CN106149782A - A kind of large span mobile and combined suspension cable shovel digs to grab and hangs traction transport system - Google Patents

A kind of large span mobile and combined suspension cable shovel digs to grab and hangs traction transport system Download PDF

Info

Publication number
CN106149782A
CN106149782A CN201510902650.XA CN201510902650A CN106149782A CN 106149782 A CN106149782 A CN 106149782A CN 201510902650 A CN201510902650 A CN 201510902650A CN 106149782 A CN106149782 A CN 106149782A
Authority
CN
China
Prior art keywords
cableway
support
grab
mobile
pulley
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510902650.XA
Other languages
Chinese (zh)
Other versions
CN106149782B (en
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xu Shaogang
Original Assignee
Qinhuai Xuzhou Hydraulic Engineering Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qinhuai Xuzhou Hydraulic Engineering Machinery Co Ltd filed Critical Qinhuai Xuzhou Hydraulic Engineering Machinery Co Ltd
Priority to CN201510902650.XA priority Critical patent/CN106149782B/en
Publication of CN106149782A publication Critical patent/CN106149782A/en
Application granted granted Critical
Publication of CN106149782B publication Critical patent/CN106149782B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F5/00Dredgers or soil-shifting machines for special purposes
    • E02F5/28Dredgers or soil-shifting machines for special purposes for cleaning watercourses or other ways
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F5/00Dredgers or soil-shifting machines for special purposes
    • E02F5/30Auxiliary apparatus, e.g. for thawing, cracking, blowing-up, or other preparatory treatment of the soil

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Earth Drilling (AREA)
  • Control And Safety Of Cranes (AREA)

Abstract

This patent provides a kind of large span, can on the ground, can underwater operation powerful combined hanging, integrate to shovel to dig and grabs the work system hung with traction transport.It at least includes a main working machine unit and a driven unit as the cableway strong point;The assembly of getting off that main computer unit is made up of support and running part (1), power and operation part (2), and the assembly of getting on the bus being made up of operation part (3), elevator and capstan winch part (13), support (4), assembly pulley (5), Rail sliding car (12), counterweight (14) forms;The selection of driven support unit can be arranged according to construction site condition, both can arrange on natural forms and at heavy engineerings such as excavator, bull-dozer or loading machines, pulley can be mechanically installed and constitute, as long as fixing guide rail cableway can be played and makes hawser walk around the purpose that pulley goes and back running.Between slave, cableway is passed through pulley (5) and coaster (12) guides and connects at least one hopper.

Description

A kind of large span mobile and combined suspension cable shovel digs to grab and hangs traction transport system
Technical field
The present invention relates to a kind of large span vehicle-mounted mobile combined type suspension cable collection shovel and dig to grab to hang with traction transport function be The engineering machinery of complete set system.
Background technology
Earth scraper, also known as loading machine, scraper, earth scraper, bull-dozer, be one be widely used in highway, railway, building, Water conservancy, the restoration in earth-rock construction machinery of the construction projects such as electric power, harbour, mine, it is mainly used in shovel and fills various collection bulk material, shovel Dig and handling operation.It is one of the main machine of restoration in earth-rock construction in engineering construction.
Excavator, also known as excavation machinery (excavating machinery), is to excavate to be higher or lower than with scraper bowl to hold machine The material in face, and load haulage vehicle or unload to the earthmoving machinery of rickyard.Excavator excavate material be mainly soil, coal, Silt and the soil after pre-pine and rock.
Grab bucket crane, is that one takes thing machinery automatically, its crawl and to draw off material action be to be grasped by ship unloaders driver Vertical, it is not necessary to support staff, thus avoid the heavy labor of workman, save service working time, substantially increase handling Efficiency.
Crane, also known as crane, is a kind of lifting carrying being widely used in the places such as harbour, workshop, water conservancy, electric power building site Machinery.This title of crane is the unified title of hoisting machinery.It is frequently the main of crane or truck crane, crawler crane and tire Hang
Above-mentioned machinery, referred to as general engineering machinery, is all unit independently working when actually used, and these engineering machinery are by self The restriction of structure, just cannot be carried out operation beyond after the scope that its mechanical arm can cover, and traveling moving structure also causes very How soft area cannot be introduced into operation.In sum, to there is work span little for engineering machinery of the prior art, underwater operation energy Power difference, efficiency is low, and energy consumption is high, the not strong weak point of function.
Content of the invention
It is big that the technical problem to be solved in the present invention is to provide a kind of work span, and underwater operation ability is strong, and efficiency is high, energy Consuming low, the powerful mobile and combined suspension cable of a kind of large span integrates to shovel to dig grabs the work hung with traction transport function Journey mechanical combination system.
For solving above-mentioned technical problem, the technical scheme that the present invention provides is: a kind of mobile and combined cableway of large span hangs Extension shovel digs to grab and hangs traction transport system, and it includes double main frame configuration combination of the paired vehicle-mounted hoist engine unit of at least two, or One is to be provided with the main frame of vehicle-mounted hoist engine and another is provided with pulley for supporting cableway track and drag rope The slave combination of driven machine configuration.Each board units includes support and running gear, power section, support, elevator part And assembly pulley, power section, support and elevator part be mounted on support and running gear, the power of described power section Output mechanism is connected with the power input mechanism of elevator part;Described support is vertically arranged on support and running gear;Institute The assembly pulley stated is arranged on the upper end of support;It is also associated with guide rail cableway and traction cableway between every a pair board units;Described Guide rail cableway and traction cableway guided by assembly pulley, and be connected with at least one hopper.
The invention provides a kind of work span big, underwater operation ability is strong, and efficiency is high, and energy consumption is low, and powerful one is many Function large span Vehicular mobile multicomputer box-like Ji Suodaoxuanguaji shovel digs to grab to hang and works in a set of combination system with traction transport Work mechanism equipment in system.It includes at least two vehicle-mounted working machine unit;Two working machine unit are configurable to double main Machine system or host slave system (having installation hoisting system on general main frame, be made up of from machine an excavator), each main work Machine unit includes support and running gear (1), power section (2), support (3), elevator part (4) and assembly pulley (5), power part (2), support (3) and elevator part (4) is divided to be mounted on support and running gear (1), the output machine of power section (2) Structure is connected with the power input mechanism of elevator part (4);Support (3) is operationally vertically arranged to support and running gear (1) On;Assembly pulley (5) is arranged on the upper end of support (3);It is also associated with guide rail cableway (6) and traction between every a pair working machine unit Cableway (7);Guide rail cableway (6) and traction cableway (7) guide and are connected with at least one hopper by assembly pulley (5).Slave Driven machine (12) in configuration, is provided with pulley (13), is used for supporting guide cableway and traction cableway.Generally, driven One excavator of machine is installed pulley and is constituted, it is possible to use the fixing object of other forms, as long as fixing guide rail can be played Cableway and make hawser walk around the purpose that pulley is reversely walked.
As preferably, described hopper includes grab bucket, bucket, scraper bowl and suspension hook.
As improvement, described bucket for can the twin-bucket structure of folding, the folding of bucket is by drawing cableway control.
As improvement, it also includes for finding out underwater material form and architectonic remote sensing device and display Mechanism, described detection device is installed on cableway and hopper, and described remote sensing device and indication mechanism are installed on machine Seat with in the operational control room on running gear (1);Described detection device shows with underwater material form and geological structure And wireless connection between processing means.
As improvement, it also includes reducing mechanism, for when hopper cannot separate being mined material, will be mined thing Cut pulverizing;Described reducing mechanism is with the functional part such as explosion, weight, and what described reducing mechanism was removable is lifted on guide rail On cableway (6), described reducing mechanism is additionally provided with for controlling the elevating mechanism that device moves up and down.
It as improvement, is designed with long distance wireless voice communication device in the control room of each excavator unit and video leads to News device, for providing the support of real-time communication for the operating personnel between unit.
As improvement, for making system operationally keep good stability, (1) is from main frame upwall rightabout Being provided with several ropes that can be fixed on ground, (2) rightabout in host work face installs movable counterweight system.
After using said structure, there is advantages that this set digging system is applicable to carry out distance big The excavation of span material especially under water and movement.During work, two described units are respectively placed in two ends, construction site Support is holded up by edge, is driven hoist engine to release by power section and the cableway track that is erected on support of income, and hopper by Another group rolling control reaches to collect along cableway track by moving up and down before and after pulley, delivery and the construction mesh releasing material , when using suspension hook, it is possible to achieve remote lifting and mobile material.
The invention provides work span in sum big, underwater operation ability is strong, and efficiency is high, and energy consumption is low, powerful A kind of large span mobile and combined suspension cable shovel dig to grab and hang traction transport system.
Brief description
Fig. 1 is that the large span vehicle-mounted mobile multicomputer box-like suspension cable collection shovel of dual host system composition in prior art digs Grab the structural representation hanging the integrated system being integrated with traction transport function.
As shown in Figure 1: the 1st, support and running part, the 2nd, power and operation part, the 3rd, operation part, the 4th, support, the 5th, Assembly pulley, the 6th, guide rail cableway, the 7th, draw cableway, the 8th, grab bucket, the 9th, bucket, the 10th, scraper bowl, the 11st, suspension hook.12nd, coaster, the 13rd, elevator and Capstan winch part, the 14th, counterweight.
Fig. 2 is that the large span vehicle-mounted mobile multicomputer box-like suspension cable collection shovel of host slave system composition in prior art digs to grab and hangs Structural representation with the integrated system that traction transport function is integrated.
As shown in Figure 1: the 1st, support and running part, the 2nd, power and operation part, the 3rd, operation part, the 4th, support, the 5th, pulley Group, the 6th, guide rail cableway, the 7th, draw cableway, the 8th, grab bucket, the 9th, bucket, the 10th, scraper bowl, the 11st, suspension hook.12nd, coaster, the 13rd, elevator and capstan winch Part, the 14th, counterweight, the 15th, driven machine unit
Fig. 3 is that the large span vehicle-mounted mobile multicomputer box-like suspension cable collection shovel being made up of four units in prior art digs to grab and hangs Structural representation with the integrated system that traction transport function is integrated.
As shown in Figure 3: the 1st, two mover unit (each several part configures with shown in Fig. 1), the 2nd, two driven machine unit (can be as leading Draw pulley and any form of guide rail cableway strong point effect), the 3rd, the hopper of operational terminal.
Detailed description of the invention
The present invention is described in further detail below in conjunction with the accompanying drawings.
In conjunction with accompanying drawing 1, a kind of large span mobile and combined suspension cable shovel digs to grab and hangs traction transport system, and it includes at least Two paired excavator unit;Each excavator unit includes support and running gear the 1st, power section the 2nd, support the 3rd, elevator portion Points 4 and assembly pulley 5, power section the 2nd, support 3 and elevator part 4 be mounted on support with on running gear 1, described power part The power take-off mechanism dividing 2 is connected with the power input mechanism of elevator part 4;Described support 3 is vertically arranged to support and row Walk in part 1;Described assembly pulley 5 is arranged on the upper end of support 3;It is also associated with guide rail cableway between every a pair excavator unit 6 and traction cableway 7;Described guide rail cableway 6 and traction cableway 7 are guided by assembly pulley 5, and are connected with at least one hopper.
As preferably, described hopper includes grabbing bucket the 8th, bucket the 9th, scraper bowl 10 and suspension hook 11.
As improvement, described bucket 9 for can the twin-bucket structure of folding, the folding of bucket 9 is controlled by drawing cableway 7.
As improvement, it also includes for finding out underwater material form and architectonic remote sensing device and display Mechanism, described detection device is installed on cableway and hopper, and described remote sensing device and indication mechanism are installed on machine Seat with in the operational control room on running gear (1);Described detection device shows with underwater material form and geological structure And wireless connection between processing means.
As improvement, it also includes reducing mechanism, for when hopper cannot separate being mined material, will be mined thing Cut pulverizing;Described reducing mechanism is with the functional part such as explosion, weight, and what described reducing mechanism was removable is lifted on guide rail On cableway (6), described reducing mechanism is additionally provided with for controlling the elevating mechanism that device moves up and down.
It as improvement, is designed with long distance wireless voice communication device in the control room of each excavator unit and video leads to News device, for providing the support of real-time communication for the operating personnel between unit.
In conjunction with accompanying drawing 2, a kind of large span mobile and combined suspension cable shovel digs traction transport system of hanging of grabbing, and slave configures Driven machine (12) in system in combination, it functions as the opposite side connecting guide rails cableway and drag rope at working face The strong point, be commonly used on a single armed excavator installation pulley (13) constitute, it is possible to other reach constant weight, Ke Yiqi Object replacement to fixation.
The present invention in the specific implementation, described support and running gear the 1st, power section the 2nd, support the 3rd, elevator part 4 and Assembly pulley 5, and the single armed excavator as driven machine all have maturation commercially available parts, the ingenious part of the present invention be realize Being applied in combination between multiple excavators breaches the too short restriction of traditional excavator arm of force, uses runway structures, coverage rate Long-pending wide, depth of implements is big.It is an object of the invention to provide a kind of suspension cableway that builds in on-vehicle machines and realize remote-controlled operation Combined suspension cableway-type shovel dig to grab and hang traction transport change system, its simple in construction is easily achieved, and convenient uses and function Powerful, less energy consumption, efficiency is high.Additional embodiment only illustrates the situation that two excavators are combined into a pair, simultaneously all right Being partnered by four excavators, four simultaneously act on a hopper, or are respectively acting on two hoppers.User Can configure voluntarily according to actual conditions.
It should be noted that system in combination mode has following 3 kinds:
1, slave combines, in i.e. two units, and a mover, a driven machine, generally, pass through during bucket work Draw or hang to drag and move material to mover side.Accompanying drawing 2.
2, double main frames combine, and i.e. two units are all mover, and bucket can be to either side mobile working.Accompanying drawing 1.
3, four machine sets closes, and a: four units are all mover.B: or two, side mover, two driven machines of opposite side. C: or one, side mover and a driven machine, opposite side is arranged equally.Accompanying drawing 3.
Additionally when hopper can work with way moving, hopper cut-out direction can turn to 180 degree, and go to action is by hanging The control of lashed cable rope completes.
Being described the present invention and embodiments thereof above, this description does not has restricted, shown in accompanying drawing also only Being one of embodiments of the present invention, actual structure is not limited thereto.If the generally speaking ordinary skill people of this area Member is enlightened by it, in the case of without departing from the invention objective, without creative design similar to this technical scheme Frame mode and embodiment, protection scope of the present invention all should be belonged to.

Claims (9)

1. a large span mobile and combined suspension cable shovel digs to grab and hangs traction transport system, it is characterised in that: it includes at least Two vehicle-mounted working machine unit;Two working machine unit are configurable to dual host system or host slave system (on general main frame Have installation hoisting system, be made up of an excavator from machine), each main working machine unit includes support and running gear (1), moves Power part (2), support (3), elevator part (4) and assembly pulley (5), power section (2), support (3) and elevator part (4) are all pacified It is loaded on support and running gear (1), the power input mechanism of the power take-off mechanism of power section (2) and elevator part (4) It is connected;Support (3) is operationally vertically arranged on support and running gear (1);Assembly pulley (5) is arranged on the upper of support (3) End;It is also associated with guide rail cableway (6) and traction cableway (7) between every a pair working machine unit;Guide rail cableway (6) and traction cableway (7) guide and be connected with at least one hopper, the driven machine (12) in slave configuration by assembly pulley (5), pulley is installed (13), being used for supporting guide cableway and traction cableway, generally, one excavator of driven machine is installed pulley and is constituted, also The fixing object of other forms can be used, as long as fixing guide rail cableway can be played and makes hawser walk around pulley inverted running Purpose.
2. large span according to claim 1 mobile and combined suspension cable shovel digs to grab and hangs traction transport system, its feature It is: described hopper includes grab bucket (8), bucket (9) scraper bowl (10) and suspension hook (11).
3. large span according to claim 2 mobile and combined suspension cable shovel digs to grab and hangs traction transport system, its feature Be: described bucket (9) for can the twin-bucket structure of folding, the folding of bucket (9) is by drawing cableway (7) control.
4. large span according to claim 1 mobile and combined suspension cable shovel digs to grab and hangs traction transport system, its feature It is: it also includes for finding out underwater material form and architectonic remote sensing device and indication mechanism, described Detection device is installed on cableway and hopper, and described remote sensing device and indication mechanism are installed on support and running gear (1) in the operational control room on;Described detection device and underwater material form and geological structure show with processing means it Between wireless connection.
5. large span according to claim 1 mobile and combined suspension cable shovel digs to grab and hangs traction transport system, its feature It is: it also includes reducing mechanism, for when hopper cannot separate being mined material, thing will be mined and cut pulverizing;Described Reducing mechanism with the functional part such as explosion, weight, what described reducing mechanism was removable is lifted on guide rail cableway (6), Described reducing mechanism is additionally provided with for controlling the elevating mechanism that device moves up and down.
6. large span according to claim 1 mobile and combined suspension cable shovel digs to grab and hangs traction transport system, its feature It is: be designed with long distance wireless voice communication device and video communication device in the control room of each working machine unit, be used for The support of real-time communication is provided for the operating personnel between each working machine unit.
7. large span according to claim 1 mobile and combined suspension cable shovel digs to grab and hangs traction transport system, its feature It is: main combination mode during system work has three kinds, respectively: (1) slave combines, in i.e. two units, a master Motivation, a driven machine, generally, by traction or hang to drag and move material to mover side during bucket work, (2) are double Main frame combines, and i.e. two units are all mover, and bucket can be to either side mobile working, and (3) four machine sets closes, a: four lists Machine is all mover, b: or two, side mover, two driven machines of opposite side, c: or one, side mover and one driven Machine, opposite side is arranged equally.
8. large span according to claim 1 mobile and combined suspension cable shovel digs to grab and hangs traction transport system, its feature Being: during the work of hopper way moving, hopper cut-out direction can turn to 180 degree, go to action has been controlled by hanging hawser Become.
9. large span according to claim 1 mobile and combined suspension cable shovel digs to grab and hangs traction transport system, its feature Being: when system is configured to slave combination, functioning as of its driven machine (12) guides cableway and draws propping up of cableway Support point, generally, one excavator of driven machine is installed pulley and is constituted, it is possible to use the fixing object of other forms, As long as fixing guide rail cableway can be played and makes pull-cord walk around the purpose that pulley comes and goes operation.
CN201510902650.XA 2015-12-09 2015-12-09 A kind of mobile and combined suspension cable shovel of large span, which digs to grab, hangs traction transport system Active CN106149782B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510902650.XA CN106149782B (en) 2015-12-09 2015-12-09 A kind of mobile and combined suspension cable shovel of large span, which digs to grab, hangs traction transport system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510902650.XA CN106149782B (en) 2015-12-09 2015-12-09 A kind of mobile and combined suspension cable shovel of large span, which digs to grab, hangs traction transport system

Publications (2)

Publication Number Publication Date
CN106149782A true CN106149782A (en) 2016-11-23
CN106149782B CN106149782B (en) 2018-06-22

Family

ID=57348142

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510902650.XA Active CN106149782B (en) 2015-12-09 2015-12-09 A kind of mobile and combined suspension cable shovel of large span, which digs to grab, hangs traction transport system

Country Status (1)

Country Link
CN (1) CN106149782B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108791318A (en) * 2018-04-11 2018-11-13 北京好运达智创科技有限公司 A kind of mobile shipping cable car suitable for complicated landform
CN110593344A (en) * 2019-10-08 2019-12-20 长沙矿冶研究院有限责任公司 Underwater obstacle removing vehicle
CN113338375A (en) * 2021-06-03 2021-09-03 全志君 Full-automatic fishpond silt digging equipment
CN115341602A (en) * 2022-08-30 2022-11-15 徐少钢 Flexible control soil feeding excavation system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101348161A (en) * 2008-05-21 2009-01-21 三一电气有限责任公司 Traction anchor vehicle and non-self propelling work platform traction system
EP2520726A1 (en) * 2011-05-06 2012-11-07 BRA turbo Ing AG Device and method for removing material deposits from the reservoir of a hydrotechnical structure
CN204532065U (en) * 2015-03-23 2015-08-05 徐州盾安重工机械制造有限公司 A kind of novel full-sleeve full-rotation drill work station
DE102014007827A1 (en) * 2014-06-02 2015-12-03 JOBO Spezial-Maschinen GmbH Crawler-drive amphibious working machine

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101348161A (en) * 2008-05-21 2009-01-21 三一电气有限责任公司 Traction anchor vehicle and non-self propelling work platform traction system
EP2520726A1 (en) * 2011-05-06 2012-11-07 BRA turbo Ing AG Device and method for removing material deposits from the reservoir of a hydrotechnical structure
DE102014007827A1 (en) * 2014-06-02 2015-12-03 JOBO Spezial-Maschinen GmbH Crawler-drive amphibious working machine
CN204532065U (en) * 2015-03-23 2015-08-05 徐州盾安重工机械制造有限公司 A kind of novel full-sleeve full-rotation drill work station

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108791318A (en) * 2018-04-11 2018-11-13 北京好运达智创科技有限公司 A kind of mobile shipping cable car suitable for complicated landform
CN110593344A (en) * 2019-10-08 2019-12-20 长沙矿冶研究院有限责任公司 Underwater obstacle removing vehicle
CN113338375A (en) * 2021-06-03 2021-09-03 全志君 Full-automatic fishpond silt digging equipment
CN115341602A (en) * 2022-08-30 2022-11-15 徐少钢 Flexible control soil feeding excavation system

Also Published As

Publication number Publication date
CN106149782B (en) 2018-06-22

Similar Documents

Publication Publication Date Title
CN106149782B (en) A kind of mobile and combined suspension cable shovel of large span, which digs to grab, hangs traction transport system
CN108590518B (en) Adjustable anchor rod drilling machine for high slope anchoring
RU2396394C1 (en) Stripping aggregate
KR100907727B1 (en) Crane for establishing transmission tower
CN107653920A (en) A kind of rescue vehicle
CN101434358A (en) Elevator for deep foundation pit excavation by inverse construction method, and excavation system and method
CN103741731A (en) Mine power-driven excavator with plane controllable mechanism
CN104652298A (en) Integral lowering and removing system of span box girders based on bridge deck support and construction method of integral lowering and removing system
CN202690063U (en) Derrick-free shaft-sinking construction device for mine shaft
CN109162721B (en) Unmanned tunneling system and method for coal mine tunnel
CN111335941B (en) Method for dredging and blocking inclined chute ore drawing and transferring equipment of strip mine
CN102910463B (en) Vibration breaking-down shovel
CN204370488U (en) A kind of telescopic boom tunnelling and loading attachment
CN207111078U (en) A kind of fully-mechanized digging machine cable dragging device
CN207597466U (en) A kind of rescue vehicle
CN203053721U (en) Coal rock heading machine large-gradient testing stand
RU137573U1 (en) MECHANIZED COMPLEX FOR PERFORMING VERTICAL TRUNKS OF MINING ENTERPRISES
CN209567738U (en) A kind of multiple spot lift for the rotary shaft excavation machine of method of sinking
CN209025120U (en) Mining multi-purpose crawler type draws excavator truck-mounted crane
CN209493236U (en) A kind of self-unloading gantry of slagging tap applied to excavation of foundation pit
CN103387114B (en) A kind of chute installation device of drag conveyer at front part of coalface
CN209799865U (en) Roadway excavation of taking extending structure is with boring dress anchor all-in-one
CN207525752U (en) Antiskid pile concreting protective device
CN218025011U (en) Hole assembled longmen gallows is dug in manual work
CN205636841U (en) Crawler -type lifting machine excavator all -in -one

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20180212

Address after: 116023 digital road, Shahekou District, Liaoning, Dalian 70-27-02

Applicant after: Xu Shaogang

Address before: 221011 office building, Suzhou Avenue North office building, Xuzhou Industrial Park, Jiawang District, Xuzhou, Jiangsu Province, 208D

Applicant before: Qinhuai Xuzhou Hydraulic Engineering Machinery Co., Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant