CN106149887A - Pin-connected panel container trailer - Google Patents

Pin-connected panel container trailer Download PDF

Info

Publication number
CN106149887A
CN106149887A CN201610715408.6A CN201610715408A CN106149887A CN 106149887 A CN106149887 A CN 106149887A CN 201610715408 A CN201610715408 A CN 201610715408A CN 106149887 A CN106149887 A CN 106149887A
Authority
CN
China
Prior art keywords
section bar
column
pin
corner fittings
folding wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610715408.6A
Other languages
Chinese (zh)
Inventor
邵华良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610715408.6A priority Critical patent/CN106149887A/en
Publication of CN106149887A publication Critical patent/CN106149887A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/343Structures characterised by movable, separable, or collapsible parts, e.g. for transport
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/343Structures characterised by movable, separable, or collapsible parts, e.g. for transport
    • E04B1/34336Structures movable as a whole, e.g. mobile home structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D13/00Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage ; Sky-lights
    • E04D13/04Roof drainage; Drainage fittings in flat roofs, balconies or the like

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention relates to a kind of pin-connected panel container trailer, including framework, base plate, top board and wallboard.Framework is included the underframe being formed by connecting by bottom girder by corner fittings and pushes up frame, column top frame and underframe being attached via corner fittings.Bottom girder and back timber are made up of the first section bar, and column is made up of the second section bar.Corner fittings includes corner fittings main body, the beam connecting portion being formed at two sides of corner fittings main body and is formed at the column connecting portion of upper end of corner fittings main body.Beam connecting portion and column connecting portion can insert in the end of the first section bar and the end of the second section bar respectively, are connected with the first section bar and the second section bar respectively by fastening connection piece.Floor board framing is located in the support folding wall of the bottom girder of underframe, top board is counter to be beaten in the support folding wall of the back timber of frame, the lower end of wallboard is supported by the support folding wall of the bottom girder of underframe, and be clamped between base plate and bottom girder, the upper end of wallboard is connected with the position of the lower section of the support folding wall of back timber by fastening connection piece.

Description

Pin-connected panel container trailer
Technical field
The present invention relates to a kind of movable plank house, particularly relate to a kind of pin-connected panel container trailer.
Background technology
At present, in construction site, in order to meet the needs of the inhabitation of relative short-term, generally use movable plank house, for construction Workman lives, and current building site uses is the container-type movable plank house of fixed welding mostly.
But, along with expanding economy, the progress of society, environmental protection, efficiently have become as certainty and social consensus.And it is above-mentioned That board house needs to carry out finished product in the factory and could use, thus the most inconvenient in transportation.And current needs The container-type movable plank house of fixing welding needs in process of production cut, welds, arranges the technological process such as plate, packing, manufacture Cost is high, and the cost of finished product is high, and dismounts extremely inconvenience, limits market application.Simultaneously as transport and installing space Demand, causes this series products and is not widely deployed for various building site.
Summary of the invention
The present invention produces in view of the above problems, its object is to provide a kind of low cost, produces, transports and install Efficiency is high, it is simple to the container trailer of dismounting.
Adopt the following technical scheme that for realizing the purpose of the present invention.
The invention of technical scheme 1 is a kind of pin-connected panel container trailer, including framework, base plate, top board and wallboard, institute State framework include underframe bottom girder being formed by connecting by corner fittings, top frame back timber being formed by connecting by described corner fittings, via The column that described top frame and described underframe are attached by described corner fittings.
Described bottom girder and described back timber are made up of the first section bar, are observing described along the length direction of described first section bar During the cross section of the first section bar, the cross sectional shape of described first section bar is formed as a sidewall and has the tubular of sidewall breach, in institute Stating on a sidewall breach limit of sidewall breach, connecting on the whole length direction on described sidewall breach limit has and described sidewall Vertical and outward extending support folding wall.
Described column is made up of the second section bar, observes described second section bar at the length direction along described second section bar During cross section, the cross sectional shape of described second section bar is formed as being cut away at an angle and being formed with the tubular of angle breach.
Described corner fittings includes corner fittings main body, the beam connecting portion being formed at two sides of described corner fittings main body and is formed at institute State the column connecting portion of the upper end of corner fittings main body.The shape of described beam connecting portion is mated with the cross sectional shape of described first section bar, The shape of described column connecting portion is mated with the cross sectional shape of described second section bar.Described beam connecting portion and described column connecting portion Can insert in the end of described first section bar and the end of described second section bar respectively, by fastening connection piece respectively with described First section bar and described second section bar connect.
Described floor board framing is located in the support folding wall of the bottom girder of described underframe, and described top board connects with the back timber of described top frame Connecing, the lower end of described wallboard is supported by the support folding wall of the bottom girder of described underframe, and be clamped in described base plate and described bottom girder it Between, the upper end of described wallboard is connected with the position of the lower section of the support folding wall of described back timber by fastening connection piece.
It addition, according to the invention of technical scheme 2, in the pin-connected panel container trailer of the invention of technical scheme 1, also have There is catching groove.Described catching groove is supported folding wall constituted by the cell body of side's U-shaped and the outward extending auxiliary of an edge from described cell body. Described cell body stretches into the sidewall breach China and foreign countries of the first section bar constituting described back timber and covers in described support folding wall by described support Folding wall supports, and the upper end of described wallboard is inserted in outside the cell body of described catching groove and covers on the slot formed in described support folding wall In, it is connected with described back timber by fastening connection piece.
It addition, according to the invention of technical scheme 3, in the pin-connected panel container trailer of the invention of technical scheme 2, in institute State many root bottom parts that base plate the is supported auxiliary support beam being formed with on underframe in the support folding wall being erected at described bottom girder, The many tops being supported top board being formed in the auxiliary support folding wall being erected at described catching groove on the frame of described top are auxiliary Help support beam.
It addition, according to the invention of technical scheme 4, in the pin-connected panel container trailer of the invention of technical scheme 3, described Top board includes top coat, heat-insulation layer and top watt layer, and described top coat is connected with the lower surface of described top auxiliary support beam, described The upper surface of heat-insulation layer and described top auxiliary support beam is connected, and layer covering in described top watt is at the upper surface of described heat-insulation layer and stretches Enter to the sidewall breach of the first section bar constituting described back timber.
It addition, according to the invention of technical scheme 5, in the pin-connected panel container trailer of the invention of technical scheme 3, described Top auxiliary support beam includes cross one another cross-brace beam and longitudinal support beam, is formed in the both sides of described cross-brace beam Overlap joint groove, described longitudinal support beam is had to be overlapped in the overlap joint groove of adjacent described cross-brace beam.
It addition, according to the invention of technical scheme 6, in the pin-connected panel container trailer of the invention of technical scheme 1, in institute Stating the guide card being provided with L-shaped in column, described guide card is connected with the angle breach of described column.
It addition, according to the invention of technical scheme 7, in the pin-connected panel container trailer of the invention of technical scheme 1, in institute State in the stud edge constituting angle breach of column, the whole length direction of described column is formed by outer flanging.
It addition, according to the invention of technical scheme 8, in the pin-connected panel container trailer of the invention of technical scheme 4, described Top watt layer is made up of a watt top flat, is bondd by marine glue between the tile of described top.
It addition, according to the invention of technical scheme 9, in the pin-connected panel container trailer of the invention of technical scheme 8, in institute State and between top tile and the outer eaves of described catching groove, sealing strip is set.
It addition, according to the invention of technical scheme 10, in the pin-connected panel container trailer of the invention of technical scheme 1, On described corner fittings, there is hole for hoist.
Compared with prior art, the present invention has following beneficial effect.
According to a kind of pin-connected panel container trailer of technical scheme 1 invention, including framework, base plate, top board and wallboard, The underframe that bottom girder is formed by connecting by corner fittings, top frame back timber being formed by connecting by corner fittings, company by column and corner fittings Connect and underframe and top frame are linked together.Back timber and corner fittings, bottom girder and corner fittings, column and corner fittings and wallboard, top board and base plate Install and be all bolted.The present invention is compared with traditional movable plank house being welded to connect, and all parts only pass through spiral shell Bolt or screw etc. connect, it becomes possible to constitute movable plank house, need not to carry out as conventional in disassembly process to cut, weld, The operations such as row's plate, it is the most convenient to dismount, and improves production efficiency.Further, since can install at building-site, it is not necessary to As in the past, need to carry out in the factory finished product, then transport to building-site, consequently facilitating transport, and not by building site The impact of on-the-spot installing space, it is possible to be adapted to various building site.Therefore, largely reduce the cost of movable plank house, Improve its popularity used.
It addition, top has certain gradient, the inside of the pipe constituting the first section bar of back timber is a guiding gutter, water edge Gradient direction to be discharged by guiding gutter, make top draining convenient, the water proofing property in house is more preferable.
According to a kind of pin-connected panel container trailer of technical scheme 2 invention, also having catching groove, catching groove is by the groove of side's U-shaped Body and the outward extending auxiliary of an edge from cell body support folding wall and constitute.Cell body stretches into the side of the first section bar constituting back timber Wall breach China and foreign countries cover on and are supported by support folding wall in support folding wall, and the upper end of wallboard is inserted in outside the cell body of catching groove and covers on support folding In the slot formed on wall, it is connected with back timber by fastening connection piece.The connection between wallboard and back timber is made more by catching groove Add firm, also make wallboard preferably be fixed, and make the installation of wallboard more convenient.
According to a kind of pin-connected panel container trailer of technical scheme 3 invention, underframe is formed and is erected at bottom girder Support many root bottom parts that base plate the is supported auxiliary support beam in folding wall, top frame is formed the auxiliary being erected at catching groove Support the many top auxiliary support beams that top board is supported in folding wall.Bottom auxiliary support beam and top auxiliary support beam Arrange base plate and top board played firm supporting role, also enhance the safety of movable plank house.
According to a kind of pin-connected panel container trailer of technical scheme 4 invention, top board includes top coat, heat-insulation layer and top watt Layer.Top coat is connected with the lower surface of top auxiliary support beam, and heat-insulation layer is connected with the upper surface of top auxiliary support beam, top watt Layer covers at the upper surface of heat-insulation layer and stretches to constitute the sidewall breach of the first section bar of back timber.Thus enhance this assembly The heat insulating ability of formula container trailer and water proofing property.
According to a kind of pin-connected panel container trailer of technical scheme 5 invention, top auxiliary support beam includes intersecting Cross-brace beam and longitudinal support beam, be formed with overlap joint groove in the both sides of cross-brace beam, longitudinal support beam is overlapped on adjacent Cross-brace beam overlap joint groove in.Thus enhance the intensity of top support beam, and enhance the load-bearing of board house, transverse and longitudinal is propped up The overlap joint of support beam connects the convenient transport also further increasing movable plank house assembled material.
According to a kind of pin-connected panel container trailer of technical scheme 6 invention, column is provided with the guide card of L-shaped, leads Sheet is connected with the angle breach of column.Thus the intensity of column serves booster action and serves in wallboard installation process Positioning action.
According to a kind of pin-connected panel container trailer of technical scheme 7 invention, in the stud edge constituting angle breach of column On, the whole length direction of column is formed by outer flanging.Consequently facilitating column and corner fittings and the installation of wallboard.
According to a kind of pin-connected panel container trailer of technical scheme 8 invention, top watt layer is made up of a watt top flat, top tile it Between bondd by marine glue.Thus enhance the water proofing property of movable plank house, also prevent water droplet and flow within doors.
According to a kind of pin-connected panel container trailer of technical scheme 9 invention, set between top tile and the outer eaves of catching groove Put sealing strip.Thus effectively prevent water from refluxing.
According to a kind of pin-connected panel container trailer of technical scheme 10 invention, corner fittings has hole for hoist.Thus side It is mobile that the most whole movable plank house realizes lifting in short distance.
Accompanying drawing explanation
In order to be illustrated more clearly that the specific embodiment of the invention or technical scheme of the prior art, below will be to specifically In embodiment or description of the prior art, the required accompanying drawing used is briefly described, it should be apparent that, in describing below Accompanying drawing is some embodiments of the present invention, for those of ordinary skill in the art, before not paying creative work Put, it is also possible to obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is the integrally-built schematic diagram of the pin-connected panel container trailer representing the present invention.
Fig. 2 is the architecture figure of the first section bar.
Fig. 3 is the structural representation of the guide card on column and column.
Fig. 4 is the sectional view of the guide card on column and column.
Fig. 5 is the structural representation of corner fittings.
Fig. 6 is the structural representation of upper and lower support beam.
Fig. 7 is the structural representation of catching groove.
Fig. 8 is the structural representation of top board.
100-framework;110-bottom girder;111-supports folding wall;Support beam is assisted bottom 112-;120-back timber;121-longitudinally props up Support beam;122-cross-brace beam;123-catching groove;1231-auxiliary supports folding wall;130-column;131-guide card;200-base plate; 300-top board;310-pushes up watt layer;320-heat-insulation layer;330-top coat;400-wallboard;500-corner fittings;510-corner fittings main body;520- Beam connecting portion;530-column connecting portion;540-hole for hoist;550-bolt connecting hole.
Detailed description of the invention
Below in conjunction with accompanying drawing, technical scheme is clearly and completely described, it is clear that described enforcement Example is a part of embodiment of the present invention rather than whole embodiments.Based on the embodiment in the present invention, ordinary skill The every other embodiment that personnel are obtained under not making creative work premise, broadly falls into the scope of protection of the invention.
In describing the invention, it should be noted that term " " center ", " on ", D score, "left", "right", " vertically ", Orientation or the position relationship of the instruction such as " level ", " interior ", " outward " they are based on orientation shown in the drawings or position relationship, merely to Be easy to describe the present invention and simplifying describe rather than instruction or the hint device of indication or element must have specific orientation, With specific azimuth configuration and operation, therefore it is not intended that restriction to invention.Additionally, term " first ", " second ", " Three " it is only used for describing purpose, and it is not intended that indicate or hint relative importance.
In describing the invention, it should be noted that unless otherwise clearly defined and limited, term " is installed ", " phase Even ", " connection " should be interpreted broadly, for example, it may be fixing connection, it is also possible to be to removably connect, or be integrally connected;Can To be mechanical connection, it is also possible to be electrical connection;Can be to be joined directly together, it is also possible to be indirectly connected to by intermediary, Ke Yishi The connection of two element internals.For the ordinary skill in the art, can understand that above-mentioned term is at this with concrete condition Concrete meaning in invention.
Fig. 1 is the integrally-built schematic diagram of the pin-connected panel container trailer representing the present invention.Fig. 2 is the first section bar Architecture figure.Fig. 3 is the structural representation of the guide card on column and column.Fig. 4 is the cross section of the guide card on column and column Figure.Fig. 5 is the structural representation of corner fittings.Fig. 6 is the structural representation of upper and lower support beam.Fig. 7 is the structural representation of catching groove.Figure 8 is the structural representation of top board.
As shown in Figures 1 to 8, a kind of pin-connected panel container trailer, including framework 100, base plate 200, top board 300 and Wallboard 400.Framework 100 includes the underframe being made up of bottom girder 110, be made up of back timber 120 top frame and underframe and top frame are connected Column 130.Bottom girder 110 is formed by connecting by underframe by corner fittings 500, and top frame is to be connected by back timber 120 by corner fittings 500 Forming, top frame and underframe are attached by column 130 via corner fittings 500.
Bottom girder 110 and back timber 120 are made up of the first section bar, are observing the first section bar along the length direction of the first section bar During cross section, the cross sectional shape of the first section bar is formed as a sidewall and has the tubular of sidewall breach, in a side of sidewall breach On wall breach limit, the whole length direction on sidewall breach limit connects and has vertical with sidewall and outward extending support folding wall 111。
Specifically, the first section bar has a base plate, and there is vertical and two side plates that is first side of base plate at base plate two ends Plate and the second side plate, have in the first side plate upper end vertically and the first side plate, and is folded to the first flanging of the second side plate, in the second side There is vertical and the second side plate plate upper end is folded to the second flanging of the first side plate, is provided with in the end of the second flanging and vertically has second Flanging the baby hem being folded upward at, this baby hem support folding wall 111 the most as above.
It addition, column 130 is made up of the second section bar, in the cross section observing the second section bar along the length direction of the second section bar Time, the cross sectional shape of the second section bar is formed as being cut away at an angle and being formed with the tubular of angle breach.
Specifically, the second section bar has two orthogonal straight plates, the i.e. first straight plate and the second straight plate, straight first The end of plate is provided with and is perpendicular to the first straight plate and parallel with the second straight plate, and is positioned at the of the first straight plate homonymy with the second straight plate One auxiliary flanging, is provided with in the end of the second straight plate and is perpendicular to the second straight plate and parallel and the first straight plate, and with the first straight plate It is positioned at the second auxiliary flanging of the second straight plate homonymy, and is additionally provided with outer folding at the first auxiliary flanging and the second auxiliary flanging end Limit, outer flanging prolongs outside the cavity being collectively forming by the first straight plate, the second straight plate, the first auxiliary flanging and the second auxiliary flanging Stretch.
It addition, be provided with the guide card 131 of L-shaped in column 130, guide card 131 is welded on one with the angle breach of column 130 Rise, and arrange multiple guide card 131 in the longitudinal direction, such as 3 guide cards, 4 guide cards or 5 guide cards.
It addition, corner fittings 500 includes that the beam connecting portion 520 of 510, two sides of corner fittings main body and the column 130 of upper end connect Portion 530, the shape of beam connecting portion 520 mates with the cross sectional shape of the first section bar, the shape of column connecting portion 530 and the second section bar Cross sectional shape coupling.Beam connecting portion 520 and column connecting portion 530 can insert end and second section bar of the first section bar respectively End in, be connected with the first section bar and the second section bar respectively by bolt.And in the main body of corner fittings 500, there is hole for hoist 540, can move as desired by lifting.
It addition, also have catching groove 123, catching groove 123 is outward extending auxiliary by the cell body of side's U-shaped and an edge from cell body Help support folding wall 1231 constitute, cell body stretch into constitute back timber the first section bar sidewall breach China and foreign countries cover on support folding wall on propped up Support folding wall 111 supports.
It addition, be formed on underframe in the support folding wall 111 being erected at bottom girder 110 base plate 200 is supported Many root bottom parts auxiliary support beam 112, base plate 200 be erected at the support folding wall 111 of bottom girder 110 and bottom auxiliary support beam 112 it On.
Top frame is formed and is erected at the many top auxiliary support beams that the auxiliary of catching groove 123 supports in folding wall 1231, Top board 300 is arranged in the auxiliary support beam of top.Top auxiliary support beam includes cross one another cross-brace beam 122 and longitudinal direction Support beam 121, is formed with overlap joint groove in the both sides of cross-brace beam 122, and longitudinal support beam 121 is overlapped on adjacent cross-brace In the overlap joint groove of beam 122.
The lower end of wallboard 400 is supported by the support folding wall 111 of bottom girder 110, and is clamped between base plate 200 and bottom girder 110, The upper end of wallboard 400 is inserted in outside the cell body of catching groove 123 to cover on and supports in the slot formed in folding wall 111, then passes through spiral shell Bolt is fixing to be connected.
It addition, top board 300 includes top coat 330, heat-insulation layer 320 and top watt layer 310.Top coat 330 and top auxiliary The lower surface of support beam connects, and heat-insulation layer 320 is connected with the upper surface of top auxiliary support beam, and top watt layer 310 covers at heat-insulation layer The upper surface of 320 and stretching to is constituted in the sidewall breach of the first section bar of back timber 120.Top watt layer 310 is made up of a watt top flat, top Bondd by marine glue between tile.Between top tile and the outer eaves of catching groove 123, sealing strip is set.
Above the structure of a specific embodiment of the present invention is illustrated, its occupation mode is described below.
Before using, carry out installment work.First installation frame 100, connects into underframe, angle by corner fittings 500 by bottom girder 110 It is bolted between part 500 and bottom girder 110.Then adjusting horizontal and diagonal, suitable padded chassis is to ensure that chassis exists Same level position.It addition, there is mounted locating piece on bottom girder 110, assist support beam in order to fixed and positioned bottom 112, wallboard 400 can also be played the effect that auxiliary supports simultaneously.After underframe leveling, bottom installation, assist support beam 112, Bottom auxiliary support beam 112 is bolted with locating piece.Bottom auxiliary support beam 112 according to locational requirement, set size Different, equally, set quantity can also be different.
Four root posts 130 are inserted in the column connecting portion 530 of corner fittings 500, and are bolted connection.And then top is installed Frame, is respectively fitted over the column connecting portion 530 of corner fittings 500, then back timber 120 is enclosed within corner fittings 500 on four root post 130 tops Beam connecting portion 520, is bolted to connection between corner fittings 500 and back timber 120.
Next installing wallboard 400 and base plate 200, wallboard 400 can be whole chromatic steel sandwich plate, it is also possible to be that polylith is little Block chromatic steel sandwich plate is spliced.Wallboard 400 is placed into installation site, and top catching groove 123 by wallboard 400 and constitutes back timber Support folding wall 111 on first section bar of 120 is buckled together.With the self threading pin of different length respectively from the above of catching groove 123 and Metope is fixed by side, makes wallboard 400, catching groove 123 and back timber 120 be fixed as an entirety.Required position at wallboard 400 Put the door and window being disposed with requirement.
Installing followed by top, the installation at top first has to install top auxiliary support beam.Top auxiliary support beam Intersect layout including cross-brace beam 122 and longitudinal support beam 121, cross-brace beam 122 and longitudinal support beam 121, and And on cross-brace beam 122, having overlap joint groove, longitudinal support beam 121 is overlapped on cross-brace beam 122 by overlap joint groove.Top is auxiliary Helping support beam according to locational requirement, set size is different, and equally, set quantity can also be different.Top auxiliary support beam Two ends are placed on the auxiliary of catching groove 123 and support in folding wall 1231, and connect by screw is fixing.
Then top coat 330 is fixedly attached to the lower surface of top auxiliary support beam by screw, and top auxiliary supports The upper surface of beam spreads heat-insulation layer 320, and heat-insulation layer 320 covers top watt layer 310 above.Top watt layer 310 stretches to constitute back timber 120 The first section bar sidewall breach in, top watt layer 310 and the outer eaves of catching groove 123 between sealing strip is set.By anti-between watt layer 310 of top Glue bonds.
Mounted movable plank house can carry out moving of position by hole for hoist 540 according to demand.
In embodiment of above, pin-connected panel container trailer includes framework, base plate, top board and wallboard, passes through angle The underframe that bottom girder is formed by connecting by part, the top frame being formed by connecting by back timber by corner fittings, by the connection of column and corner fittings the end of by Frame and top frame link together.The installation of back timber and corner fittings, bottom girder and corner fittings, column and corner fittings and wallboard, top board and base plate is all It is to be bolted.The present invention is compared with traditional movable plank house being welded to connect, and all parts are only by bolt or spiral shell Nails etc. connect, it becomes possible to constitute movable plank house, need not to carry out as conventional to cut, weld, arrange plate etc. in disassembly process Operation, it is the most convenient to dismount, and improves production efficiency.Further, since can install at building-site, it is not necessary to as in the past Like that, need to carry out in the factory finished product, then transport to building-site, consequently facilitating transport, and not by building-site The impact of installing space, it is possible to be adapted to various building site.Therefore, largely reduce the cost of movable plank house, improve Its popularity used.
It addition, top has certain gradient, the inside of the pipe constituting the first section bar of back timber is a guiding gutter, water edge Gradient direction to be discharged by guiding gutter, make top draining convenient, the water proofing property in house is more preferable.
In embodiment of above, pin-connected panel container trailer also has catching groove, and the upper end of wallboard is inserted in catching groove Cover on outside cell body and support in the slot formed in folding wall, be connected with back timber by fastening connection piece.By catching groove make wallboard with Connection between back timber is more firm, also makes wallboard preferably be fixed, and makes the installation of wallboard more convenient.
In embodiment of above, pin-connected panel container trailer has many root bottom parts auxiliary support beam and Duo Gen top is auxiliary Help support beam.Base plate and top board are played firm supporting role, also by bottom auxiliary support beam and top arranging of support beam of auxiliary Enhance the safety of movable plank house.
In embodiment of above, the top board of pin-connected panel container trailer includes top coat, heat-insulation layer and top watt layer.Top Surface layer is connected with the lower surface of top auxiliary support beam, and heat-insulation layer is connected with the upper surface of top auxiliary support beam, and a top watt layer covers Cover at the upper surface of heat-insulation layer and stretch to constitute the sidewall breach of the first section bar of back timber.Thus enhance this pin-connected panel collection The heat insulating ability of vanning prefabricated house and water proofing property.
In embodiment of above, the top of pin-connected panel container trailer auxiliary support beam include cross one another laterally Support beam and longitudinal support beam, be formed with overlap joint groove in the both sides of cross-brace beam, and longitudinal support beam is overlapped on adjacent horizontal In the overlap joint groove of support beam.Thus enhance the intensity of top support beam, and enhance the load-bearing of board house, transverse and longitudinal support beam Overlap joint connects the convenient transport also further increasing movable plank house assembled material.
In embodiment of above, column is provided with the guide card of L-shaped, thus the intensity of column serves to add and pretends With and in wallboard installation process, serve positioning action.
In embodiment of above, in the stud edge constituting angle breach of column, on the whole length direction of column Formed by outer flanging.Thus wallboard can be guided when installing wallboard, it is simple to the installation of wallboard.
In embodiment of above, the top watt layer of pin-connected panel container trailer is made up of a watt top flat, logical between the tile of top Cross marine glue bonding.Thus enhance the water proofing property of movable plank house, also prevent water droplet and flow within doors.
In embodiment of above, between top tile and the outer eaves of catching groove of pin-connected panel container trailer, sealing is set Bar.Thus effectively prevent water from refluxing.
In embodiment of above, corner fittings has hole for hoist.Thus facilitate whole movable plank house real in short distance Now lift movement.
It addition, in the above-described embodiment, the concrete structure of the present invention is illustrated, but is not limited to this.
Such as, the support folding wall of wallboard upper end and back timber is fixed together by catching groove, is then connected by screw, but It is not limited to secondary, it is also possible to be not provided with catching groove, directly uses screw to be fixedly connected with supporting folding wall by wallboard, also so be able to Reach the effect above.
It addition, in the above-described embodiment, underframe is formed many root bottom parts auxiliary support beam, top frame is formed Many top auxiliary support beams, but it is not limited to this, as long as requirement of strength can be met, it is also possible to it is not provided with assisting support beam.
It addition, in the above-described embodiment, top board includes that top coat, heat-insulation layer and top watt layer, top coat assist with top The lower surface of support beam connects, and heat-insulation layer is connected with the upper surface of top auxiliary support beam, pushes up upper at heat-insulation layer of watt layer covering Surface and stretch to constitute back timber the first section bar sidewall breach in.But it is not limited to secondary, it is also possible to by top coat, heat-insulation layer Upper surface with top watt layer is placed sequentially in auxiliary support beam, also so is able to reach the effect above.
It addition, in the above-described embodiment, top auxiliary support beam includes cross one another cross-brace beam and longitudinally props up Support beam, is formed with overlap joint groove in the both sides of cross-brace beam, and longitudinal support beam is overlapped on the overlap joint groove of adjacent cross-brace beam In.But it is not limited to this, it is also possible to cross-brace beam is only set or longitudinal support beam is only set, as long as support strength can be met Require.
It addition, in the above-described embodiment, column is provided with the guide card of L-shaped, but is not limited to this, can not in column Guide card is set, as long as column can meet can be accurately placed to have position i.e. in the support strength of needs and wallboard installation process Can.
It addition, in the above-described embodiment, in the stud edge constituting angle breach of column, at the whole length direction of column Upper formation is by outer flanging.But it is not limited to this, column can be not provided with outer flanging, as long as the accurate of column and wallboard can be realized Install.
It addition, in the above-described embodiment, top watt layer is made up of a watt top flat, is bondd by marine glue between the tile of top.But Being not limited to this, top tile can have one to be monolithically fabricated, or determines to be bondd by other binding agents between tile, if energy Reach sealing effectiveness.
It addition, in the above-described embodiment, sealing strip is set between top tile and the outer eaves of catching groove.But it is not limited to This, determine to be not provided with sealing strip between tile and catching groove or arrange other sealing structure, as long as required air-proof condition can be met ?.
It addition, in the above-described embodiment, corner fittings has hole for hoist, but is not limited to this, corner fittings can be not provided with Hole for hoist, also so is able to reach the effect above.
It addition, in the above-described embodiment, fastening connection piece can include screw or bolt, as long as can be by each portion Part is attached.
It addition, the flue gas processing device of the present invention, can be formed by above-mentioned various structural groupings, can play equally The effect stated.
Last it is noted that various embodiments above is only in order to illustrate technical scheme, it is not intended to limit;To the greatest extent The present invention has been described in detail by pipe with reference to foregoing embodiments, it will be understood by those within the art that: it depends on So the technical scheme described in foregoing embodiments can be modified, or the most some or all of technical characteristic is entered Row equivalent;And these amendments or replacement, do not make the essence of appropriate technical solution depart from various embodiments of the present invention technology The scope of scheme.

Claims (10)

1. a pin-connected panel container trailer, it is characterised in that
Including framework, base plate, top board and wallboard, described framework is included the underframe being formed by connecting by bottom girder by corner fittings, passes through The column pushing up frame, via described corner fittings, described top frame and described underframe being attached that back timber is formed by connecting by described corner fittings,
Described bottom girder and described back timber are made up of the first section bar, observe described first at the length direction along described first section bar During the cross section of section bar, the cross sectional shape of described first section bar is formed as a sidewall and has the tubular of sidewall breach, in described side On one sidewall breach limit of wall breach, on the whole length direction on described sidewall breach limit, connection has vertical with described sidewall And outward extending support folding wall,
Described column is made up of the second section bar, in the cross section observing described second section bar along the length direction of described second section bar Time, the cross sectional shape of described second section bar is formed as being cut away at an angle and being formed with the tubular of angle breach,
Described corner fittings includes corner fittings main body, the beam connecting portion being formed at two sides of described corner fittings main body and is formed at described angle The column connecting portion of the upper end of part main body, the shape of described beam connecting portion is mated with the cross sectional shape of described first section bar, described The shape of column connecting portion is mated with the cross sectional shape of described second section bar, and described beam connecting portion and described column connecting portion can Insert in the end of described first section bar and the end of described second section bar respectively, by fastening connection piece respectively with described first Section bar and described second section bar connect,
Described floor board framing is located in the support folding wall of the bottom girder of described underframe, and described top board is connected with the back timber of described top frame, institute The lower end stating wallboard is supported by the support folding wall of the bottom girder of described underframe, and is clamped between described base plate and described bottom girder, institute The upper end stating wallboard is connected with the position of the lower section of the support folding wall of described back timber by fastening connection piece.
Pin-connected panel container trailer the most according to claim 1, it is characterised in that
Also having catching groove, described catching groove is supported by the cell body of side's U-shaped and the outward extending auxiliary of an edge from described cell body Folding wall is constituted, and described cell body stretches into the sidewall breach China and foreign countries of the first section bar constituting described back timber and covers on quilt in described support folding wall Described support folding wall supports,
The upper end of described wallboard is inserted in outside the cell body of described catching groove and covers in the slot formed in described support folding wall, passes through Fastening connection piece is connected with described back timber.
Pin-connected panel container trailer the most according to claim 2, it is characterised in that
The many root bottom parts being supported base plate being formed on described underframe in the support folding wall being erected at described bottom girder are auxiliary Help support beam,
Described top frame is formed many that are supported top board tops in the auxiliary support folding wall being erected at described catching groove Portion's auxiliary support beam.
Pin-connected panel container trailer the most according to claim 3, it is characterised in that
Described top board includes top coat, heat-insulation layer and top watt layer,
Described top coat is connected with the lower surface of described top auxiliary support beam, and described heat-insulation layer assists support beam with described top Upper surface connect, described top watt layer covers at the upper surface of described heat-insulation layer and stretches to constitute the first section bar of described back timber Sidewall breach in.
Pin-connected panel container trailer the most according to claim 3, it is characterised in that described top auxiliary support beam includes Cross one another cross-brace beam and longitudinal support beam, be formed with overlap joint groove, described longitudinal direction in the both sides of described cross-brace beam Support beam is overlapped in the overlap joint groove of adjacent described cross-brace beam.
Pin-connected panel container trailer the most according to claim 1, it is characterised in that be provided with L-shaped in described column Guide card, described guide card is connected with the angle breach of described column.
Pin-connected panel container trailer the most according to claim 1, it is characterised in that at the composition angle breach of described column Stud edge on, the whole length direction of described column is formed by outer flanging.
Pin-connected panel container trailer the most according to claim 4, it is characterised in that described top watt layer is by pushing up tile structure Become, bondd by marine glue between the tile of described top.
Pin-connected panel container trailer the most according to claim 8, it is characterised in that at described top tile and described catching groove Outer eaves between sealing strip is set.
Pin-connected panel container trailer the most according to claim 1, it is characterised in that on described corner fittings, there is lifting Hole.
CN201610715408.6A 2016-08-24 2016-08-24 Pin-connected panel container trailer Pending CN106149887A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610715408.6A CN106149887A (en) 2016-08-24 2016-08-24 Pin-connected panel container trailer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610715408.6A CN106149887A (en) 2016-08-24 2016-08-24 Pin-connected panel container trailer

Publications (1)

Publication Number Publication Date
CN106149887A true CN106149887A (en) 2016-11-23

Family

ID=57341828

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610715408.6A Pending CN106149887A (en) 2016-08-24 2016-08-24 Pin-connected panel container trailer

Country Status (1)

Country Link
CN (1) CN106149887A (en)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107938850A (en) * 2017-12-27 2018-04-20 北京诚栋国际营地集成房屋股份有限公司 Assembling frame house
CN108661180A (en) * 2018-07-10 2018-10-16 浙江普天集成房屋有限公司 A kind of container house roof
CN108729551A (en) * 2018-08-09 2018-11-02 中建集成房屋有限公司 The multi-functional washing module container structure of one kind and its construction method
CN109422034A (en) * 2017-08-30 2019-03-05 东莞中集专用车有限公司 Container and its top plate, side wall, front wall and connection component, connector
CN110469150A (en) * 2019-09-11 2019-11-19 云南建投建筑机械有限公司 Movable plank house
CN110485758A (en) * 2019-08-09 2019-11-22 郭培囵 A kind of assembled casing structure
CN111088888A (en) * 2019-12-12 2020-05-01 南昌航空大学 Steel structure supporting frame for assembling heat-insulation wall board of assembled container house
CN112814422A (en) * 2020-12-11 2021-05-18 天津市天友建筑设计股份有限公司 Near-zero energy consumption modular residence and construction method thereof
CN113216402A (en) * 2021-05-13 2021-08-06 苏州中南钢结构股份有限公司 Container type movable house
CN113235978A (en) * 2021-05-28 2021-08-10 江苏捷顺机电设备有限公司 Assembled movable house and construction process thereof
CN113463810A (en) * 2021-06-29 2021-10-01 云南建筑产业化研发中心有限公司 Top assembly framework of multifunctional composite shelter
CN113482162A (en) * 2021-06-29 2021-10-08 云南建筑产业化研发中心有限公司 Assembly framework of quick assembly disassembly formula shelter
GB2581484B (en) * 2019-02-15 2021-11-24 Hesco Bastion Ltd Roof structure
CN114033038A (en) * 2021-06-29 2022-02-11 云南建筑产业化研发中心有限公司 Cabin body structure for multi-layer large-scale cabin assembly
CN114108828A (en) * 2021-11-26 2022-03-01 苏州中南钢结构股份有限公司 Container type movable house on vertical roof
CN114991310A (en) * 2022-06-28 2022-09-02 江苏智建美住智能建筑科技有限公司 Box-type house convenient to straighten and capable of being built quickly

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB684931A (en) * 1951-02-09 1952-12-24 Alexander Fraser Lawrie Improvements in and relating to constructional, structural and building components
CN2926352Y (en) * 2006-06-28 2007-07-25 雅致集成房屋股份有限公司 Cased assembled house
CN203613647U (en) * 2013-12-18 2014-05-28 深圳市正工集成房屋工程有限公司 Detachable light steel structure box-type house
CN203889400U (en) * 2014-04-08 2014-10-22 邵妮 Corner member for container, container and container-type activity room
CN204059595U (en) * 2014-09-22 2014-12-31 陈伟 Detachable building
CN205917856U (en) * 2016-08-24 2017-02-01 邵华良 Pin -connected panel container prefabricated house

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB684931A (en) * 1951-02-09 1952-12-24 Alexander Fraser Lawrie Improvements in and relating to constructional, structural and building components
CN2926352Y (en) * 2006-06-28 2007-07-25 雅致集成房屋股份有限公司 Cased assembled house
CN203613647U (en) * 2013-12-18 2014-05-28 深圳市正工集成房屋工程有限公司 Detachable light steel structure box-type house
CN203889400U (en) * 2014-04-08 2014-10-22 邵妮 Corner member for container, container and container-type activity room
CN204059595U (en) * 2014-09-22 2014-12-31 陈伟 Detachable building
CN205917856U (en) * 2016-08-24 2017-02-01 邵华良 Pin -connected panel container prefabricated house

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109422034A (en) * 2017-08-30 2019-03-05 东莞中集专用车有限公司 Container and its top plate, side wall, front wall and connection component, connector
CN107938850A (en) * 2017-12-27 2018-04-20 北京诚栋国际营地集成房屋股份有限公司 Assembling frame house
CN108661180A (en) * 2018-07-10 2018-10-16 浙江普天集成房屋有限公司 A kind of container house roof
CN108661180B (en) * 2018-07-10 2023-09-01 浙江普天集成房屋有限公司 Roof of container house
CN108729551A (en) * 2018-08-09 2018-11-02 中建集成房屋有限公司 The multi-functional washing module container structure of one kind and its construction method
GB2581484B (en) * 2019-02-15 2021-11-24 Hesco Bastion Ltd Roof structure
CN110485758A (en) * 2019-08-09 2019-11-22 郭培囵 A kind of assembled casing structure
CN110469150A (en) * 2019-09-11 2019-11-19 云南建投建筑机械有限公司 Movable plank house
CN111088888A (en) * 2019-12-12 2020-05-01 南昌航空大学 Steel structure supporting frame for assembling heat-insulation wall board of assembled container house
CN112814422A (en) * 2020-12-11 2021-05-18 天津市天友建筑设计股份有限公司 Near-zero energy consumption modular residence and construction method thereof
CN113216402A (en) * 2021-05-13 2021-08-06 苏州中南钢结构股份有限公司 Container type movable house
CN113235978A (en) * 2021-05-28 2021-08-10 江苏捷顺机电设备有限公司 Assembled movable house and construction process thereof
CN113463810A (en) * 2021-06-29 2021-10-01 云南建筑产业化研发中心有限公司 Top assembly framework of multifunctional composite shelter
CN113482162A (en) * 2021-06-29 2021-10-08 云南建筑产业化研发中心有限公司 Assembly framework of quick assembly disassembly formula shelter
CN114033038A (en) * 2021-06-29 2022-02-11 云南建筑产业化研发中心有限公司 Cabin body structure for multi-layer large-scale cabin assembly
CN114033038B (en) * 2021-06-29 2023-03-07 云南建筑产业化研发中心有限公司 Cabin body structure for multi-layer large-scale cabin assembly
CN114108828A (en) * 2021-11-26 2022-03-01 苏州中南钢结构股份有限公司 Container type movable house on vertical roof
CN114991310A (en) * 2022-06-28 2022-09-02 江苏智建美住智能建筑科技有限公司 Box-type house convenient to straighten and capable of being built quickly

Similar Documents

Publication Publication Date Title
CN106149887A (en) Pin-connected panel container trailer
CN205917856U (en) Pin -connected panel container prefabricated house
CA2720211C (en) Structural building components and method of constructing same
US1988388A (en) Structural building frame
JP4858921B2 (en) Attached structures and unit buildings
CN107938850A (en) Assembling frame house
CN104929287B (en) Modular assembled lower-layer thin-walled cold-formed steel floor module
US2263214A (en) Rigid frame building
CN108661178A (en) A kind of Combined container house room
JP5358209B2 (en) Attached structures and unit buildings
JP5271739B2 (en) Rooftop structures and unit buildings
CN213297227U (en) Foldable safe construction passageway can be swiftly
CN208733819U (en) Assembling frame house
CN104736777A (en) Building system, particularly a residential building
CN107965161A (en) A kind of packaging board house
CN217711132U (en) Box type house for quickly building system
CN209568749U (en) A kind of removable box-type room
CN109838034A (en) It is a kind of for assembling the roof structure in house
CN205637640U (en) Color plate housing of canopy is prevented from area pounding
CN205369523U (en) Unsmooth channel steel of high strength connects house
CN210122808U (en) Adjustable folding steel column welding and mounting platform
CN207597728U (en) A kind of roofing bottom plate fixing structure
CN206205154U (en) The keel universal connector and keel structure of a kind of steel house
CN114809725B (en) Assembled movable house
CN214614907U (en) Cold-formed thin-wall system gable large cantilever structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20161123

RJ01 Rejection of invention patent application after publication