CN106120640A - A kind of construction method preventing and treating mountain stream bridge foundation washout - Google Patents

A kind of construction method preventing and treating mountain stream bridge foundation washout Download PDF

Info

Publication number
CN106120640A
CN106120640A CN201610493868.9A CN201610493868A CN106120640A CN 106120640 A CN106120640 A CN 106120640A CN 201610493868 A CN201610493868 A CN 201610493868A CN 106120640 A CN106120640 A CN 106120640A
Authority
CN
China
Prior art keywords
bridge foundation
construction method
mountain stream
check dam
washout
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610493868.9A
Other languages
Chinese (zh)
Inventor
朱汉华
赵永利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Langzhao Highway And Railway Maintenance Engineering Technology Co Ltd
Original Assignee
Shanghai Langzhao Highway And Railway Maintenance Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Langzhao Highway And Railway Maintenance Engineering Technology Co Ltd filed Critical Shanghai Langzhao Highway And Railway Maintenance Engineering Technology Co Ltd
Priority to CN201610493868.9A priority Critical patent/CN106120640A/en
Publication of CN106120640A publication Critical patent/CN106120640A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/02Stream regulation, e.g. breaking up subaqueous rock, cleaning the beds of waterways, directing the water flow
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/02Fixed barrages

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Revetment (AREA)

Abstract

The invention discloses a kind of construction method preventing and treating mountain stream bridge foundation washout. the method, particularly as follows: build check dam on the river course in bridge foundation downstream, forms river energy dissipating reduction of speed retention of excessive fluid pond.Check dam construction method is: squeeze at least 1 row's spud pile along river cross-section in riverbed, and riverbed surface is risen out in stake, at spud pile upstream or middle water-retaining structure of placing, formation check dam.Compared with existing mountain stream bridge foundation washout prevention and controls, its construction is simple, it is only necessary to building one check dam, cost is substantially reduced.And, the arranging of check dam can make to be washed the riverbed near the bridge foundation of erosion and back-silt, and gradually recovers bridge foundation buried depth, thus fundamentally solves bridge foundation washout problem.

Description

A kind of construction method preventing and treating mountain stream bridge foundation washout
Technical field
The invention belongs to engineering construction field, be specifically related to a kind of construction party preventing and treating mountain stream bridge foundation washout Method.
Background technology
Flood is the main cause causing bridge collapse to the souring of bridge pier, and in mountain stream, this phenomenon is outstanding especially For significantly.Mountain stream bridge foundation washout problem has many design and construction methods, and design construction standard also has respective specified, main The conditions such as flow to be considered, river width, riverbed geology, but its design calculating erosion quantity is the most inaccurate.At present for built Mountain stream bridge foundation washout prophylactico-therapeutic measures be generally as follows: 1. for sandy bed river bridge location take upstream arrange intercept water Wall, downstream arranges ladder of cascades wall, reinforces the method completely spreading mortar flag stone in the middle of bridge opening simultaneously.2. abutment is in cobble The reinforcement measure of sedimentary generally uses the method for substrate grouting methol, sets up mould and pour concrete around basis, will the most again Grating cobble is backfilling into basic platform top, pours the intensity of concrete when reaching to a certain degree, it is being carried out mud jacking before surrounding Process.3. bridge location be in transition riverbed basis situation generally by dredging upper river make water (flow) direction change, and then solution Stream the problem washing away basis.But said method all cannot fundamentally solve the flood souring to bridge pier, is only capable of adding Gu preventing and treating in a period of time after, As time goes on its effect can be more and more weak.
Summary of the invention
It is an object of the invention to solve problems of the prior art, and a kind of preventing and treating mountain stream bridge base is provided The construction method that plinth washes away.
Do not illustrate how from mechanical concept for existing mountain stream bridge foundation washout problem to prevent and treat river, mountain area comprehensively Stream bridge foundation washout risk problem, according to strokes law MV=Ft, uses energy dissipating reduction of speed retention of excessive fluid pond to change flow velocity, flushing time Etc. condition, reach to prevent and treat the purpose of mountain stream bridge foundation washout.Concrete technical scheme of the present invention is as follows:
The construction method of preventing and treating mountain stream bridge foundation washout, particularly as follows: build on the river course in bridge foundation downstream Check dam, forms river energy dissipating reduction of speed retention of excessive fluid pond.
The theoretical basis of institute of the present invention foundation is as follows:
The first step is found according to strokes law MV=Ft affects the key factor of mountain stream bridge foundation washout;
The formula that washes away in unit length river can be set up according to strokes law MV=Ft:
Q × γ × V=F × t (1.1)
Wherein Q is unit length river discharge;γ is the unit weight of water;V is river flow;F is channel scour power;T is single Bit length river discharge flushing time.
In formula (1.1), flow Q is constant;Flow velocity V is controllable;Flushing time t can time delay, channel scour Power F is changeable;And the condition such as flow, riverbed geology cannot change.I.e.
F=(Q × γ × V)/t (1.2)
From (1.2): use engineering measure to arrange check dam and can reduce flow velocity V, extend flushing time t, so that it may subtract Few channel scour power F.
Above-mentioned base case can use following optimal way to realize.
As preferably, described check dam construction method is: squeeze at least 1 row's spud pile along river cross-section in riverbed, And stake rises out riverbed surface, in spud pile upstream or middle place water-retaining structure, form check dam.This check dam is easy to execute Work, cost is relatively low.Water-retaining structure preferably employs as materials such as concrete precast block, block stone or fence.
Further, described spud pile is positioned at bridge foundation downstream 10~20m, and check dam is higher than riverbed 0.8~1m.Should Design can realize the back-silting, from the problem of long-range upper solution foundation scouring of riverbed near bridge foundation.
Further, described spud pile is precast reinforced concrete pile, to reduce cost.
Further, the described spacing between spud pile is 5~6m.
Further, for being washed the bridge foundation of erosion, need damage part is repaiied after constructing check dam Multiple.
The present invention, according to strokes law, uses and builds energy dissipating reduction of speed retention of excessive fluid pond on the river course in bridge foundation downstream, to change Become the conditions such as bridge foundation adnexa flow velocity, flushing time, reach to prevent and treat the purpose of mountain stream bridge foundation washout.With existing Mountain stream bridge foundation washout prevention and controls is compared, and its construction is simple, it is only necessary to building one check dam, cost is substantially reduced. And, the arranging of check dam can make to be washed the riverbed near the bridge foundation of erosion and back-silt, and gradually recovers bridge foundation and buries Put the degree of depth, thus fundamentally solve bridge foundation washout problem.
Accompanying drawing explanation
Fig. 1 is that in embodiment, river bridge foundation washout and protection arrange schematic diagram.
Detailed description of the invention
With detailed description of the invention the present invention it is further elaborated below in conjunction with the accompanying drawings and illustrates.In the present invention, each is implemented The technical characteristic of mode, on the premise of not colliding with each other, all can carry out respective combination.
As it is shown in figure 1, for a certain mountain stream bridge foundation being washed erosion, it is used and reinforces preventing and treating as follows Construction:
(1) in the position of bridge foundation downstream 15m, set 1~2 row's 10m length precast reinforced concrete piles, squeeze into riverbed 9m, as the spud pile of check dam.Spud pile is arranged along river channel cross section.
(2) at spud pile (spacing 5-6m) upstream or middle placement 1m3Concrete precast block (or block stone, fence), is higher than Riverbed 1m, builds the high river check dam of 1m.Find by building check dam through substantial amounts of test, can be in check dam upstream Forming river energy dissipating reduction of speed retention of excessive fluid pond, current flow velocity near bridge foundation slows down.Thus reaching to reduce flow velocity V, prolongation is washed away The effect of time t, may be reduced by channel scour power F according to theorem of impulse.Further, find to arrange height to arrive by research About 1m, can make mud and deposit back-silt under hydraulic action to the riverbed of base attachment, gradually recover bridge foundation Buried depth.
(3) for being washed the bridge foundation of erosion, after constructing check dam, again in the middle part of repair bridge base water Point, complete whole preventing and treating construction.
It addition, show through overtesting, for different river courses, the position that arranges of check dam can be in the range of 10~20m It is adjusted;The height of check dam can also be finely adjusted according to hydraulics, is located substantially between 0.8~1.0m, and height is spent Height easily blocks current, and the most too low effect of back-silting is poor.Through practical observation, for mountain stream, check dam is arranged at bridge The position in downstream, beam basis 10~20m, check dam height 0.8~1.0m between time, can make current vortex backflow intend Static position is about near bridge foundation so that effect of back-silting is preferable.
Embodiment described above is the one preferably scheme of the present invention, and so it is not intended to limiting the invention.Have Close the those of ordinary skill of technical field, without departing from the spirit and scope of the present invention, it is also possible to make various change Change and modification.The technical scheme that the most all modes taking equivalent or equivalent transformation are obtained, all falls within the guarantor of the present invention In the range of protecting.

Claims (7)

1. the construction method preventing and treating mountain stream bridge foundation washout, it is characterised in that on the river course in bridge foundation downstream Build check dam, form river energy dissipating reduction of speed retention of excessive fluid pond.
2. the construction method preventing and treating mountain stream bridge foundation washout as claimed in claim 1, it is characterised in that described blocks Dam construction method is: squeeze at least 1 row's spud pile along river cross-section in riverbed, and riverbed surface is risen out in stake, fixing Stake upstream or middle water-retaining structure of placing, formation check dam.
3. the construction method preventing and treating mountain stream bridge foundation washout as claimed in claim 2, it is characterised in that described consolidates Fixed pile is in bridge foundation downstream 10~20m, and check dam is higher than riverbed 0.8~1m.
4. the construction method preventing and treating mountain stream bridge foundation washout as claimed in claim 2, it is characterised in that described consolidates Determining stake is precast reinforced concrete pile.
5. the construction method preventing and treating mountain stream bridge foundation washout as claimed in claim 2, it is characterised in that described gear Water-bound is concrete precast block, block stone or fence.
6. the construction method preventing and treating mountain stream bridge foundation washout as claimed in claim 2, it is characterised in that described consolidates Determining the spacing between stake is 5~6m.
7. the as claimed in claim 2 construction method preventing and treating mountain stream bridge foundation washout, it is characterised in that for by Wash away the bridge foundation of erosion, need damage part is repaired after constructing check dam.
CN201610493868.9A 2016-06-29 2016-06-29 A kind of construction method preventing and treating mountain stream bridge foundation washout Pending CN106120640A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610493868.9A CN106120640A (en) 2016-06-29 2016-06-29 A kind of construction method preventing and treating mountain stream bridge foundation washout

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610493868.9A CN106120640A (en) 2016-06-29 2016-06-29 A kind of construction method preventing and treating mountain stream bridge foundation washout

Publications (1)

Publication Number Publication Date
CN106120640A true CN106120640A (en) 2016-11-16

Family

ID=57286049

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610493868.9A Pending CN106120640A (en) 2016-06-29 2016-06-29 A kind of construction method preventing and treating mountain stream bridge foundation washout

Country Status (1)

Country Link
CN (1) CN106120640A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107829411A (en) * 2017-11-08 2018-03-23 甘肃省科学院地质自然灾害防治研究所 The underground erosion control wall construction of trraning pole is set
CN112211164A (en) * 2020-10-20 2021-01-12 同济大学 Novel debris flow pile group type blocking structure and method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040265060A1 (en) * 2001-10-26 2004-12-30 Lee Keun-Hee Method for constructing scour protection of bridge and stabilization of stream bed using block mat
CN102286961A (en) * 2011-07-11 2011-12-21 合肥工业大学 Overflow dam for waste tires
CN103526721A (en) * 2013-10-29 2014-01-22 中国水电顾问集团成都勘测设计研究院有限公司 Permeable spur dike with pile foundations
CN103898867A (en) * 2014-03-13 2014-07-02 重庆交通大学 Spur dike, for inland waterway improvement, not connected with embankment
CN104213586A (en) * 2014-09-18 2014-12-17 东南大学 Pile foundation scour protection measure method
CN205171469U (en) * 2015-09-07 2016-04-20 四川省华地建设工程有限责任公司 Mud -rock flow flow blocking dam scour protection dissipation structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040265060A1 (en) * 2001-10-26 2004-12-30 Lee Keun-Hee Method for constructing scour protection of bridge and stabilization of stream bed using block mat
CN102286961A (en) * 2011-07-11 2011-12-21 合肥工业大学 Overflow dam for waste tires
CN103526721A (en) * 2013-10-29 2014-01-22 中国水电顾问集团成都勘测设计研究院有限公司 Permeable spur dike with pile foundations
CN103898867A (en) * 2014-03-13 2014-07-02 重庆交通大学 Spur dike, for inland waterway improvement, not connected with embankment
CN104213586A (en) * 2014-09-18 2014-12-17 东南大学 Pile foundation scour protection measure method
CN205171469U (en) * 2015-09-07 2016-04-20 四川省华地建设工程有限责任公司 Mud -rock flow flow blocking dam scour protection dissipation structure

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
伊廷军: "采用拦沙坝防护的浅基桥梁墩台局部冲刷研究", 《水土保持研究》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107829411A (en) * 2017-11-08 2018-03-23 甘肃省科学院地质自然灾害防治研究所 The underground erosion control wall construction of trraning pole is set
CN112211164A (en) * 2020-10-20 2021-01-12 同济大学 Novel debris flow pile group type blocking structure and method

Similar Documents

Publication Publication Date Title
CN104196034B (en) A kind of utilize steel sheet pile as the foundation ditch construction method in supporting cofferdam
CN101476305B (en) Mud-stone flow discharge guiding groove based on step anti-flushing notched sill group and use thereof
CN103510493B (en) Low overflow dam cave depot type hydropower station
CN109610487A (en) A kind of Larsen steel sheet-pile cofferdam and its construction method
CN107119624A (en) The countermeasure system and implementation of large-scale Dumping Sites in a kind of debris flow gully
CN109610405A (en) Half lunar crater shape water pond and its construction method
CN206693187U (en) A kind of spillway structure
CN101761069B (en) Construction method of three-in-one underground diaphragm wall
CN106120640A (en) A kind of construction method preventing and treating mountain stream bridge foundation washout
CN207228038U (en) The countermeasure system of large-scale Dumping Sites in a kind of debris flow gully
CN101705668B (en) Damming water conservancy project construction structure constructed in flowing water and construction method thereof
CN204875721U (en) Diversion tunnel outlet energy dissipation device
CN104846837A (en) Construction method for ultra-deep well pit in surface drainage foundation pit
CN102808394B (en) Construction method for fine sand ultra-long interception embankment closure gap bottom guard with deep covering layer
CN105178338A (en) Soil slope protection structure and protection method thereof
CN108867569A (en) Natural dredging debris flow sand dam and application thereof
CN113806955A (en) Method for calculating size of intercepting ditch on outer side of abandoned slag yard under complex terrain condition
CN107190700A (en) The excavation construction method of getting rid of the danger of mudstone flow pattern barrier lake under a kind of over-current state
CN209989781U (en) Novel structure of silty-fine sand stratum flood control dam
Pinchard et al. Spillway capacity upgrade at Malarce dam: Design of an additional Piano Key Weir spillway
CN106930242A (en) Pile foundation overfall dam and galvanized wire gabion protection-apron
CN206956682U (en) Plunge pool structure
CN206986826U (en) It is a kind of can effective reduction of speed desilting key water control project
CN206916698U (en) A kind of geomembrane anti-seepage sand-gravel dam
CN104213545B (en) Hang underflow type step stiling basin energy-dissipating system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20161116

RJ01 Rejection of invention patent application after publication