CN106192964A - Jacking system load is reallocated technical method online - Google Patents

Jacking system load is reallocated technical method online Download PDF

Info

Publication number
CN106192964A
CN106192964A CN201610621901.1A CN201610621901A CN106192964A CN 106192964 A CN106192964 A CN 106192964A CN 201610621901 A CN201610621901 A CN 201610621901A CN 106192964 A CN106192964 A CN 106192964A
Authority
CN
China
Prior art keywords
load
control unit
climbing
unit
gear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610621901.1A
Other languages
Chinese (zh)
Other versions
CN106192964B (en
Inventor
郑建
洪超
丁彦侃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Hunter Marine Equipment Co Ltd
Original Assignee
Shanghai Hunter Marine Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Hunter Marine Equipment Co Ltd filed Critical Shanghai Hunter Marine Equipment Co Ltd
Priority to CN201610621901.1A priority Critical patent/CN106192964B/en
Publication of CN106192964A publication Critical patent/CN106192964A/en
Application granted granted Critical
Publication of CN106192964B publication Critical patent/CN106192964B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B17/04Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction
    • E02B17/08Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction for raising or lowering
    • E02B17/0818Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction for raising or lowering with racks actuated by pinions
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F3/00Devices, e.g. jacks, adapted for uninterrupted lifting of loads
    • B66F3/44Devices, e.g. jacks, adapted for uninterrupted lifting of loads with self-contained electric driving motors
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F3/00Devices, e.g. jacks, adapted for uninterrupted lifting of loads
    • B66F3/46Combinations of several jacks with means for interrelating lifting or lowering movements

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Types And Forms Of Lifts (AREA)

Abstract

The present invention relates to a kind of jacking system load reallocate online technical method, for jack-up unit electric gear teeth bar type up-down system;Each main chord tube of jack-up unit spud leg is installed and is overlapped lifting unit more, and each lifting unit configuration frequency conversion motor, frequency conversion motor drives climbing gear by reduction box;Electric-control system motor control unit is the converter that the configuration of each frequency conversion motor is independent;Central control unit real time on-line monitoring all climbing gears institute is loaded with platform inclination degree, and judges platform safety situation;Central control unit is with safety as principle, with platform inclination degree as constraints, to regulate climbing gear load as target;When climbing gear stand under load degree exceedes load early warning value and meets platform inclination condition, central control unit output control signal gives the converter of the motor control unit that this climbing gear is corresponding, realize climbing gear load to reallocate online, make all climbing gear stands under load on same main chord tube all in set point.

Description

Jacking system load is reallocated technical method online
Technical field
The present invention relates to the jack-up unit electric gear teeth bar type up-down system of a kind of marine engineering equipment, especially one Kind of jacking system load is reallocated technical method online.
Background technology
Electric gear teeth bar type up-down system is widely used in English truss spud leg jack-up unit, and each spud leg typically fills There are 18 set lifting units, equipped with 6 set lifting units on the most each main chord tube.When carrying out lifting platform, 6 on each main chord tube Individual lifting unit climbing gear can be engaged motion with the tooth bar on main chord tube.But, due to rigging error, mismachining tolerance, The factor such as tooth surface abrasion, External force interference affects, and 6 lifting unit climbing gears on each main chord tube are difficult to nibble with tooth bar simultaneously Close or engagement time asynchronous, this generates load non-uniform phenomenon.6 lifting units on the most each main chord tube climb tooth Wheel, carries inconsistent, and this will cause safety problem.So one requisite function of control system of jacking system is exactly Realize platform load to redistribute between different lifting units, reach equilibrium within the specific limits.
Current practice or the load reallocation technology mentioned in the literature mainly have a following two:
1. torque sensor is installed at jacking system climbing gear and monitors climbing gear stand under load in real time, if certain tooth that climbs being detected Wheel load exceedes setting value, and jacking system will stop;Operator start " load reallocation " button on console, and system will It is automatically adjusted the step-by-step movement disc brake device tightness being installed on motor output shaft to control to export moment of torsion, thus realizes Load is reallocated;Also brake gear pine can manually be regulated according to operating instruction by operator to corresponding lifting unit Tight degree realizes load reallocation.
2. climbing gear stand under load situation is judged, when a certain climbing being detected by converter monitoring frequency conversion motor output moment of torsion When gear load exceedes setting value, jacking system stops;Operator enable standby variable frequency device, the electricity corresponding to this climbing gear Machine carries out frequency adjustment, reduces its output moment of torsion and realizes load reallocation.
In prior art, the first belongs to the method that current jacking system equipment vendor is commonly used, and Technical comparing is ripe.But It is, when realizing load reallocation, to need to stop jacking system.Stopping to jacking system when pressing " stopping " button, climb tooth The contact condition of wheel and rack has occurred and that change.Now, then carry out load reallocation have been out regulation according to.Therefore This load reallocation mode is a kind of coarse adjustment, is difficult to relatively accurately control climbing gear stand under load.It addition, at climbing gear Installing torque sensor, need to process at climbing gear center through hole, this is unfavorable to the intensity of climbing gear.
The second belongs to the technology published, and has no and used on product.But this load control method is to moment of torsion Regulating effect is the best, because its work process is similar to first kind of way: when system detects that a certain climbing gear load exceedes After setting value, jacking system stops, and is adjusted corresponding lifting unit electric machine frequency the most again.It should be clear that at jacking system In stopped process, climbing gear is the most altered as the engagement of spud leg tooth bar.When starting standby variable frequency device to this lifting When the frequency conversion motor that unit is corresponding carries out frequency regulation, load reallocation effect also can be had a greatly reduced quality.
Summary of the invention
It is an object of the invention to provide a kind of jacking system load to reallocate online technical method, this technical method is by adopting With frequency conversion control technique, on-line checking jacking system climbing gear load, need not to stop under jacking system state the most right The lifting unit output moment of torsion of overload accurately controls, and rapidly the climbing gear load on same main chord tube is carried out load Reallocation, it is ensured that jacking system work safety.
For achieving the above object, the technical scheme is that a kind of jacking system load is reallocated technology online, be used for Electric gear teeth bar type up-down system, this electric gear teeth bar type up-down system include central control unit, motor control unit, Stake limit control unit and lifting unit.One solid pile element of a spud leg main chord tube outfit of truss leg jack-up unit, one Installing on individual solid pile element and overlap lifting unit more, each lifting unit configuration frequency conversion motor, frequency conversion motor is driven by reduction box Climbing gear, motor control unit is the converter that the configuration of each frequency conversion motor is independent;Central control unit with safety as principle, With platform inclination degree as constraints, to regulate climbing gear load as target;Described central control unit real-time online is supervised Survey all climbing gear stand under load degree and platform inclined degree, exceed load early warning value when climbing gear institute is loaded and meet flat During platform inclined degree, described central control unit output control signal gives the frequency conversion of the motor control unit that this climbing gear is corresponding Device, carries out load to the frequency conversion motor that this climbing gear is corresponding and reallocates online, and make on same spud leg main chord tube all climbs Rise gear loaded all in set point.
Described climbing gear degree loaded includes load shutdown value and load early warning value;When in multiple climbing gears at least When the load of one climbing gear exceedes load shutdown value, central control unit sends warning and makes electric gear teeth bar type up-down System-down;Operator manually regulate the frequency converter frequency that this climbing gear is corresponding, it is achieved manual load is reallocated, the most again Secondary startup electric gear teeth bar type up-down system.
Described truss leg jack-up unit inclined degree includes platform inclination shutdown value, platform inclination alarming value and platform Tilting early warning value, inclined degree is as the constraints implementing load reallocation;When truss leg jack-up unit inclination angle surpasses Crossing platform inclination shutdown value, central control unit automatic alarm also makes electric gear teeth bar type up-down system-down;Operator More controlling leveling, i.e. under ignoring inclination warning function state, manually lift single pile, be up to the standard requirement;Work as purlin Frame spud leg jack-up unit inclination angle exceedes platform inclination alarming value and is not up to shutdown value, and operator manually carry out single pile Lifting, be up to the standard requirement;It is not up to alarming value when truss leg jack-up unit inclination angle exceedes platform inclination early warning value, in Centre control unit runs automatic leveling program, and be up to the standard requirement;
The invention has the beneficial effects as follows:
The jacking system load of present invention technical method of reallocating online can make same main chord tube all climbing gears stand under load all exist Set point.This technology is with safety as principle, with platform inclination degree as constraints, to regulate climbing gear stand under load as mesh Mark.Climbing gear degree loaded is divided into load shutdown value and load early warning value;Load shutdown value characterizes this climbing gear In the hole, it is necessary to stop jacking system work;Load early warning value is the frequency conversion that control system is corresponding to this climbing gear Motor carries out the essential condition that load is reallocated online.Platform inclination degree is divided into platform inclination shutdown value, platform inclination report Alert value and platform inclination early warning value, inclined degree is as the constraints implementing load reallocation
The present invention is embodied in speed, and soon and precision is high.Owing to system real-time online is adjusted climbing gear institute is loaded, Need not shut down, therefore load reallocation speed is fast;Furthermore, the foundation of load control is exactly current contact condition, therefore load is again Distribution precision is high.
Accompanying drawing explanation
Fig. 1 is that in embodiment, lifting unit configuration frequency conversion motor is connected corresponding diagram with converter;
Fig. 2 is load reallocation system flow chart in embodiment;
Fig. 3 is lifting unit layout drawing on main chord tube;
Fig. 4 is that lifting unit forms schematic diagram.
Detailed description of the invention
The invention will be further described with embodiment below in conjunction with the accompanying drawings.
Such as Fig. 1, shown in 3,4, a kind of jacking system load is reallocated technical method online, for electric gear rack type liter Fall system.This electric gear teeth bar type up-down system mainly includes that central control unit, motor control unit (comprise converter 14), stake limit control unit, lifting unit etc..One spud leg main chord tube 3 of truss leg jack-up unit is equipped with a solid stake list Unit 2, a solid pile element 2 is installed and overlaps lifting unit, as a example by this sentences six lifting units of installation more.
As shown in Figure 4, lifting unit comprises frequency conversion motor 13, reducing gear 12, climbing gear 11.Six lifting units When A1, B1, C1, A2, B2, C2 carry out lift work on spud leg main chord tube 3, six climbing gears institute is loaded to be not quite similar, And real-time change.As a example by this main chord tube, system is the most consistent to the control mode of all main chord tubes.
The jacking system load of the present invention is reallocated technology online, each lifting unit configuration frequency conversion motor 13, Mei Gebian Frequently motor configures independent converter 14, sees Fig. 1.
Described a kind of jacking system load is reallocated technology online, and by climbing gear stepping loaded, separation is distinguished It is defined as load shutdown value and load early warning value.It is in the hole that load shutdown value characterizes this climbing gear, it is necessary to stops rising Fall system works;Load early warning value is that control system carries out load to the frequency conversion motor that this climbing gear is corresponding and reallocates online Essential condition.
Described a kind of jacking system load is reallocated technology online, and by platform inclination degree stepping, separation defines respectively For platform inclination shutdown value, platform inclination alarming value and platform inclination early warning value.Platform inclination shutdown value characterization platform is in danger Danger state, it is necessary to stop jacking system work;Platform inclination alarming value characterization platform is in heeling condition and automatic leveling journey Sequence is not the most by its leveling, but is also unlikely to danger occur, and operator can carry out manual shut-down, it is also possible to continues to run with lifting System;Platform inclination early warning value characterization platform is in heeling condition, and automatic leveling program brings into operation.
Described a kind of jacking system load is reallocated technology online, realizes electric gear rack type by frequency conversion control technique The detection of jacking system real-time online and regulatory function, make same main chord tube all climbing gears stand under load all at set point.This skill Art is with safety as principle, with platform inclination degree as constraints, to regulate climbing gear stand under load as target.The invention provides A kind of implementation method, concrete technical scheme is shown in Fig. 2.
Embodiment:
Such as Fig. 1, shown in 2, install as a example by six lifting units by a main chord tube, respectively A1, B1, C1, A2, B2, C3;Each Lifting unit configuration frequency conversion motor, each frequency conversion motor configures independent converter.
(1) PLC of central control unit sends instruction in real time, detects in six lifting units A1, B1, C1, A2, B2, C2 Climbing gear stand under load degree.
(2) if certain or multiple load exceed load shutdown value and persistently sets the time in six climbing gears, in Centre control unit sends warning and makes electric gear teeth bar type up-down system-down;Now, operator can manually regulate right The frequency converter frequency answered, it is achieved manual load is reallocated, and is then again started up electric gear teeth bar type up-down system.If this spud leg On main chord tube, all climbing gear load are all not less than load shutdown value, and system will determine that whether platform inclination angle exceedes load and stop Machine value.
Note: if six climbing gear load all exceed load shutdown value and persistently set the time, central control unit is sent out Go out report to the police and make electric gear teeth bar type up-down system-down;Now should check at this spud leg guiding, wheel and rack engages Whether place has foreign body to cause clamping stagnation.
(3) if platform inclination angle exceedes load shutdown value, central control unit sends warning and makes electric gear rack type Jacking system is shut down;Now, operator more control leveling, i.e. under ignoring inclination warning function state, manually to single pile Lifting, be up to the standard requirement.If platform inclination angle is not less than shutdown value, system judges whether inclination angle exceedes alarming value.
(4) if platform inclination angle exceedes load alarming value, central control unit automatic alarm, but not shutting down, system is Run leveling procedure.Now, operator can manually make it shut down;Or watching how it develops quietly, system may just can be adjusted to Often state, it is also possible to leveling cannot make system-down until being tilted beyond shutdown value for some reason.If operator's hands Moving makes jacking system quit work, and platform can be carried out the lifting of manual single pile leveling;If operator ignore inclination and report to the police, System will continue to run with.If platform inclination angle is not less than load alarming value, system judges whether to exceed load early warning value.
(5) if platform inclination angle exceedes load early warning value, system is automatically into leveling procedure, and detection climbing gear is subject to simultaneously Carry.If platform inclination angle is not less than load early warning value, system judges whether climbing gear stand under load exceedes load early warning value.
(6) if climbing gear stand under load exceedes load early warning value, system will be automatically adjusted corresponding frequency converter frequency, it is achieved load Online reallocation.Meanwhile, system is by the loading conditions after detection climbing gear reallocation.If climbing gear load is not less than load Alarming value, system runs synchronization program, simultaneity factor real-time judge climbing gear loading conditions.
In a word, a kind of jacking system load is reallocated technical method online, finally makes six on same spud leg main chord tube Six climbing gear load in individual lifting unit A1, B1, C1, A2, B2, C2 tend to impartial and are below early warning value.

Claims (3)

1. jacking system load is reallocated a technical method online, for electric gear teeth bar type up-down system, this electric gear Wheel rack type jacking system includes central control unit, motor control unit, stake limit control unit and lifting unit;Truss leg One spud leg main chord tube (3) of jack-up unit is equipped with a solid pile element (2), and upper an installation of solid pile element (2) overlaps liter more Fall unit, it is characterised in that: each lifting unit configuration frequency conversion motor, frequency conversion motor drives climbing gear, electricity by reduction box Machine control unit is the converter that the configuration of each frequency conversion motor is independent;Central control unit is with safety as principle, with platform inclination Degree is constraints, to regulate climbing gear load as target;Described central control unit real time on-line monitoring is all to climb Gear stand under load degree and platform inclined degree, exceed load early warning value when climbing gear institute is loaded and meets platform inclination condition Time, described central control unit output control signal is given the converter of the motor control unit that this climbing gear is corresponding, is climbed this The frequency conversion motor that liter gear mesh is answered carries out load and reallocates online, makes all climbing gears on same spud leg main chord tube (3) Loaded all in set point.
Jacking system load the most according to claim 1 is reallocated technical method online, it is characterised in that climb described in: tooth Take turns degree loaded and include load shutdown value and load early warning value;When the load of one of them climbing gear in all climbing gears When lotus exceedes load shutdown value, central control unit sends warning and makes electric gear teeth bar type up-down system-down;Operator Member manually regulates the frequency converter frequency that this climbing gear is corresponding, it is achieved manual load is reallocated, and is then again started up electric gear Teeth bar type up-down system.
Jacking system load the most according to claim 1 is reallocated technical method online, it is characterised in that: described truss stake Lower limb jack-up unit inclined degree includes platform inclination shutdown value, platform inclination alarming value and platform inclination early warning value, as reality Execute the constraints of load reallocation;When truss leg jack-up unit inclination angle exceedes platform inclination shutdown value, and central authorities control Unit automatic alarm also makes electric gear teeth bar type up-down system-down;Operator more control leveling, are i.e. ignoring inclination Under warning function state, manually lifting single pile, be up to the standard requirement;When truss leg jack-up unit inclination angle exceedes When platform inclination alarming value is not up to shutdown value, operator manually carry out single pile lifting, and be up to the standard requirement;Work as truss Spud leg jack-up unit inclination angle exceedes platform inclination early warning value when being not up to alarming value, and central control unit runs automatic leveling Program, be up to the standard requirement.
CN201610621901.1A 2016-08-01 2016-08-01 Jacking system load is reallocated technical method online Active CN106192964B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610621901.1A CN106192964B (en) 2016-08-01 2016-08-01 Jacking system load is reallocated technical method online

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610621901.1A CN106192964B (en) 2016-08-01 2016-08-01 Jacking system load is reallocated technical method online

Publications (2)

Publication Number Publication Date
CN106192964A true CN106192964A (en) 2016-12-07
CN106192964B CN106192964B (en) 2018-02-16

Family

ID=57498256

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610621901.1A Active CN106192964B (en) 2016-08-01 2016-08-01 Jacking system load is reallocated technical method online

Country Status (1)

Country Link
CN (1) CN106192964B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106849763A (en) * 2017-02-28 2017-06-13 武汉船用机械有限责任公司 The control method and control device of a kind of hoistable platform
CN109056850A (en) * 2018-07-16 2018-12-21 武汉船用机械有限责任公司 The monitoring method and monitoring system of the spud leg load of self-elevating ocean platform
CN112962558A (en) * 2021-02-05 2021-06-15 太原重工股份有限公司 Drilling platform lifting control system and method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001261292A (en) * 2000-03-24 2001-09-26 Nippon Sharyo Seizo Kaisha Ltd Jack device
CN103015388A (en) * 2013-01-21 2013-04-03 上海振华重工(集团)股份有限公司 Self-elevating platform lifting device allowing for dynamically detection of load
CN203729285U (en) * 2014-02-24 2014-07-23 上海振华重工(集团)股份有限公司 Lifting control device of self-elevating drilling platform
CN105369791A (en) * 2015-09-30 2016-03-02 武汉船用机械有限责任公司 Control method and device of gear rack lifting system
CN205062784U (en) * 2015-08-19 2016-03-02 广东精铟海洋工程股份有限公司 Offshore platform operating system of high reliability wide range speed control scope

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001261292A (en) * 2000-03-24 2001-09-26 Nippon Sharyo Seizo Kaisha Ltd Jack device
CN103015388A (en) * 2013-01-21 2013-04-03 上海振华重工(集团)股份有限公司 Self-elevating platform lifting device allowing for dynamically detection of load
CN203729285U (en) * 2014-02-24 2014-07-23 上海振华重工(集团)股份有限公司 Lifting control device of self-elevating drilling platform
CN205062784U (en) * 2015-08-19 2016-03-02 广东精铟海洋工程股份有限公司 Offshore platform operating system of high reliability wide range speed control scope
CN105369791A (en) * 2015-09-30 2016-03-02 武汉船用机械有限责任公司 Control method and device of gear rack lifting system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106849763A (en) * 2017-02-28 2017-06-13 武汉船用机械有限责任公司 The control method and control device of a kind of hoistable platform
CN109056850A (en) * 2018-07-16 2018-12-21 武汉船用机械有限责任公司 The monitoring method and monitoring system of the spud leg load of self-elevating ocean platform
CN109056850B (en) * 2018-07-16 2020-12-15 武汉船用机械有限责任公司 Monitoring method and monitoring system for pile leg load of self-elevating ocean platform
CN112962558A (en) * 2021-02-05 2021-06-15 太原重工股份有限公司 Drilling platform lifting control system and method

Also Published As

Publication number Publication date
CN106192964B (en) 2018-02-16

Similar Documents

Publication Publication Date Title
US11118568B2 (en) Control of a wind turbine with a fault condition
US10337497B2 (en) Control of a wind turbine based on operational trajectory validation
CN106192964A (en) Jacking system load is reallocated technical method online
US20150337802A1 (en) System and method for pitch fault detection
RU2274599C2 (en) Method of and device for simulation of loads for load-lifting sets
JP2010531795A (en) Electric control method for multiple suspension point crane
CN104631839A (en) Construction method for integrally lifting super-high, super-heavy, large-span space corridor
WO2016128119A1 (en) Crane and method for monitoring the overload protection of such a crane
EP3256415A1 (en) Crane and method for monitoring the overload protection of such a crane
WO2013182201A1 (en) Wind turbine control
KR102183933B1 (en) Agitator with selfdiagnosis and recovery function
CN102849642B (en) Hydraulic hoisting mechanism control method and system
CN103738853B (en) Hoisting crane method of controlling operation and system
JP2012101919A (en) Adjustment method for elevator load detection device, and elevator monitoring device
CN104760889B (en) A kind of determine arm of force Crane control method with vector variable voltage variable frequency converter as power supply
CN102471013A (en) Elevator control device
CN107901897A (en) Proportional pressure-reducing valve closed loop control method, device and rail vehicle control system
CN107035617A (en) System and method for multi-vendor wind turbine of upgrading
CN104817018B (en) A kind of variable arm Crane control method with vector variable voltage variable frequency converter as power supply
CN112173972B (en) Method and system for detecting abnormal multiplying power setting of tower crane monitoring system
CN104881056A (en) Semisubmersible platform anchoring automatic control system
CN103010888B (en) The automatically controlled protection test method of mine hoist S7-300
CN204828087U (en) Down sealing -tape machine disc brake hydraulic control system
CN101581917B (en) Integrated control method for large-span roof support dismantlement construction
CN109665361B (en) Foil release delay automatic control system in foil corrosion production

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant