CN106087959A - A kind of grouting strengthening method of effective minimizing building foundation uneven settlement - Google Patents

A kind of grouting strengthening method of effective minimizing building foundation uneven settlement Download PDF

Info

Publication number
CN106087959A
CN106087959A CN201610509519.1A CN201610509519A CN106087959A CN 106087959 A CN106087959 A CN 106087959A CN 201610509519 A CN201610509519 A CN 201610509519A CN 106087959 A CN106087959 A CN 106087959A
Authority
CN
China
Prior art keywords
slip casting
grouting
strengthening
district
casting district
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610509519.1A
Other languages
Chinese (zh)
Other versions
CN106087959B (en
Inventor
连新增
朱旭
黄明利
李景云
王海涛
赵建明
钱文斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Municipal Construction Co Ltd
Original Assignee
Beijing Municipal Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Municipal Construction Co Ltd filed Critical Beijing Municipal Construction Co Ltd
Priority to CN201610509519.1A priority Critical patent/CN106087959B/en
Publication of CN106087959A publication Critical patent/CN106087959A/en
Application granted granted Critical
Publication of CN106087959B publication Critical patent/CN106087959B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/12Consolidating by placing solidifying or pore-filling substances in the soil

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The present invention relates to the grouting strengthening method of a kind of effective minimizing building foundation uneven settlement, it obtains the positional information of excavation face of Tunnel footpath D in real time;Tunnel excavation face horizontal range L to building basis geometric center point is determined according to this positional information;When determining L=mD (m, for setting coefficient, determines) according to strata condition, the Peck curve formed according to footpath, tunneling hole determines the strengthening slip casting district in the footpath, tunneling hole on building basis and general slip casting district;Utilize pressure grout method that strengthening slip casting district and general slip casting district are carried out grouting and reinforcing;Utilize grouting pressure to control grouting amount, stop slip casting when strengthening when slip casting district final grouting pressure reaches the first setting intensity threshold, stop slip casting when general slip casting district final grouting pressure reaches the second setting intensity threshold.The present invention can make up the sedimentation that Stratum Loss brings effectively, makes the sedimentation in the middle part of subsider reach unanimity with both sides, reduces the relative settlement on building basis, and cost is few.

Description

A kind of grouting strengthening method of effective minimizing building foundation uneven settlement
Technical field
The present invention relates to tunnel construction field, particularly relate to the slip casting of a kind of effective minimizing building foundation uneven settlement Reinforcement means.
Background technology
Along with national basis facility investment builds the increasing of dynamics, city underground and municipal pipeline project increase, under wear and build The situation building thing happens occasionally.While digging building under, need the basic maximum settlement that strict control tunnel excavation causes Amount.But for building, adverse conditions the most is not basis bulk settling, but relative settlement (differential settlement).Relatively Big relative settlement can cause the inclination of building even to ftracture, especially for some skyscrapers, for relative settlement more For sensitivity.
Tunnel construction field generally uses surface grouting for the measure controlling building base area stratum settlement at present The method reinforced, if carried out the surface grouting of single intensity, the relatively low meeting of fastening strength of the single intensity slip casting in local causes difference to be sunk Fall is relatively big, affects safety;Gamut list intensity grouting and reinforcing intensity is higher, though maximum settlement and relative settlement can be reduced, but It is to cause bigger input, affects economy.
Summary of the invention
It is an object of the invention to for the problem that presently, there are, it is provided that a kind of effectively minimizing building foundation uneven settlement Grouting strengthening method, it can effectively solve the problem that the differential settlement on building basis, and input cost is relatively low.
The purpose of the present invention is achieved through the following technical solutions:
The present invention provides the grouting strengthening method of a kind of effective minimizing building foundation uneven settlement, comprising:
Step S101, obtains the positional information of the excavation face of Tunnel footpath D in real time;
Step S102, according to the positional information of the excavation face in Tunnel footpath, determines that tunnel excavation face is several to building basis Horizontal range L of what central point;
Step S103, when determining L=mD, wherein m is for setting coefficient, proceeds to step S104;
Step S104, the Peck curve formed according to footpath, tunneling hole determines the footpath, tunneling hole on building basis Strengthening slip casting district and general slip casting district;
Step S105, utilizes pressure grout method that strengthening slip casting district and general slip casting district are carried out grouting and reinforcing;
Step S106, utilizes grouting pressure to control grouting amount, and when strengthening slip casting district, final grouting pressure reaches the first setting intensity Stop slip casting during threshold value, stop slip casting when general slip casting district final grouting pressure reaches the second setting intensity threshold.
It is highly preferred that choose the stratum within the subsider width of the Peck curve that footpath, tunneling hole is formed as strengthening Slip casting district, stratum in addition is general slip casting district.
More preferably, it is characterised in that, the long L1 in described strengthening slip casting district is true by the Peck curve shown in equation below Fixed:
S ( x ) = S max exp ( - x 2 2 i 2 )
In formula: S (x) represents when the distance of this some distance tunnel centrage is x, the sedimentation value of this point;
SmaxRepresenting the sedimentation value on earth's surface directly over tunnel centrage, this sedimentation value is maximum;
I represents that subsider spread factor, the i.e. centrage in Tunnel footpath are to the distance of inflection point;
X represents the earth's surface certain point horizontal range to tunnel central axis;
The wide B1 in strengthening slip casting district is that building foundation width is plus 1.8m~2.2m;
The long L2 in general slip casting district is 2.5i times of Tunnel footpath D of stretching out from the outer in strengthening slip casting district, wherein I be subsider spread factor;The wide B2 in general slip casting district is that building foundation width is plus 1.8m~2.2m.
It is highly preferred that during slip casting, the serosity that strengthening slip casting district and general slip casting district are used is cement-sodium silicate Dual slurry.
It is highly preferred that described grouting strengthening method also includes:
Step S107, after mortar depositing construction terminates, core-drilling in injecting cement paste, check slip casting situation;
Step S108, by core censorship;
Step S109, it is judged that whether intensity and the serosity filling situation of core reach construction reference, the most then perform step S110, continues from the radially outwardly extending tunneling in current tunnel hole;If it is not, then restart step S105.
It is highly preferred that according to the presetting period of cement grout, start boring after slip casting terminates after 45min~1h again and take Core.
It is highly preferred that the intensity of institute's coring is not less than 1.0MPa.
By the technical scheme of the invention described above it can be seen that the present invention is by subregion slip casting, can not only effectively reduce The problem of building foundation uneven settlement, but also taken into account safety and economy.From the knowledge of Probability, due to Peck curve is normal distribution curve, and the stratum settlement in distance between its subsider width that is two inflection point account for whole Tunnel excavation causes more than the 90% of stratum settlement, carries out this part region strengthening slip casting, can effectively make up Stratum Loss The sedimentation brought, makes the sedimentation in the middle part of subsider reach unanimity with both sides, reduces the relative settlement on building basis.Keep away again simultaneously That has exempted from that gamut high strength grouting brings puts into too high problem, it is ensured that engineering puts into the most controlled.
Accompanying drawing explanation
The flow chart of surface grouting scheme when Fig. 1 is tunneling;
Fig. 2 is the distance schematic diagram between tunnel and building basis;
Fig. 3 is the Peck curve synoptic diagram that footpath, tunneling hole is formed;
The stratum slip casting Division front view on building basis when Fig. 4 is tunneling;
The stratum slip casting Division top view on building basis when Fig. 5 is tunneling.
In accompanying drawing:
Peck curve 1;Strengthening slip casting district 2;General slip casting district 3;Building basis 4.
Detailed description of the invention
In order to make those skilled in the art be more fully understood that the technical scheme of the application, below with reference to accompanying drawing to this Bright it is described in further details.
In describing the invention, it is to be understood that in describing the invention, the implication of " multiple " refer to two or Person's two or more, unless otherwise expressly limited specifically.
Embodiment one:
The present invention provides the grouting strengthening method of a kind of effective minimizing building foundation uneven settlement, and its implementing procedure is such as Shown in Fig. 1, comprise the steps:
Step S101, obtains the positional information of the excavation face in Tunnel footpath (being designated as D) in real time;
The centrage in this Tunnel footpath overlaps with the centrage on building basis.
Step S102, according to the positional information of the excavation face in Tunnel footpath, determines that tunnel excavation face is several to building basis The horizontal range of what central point, is designated as L (see Fig. 2);
Step S103, it is judged that whether L=mD (wherein m is for setting coefficient, determines according to strata condition) sets up, if not becoming Vertical, then proceed to step S101;If setting up, then proceed to step S104;
Determine whether tunnel excavation face reaches m times of Tunnel footpath D to horizontal range L of building basis geometric center point Time, start the step of following grouting and reinforcing.In order to further ensure grouting effect, need to carry out surface grouting immediately and add Solid step.
Step S104, determines building basis 4 according to the Peck curve 1 (as shown in Figure 3) that footpath, tunneling hole is formed The strengthening slip casting district 2 in footpath, tunneling hole and general slip casting district 3 (as shown in Figure 4 and Figure 5).
Choose footpath, tunneling hole formed Peck curve 1 subsider width (this subsider width i.e. Peck curve 1 Distance between two inflection points) within stratum as strengthening slip casting district 2, stratum in addition is general slip casting district 3.
The wide B1 in strengthening slip casting district 2 is that building foundation width is plus 1.8m~2.2m, it is therefore preferable to 2m;Strengthening slip casting district Length L1 of 2 is determined by the Peck curve 1 (as shown in Figure 3) shown in equation below 1 and formula 2:
L1=2i................................................ formula 2
In formula:
S (x) represents when the distance of this some distance tunnel centrage is x, the sedimentation value of this point;
SmaxRepresenting the sedimentation value on earth's surface directly over tunnel centrage, this sedimentation value is maximum;
I represents that subsider spread factor, the i.e. centrage in Tunnel footpath are to the distance of inflection point;
X represents the earth's surface certain point horizontal range to tunnel central axis.
The wide B2 in general slip casting district 3 is that building foundation width is plus 1.8m~2.2m, it is therefore preferable to 2m;General slip casting district The long L2 of 3 is to stretch out from the outer in strengthening slip casting district 2 that (i therein is subsider width system for the 2.5i of Tunnel footpath D Number) times.
Step S105, utilizes pressure grout method that strengthening slip casting district 2 and general slip casting district 3 are carried out grouting and reinforcing.
During slip casting, the serosity that strengthening slip casting district 2 and general slip casting district 3 are used is cement-sodium silicate double liquid.
Step S106, utilizes grouting pressure to control grouting amount, and when strengthening slip casting district 2, final grouting pressure reaches the first setting intensity Stop slip casting during threshold value, stop slip casting when general slip casting district 3 final grouting pressure reaches the second setting intensity threshold.
Generally, first intensity threshold is set as 1.5MPa;Second sets intensity threshold as 0.5MPa.
Step S107, after mortar depositing construction terminates, core-drilling in injecting cement paste, check slip casting situation.
After slip casting terminates, according to the presetting period of cement grout, start again after 45min~1h boring take one or Multiple cores.When drilling through multiple core, take diverse location region and drill through.
During boring coring, using special rig, the length of core controls 10~15cm, diameter control 5~ 8cm。
Step S108, by core censorship.
Step S109, it is judged that whether intensity and the serosity filling situation of core reach construction reference, the most then perform step S110, continues from the radially outwardly extending tunneling in current tunnel hole;If it is not, then restart step S105.
Generally, the intensity of institute's coring is i.e. thought do not reach construction reference less than 1.0MPa.
The slip casting degree of depth in above-mentioned strengthening slip casting district 2 and general slip casting district 3 is the conventional slip casting degree of depth, according to fabric Fixed.
The present invention determines the general note of maximally effective strengthening slip casting district 2 and periphery based on Peck curve and Probability knowledge Slurry district 3, by subregion slip casting, the problem that can not only effectively reduce building foundation uneven settlement, but also takes into account Safety and economy.
Embodiment two:
Difference between the embodiment of the present invention two and embodiment one is, only includes in embodiment one in this embodiment two Step S101-S106.The uneven of tunnel construction thing basis i.e. it is effectively reduced by the grouting and reinforcing process of these steps Sedimentation.
Although the present invention is open as above with preferred embodiment, but embodiment does not limit the present invention.Without departing from this In bright spirit and scope, any equivalence change done or retouching, also belong to the protection domain of the present invention.Therefore the present invention The content that should be defined with claims hereof of protection domain as standard.

Claims (7)

1. the grouting strengthening method of an effective minimizing building foundation uneven settlement, it is characterised in that described grouting and reinforcing Method includes:
Step S101, obtains the positional information of the excavation face of Tunnel footpath D in real time;
Step S102, according to the positional information of the excavation face in Tunnel footpath, determines that tunnel excavation face is in the geometry of building basis Horizontal range L of heart point;
Step S103, when determining L=mD, wherein m is for setting coefficient, proceeds to step S104;
Step S104, the Peck curve (1) formed according to footpath, tunneling hole determines the tunneling hole of building basis (4) The strengthening slip casting district (2) in footpath and general slip casting district (3);
Step S105, utilizes pressure grout method that strengthening slip casting district (2) and general slip casting district (3) are carried out grouting and reinforcing;
Step S106, utilizes grouting pressure to control grouting amount, when strengthening slip casting district (2) final grouting pressure reaches the first setting intensity threshold Stop slip casting during value, stop slip casting when general slip casting district (3) final grouting pressure reaches the second setting intensity threshold.
The grouting strengthening method of a kind of effective minimizing building foundation uneven settlement the most according to claim 1, it is special Levy and be,
Choose footpath, tunneling hole formed Peck curve (1) subsider width within stratum as strengthening slip casting district (2), Stratum in addition is general slip casting district (3).
The grouting strengthening method of a kind of effective minimizing building foundation uneven settlement the most according to claim 2, it is special Levying and be, the long L1 of described strengthening slip casting district (2) is determined by the Peck curve (1) shown in equation below:
S ( x ) = S max exp ( - x 2 2 i 2 )
In formula: S (x) represents when the distance of this some distance tunnel centrage is x, the sedimentation value of this point;
SmaxRepresenting the sedimentation value on earth's surface directly over tunnel centrage, this sedimentation value is maximum;
I represents that subsider spread factor, the i.e. centrage in Tunnel footpath are to the distance of inflection point;
X represents the earth's surface certain point horizontal range to tunnel central axis;
The wide B1 of strengthening slip casting district (2) is that building foundation width is plus 1.8m~2.2m;
The long L2 in general slip casting district (3) be 2.5i times of Tunnel footpath D of stretching out from the outer strengthening slip casting district (2), its In i be subsider spread factor;The wide B2 in general slip casting district (3) is that building foundation width is plus 1.8m~2.2m.
4. add according to the slip casting of a kind of effective minimizing building foundation uneven settlement described in claims 1 to 3 any one Solid method, it is characterised in that during slip casting, the serosity that strengthening slip casting district (2) and general slip casting district (3) are used is water Mud-waterglass dual slurry.
The grouting strengthening method of a kind of effective minimizing building foundation uneven settlement the most according to claim 4, it is special Levying and be, described grouting strengthening method also includes:
Step S107, after mortar depositing construction terminates, core-drilling in injecting cement paste, check slip casting situation;
Step S108, by core censorship;
Step S109, it is judged that whether intensity and the serosity filling situation of core reach construction reference, the most then perform step S110, continues from the radially outwardly extending tunneling in current tunnel hole;If it is not, then restart step S105.
The grouting strengthening method of a kind of effective minimizing building foundation uneven settlement the most according to claim 5, it is special Levy and be, according to the presetting period of cement grout, after slip casting terminates, after 45min~1h, start coring of holing again.
The grouting strengthening method of a kind of effective minimizing building foundation uneven settlement the most according to claim 6, it is special Levying and be, the intensity of institute's coring is not less than 1.0MPa.
CN201610509519.1A 2016-06-30 2016-06-30 A kind of effective grouting strengthening method for reducing building foundation uneven settlement Active CN106087959B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610509519.1A CN106087959B (en) 2016-06-30 2016-06-30 A kind of effective grouting strengthening method for reducing building foundation uneven settlement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610509519.1A CN106087959B (en) 2016-06-30 2016-06-30 A kind of effective grouting strengthening method for reducing building foundation uneven settlement

Publications (2)

Publication Number Publication Date
CN106087959A true CN106087959A (en) 2016-11-09
CN106087959B CN106087959B (en) 2018-05-18

Family

ID=57211617

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610509519.1A Active CN106087959B (en) 2016-06-30 2016-06-30 A kind of effective grouting strengthening method for reducing building foundation uneven settlement

Country Status (1)

Country Link
CN (1) CN106087959B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106968689A (en) * 2017-03-21 2017-07-21 北京市政建设集团有限责任公司 A kind of subregion for being adapted to the construction of tunnel proximate building strong grouting strengthening method such as not
CN112796765A (en) * 2021-01-07 2021-05-14 中铁十九局集团第三工程有限公司 Partitioned grouting reinforcement method for tunnel adjacent building construction

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102704937A (en) * 2011-03-28 2012-10-03 同济大学 Method for identifying settlement pattern during shield tunnel construction
CN102967481A (en) * 2012-12-13 2013-03-13 青岛理工大学 Method for determining action relationship between ground building and underground structure
JP5378860B2 (en) * 2009-03-31 2013-12-25 住友林業株式会社 Foundation structure of buildings in soft ground
CN103628920A (en) * 2013-11-07 2014-03-12 广州市地下铁道总公司 Early-warning and prediction method for sedimentation nearby tunnel construction working face
CN104965994A (en) * 2015-07-17 2015-10-07 青岛理工大学 Method for measuring and estimating characteristic parameters of surface subsidence caused by subway tunnel construction

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5378860B2 (en) * 2009-03-31 2013-12-25 住友林業株式会社 Foundation structure of buildings in soft ground
CN102704937A (en) * 2011-03-28 2012-10-03 同济大学 Method for identifying settlement pattern during shield tunnel construction
CN102967481A (en) * 2012-12-13 2013-03-13 青岛理工大学 Method for determining action relationship between ground building and underground structure
CN103628920A (en) * 2013-11-07 2014-03-12 广州市地下铁道总公司 Early-warning and prediction method for sedimentation nearby tunnel construction working face
CN104965994A (en) * 2015-07-17 2015-10-07 青岛理工大学 Method for measuring and estimating characteristic parameters of surface subsidence caused by subway tunnel construction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106968689A (en) * 2017-03-21 2017-07-21 北京市政建设集团有限责任公司 A kind of subregion for being adapted to the construction of tunnel proximate building strong grouting strengthening method such as not
CN112796765A (en) * 2021-01-07 2021-05-14 中铁十九局集团第三工程有限公司 Partitioned grouting reinforcement method for tunnel adjacent building construction

Also Published As

Publication number Publication date
CN106087959B (en) 2018-05-18

Similar Documents

Publication Publication Date Title
CN110130936B (en) Construction method for sudden encountering untreated karst cave or crack in shield tunneling process
CN104631438B (en) Long auger guncreting uplift pile construction method
CN110985055B (en) Tunnel grouting and drainage synchronous construction method for controlling surface uplift
CN110864162B (en) Construction process of argillaceous sandstone geological pipe jacking
CN104711987B (en) A kind of deep covering layer sleeving valve tube method controllable grouting method
CN103866762A (en) Pile body longitudinal multipoint grouting device
CN111706337B (en) Construction method for shield to penetrate high-speed rail
CN105696550A (en) Three axes agitating pile construction method capable of assisting in grooving of reinforced underground diaphragm wall
CN110685272B (en) Method for treating soft foundation settlement overrun by utilizing inclined-hole cloth bag pile
CN109594575A (en) A kind of open caisson periphery grouting and reinforcing soil body construction method
CN109440757A (en) A kind of foundation reinforcement method for karst region
CN106087959A (en) A kind of grouting strengthening method of effective minimizing building foundation uneven settlement
CN105569041B (en) Borehole wall-protection method in the deep sand-pebble layer in karst area
CN106592615A (en) Deviation rectification construction method for inclined sink
CN103510507A (en) Slurry protection wall construction method with holes formed in cast-in-situ bored pile sand soil layer
CN207959202U (en) A kind of CFG bracing means
CN110344394A (en) A kind of surrounding deep foundation pit shallow embedding structure base ruggedized construction and construction method
CN206233232U (en) A kind of upper and lower part expansion type soil cement is combined pile tube
CN209959261U (en) Real-time feedback grouting device for correcting horizontal deformation of subway tunnel
CN205778943U (en) A kind of duct pieces of shield tunnel that is applicable to settles the lifting system transfinited
CN205259188U (en) Miniature pressure -bearing stake of bag pocket type of controllable slip casting scope
CN211816292U (en) Sand-flow prevention device for water-rich sand layer anchor rod construction
CN106948315A (en) A kind of stone masonry dam dam grouting reinforcing structure inferior and method
Cui Nondestructive controllable grouting: a novel method to correct deviation of building foundation
CN104727305B (en) Boring high-pressure slip-casting uplift pile construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Lian Xinzeng

Inventor after: Zhu Xu

Inventor after: Wang Hongbin

Inventor after: Huang Mingli

Inventor after: Li Jingyun

Inventor after: Wang Haitao

Inventor after: Zhao Jianming

Inventor after: Qian Wenbin

Inventor before: Lian Xinzeng

Inventor before: Zhu Xu

Inventor before: Huang Mingli

Inventor before: Li Jingyun

Inventor before: Wang Haitao

Inventor before: Zhao Jianming

Inventor before: Qian Wenbin