality of control rain collector, after completing rain collector construction, it is rinsed with water pipe, keeps rainwater Collection device entirety cleans.So rain collector can collect the rainwater of abundance, and the rainwater collected is used rain Water pollution cutting device goes the removal of impurity, and rainwater return duct be provided with beneficially filtration repeatedly to rainwater, improve rainwater degree of purity, reach To the effect of delay rainwater, alleviate municipal drainage pressure;
The rainwater collected is drained in cistern by the present invention, and rainwater is purified, stores by cistern, fresh-keeping one Change collection to process.Rainwater after the present invention purifies can be used for various place, plays ecological, environmental protective, free of contamination effect, economic effect Benefit is notable.
Accompanying drawing explanation
The invention will be further described below in conjunction with the accompanying drawings:
Fig. 1 is the structural representation of a kind of Rainwater collection system for sponge city in the present invention;
Fig. 2 is the structural representation of rain water drainage defecator in the present invention;
Fig. 3 is the structural representation of rainwater pollution cutting device in the present invention.
Detailed description of the invention
As shown in Figure 1 to Figure 3, for the Rainwater collection system for sponge city a kind of in the present invention, including rainwater Abandoned stream ditch 1, rainwater-collecting ditch 2 and cistern 3.
The bottom of rain water drainage ditch 1 is provided with ventilation anti-seepage layer of sand 4, ventilation anti-seepage layer of sand 4 be arranged over sand base permeable ditch Cover plate 5, ventilation anti-seepage layer of sand 4 is provided with rain water drainage defecator 6, and rain water drainage defecator 6 connects abandoned stream ditch water discharge Pipe 7.Being provided with side plate building enclosure 26 in rain water drainage ditch 1, side plate building enclosure 26 is provided with fastener 27, and fastener 27 positions Rain water drainage defecator 6.Rain water drainage defecator 6 includes upper plate 28 and lower shoe 29, upper plate 28 and lower shoe 29 Between be filled with filtering material 30.
The bottom of rainwater-collecting ditch 2 is provided with waterproof layer 8, waterproof layer 8 be arranged over rain collector 9, rainwater-collecting Device 9 be arranged over screed-coat 10, screed-coat 10 is provided with sand base drainage brick 11, screed-coat 10 and sand base drainage brick 11 to be had High water penetration.Accessing rain pollution cutting device 13 on rain collector 9, intercepting pollution for rainwater device 13 includes housing 31, shell Body 31 is provided with water inlet 32, outlet 33 and sewage draining exit 34, is provided with filtering basket 35, the top of filtering basket 35 in housing 31 Being provided with handle 36, filtering basket 35 is stamped to form for aluminium sheet, and its surface is provided with permeability hole, by contaminant filter at filtering basket 35 In, by exerting a force on handle 36, filtering basket 35 can be taken out, removal of contamination.It is provided with rainwater at intercepting pollution for rainwater device 13 to promote Pump 14 and collection ditch water discharge pipe 15, be provided with rainwater return duct 16 at the inwall of rainwater-collecting ditch 2, rainwater return duct 16 is linked into rain On water elevator pump 14.The top of rainwater-collecting ditch 2 is provided with biochemical filtering device 12, and biochemical filtering device 12 can remove rainwater and be in Partial impurities during earth's surface.
It is provided with regulating reservoir 17 between rain water drainage ditch 1 and rainwater-collecting ditch 2, regulating reservoir 17 is provided with rainwater purification apparatus 18, regulating reservoir 17 connects rainwater return duct 16, is provided with overfall 19 bottom regulating reservoir 17.Regulating reservoir 17 is provided with liquid level induction apparatus 37, it is provided with flow control valve 38 at overfall 19, liquid level induction apparatus 37 connects controller, controller connection traffic control valve 38。
Cistern 3 accesses rain gathering tube 20, and rainwater gathering tube 20 connects abandoned stream ditch water discharge pipe 7 respectively and collects ditch row Water pipe 15.The bottom of cistern 3 is provided with ventilation anti-seepage brick 21, cistern 3 be formed around anti-seepage geotextile 22, anti-seepage geotextile 22 be arranged over bed course 23, bed course 23 is piled up for small crushed stone and is formed.Bed course 23 is equipped with Water-storage machine structure 24, water storage mechanism 24 It is provided with concrete cover 25.Water storage mechanism 24 includes that silica sand building block, silica sand building block are cellular, is provided with and leads in water storage mechanism 24 Head piece 39.
The permeable formation laid in the base water permeation channel cover plate of laying, regulating reservoir 17 in rain water drainage ditch 1 of the present invention and rainwater collection The sand base drainage brick 11 laid in collection ditch 2 is respectively provided with high water permeable ability, strengthens the naturally vertical penetrating power of rainwater so that Rainwater is collected by rain water drainage ditch 1 and rainwater-collecting ditch 2, reaches to be detained the effect of rainwater, alleviates municipal drainage pressure.? Rain water drainage ditch 1 carries rain water drainage defecator 6, the water oozed under in rain water drainage ditch 1 is carried out impurity screening effect, rain Water is collected in ditch 2 and is carried intercepting pollution for rainwater device 13, the water oozed under in rainwater-collecting ditch 2 is carried out impurity screening effect, so may be used The rainwater oozed under earth's surface is filtered, plays the effect of purifying water body, and intercepting pollution for rainwater device 13 connects rainwater elevator pump 14, When opening rainwater elevator pump 14, the water body that intercepting pollution for rainwater device 13 purifies is driven into regulating reservoir 17, the rain in regulating reservoir 17 Water purification installation 18 carries out filtration to rainwater, and in the rain penetration in regulating reservoir 17 to rainwater-collecting ditch 2, rainwater is at rainwater Collect in ditch 2 and filtration be repeated, so the rainwater collected can be carried out repeated multiple times filtration, remove in rainwater 90% miscellaneous Matter, improves clean-up effect.Regulating reservoir 17 the collecting amount that can strengthen rainwater is set, and rainwater return duct 16 with U-shaped around rotating into Row is laid, and increase rainwater flows through distance, strengthens the collecting amount of rainwater, the rainwater simultaneously pumped out rainwater elevator pump 14 further Carry out cushioning effect so that the hydraulic pressure in rainwater return duct 16 is impartial, improve the safety of rainwater conveying.When regulating reservoir 17 is received When the rainwater of collection reaches the upper limit, liquid level induction apparatus 37 senses rainwater liquid level, sends signal, and controller obtains signal and shows Showing that red light carries out alarm condition, staff turn-on flow rate control valve 38 can open overfall 19, by the rainwater in regulating reservoir 17 Discharge, control the liquid level of rainwater.The water storage mechanism 24 laid in cistern 3 can increase the dissolved oxygen content in rainwater, battalion Making growth of microorganism environment, purify rainwater, store, fresh-keeping integration collection processes, the rainwater after purification can be used for respectively Plant place, play ecological, environmental protective, free of contamination effect, remarkable in economical benefits.
Construction deployment
1, careful, technical annotation in construction painted by tissue drawing, specifies construction quality target, exploration scene.
2, set up job site quality control circle, set up the responsibility of engineering quality system.
3, project manager is responsible for engineering construction, organizes and implements construction, works out every plan, configuration management scheme, target, arranges Execute, and management that construction quality, cost, security civilization, construction are exercised supervision.
4, arrange place electricity consumption, use water, material storehouse, handle visa formality of marching into the arena.
5, organization material is marched into the arena, by construction quality requirement clear and definite material brand, specification, model.
6, organization arrangement workmen, coordinates total bag, Party A, management according to construction drawing.System for reclaiming rainwater is installed, In work progress, control the construction quality of each operation.
The construction method of a kind of Rainwater collection system for sponge city, comprises the steps:
(a) excavation of foundation pit:
Preparation of construction:
1, careful, technical annotation in construction painted by tissue drawing, specifies construction quality target, exploration scene.
2, set up job site quality control circle, set up the responsibility of engineering quality system.
3, project manager is responsible for engineering construction, organizes and implements construction, works out every plan, configuration management scheme, target, arranges Execute, and management that construction quality, cost, security civilization, construction are exercised supervision.
4, arrange place electricity consumption, use water, material storehouse, handle visa formality of marching into the arena.
5, organization material is marched into the arena, by construction quality requirement clear and definite material brand, specification, model.
6, organization arrangement workmen, coordinates total bag, Party A, management according to construction drawing.System for reclaiming rainwater is installed, In work progress, control the construction quality of each operation.
Unwrapping wire is measured, successively to rain water drainage ditch 1, regulating reservoir 17, rainwater-collecting ditch 2 and water-retention according to construction drawing Pond 3 is excavated.Digging machine cooperation each foundation ditch of hand excavation is to designed elevation, then tamps bottom foundation ditch.Through site operation technology Personnel detect qualified after, the surface of foundation ditch lay protection network.
B () rainwater gathering tube 20 is laid: according to drawing select the pipeline of regulation model as rainwater gathering tube 20, and to pipe Road inwall is rinsed.Foundation ditch bottom section at excavation lays pipeline again, arranges cushion block in the bottom of foundation ditch, by every segment pipe Being placed on cushion block, and buckled on cushion block by pipeline with clasp, between pipeline, in addition pipe box is protected.Rainwater gathering tube 20 Overall holding, specifies that the gradient is laid, and keeps draining smooth and easy.Then at design attitude preserved pipeline access port, soil is then backfilled.
C () rain water drainage ditch 1 is built: first laying geotextiles at the foundation ditch of rain water drainage ditch 1, geotextile laying is smooth, The lap of splice is at 80mm-120mm.After geotextile laying completes, lay ventilation anti-seepage sand in bottom, and arrange smooth, formed thoroughly Gas antiseepage layer of sand 4.Foundation ditch side at rain water drainage ditch 1 builds the permeable roadbed in edge, the permeable roadbed in test edge by laying bricks or stones again.Ensure limit The bearing capacity of the permeable roadbed of edge is qualified, then punches in the permeable roadbed in edge, then lays abandoned stream ditch water discharge pipe 7, and by abandoned stream Ditch water discharge pipe 7 is through the preformed hole of the permeable roadbed in edge, and abandoned stream ditch water discharge pipe 7 is linked into the access port of rainwater gathering tube 20 On.Then side plate building enclosure 26 is set by the permeable roadbed in edge, then rain water drainage is set between side plate building enclosure 26 Defecator 6, adjusts rain water drainage defecator 6 position, is connected, so with abandoned stream ditch water discharge pipe 7 by rain water drainage defecator 6 With fastener 27, rain water drainage defecator 6 is positioned fixing afterwards.Then at edge, the top laying sand base of permeable roadbed is permeable Trench cover 5, then on sand base water permeation channel cover plate 5, lay turf.
D () regulating reservoir 17 is built: lay the sand of 100mm bottom the foundation ditch of regulating reservoir 17, then backfill soil, and be layered rammer Real.Then bottom the foundation ditch of regulating reservoir 17 and surrounding casting concrete, and reserved water exit position, pour excessive at water exit position Head piece 19.After concrete curing, concrete is set up bracing frame, then rainwater purification apparatus 18 is set on bracing frame.Then At the top formwork of regulating reservoir 17, and at formwork, lay one layer of permeable formation, at permeable formation, be downwardly into liquid level induction apparatus 37, Turf is laid again on permeable formation.
E () rainwater-collecting ditch 2 is built: lay one layer of 200-300mm waterproof layer 8 bottom the foundation ditch of rainwater-collecting ditch 2, anti- Arranging of water layer 8 is first laid with one layer of fine sand, as base bed course 23, and sprinkles water fine sand, keeps the humidity of sand bed, so After lay successively protecting film one layer, strengthen geotextiles one layer.Personnel on site's assembly rainwater-collecting mould is arranged again on waterproof layer 8 Block, rainwater-collecting module according to design requirement and size install, the dimensions of rainwater-collecting module is 800*400* 230mm, thus can be fixed into rain collector 9, and the pressure-bearing of rain collector 9 is 35 tons/, rainwater-collecting rate reaches More than 93%.Then with water pipe, rain collector 9 is rinsed, keeps the overall cleaning of rain collector 9.Then at rain Screed-coat 10 and sand base drainage brick 11 are successively laid in the top of water collecting device 9, then pick out separatory at rain collector 9 Pipe, the position further according to each separating tube arranges U-type groove, then arranges steel plate in U-type groove, then by solid for intercepting pollution for rainwater device 13 Fixed on steel plate, and separating tube is connected on intercepting pollution for rainwater device 13, then collection ditch water discharge pipe 15 is linked into rainwater and converges On the access port of house steward 20.Then rainwater elevator pump 14 is connected with intercepting pollution for rainwater device 13, then at rainwater elevator pump 14 Lower section arranges access hole, then lays rainwater return duct 16 above sand base drainage brick 11, protects when rainwater return duct 16 is installed Water holding level state, uses U-shaped rotating to lay, and the pipeline place of rotating uses to insert under metal button member and fixes, and is then refluxed by rainwater Pipe 16 is linked on regulating reservoir 17, then backfills soil, and at one piece of biochemical filtering device 12 of surface configuration, then lays grass Skin.
F () cistern 3 is built: first the foundation ditch surrounding at cistern 3 lays anti-seepage geotextile 22, and anti-seepage geotextile 22 is laid Smooth.Above anti-seepage geotextile 22, lay the bed course 23 of 400-500mm again, then with side plate, bed course 23 is carried out compacting admittedly Fixed.Being passed into by rainwater gathering tube 20 in the foundation ditch of cistern 3, then the mouth of pipe to rainwater gathering tube 20 is inserted in protection set again, Laying ventilation anti-seepage brick 21 bottom the foundation ditch of cistern 3 again, the spaced apart 300-600mm hole of ventilation anti-seepage brick 21, and Casting concrete in hole, then builds silica sand building block above concrete by laying bricks or stones, constitutes cellular water storage mechanism 24, and at water storage Flow-guiding mouth 39 is set in mechanism 24, then backfills soil, on soil, then lay concrete cover 25.
The sampling detection of (g) cistern 3 water body.
H () cistern 3 water body utilizes.
The present invention, in work progress, successively builds rain water drainage ditch 1, regulating reservoir 17, rainwater-collecting according to construction drawing Ditch 2 and cistern 3 so that each can carry out the adjustment of area and position at the facility of rear construction according to facility above, accordingly Interior arrangement also can adjust installation further, reduce the waste of material in work progress, it is to avoid phenomenon of doing over again occurs.The present invention During rainwater gathering tube 20 is laid, segmentation is used to lay, it is simple to pick and place pipeline, and every segment pipe is fixed on cushion block, Prevent pipeline from inconsistent phenomenon occurring, and keep the regulation gradient to lay by overall for rainwater gathering tube 20, keep draining smooth and easy.The present invention When rain water drainage ditch 1 is built, rely on the bearing capacity of the permeable roadbed in edge to set up rain water drainage defecator 6, improve construction Stability, arranges side plate building enclosure 26 on the permeable roadbed in edge, and rainwater is abandoned by the fastener 27 in side plate building enclosure 26 Stream defecator 6 location is fixing so that rain water drainage defecator 6 loosening phenomenon will not occur because of the impact of rainwater, protects Card rain water drainage defecator 6 reaches optimal to the filtration of rainwater.It is clean that the present invention utilizes the bracing frame on concrete to arrange rainwater Gasifying device 18, the convenient rainwater purification apparatus 18 that adjusts is in the lengthwise position on regulating reservoir 17, it is ensured that rainwater purification apparatus 18 is right The filtration of rainwater reaches optimal.Rain collector 9 of the present invention is according to the requirement designed and size phase by rainwater-collecting module The most assembled, it is simple to control the construction quality of rain collector 9, after completing rain collector 9 construction, enter with water pipe Row rinses, and keeps the overall cleaning of rain collector 9.So rain collector 9 can collect the rainwater of abundance, and to receipts Collect to rainwater use intercepting pollution for rainwater device 13 to go the removal of impurity, and rainwater return duct 16 be provided with beneficially mistake repeatedly to rainwater Filter, improves rainwater degree of purity, reaches to be detained the effect of rainwater, alleviates municipal drainage pressure.The Water in Rainwater Drainage that the present invention will collect Entering in cistern 3, rainwater is purified, stores by cistern 3, fresh-keeping integration collection processes.Rain after present invention purification Water can be used for various place, plays ecological, environmental protective, free of contamination effect, remarkable in economical benefits.
Construction safety safeguard measure
1, study hard, implement, perform country, the local construction safety pertinent regulations promulgated.Project management department security official strengthens Safety is told somebody what one's real intentions are and safety education work, extensively organizes various security activity, strengthens construction safety prevention awareness, improves construction Safe practice level.
2, in strict accordance with code national, that local government is relevant, regulation, set up, perfect safety in production guarantee system, formulate The object of safety management, implements safety management responsibility.Improve and perfect the every account of safety management.
3, outfit is trained, examines qualified accredited management, execution and inspection personnel.
Civilized construction measure
1, special messenger is responsible for handling every examination and approval procedures and coordinating the relation of the departments concerned, obtains and supports the most energetically, really Guarantor's engineering is smoothed out.
2, project management department must designate a special person to take charge civilized construction (or standardization building site construction) management work.Project management department builder Civilized construction should be included in the groundwork content of its daily management, supervise work layer to do civilized construction well, and perform corresponding note Record.The factor that waste oil, waste water and the refuse etc. produced in construction, production, repair procedures affect environment is controlled.Waste oil, Waste water, garbage centralized collection and process respectively,
3, write this engineering civilized construction detailed rules and regulations, and organize project management department to learn and perform.
4, construction site arranges building site nameplate, comprises project profile board, project management staff list board, job site Standardized management board, engineering-environment board, safety in production six big discipline boards, safety in production sky counting number board, fire prevention tissue board, construction Spot plane layout drawing.The making of label, hang the standard of having to comply with.System of keeping a public place clean is carried out in job site and Office Area, arranges Full-time health director, partition management, specify responsibility, keep facing construction execute, construction site and the cleaning of entrance construction area road.
These are only the specific embodiment of the present invention, but the technical characteristic of the present invention is not limited thereto.Any with this Based on bright, for solving essentially identical technical problem, it is achieved essentially identical technique effect, done simple change, etc. With replacement or modification etc., all it is covered by among protection scope of the present invention.

Claims (9)

1. the Rainwater collection system for sponge city, it is characterised in that: include rain water drainage ditch, rainwater-collecting ditch And cistern;
The bottom of described rain water drainage ditch is provided with ventilation anti-seepage layer of sand, described ventilation anti-seepage layer of sand be arranged over sand base permeable ditch Cover plate, described ventilation anti-seepage layer of sand is provided with rain water drainage defecator, and described rain water drainage defecator connects abandoned stream ditch Drain pipe;
The bottom of described rainwater-collecting ditch is provided with waterproof layer, described waterproof layer be arranged over rain collector, described rainwater Collection device be arranged over screed-coat, described screed-coat is provided with sand base drainage brick, on described rain collector access have Intercepting pollution for rainwater device, is provided with rainwater elevator pump and collects ditch water discharge pipe at described intercepting pollution for rainwater device, described rainwater-collecting ditch Being provided with rainwater return duct at inwall, described rainwater return duct is linked on described rainwater elevator pump, the top of described rainwater-collecting ditch Portion is provided with biochemical filtering device;
It is provided with regulating reservoir between described rain water drainage ditch and described rainwater-collecting ditch, described regulating reservoir is provided with rainwater purification dress Putting, described regulating reservoir connects described rainwater return duct, is provided with overfall bottom described regulating reservoir;
Described cistern accesses rain gathering tube, and described rainwater gathering tube connects described abandoned stream ditch water discharge pipe and described receipts respectively Collection ditch water discharge pipe, the bottom of described cistern is provided with ventilation anti-seepage brick, described cistern be formed around anti-seepage geotextile, described Anti-seepage geotextile be arranged over bed course, described bed course is equipped with Water-storage machine structure, described water storage mechanism is provided with coagulation earth mulch Plate.
A kind of Rainwater collection system for sponge city the most according to claim 1, it is characterised in that: described rain Being provided with side plate building enclosure in water abandoned stream ditch, described side plate building enclosure is provided with fastener, and described fastener positions described rain Water abandoned stream defecator.
A kind of Rainwater collection system for sponge city the most according to claim 1, it is characterised in that: described rain Water abandoned stream defecator includes upper plate and lower shoe, is filled with filtering material between described upper plate and described lower shoe.
A kind of Rainwater collection system for sponge city the most according to claim 1, it is characterised in that: described rain Water pollution cutting device includes that housing, described housing are provided with water inlet, outlet and sewage draining exit, is provided with filtration and carries in described housing Basket, the top of described filtering basket is provided with handle.
A kind of Rainwater collection system for sponge city the most according to claim 1, it is characterised in that: described tune Joint is provided with liquid level induction apparatus in pond, is provided with flow control valve at described overfall, and described liquid level induction apparatus connects controller, institute State controller and connect described flow control valve.
A kind of Rainwater collection system for sponge city the most according to claim 1, it is characterised in that: described storage Water mechanism includes silica sand building block, and described silica sand building block is cellular, is provided with flow-guiding mouth in described water storage mechanism.
7. a construction method based on the Rainwater collection system for sponge city described in claim 1, its feature It is to comprise the steps:
(a) excavation of foundation pit;
B () rainwater gathering tube is laid: select the pipeline of regulation model as rainwater gathering tube according to drawing, and enter inner-walls of duct Row rinses, then the foundation ditch bottom section laying pipeline at excavation, arranges cushion block in the bottom of foundation ditch, every segment pipe is placed into pad On block, and being buckled on cushion block by pipeline with clasp, between pipeline, in addition pipe box is protected, and rainwater gathering tube entirety keeps rule Grade is laid, and keeps draining smooth and easy, then at design attitude preserved pipeline access port, then backfills soil;
C () rain water drainage ditch is built: first laying geotextiles at the foundation ditch of rain water drainage ditch, geotextile laying is smooth, and overlap joint is long Degree is at 80mm-120mm, after geotextile laying completes, lays ventilation anti-seepage sand in bottom, and arranges smooth, form ventilation anti-seepage Layer of sand, then build the permeable roadbed in edge, the permeable roadbed in test edge, it is ensured that permeable road, edge by laying bricks or stones at the foundation ditch side of rain water drainage ditch The bearing capacity of base is qualified, then punches in the permeable roadbed in edge, then lays abandoned stream ditch water discharge pipe, and is worn by abandoned stream ditch water discharge pipe Cross the preformed hole of the permeable roadbed in edge, and abandoned stream ditch water discharge pipe is linked on the access port of rainwater gathering tube, then by limit The permeable roadbed of edge arranges side plate building enclosure, then arranges rain water drainage defecator between side plate building enclosure, adjusts rainwater Abandoned stream defecator position, connects rain water drainage defecator with abandoned stream ditch water discharge pipe, then with fastener by rain water drainage Defecator location is fixing, and then at edge, sand base water permeation channel cover plate is laid at the top of permeable roadbed, then at the permeable operculum colpi of sand base Turf is laid on plate;
(d) regulating reservoir construction: lay the sand of 100mm bottom the foundation ditch of regulating reservoir, then backfill soil, and compaction in layers, then Bottom the foundation ditch of regulating reservoir and surrounding casting concrete, and reserved water exit position, at water exit position, pour overfall, coagulation After soil maintenance, concrete is set up bracing frame, then rainwater purification apparatus is set on bracing frame, then at the top of regulating reservoir Formwork, and at formwork, lay one layer of permeable formation, at permeable formation, it is downwardly into liquid level induction apparatus, then on permeable formation, lays grass Skin;
E () rainwater-collecting ditch is built: lay one layer of 200-300mm waterproof layer bottom the foundation ditch of rainwater-collecting ditch, then waterproof Arranging personnel on site's assembly rainwater-collecting module on layer, rainwater-collecting module is installed according to requirement and the size of design, Gu Surely become rain collector, then with water pipe, rain collector is rinsed, keep rain collector entirety cleaning, so After above rain collector, successively lay screed-coat and sand base drainage brick, then pick out separatory at rain collector Pipe, the position further according to each separating tube arranges U-type groove, then arranges steel plate in U-type groove, then fixed by intercepting pollution for rainwater device On steel plate, and separating tube is connected on intercepting pollution for rainwater device, is then linked into rainwater gathering tube by collecting ditch water discharge pipe On access port, being then connected with intercepting pollution for rainwater device by rainwater elevator pump, then the lower section at rainwater elevator pump arranges access hole, Then above sand base drainage brick, lay rainwater return duct, keep level when rainwater return duct is installed, use U-shaped rotating Laying, the pipeline place of rotating uses to insert under metal button member and fixes, and is then linked on regulating reservoir by rainwater return duct, then returns Banket earth, and at one piece of biochemical filtering device of surface configuration, then lays turf;
(f) cistern construction: first the foundation ditch surrounding at cistern lays anti-seepage geotextile, and anti-seepage geotextile is laid smooth, then The bed course of 400-500mm is laid in the top of anti-seepage geotextile, then with side plate, bed course is carried out compacting and fixes, then is collected by rainwater Pipe is passed in the foundation ditch of cistern, and then the mouth of pipe to rainwater gathering tube is inserted in protection set, then bottom the foundation ditch of cistern Laying ventilation anti-seepage brick, the spaced apart 300-600mm hole of ventilation anti-seepage brick, and casting concrete in hole, then mixed The top of solidifying soil builds silica sand building block by laying bricks or stones, constitutes cellular water storage mechanism, and arranges flow-guiding mouth in water storage mechanism, then backfills soil Earth, then lays concrete cover on soil;
The sampling detection of (g) cistern water body;
H () cistern water body utilizes.
The construction method of a kind of Rainwater collection system for sponge city the most according to claim 7, its feature It is: step (a) excavation of foundation pit concrete operations are for measure unwrapping wire according to construction drawing, successively to rain water drainage ditch, regulation Pond, rainwater-collecting ditch and cistern excavate, and digging machine cooperation each foundation ditch of hand excavation is to designed elevation, then tamps at the bottom of foundation ditch Portion, through site operation technical staff detect qualified after, the surface of foundation ditch lay protection network.
The construction method of a kind of Rainwater collection system for sponge city the most according to claim 7, its feature Being: in step (e), arranging of waterproof layer is first laid with one layer of fine sand, as base bed course, and sprinkles water fine sand, protects Hold the humidity of sand bed, lay protecting film one layer the most successively, strengthen geotextiles one layer.
CN201610567568.0A 2016-07-18 2016-07-18 A kind of Rainwater collection system and construction method for sponge city Active CN106193259B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610567568.0A CN106193259B (en) 2016-07-18 2016-07-18 A kind of Rainwater collection system and construction method for sponge city

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610567568.0A CN106193259B (en) 2016-07-18 2016-07-18 A kind of Rainwater collection system and construction method for sponge city

Publications (2)

Publication Number Publication Date
CN106193259A true CN106193259A (en) 2016-12-07
CN106193259B CN106193259B (en) 2019-07-19

Family

ID=57493033

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610567568.0A Active CN106193259B (en) 2016-07-18 2016-07-18 A kind of Rainwater collection system and construction method for sponge city

Country Status (1)

Country Link
CN (1) CN106193259B (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106758799A (en) * 2016-12-13 2017-05-31 浙江水利水电学院 For the system for reclaiming rainwater and its construction method of sponge urban interchange
CN107740486A (en) * 2017-12-08 2018-02-27 芜湖德司节能科技有限公司 A kind of urban road collects rainwater installation and its method
CN107794971A (en) * 2017-11-17 2018-03-13 芜湖德司节能科技有限公司 A kind of sponge urban rainwater collection processing system and its rainwater-collecting processing method
CN107989153A (en) * 2017-12-08 2018-05-04 芜湖德司节能科技有限公司 A kind of novel construction method for building sponge city
CN109989474A (en) * 2017-12-29 2019-07-09 江苏森洋环境建设集团有限公司 A kind of construction method of rain water collecting system
CN110122277A (en) * 2019-07-02 2019-08-16 余姚心智新能源科技有限公司 A kind of park water accumulating and supplying deep-well based on sponge city
CN110374181A (en) * 2019-07-31 2019-10-25 云南省建设投资控股集团有限公司 A kind of rainwater collection pool and its construction method
CN111005420A (en) * 2019-12-05 2020-04-14 浙江水利水电学院 Rainwater collection system and construction method thereof
CN111155594A (en) * 2019-12-31 2020-05-15 深圳粤鹏环保技术股份有限公司 Rural drinking water safety guarantee system and method in water-deficient area
CN111809685A (en) * 2019-12-03 2020-10-23 太原理工大学 Series-connection type water and fertilizer resource collecting and utilizing system for greenbelt and farmland
CN112095711A (en) * 2020-09-07 2020-12-18 苏州胜景泰园林环境建设有限公司 Rainwater collection and recovery construction method applied to sponge city
CN114568236A (en) * 2022-04-19 2022-06-03 浙江南琪生态环保技术有限公司 High-standard paddy field system built by sand-based microbead technology

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101649592A (en) * 2009-09-07 2010-02-17 北京仁创科技集团有限公司 Road drainage system
JP2012036711A (en) * 2010-08-05 2012-02-23 Daishin Kogyo Co Ltd Road surface drainage treatment device
CN202831061U (en) * 2012-10-29 2013-03-27 北京泰宁科创雨水利用技术股份有限公司 Rain water comprehensive utilization system of parking lot
CN105297872A (en) * 2015-11-06 2016-02-03 厦门理工学院 LID type city rainwater closed conduit with functions of water permeating, storing, purifying and draining
KR20160071050A (en) * 2014-12-11 2016-06-21 최기재 The initial rain processing unit of filtering type mounted on Rain Gutters for nonpoint pollution sources removal and odor removal and flood prevention
CN105696606A (en) * 2016-01-22 2016-06-22 岭南新科生态科技研究院(北京)有限公司 Semi-arid area ecological slope protection structure and construction method thereof

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101649592A (en) * 2009-09-07 2010-02-17 北京仁创科技集团有限公司 Road drainage system
JP2012036711A (en) * 2010-08-05 2012-02-23 Daishin Kogyo Co Ltd Road surface drainage treatment device
CN202831061U (en) * 2012-10-29 2013-03-27 北京泰宁科创雨水利用技术股份有限公司 Rain water comprehensive utilization system of parking lot
KR20160071050A (en) * 2014-12-11 2016-06-21 최기재 The initial rain processing unit of filtering type mounted on Rain Gutters for nonpoint pollution sources removal and odor removal and flood prevention
CN105297872A (en) * 2015-11-06 2016-02-03 厦门理工学院 LID type city rainwater closed conduit with functions of water permeating, storing, purifying and draining
CN105696606A (en) * 2016-01-22 2016-06-22 岭南新科生态科技研究院(北京)有限公司 Semi-arid area ecological slope protection structure and construction method thereof

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106758799A (en) * 2016-12-13 2017-05-31 浙江水利水电学院 For the system for reclaiming rainwater and its construction method of sponge urban interchange
CN107794971A (en) * 2017-11-17 2018-03-13 芜湖德司节能科技有限公司 A kind of sponge urban rainwater collection processing system and its rainwater-collecting processing method
CN107740486A (en) * 2017-12-08 2018-02-27 芜湖德司节能科技有限公司 A kind of urban road collects rainwater installation and its method
CN107989153A (en) * 2017-12-08 2018-05-04 芜湖德司节能科技有限公司 A kind of novel construction method for building sponge city
CN109989474B (en) * 2017-12-29 2020-09-04 江苏森洋环境建设集团有限公司 Construction method of rainwater collection system
CN109989474A (en) * 2017-12-29 2019-07-09 江苏森洋环境建设集团有限公司 A kind of construction method of rain water collecting system
CN110122277A (en) * 2019-07-02 2019-08-16 余姚心智新能源科技有限公司 A kind of park water accumulating and supplying deep-well based on sponge city
CN110374181A (en) * 2019-07-31 2019-10-25 云南省建设投资控股集团有限公司 A kind of rainwater collection pool and its construction method
CN111809685A (en) * 2019-12-03 2020-10-23 太原理工大学 Series-connection type water and fertilizer resource collecting and utilizing system for greenbelt and farmland
CN111005420A (en) * 2019-12-05 2020-04-14 浙江水利水电学院 Rainwater collection system and construction method thereof
CN111005420B (en) * 2019-12-05 2021-02-26 浙江水利水电学院 Rainwater collection system and construction method thereof
CN111155594A (en) * 2019-12-31 2020-05-15 深圳粤鹏环保技术股份有限公司 Rural drinking water safety guarantee system and method in water-deficient area
CN112095711A (en) * 2020-09-07 2020-12-18 苏州胜景泰园林环境建设有限公司 Rainwater collection and recovery construction method applied to sponge city
CN114568236A (en) * 2022-04-19 2022-06-03 浙江南琪生态环保技术有限公司 High-standard paddy field system built by sand-based microbead technology

Also Published As

Publication number Publication date
CN106193259B (en) 2019-07-19

Similar Documents

Publication Publication Date Title
CN106193259B (en) A kind of Rainwater collection system and construction method for sponge city
WO2019137149A1 (en) Engineering system for collecting and utilizing regional rainwater and allocation method
CN106088289A (en) A kind of water storage system for sponge Front river course road and construction method
CN109356225A (en) A kind of Multifunctional rain ecological utilization system
CN106192665B (en) A kind of sponge urban road rain infiltration system and its construction method
CN106639180A (en) Rainwater collecting system for roof garden and construction method
CN106638918A (en) Construction method for sponge city rainwater collection system
CN107989153A (en) A kind of novel construction method for building sponge city
CN207567889U (en) Residential quarters Rainwater collection system
CN104692588A (en) Ecological multidimensional retention system for rainwater drainage on bank side of river
CN105621617B (en) A kind of pavement runoff Integral purifier
CN204474499U (en) A kind of ecological multidimensional gaseous-waste holdup system for the treatment of bank, river course rain-water drainage
CN106193245B (en) A kind of paddy field underground reservoir and its construction method for sponge city
CN106045214A (en) Rain water system for building districts of sponge cities and construction method of rain water system
CN110042724A (en) Collapsible Loess District road sponge facility rainwater catchment system and exhaust system
CN113818534A (en) Biological retention facility for sponge urban road
CN106958264A (en) A kind of highway greenbelt and its construction method
CN206052850U (en) A kind of roadside greening rainwater regulating pondage system
CN106320494B (en) The construction method of sponge engineering system based on existing urban road and drainage condition
CN110374181A (en) A kind of rainwater collection pool and its construction method
CN112854405B (en) Multifunctional biological detention pond and construction method thereof
CN207633496U (en) Integrated rainwater recycling system for sponge cities in super-large square
CN203347000U (en) Rainwater garden system suitable for mountainous city runoff containing large amount of sand
CN210684945U (en) Rainwater collecting pool
CN106759797B (en) A kind of sunk type greenery patches rain processing system and its construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant