CN106149563A - Stand alone type Sarasota built-in steel anchor beam accurate positioning device and installation method - Google Patents
Stand alone type Sarasota built-in steel anchor beam accurate positioning device and installation method Download PDFInfo
- Publication number
- CN106149563A CN106149563A CN201610730838.5A CN201610730838A CN106149563A CN 106149563 A CN106149563 A CN 106149563A CN 201610730838 A CN201610730838 A CN 201610730838A CN 106149563 A CN106149563 A CN 106149563A
- Authority
- CN
- China
- Prior art keywords
- steel anchor
- anchor beam
- built
- sarasota
- positioning device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/14—Towers; Anchors ; Connection of cables to bridge parts; Saddle supports
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The present invention relates to a kind of stand alone type Sarasota built-in steel anchor beam accurate positioning device and installation method, belong to fixed buildings is exclusively used in the method and technology field built a bridge.This stand alone type Sarasota built-in steel anchor beam accurate positioning device includes support, a backing plate, limited block and transverse micro-adjustment mechanism;Support includes multiple bedplate, column, two main spandrel girders and connects the link of column, and main spandrel girder is shaped with for laying the trapezoidal recessed uncovered of steel anchor beam beam body, and trapezoidal recessed open-mouth is provided with correcting wedge;Propping up backing plate be located at anchor slab bottom surface and can move up and down, limited block is resisted against at the anchor slab back side, and transverse micro-adjustment mechanism includes two bearing plates bearing against on anchor slab two sides and for moving a jack of each bearing plate.This stand alone type Sarasota built-in steel anchor beam accurate positioning device and installation method have the advantage that steel anchor beam high-altitude is overall fast and accurate for positioning and precision is high.
Description
Technical field
The present invention relates to a kind of stand alone type Sarasota built-in steel anchor beam accurate positioning device and installation method, belong to fixed building
Thing be exclusively used in the method and technology field built a bridge.
Background technology
The Sarasota of cable-stayed bridge is the main supporting member of whole bridge, and beam body load is converted into vertical load by suspension cable and passes
Passing Sarasota, Sarasota is complicated with the anchorage zone stress condition of suspension cable joint.In highway bridge, it is typically designed to built-in
Steel anchor beam structure, the horizontal component powerful to resist suspension cable.
Built-in steel anchor beam has two kinds of structures to design: 1) end to end structure, it is only necessary to location head joint steel anchor beam, follow-up steel anchor
Beam embedded board is directly seated on the steel anchor beam that a joint is complete;2) independent structure, then showing as each steel anchor beam is
Need the independent individual of location.
And steel anchor beam mounting means has two kinds: 1) separate type installation, both sides steel anchor beam embedded board is the most first installed, then steel is installed
Anchor beam beam body, the method cannot direct measurement and positioning, high-altitude connects low precision, and assembled difficulty is big;2) monoblock type is installed: by tower
Hanging device promotes whole sections steel anchor beam, and hand fit is in place, and the method precision is the highest, and tower crane cannot be right during adjusting attitude
Steel anchor beam installation site carries out real-time measurement, and adjustment difficulty is big, and location efficiency is low.
According to the applicant understood, the precision controlling of steel anchor beam location is the key technology of cable-pylon anchorage zone construction, directly affects
Whole anchorage zone steel anchor beam is linear and later stage hanging cable of stay cable is constructed, but above-mentioned steel anchor beam mounting process all exists: it is fixed to install
Position precision is the highest, it is impossible to realizes accurate adjustment, the time-consuming and shortcoming of poor effect, especially can not solve independent type steel anchor beam high-altitude
Overall location difficulty, the unmanageable problem of precision.
Summary of the invention
The technical problem to be solved in the present invention is, not enough for prior art, proposes entirety location, a kind of steel anchor beam high-altitude
Quick and precisely and the high free-standing Sarasota built-in steel anchor beam accurate positioning device of precision and installation method.
The present invention solves that one of technical scheme that above-mentioned technical problem proposes is: a kind of stand alone type Sarasota built-in steel anchor beam
Accurate positioning device, including support and be located on the concrete segment end face of bottom and be respectively positioned at the anchor slab of steel anchor beam end
Backing plate, limited block and transverse micro-adjustment mechanism;Multiple bedplates that described support includes being embedded on the concrete segment end face of bottom,
The column being fixed on bedplate, the two main spandrel girders being separately fixed on adjacent two root posts and being oppositely arranged and connection
The link of described column, described main spandrel girder is shaped with for laying the trapezoidal recessed uncovered of steel anchor beam beam body, described trapezoidal under
Recessed open-mouth is provided with and is fixed in steel anchor beam beam body and for filling up the wedge piece in space between steel anchor beam beam body and main spandrel girder
Block;Described backing plate is located at anchor slab bottom surface and can move up and down, and described limited block is resisted against at the anchor slab back side, described the most micro-
Regulating mechanism includes two bearing plates bearing against on anchor slab two sides and for moving a jack of each bearing plate.
The present invention solves that the two of the technical scheme that above-mentioned technical problem proposes is: a kind of stand alone type Sarasota built-in steel anchor beam
Accurately installation method, use claim 1 to 6 arbitrary as described in free-standing Sarasota built-in steel anchor beam accurate positioning device,
Comprise the following steps:
1) before the bottom concrete segment at Sarasota pours, difference mounting seat plate, spiral shell at the top of bottom concrete segment
Bar, tower wall embedded board and counter-force seat;
2) pouring bottom concrete segment, after bottom concrete segment solidifies, mounting bracket also makes the trapezoidal of winner's spandrel girder
The height of recessed open-mouth reaches preset height;
3) backing plate is installed, screws fine-tuning nut and make pad plate top surface height reach preset height, synchronize limited block and horizontal stroke are installed
To micro-adjusting mechanism;
4) using the hanging device that Sarasota is other, integral hoisting steel anchor beam, to installation site top, slowly transfers steel anchor beam so that steel
The anchor slab of anchor beam falls within a backing plate, and anchor beam beam body falls within the trapezoidal recessed open-mouth of main spandrel girder;
5) use correcting wedge to fill up space between steel anchor beam beam body and main spandrel girder, and carry out steel anchor beam Slope angle adjustment, full
After foot predetermined inclination degree, with bolt, correcting wedge is fixed in steel anchor beam beam body, forms entirety;
6) accurate measurement steel anchor beam anchor point transversal displacement, by transverse micro-adjustment mechanism, promotes anchor slab to move to adjust steel anchor beam
To predeterminated position.
The present invention uses technique scheme to provide the benefit that: 1) present invention is by being located at support, is provided with on support
The two main spandrel girders being fixed on adjacent two root posts and being oppositely arranged, main spandrel girder is shaped with for laying steel anchor beam beam body
Trapezoidal recessed uncovered, it is simultaneously provided with a backing plate, limited block and transverse micro-adjustment mechanism, so, steel anchor beam elevation and lengthwise position can
Determine in a pre-installation, lift the rear lateral attitude that only need to utilize transverse micro-adjustment mechanism accurate adjustment steel anchor beam in place, pass through correcting wedge
Control steel anchor beam positioning posture, it is possible to weaken steel anchor beam Affecting Factors of Accuracy in an orderly manner and save the adjustment time, efficiently solve
Common process positioning precision is the highest, it is impossible to realize accurate adjustment, the time-consuming and shortcoming of poor effect, solves Sarasota stand alone type
Steel anchor beam high-altitude entirety location difficulty, the unmanageable problem of precision;2) take into full account during support Design that major project structure is divided
Joint construction, is prevented effectively from and clashes with mould installing space in Sarasota, do not affect tower body concrete and normally pour, it is to avoid rope
Ta Neimo perforate, has saved cost;
3) this construction method thinking is distinct, simple to operate, Stability Analysis of Structures, work efficiency height, improves steel anchor beam installation accuracy.
The one of perfect of one of technique scheme is: be equipped with screw rod on described backing plate, described screw pre-buried under
On portion's concrete segment end face, described screw rod is bolted with the fine-tuning nut and fastening laid respectively on a backing plate bottom surface and end face
Nut.
Perfect two of one of technique scheme are: described limited block is fixed on tower wall embedded board, and described tower wall is pre-
Buried plate is embedded on the concrete segment end face of bottom.
Perfect three of one of technique scheme are: described limited block be provided with the anchor slab back side against rubber blanket
Block.
By be provided with on limited block with the anchor slab back side against rubber cushion blocks, anchor slab presentation quality can be protected.
Perfect four of one of technique scheme are: described jack one end is fixed on counter-force seat, described counter-force seat
It is fixed on the concrete segment end face of bottom.
Perfect five of one of technique scheme are: described correcting wedge is bolted to steel anchor beam beam body by fixing
On.
Accompanying drawing explanation
The invention will be further described below in conjunction with the accompanying drawings:
Fig. 1 is the structural representation of embodiment of the present invention stand alone type Sarasota built-in steel anchor beam accurate positioning device.
Fig. 2 is the structural representation of Fig. 1 support.
Fig. 3 is the structural representation that Fig. 1 correcting wedge is installed.
Fig. 4 is the structural representation that Fig. 1 props up that backing plate is installed.;
Fig. 5 is the structural representation that Fig. 1 limited block is installed.
Fig. 6 is the structural representation of Fig. 1 transverse micro-adjustment mechanism.
Fig. 7 is that Fig. 1 stand alone type Sarasota built-in steel anchor beam accurate positioning device is located at the schematic diagram in Sarasota inner chamber.
Wherein: support 1, bedplate 11, column 12, main spandrel girder 13, link 14, correcting wedge 15, fixing bolt 16,
Prop up backing plate 2, screw rod 21, fine-tuning nut 22, clamp nut 23, limited block 3, tower wall embedded board 31, rubber cushion blocks 32, laterally finely tune
Mechanism 4, bearing plate 41, jack 42, counter-force seat 43, reinforcement 44.
Detailed description of the invention
Embodiment
The free-standing Sarasota built-in steel anchor beam accurate positioning device of the present embodiment, as shown in Figures 1 to 6, including support 1 with
And be located on the concrete segment end face of bottom and be respectively positioned on backing plate 2, the limited block 3 at the anchor slab of steel anchor beam end and laterally finely tune
Mechanism 4.
Support 1 includes the multiple bedplates 11 being embedded on the concrete segment end face of bottom, is fixed on bedplate 11
Column 12, the two main spandrel girders 13 being separately fixed on adjacent two root posts 12 and being oppositely arranged and the company of connection column 12
Connect frame 14.Link 14 is used for strengthening whole support 1.
Main spandrel girder 13 is shaped with for laying the trapezoidal recessed uncovered of steel anchor beam beam body, and trapezoidal recessed open-mouth is provided with fixing
In steel anchor beam beam body and for filling up the correcting wedge 15 in space between steel anchor beam beam body and main spandrel girder 13.The present embodiment
Correcting wedge 15 is fixed in steel anchor beam beam body by fixing bolt 16.
Propping up backing plate 2 be located at anchor slab bottom surface and can move up and down, limited block 3 is resisted against at the anchor slab back side, horizontal freqency fine adjustment machine
Structure 4 includes two bearing plates 41 bearing against on anchor slab two sides and for moving a jack of each bearing plate 41
42。
Being equipped with screw rod 21 on a backing plate 2 of the present embodiment, screw rod 21 is embedded on the concrete segment end face of bottom, screw rod
The fine-tuning nut 22 and clamp nut 23 laid respectively on backing plate 2 bottom surface and end face it is bolted with on 21.
The limited block 3 of the present embodiment is fixed on tower wall embedded board 31, and tower wall embedded board 31 is embedded in bottom concrete joint
On section end face.Limited block 3 be provided with the anchor slab back side against rubber cushion blocks 32.
Jack 42 one end of the present embodiment is fixed on counter-force seat 43, and counter-force seat 43 is fixed on concrete segment top, bottom
On face.Reinforcement 44 it is shaped with on counter-force seat 43.
A kind of stand alone type Sarasota built-in steel accurate installation method of anchor beam of the present embodiment, in using above-mentioned free-standing Sarasota
Put steel anchor beam accurate positioning device, comprise the following steps:
1) before the bottom concrete segment at Sarasota pours, at the top of bottom concrete segment respectively mounting seat plate 11,
Screw rod 21, tower wall embedded board 31 and counter-force seat 43;
2) pouring bottom concrete segment, after bottom concrete segment solidifies, mounting bracket 1 also makes the ladder of winner's spandrel girder 13
The height of the recessed open-mouth of shape reaches preset height;
3) backing plate 2 is installed, screws fine-tuning nut 22 and make backing plate 2 apical side height reach preset height, synchronize limited block 3 is installed
With transverse micro-adjustment mechanism 4;
4) using the hanging device that Sarasota is other, integral hoisting steel anchor beam, to installation site top, slowly transfers steel anchor beam so that steel
The anchor slab of anchor beam falls within a backing plate 2, and anchor beam beam body falls within the trapezoidal recessed open-mouth of main spandrel girder 13;
5) use correcting wedge to fill up space between steel anchor beam beam body and main spandrel girder 13, and carry out steel anchor beam Slope angle adjustment,
After meeting predetermined inclination degree, with bolt, correcting wedge is fixed in steel anchor beam beam body, forms entirety;
6) accurate measurement steel anchor beam anchor point transversal displacement, by transverse micro-adjustment mechanism 4, promotes anchor slab to move to adjust steel anchor beam
To predeterminated position.
The present invention is not limited to above-described embodiment.The technical scheme that all employing equivalents are formed, all falls within the present invention and wants
The protection domain asked.
Claims (7)
1. a free-standing Sarasota built-in steel anchor beam accurate positioning device, it is characterised in that: include support and be located at bottom mix
Coagulate on soil sections end face and be respectively positioned on a backing plate, limited block and the transverse micro-adjustment mechanism at the anchor slab of steel anchor beam end;Described support
Including the multiple bedplates being embedded on the concrete segment end face of bottom, the column being fixed on bedplate, it is separately fixed at phase
On adjacent two root posts and two main spandrel girders being oppositely arranged and the link connecting described column, described main spandrel girder is shaped with
For laying the trapezoidal recessed uncovered of steel anchor beam beam body, described trapezoidal recessed open-mouth is provided with and is fixed in steel anchor beam beam body and uses
In filling up the correcting wedge in space between steel anchor beam beam body and main spandrel girder;Described backing plate is located at anchor slab bottom surface and can be upper and lower
Mobile, described limited block is resisted against at the anchor slab back side, and described transverse micro-adjustment mechanism includes bearing against on anchor slab two sides
Two bearing plates and for moving a jack of each bearing plate.
2. the most free-standing Sarasota built-in steel anchor beam accurate positioning device, it is characterised in that: on described backing plate
Being equipped with screw rod, described screw pre-buried, on the concrete segment end face of bottom, described screw rod is bolted with and lays respectively at a backing plate
Fine-tuning nut on bottom surface and end face and clamp nut.
3. the most free-standing Sarasota built-in steel anchor beam accurate positioning device, it is characterised in that: described limited block is solid
Being scheduled on tower wall embedded board, described tower wall embedded board is embedded on the concrete segment end face of bottom.
4. the most free-standing Sarasota built-in steel anchor beam accurate positioning device, it is characterised in that: on described limited block
Be provided with the anchor slab back side against rubber cushion blocks.
5. the most free-standing Sarasota built-in steel anchor beam accurate positioning device, it is characterised in that: described jack one
End is fixed on counter-force seat, and described counter-force seat is fixed on the concrete segment end face of bottom.
6. the most free-standing Sarasota built-in steel anchor beam accurate positioning device, it is characterised in that: described correcting wedge
It is bolted in steel anchor beam beam body by fixing.
7. the accurate installation method of free-standing Sarasota built-in steel anchor beam, use claim 1 to 6 arbitrary as described in independence
Formula Sarasota built-in steel anchor beam accurate positioning device, it is characterised in that comprise the following steps:
1) before the bottom concrete segment at Sarasota pours, difference mounting seat plate, spiral shell at the top of bottom concrete segment
Bar, tower wall embedded board and counter-force seat;
2) pouring bottom concrete segment, after bottom concrete segment solidifies, mounting bracket also makes the trapezoidal of winner's spandrel girder
The height of recessed open-mouth reaches preset height;
3) backing plate is installed, screws fine-tuning nut and make pad plate top surface height reach preset height, synchronize limited block and horizontal stroke are installed
To micro-adjusting mechanism;
4) using the hanging device that Sarasota is other, integral hoisting steel anchor beam, to installation site top, slowly transfers steel anchor beam so that steel
The anchor slab of anchor beam falls within a backing plate, and anchor beam beam body falls within the trapezoidal recessed open-mouth of main spandrel girder;
5) use correcting wedge to fill up space between steel anchor beam beam body and main spandrel girder, and carry out steel anchor beam Slope angle adjustment, full
After foot predetermined inclination degree, with bolt, correcting wedge is fixed in steel anchor beam beam body, forms entirety;
6) accurate measurement steel anchor beam anchor point transversal displacement, by transverse micro-adjustment mechanism, promotes anchor slab to move to adjust steel anchor beam
To predeterminated position.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610730838.5A CN106149563B (en) | 2016-08-26 | 2016-08-26 | Steel anchor beam accurate positioning device and installation method built in free-standing Sarasota |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610730838.5A CN106149563B (en) | 2016-08-26 | 2016-08-26 | Steel anchor beam accurate positioning device and installation method built in free-standing Sarasota |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106149563A true CN106149563A (en) | 2016-11-23 |
CN106149563B CN106149563B (en) | 2017-11-28 |
Family
ID=57342910
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610730838.5A Active CN106149563B (en) | 2016-08-26 | 2016-08-26 | Steel anchor beam accurate positioning device and installation method built in free-standing Sarasota |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106149563B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107841954A (en) * | 2017-12-06 | 2018-03-27 | 中铁十局集团第三建设有限公司 | A kind of linear adjuster of track girder ball pivot and method |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08120620A (en) * | 1994-10-24 | 1996-05-14 | P S Co Ltd | Block manufacturing device of short line type |
CN103243654A (en) * | 2013-05-16 | 2013-08-14 | 中交路桥华南工程有限公司 | Mounting method for steel anchor beam of cable-stayed bridge and assembly jig and cable bent tower mounting platform used in method |
CN203160133U (en) * | 2013-03-12 | 2013-08-28 | 中铁四局集团第二工程有限公司 | Three-dimensional combined accurate positioning device for stayed-cable bridge body cable duct |
CN103306204A (en) * | 2013-06-19 | 2013-09-18 | 中铁四局集团第二工程有限公司 | Three-way positioning device for base steel anchor box |
CN203440753U (en) * | 2013-07-08 | 2014-02-19 | 中交第二公路工程局有限公司 | Multifunctional steel bar locating framework |
CN203625785U (en) * | 2013-12-19 | 2014-06-04 | 中铁六局集团有限公司 | Coordinate adjusting device for arch sections of steel pipe arch mounted in support method |
CN206015523U (en) * | 2016-08-26 | 2017-03-15 | 中铁四局集团第二工程有限公司 | The built-in steel anchor beam accurate positioning device of free-standing Sarasota |
-
2016
- 2016-08-26 CN CN201610730838.5A patent/CN106149563B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08120620A (en) * | 1994-10-24 | 1996-05-14 | P S Co Ltd | Block manufacturing device of short line type |
CN203160133U (en) * | 2013-03-12 | 2013-08-28 | 中铁四局集团第二工程有限公司 | Three-dimensional combined accurate positioning device for stayed-cable bridge body cable duct |
CN103243654A (en) * | 2013-05-16 | 2013-08-14 | 中交路桥华南工程有限公司 | Mounting method for steel anchor beam of cable-stayed bridge and assembly jig and cable bent tower mounting platform used in method |
CN103306204A (en) * | 2013-06-19 | 2013-09-18 | 中铁四局集团第二工程有限公司 | Three-way positioning device for base steel anchor box |
CN203440753U (en) * | 2013-07-08 | 2014-02-19 | 中交第二公路工程局有限公司 | Multifunctional steel bar locating framework |
CN203625785U (en) * | 2013-12-19 | 2014-06-04 | 中铁六局集团有限公司 | Coordinate adjusting device for arch sections of steel pipe arch mounted in support method |
CN206015523U (en) * | 2016-08-26 | 2017-03-15 | 中铁四局集团第二工程有限公司 | The built-in steel anchor beam accurate positioning device of free-standing Sarasota |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107841954A (en) * | 2017-12-06 | 2018-03-27 | 中铁十局集团第三建设有限公司 | A kind of linear adjuster of track girder ball pivot and method |
Also Published As
Publication number | Publication date |
---|---|
CN106149563B (en) | 2017-11-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101525871B (en) | Multifunctional complete cantilever form and concrete pouring method thereby | |
CN109989330B (en) | Continuous track and erection method thereof | |
CN109138457B (en) | Support system for installing prefabricated building and construction method thereof | |
CN107653781A (en) | Big steel pipe truss and construction method for bent cap cast-in-place construction | |
CN102296542A (en) | Method for constructing high pier capping beams | |
CN104032969A (en) | Precise positioning and process regulation and control device for vibration isolation support embedded plate | |
CN110644371A (en) | Prefabricated capping beam installation method and system | |
JP2020183678A (en) | Box girder construction method and construction system | |
CN107268455B (en) | Concrete girder gooseneck composite structure beam cradle construction method | |
CN202882446U (en) | Horse stool suspended by steel bars | |
CN206015523U (en) | The built-in steel anchor beam accurate positioning device of free-standing Sarasota | |
CN102691412A (en) | Prefabricated frame structure connection supporting template with adjustable vertical height | |
CN207244435U (en) | A kind of anchor and height-adjustable supports suitable for beam bridge | |
CN204151820U (en) | Stone bolt location and installation support | |
CN106149563B (en) | Steel anchor beam accurate positioning device and installation method built in free-standing Sarasota | |
CN109235280A (en) | The operation platform and construction method of bridge coping | |
CN105649248A (en) | Fabricated prestressed concrete hollow slab and cast-in-place beam integrated construction method | |
CN100497834C (en) | Construction equipment for integral roof-holding highway bridge top structure | |
CN209194354U (en) | High-altitude long-span binder base-supporting shellfish thunder support construction | |
CN207047889U (en) | A kind of device for installing forging machine main frame embedded part | |
CN109129849B (en) | Prefabricated beam wedge block and embedded bolt mounting die and construction method thereof | |
CN110820559A (en) | Cement concrete bridge deck pavement and construction method | |
CN114687567B (en) | Method for hanging construction tool of ultrahigh heavy embedded part | |
CN104878926A (en) | Suspended template system construction method and turnover brackets | |
CN111005324B (en) | Support-free suspension and locking construction method for assembled type segmental box girder |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |